Roof Replacement SOW~1.docx
DOCX document 49 KB Posted
- Attached to
- EMERGENCY FINAL COST NOTICE-Frank Holten SP Grand Marias Golf Course Roof Replacement Project
- Solicitation number
- 27-422DNR-DIREC-B-53784
- Issued by
- Sangamon County, Illinois
About this file
This is a Scope of Work document issued by the Illinois Department of Natural Resources for a roof replacement project at Frank Holten State Park. The project involves replacing the roof on the Club House building, which encompasses approximately 9,100 square feet of shingle removal and replacement. The scope includes removal of existing shingles down to the wood deck, repair of up to 15% of the existing wood decking, installation of ice and water shield and felt underlayment, installation of new lead flashings around vents, installation of aluminum drip edge, installation of new shingles to match existing specifications, and cleanup and debris removal. The prime contractor, Tori Construction, must complete a minimum of 51% of the work. All work activities must be coordinated with site superintendent James Gowen at 618-874-7920. The contract requires deliverables including progress photographs at each major step of construction. The project was originally scheduled for completion by November 30, 2025, with bids submitted through BidBuy. Questions regarding the scope of work must be directed to nicholas.a.bearss@illinois.gov no later than three business days before the bid date.
The contract is subject to Illinois Prevailing Wage Act requirements, with contractors obligated to pay prevailing wage rates as published by the Illinois Department of Labor. The project qualifies as a small business set-aside, requiring the awarded contractor to be registered as a small business. Certified payroll records must be submitted monthly to the Department of Natural Resources, and contractors must maintain records for five years. If the project cost exceeds $50,000, performance and labor/material payment bonds are required. The contractor must maintain general commercial liability insurance of $1,000,000 per occurrence and $2,000,000 annual aggregate, auto liability of $1,000,000 per occurrence, and worker's compensation insurance as required by law. A one-year workmanship warranty is required for leaks or issues, with a 40-year commercial warranty provided for GAF Timberline HDZ Architectural Shingles. The contract is subject to the Illinois Procurement Code, and payment will be made according to the State Prompt Payment Act.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ILLINOIS DEPARTMENT OF NATURAL RESOURCES
SMALL PURCHASE PROCUREMENT
SCOPE OF WORK & PROJECT REQUIREMENTS
Date: December 1, 2025 File# 4-26-077
LOCATION: Frank Holten State Park
PROJECT TITLE: Replace Roof on Club House
PROJECT NARRATIVE:
The existing shingles are beyond their serviceable life and need replaced. The roof is leaking in multiple spots and flashing around vents also all needs replaced. Due to the duration the roof has been in it’s current state it is expected for some roof decking to also need to be replaced.
SCOPE OF WORK:
1. Remove all existing shingles down to the wood deck of the building approximately 9100 square feet.
2. Repair up to 15% of the total existing wood decking
3. Install ice and water shield and felt underlayment
4. Install all new lead flashings around the vents
5. Install new aluminum drip edge
6. Install shingles to closest match existing or as approved by IDNR
7. Cleanup and haul away all debris
ATTACHMENTS:
The following documents are included:
None
PROJECT SPECIFICATIONS & REQUIREMENTS:
| A. | Project Specifications: |
| 1) | Tori Construction will perform the work. |
| B. | Project Instructions and Notes: |
| Please coordinate upcoming work schedule with James Gowen 618-874-7920. |
1) Work Completed by Prime Contractor:
A minimum of fifty-one percent of the work shall be completed by the Prime Contractor on this project. Pursuant to (30 ILCS 500/1-15.17) the Contractor is the person having a contract with the Illinois Department of Natural Resources.
2) Coordination of Work Activities:
All work activities and entry to the site must be coordinated with the site superintendent.
3) Deliverables:
Pictures of roof progress after each major step. After demo, before ice and water shield / underlayment is installed, after flashings complete, final product.
4) Independent Testing:
N/A
5) Contractor’s Licensing and/or Certifications:
Contractor shall be responsible for compliance with all applicable contractor and trades person licensing with the appropriate State agency. This includes, but is not limited to:
N/A
6) Shop Drawings:
Submit for the approval of the DNR Project Architect/Engineer, shop drawings and product data for the following items:
a. N/A
7) As-Built Markups:
N/A
8) Extended Warranty:
1 year workmanship warranty for any leaks or issues. 40 Year Commercial warranty on the GAF Timberline HDZ Architectural Shingle.
