Frank Holten SP Grand Marias Golf Course Roof Replacement Project Emergency Final Costs .pdf

PDF 1 MB Posted

Attached to
EMERGENCY FINAL COST NOTICE-Frank Holten SP Grand Marias Golf Course Roof Replacement Project
Solicitation number
27-422DNR-DIREC-B-53784
Issued by
Sangamon County, Illinois

About this file

This is an Emergency Purchase Final Cost notice issued by the State of Illinois Chief Procurement Office for General Services reporting the completion of an emergency roof replacement project at Frank Holten State Park's Grand Marias Golf Course. The Illinois Department of Natural Resources, Office of Land Management, procured emergency services to address critical roofing issues at the facility located in Springfield, Illinois.

The final cost for the emergency roof replacement project totaled $166,600.00. TORI Construction LLC, a vendor based in Alsip, Illinois (zip code 60803), was selected to execute the work. The emergency purchase was processed under the authority of 30 ILCS 500/20-30(b), which permits expedited procurement procedures for emergency situations. Nick Bearss, Procurement Administrator, authorized the final cost notice dated August 19, 2026, with reference number 50225 and contract number 53784.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

Page of

EMERGENCY PURCHASE FINAL COST

State of Illinois Chief Procurement Office for General Services Emergency Purchase Final Cost and Term v.25.1

EMERGENCY PURCHASE FINAL COST

Page of State of Illinois Chief Procurement Office for General Services Emergency Purchase Final Cost v.26.1 Pursuant to 30 ILCS 500/20-30(b), the actual final cost shall be published.

Final Cost I am reporting the final cost for the referenced emergency contract to the CPO and the Auditor General.

11.0.0.20130303.1.892433.887364

PageCount:
CurrentPage:
VendorZip: 60803
VendorState: IL
VendorCity: Alsip
VendorAddress: 4234 W. 124th Place
Vendor: TORI Construction LLC
AgencyZip: 62712
AgencyState: IL
AgencyCity: Springfield
AgencyAddress: One Natural Resources Way
AgencyDivision: Office of Land Management
AgencyUniversity: Illinois Department of Natural Resources
CurrentMasterPage:
MasterPageCount:
ReferenceNumber: 50225
TextField1: 53784
FinalTotalCost: 166,600.00
PrintedName: Nick Bearss
TitleField: Procurement Administrator
AuthorizedSignature:
Date: 2026-08-19

File details come from the government source that posted it. Updated .