| 9) | Contractor’s Schedule of Values: |
| The Contractor shall provide to the DNR Project Architect/Engineer, a cost breakdown of | |
| each item of work required to fulfill the contract. The breakdown shall be identified on | |
| the Contractor’s Schedule of Values (CSV) form included in the Attachments. |
| C. | Project Requirements: |
| 1) | Project Meeting |
| PROJECT MEETING TO BE HELD: YES |_| NO |_|X | |
| MANDATORY ATTENDANCE: YES |_| NO |_|X |
| 3) | Duration |
| Bids shall be good for ninety (90) calendar days after the submittal date, or | |
| for an extended period, if agreed to in writing by the Bidder and DNR. |
| 4) | Prevailing Wage Rates |
| This contract [or agreement] calls for the construction of a “public work,” within the meaning of | |
| the Illinois Prevailing Wage Act, 820 ILCS 130/.01 et seq. (“the Act”). The Act requires | |
| contractors and subcontractors to pay laborers, workers and mechanics performing services on | |
| public works projects no less than the current “prevailing rate of wages” (hourly cash wages | |
| plus, amount for fringe benefits) in the county where the work is performed. The Illinois | |
| Department of Labor (IDOL) publishes the prevailing wage rates on its website at | |
| http://labor.illinois.gov/. IDOL revises the prevailing wage rates and the | |
| contractor/subcontractor has an obligation to check the IDOL’s web site for revisions to | |
| prevailing wage rates. For information regarding current prevailing wage rates, please refer to | |
| IDOL’s website. All contractors and subcontractors rendering services under this contract must | |
| comply with all requirements of the Act, including but not limited to, all wage requirements and | |
| notice and record keeping duties. |
| 5) | Certified Payroll |
| State law 820 ILCS 130/5 requires all contractors and sub-contractors working on state | |
| construction projects to submit certified payroll records to the Department of Natural | |
| Resources. The payroll records must include all workers employed by contractors on the | |
| project. |
In accordance with 820 ILCS 130/5, the contractor and sub-contractor(s) shall make and keep, for a period of 5 years from the date of the last payment made on or after January 1, 2014 (the effective date of Public Act 98-328) on a contract or subcontract for public works, records of all laborers, mechanics, and other workers employed by them on the project.
No later than the 15th day of each calendar month, the contractor shall file a certified payroll for the immediately preceding month with the Department of Natural Resources.
6) Small Business Set-Aside The contractor awarded the bid must be registered as a small business, as required by the Small Business Set-Aside program. (For complete requirements, to become registered, or certify your business in the Small Business Set-Aside Program, visit http://www.sell2.illinois.gov/sbsp/set_aside.htm. or contact the Department of Central Management Services’ small business coordinator at 1-866-455-2897.)
7) Apprenticeship-in-Training When applicable, the contractor and all subcontractors must be participants in apprenticeship and training programs that are both approved by and registered with the U.S. Department of Labor’s Bureau of Apprenticeship and Training. The program(s) must be in the same trade(s) in which the contractor or subcontractor performs work. For information on how to participate in or set up a program, contractors may call the U.S. Department of Labor at 312/596-5508 or visit their website http://www.doleta.gov/oa/ .
8) Illinois Office The bidder must certify that the bidder will maintain an Illinois office as the primary place of employment for persons employed in the construction authorized by the contract.
| 9) | Subcontractors |
| The Contractor shall identify the names of all subcontractors to be utilized by them in the | |
| performance of this contract, together with the anticipated amount of money that each | |
| subcontractor is expected to receive pursuant to this contract. Pursuant to Illinois Procurement | |
| Code (30 ILCS 500/1-15-108), a person or entity is not a “subcontractor” if that person only | |
| Provides goods or supplies that are incidental to the performance of a contract by a person | |
| who has a contract subject to the Code. |
| 10) | Insurance |
| Contractor shall, at all times during the term of this contract and any renewals or extensions, maintain and provide a Certificate of Insurance naming the State as an additionally insured for all required bonds and insurance. Certificates may not be modified or canceled until at least thirty (30) days’ notice has been provided to the State. Contractor shall provide: (a) General Commercial Liability insurance in the amount of $1,000,000 per occurrence (Combined Single Limit Bodily Injury and Property Damage) and $2,000,000 Annual Aggregate; (b) Auto Liability, including Hired Auto and Non-owned Auto (Combined Single Limit Bodily Injury and Property Damage), in amount of $1,000,000 per occurrence; and (c) Worker’s Compensation Insurance in the amount required by law. Insurance shall not limit Contractor’s obligation to indemnify, defend, or settle any claims. |
11) Performance Bond/Labor and Material Payment Bond Pursuant to the Public Construction Bond Act (30 ILCS 550/), a performance bond and a labor and material payment bond covering the faithful performance of the contract and the payment of all obligations arising thereunder, shall be required if the project cost exceeds $50,000. Each bond shall be in the full amount of the contract. The bond must be from a surety licensed to do business within the State of Illinois and acceptable to IDNR.
12) Minority Contractor Opportunity Initiative The State requires a fee of $15 to cover Expenses related to the administration of the Minority Contractor Opportunity Initiative. Any Vendor awarded a contract under Section 20-10, 20-15, 20-25 or 20-30 of the Illinois Procurement Code (30 ILCS 500) of $1000 or more is required to pay a fee of $15. The Comptroller shall deduct the fee from the first check issued to the Vendor under the contract and deposit the fee in the Comptroller’s Administrative Fund.
13) Permits and Licenses Permits and licenses necessary for the execution of the work shall be secured and paid for by the Contractor.
14) Utilities Before starting excavation, establish location and extent of underground utilities occurring in the work area. Contractor shall contact Joint Utility Locating Information for Excavators (J.U.L.I.E.) 800-892-0123.
15) Highway Permits The Contractor is responsible for contacting the appropriate County Superintendent(s) of Highways and/or other appropriate local officials concerning the proposed work activities on the project as they may relate to use of the County and local road system. Coordination of any activities of concern to the County or Township shall be the responsibility of the Contractor. Special attention shall be given to load limits and seasonal restrictions.
16) New Products Unless otherwise specifically provided in the contract documents, all materials, equipment and products incorporated in the work under the contract shall be new and of a suitable grade for the purpose intended.
| 17) | Steel Products |
| Any steel product(s) used or supplied in the performance of this contract shall be manufactured or produced in the United States, in accordance with the Steel Products Procurement Act, unless a waiver is granted by IDNR (30 ILCS 565/). |
18) Specified Materials Bids shall be based on providing all products/materials exactly as required by the project specifications. Contractor may select from the list of acceptable manufacturers, offer an “equal” product and provide proof of its capabilities to meet the project specifications or, for products specified only by reference or performance standards, select any product which meets or exceeds the specified standards, by any manufacturer, subject to the approval of DNR.
19) Final Cleaning Contractor shall clean-up all work related debris and construction materials and properly dispose off-site. The Contractor shall repair and otherwise make good any damage caused by the work and leave the premises in the equivalent of the original condition.
20) Warranties The Contractor warrants that all work provided under the contract will be in conformance with the contract and free from defects in workmanship, materials, and equipment for a period of one year from the goods acceptance date. See Section B. Project Instructions and Notes, for any extended warranties that may apply.
21) Change Orders Change order shall be defined as a change in a contract term, other than as specifically provided for in the contract, which authorizes or necessitates any increase or decrease in the cost of the contract or the time for completion. A change order shall be executed by the State agency and vendor evidencing the change. All changes shall be approved by the CPO, or designee, and be accompanied by a written determination that the circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed and the change is germane to the original contract as signed.
A change order or series of change orders which authorize or necessitate an increase or decrease in either the cost of a public contract by a total of $25,000 or more or the time of completion by a total of 180 days or more. (720 ILCS 5/33E-9). Change orders to contracts over the Small Purchase Threshold of $100,000, shall be published to the Illinois Procurement Bulletin, pursuant to Section 15-25 of the Code and documented pursuant to Section 33E-9 of the Criminal Code of 2012, in advance of execution of the change order.
The DNR Architect/Engineer shall determine if the change was unforeseeable and/or germane to the original contract and that the price is fair and reasonable. When changes in or modifications to the work become necessary, the Contractor shall submit an itemized cost for the work and shall include appropriate documentation to support the cost for the labor, material, and equipment.
22) Inducement Resolution All or a portion of this project may be paid or reimbursed from the proceeds of tax-exempt bonds subsequently issued by the State.
23) Payment Payments, including late payment charges, will be paid in accord with the State Prompt Payment Act and rules when applicable, 30 ILCS 540/; 74 III. Adm. Code 900. This shall be the Contractor’s sole remedy for late payments by the State. Payment terms contained in Contractor’s invoice(s) shall have no force or effect.
| 24) | Contract Award |
| Contract award will be made to the lowest, responsible, responsive bidder. The Department of Natural Resources reserves the right to reject any or all bids. |
| 25) | Term of Contract |
| All work shall be completed by November 30, 2025 unless agreed to by both the Contractor and | |
| DNR, that a time extension is warranted. |
26) Bid Submittal Bids may be submitted electronically on BidBuy or by submitting the attached Bid Form.
| 27) | Bid Submittal Date and Time |
| Refer to the BIDBUY solicitation for the bid date and time. |
28) Questions
ALL QUESTIONS PERTAINING TO THE SCOPE OF WORK OR THE BIDBUY PROCEDURES, MUST
BE DIRECTED TO nicholas.a.bearss@illinois.gov ALL QUESTIONS MUST BE SUBMITTED IN WRITING NO LATER THAN THREE (3) BUSINESS DAYS BEFORE THE BID DATE.
29) Project Contacts: The following individuals are listed as project contacts during the construction phase. The Bidder may not communicate directly with any of these individuals during the bidding process. All communication during the bidding phase must be directed to the nicholas.a.bearss@illinois.gov email address.
| Project Architect/Engineer: | ||
| Engineer: Jeffrey Schweizer | ||
| Illinois Department of Natural Resources |
Address: One Natural Way Springfield, IL 62702
| Phone: 217-986-9467 |
| E-mail: Jeffrey.a.schweizer@illinois.gov |
| Site Superintendent: | ||
| Name: James Gowen | ||
| Frank Holten |
Address: 5802 Lake Dr.
Centreville Township, IL 62205
| Phone: 618-874-7920 |
| E-mail: james.gowen@illinois.gov |
| Billing: | ||||||
| Erick Huck | ||||||
| Illinois Department of Natural Resources | Division of Architecture & Engineering | One Natural Resources Way | Springfield, IL 62702 | |||
| Phone: 217-782-5694 | ||||||
| E-mail: erick.huck@illinois.gov |
File details come from the government source that posted it. Updated .