BASE BID: SEE DRAWING SHEET 4 OF 17, DRAWING SHEET 5 OF 17, AND DRAWING SHEET 6 OF 17
Item Number Specification Identifier Description Estimated Quantity Unit Unit Price Line Item Amount
1 01505(1) MOBILIZATION 1 Lump Sum $ $
2 02834(1A) FENCE REMOVAL FOR REPLACEMENT 875 Rod $ $
3 02834(1B) NEW BARBED WIRE FENCE ALL STEEL (4‐WIRE) 875 Rod $ $
4 02834(1C) FOUR‐POST BARBED WIRE STEEL CORNER PANEL 2 Each $ $
5 02834(1D) THREE‐POST BARBED WIRE STEEL CORNER PANEL 7 Each $ $
6 02834(1E) THREE‐POST BARBED WIRE STEEL STRESS PANEL 18 Each $ $
7 02834(1F) TWO‐POST BARBED WIRE STEEL END PANEL 13 Each $ $
8 02834(1G) BARBED WIRE GATE (4‐WIRE) 3 Each $ $
Total Base Bid (All or Nothing): $
ADDITIVE ALTERNATE 1: SEE DRAWING SHEET 7 OF 17, AND DRAWING SHEET 8 OF 17
Item Number Specification Identifier Description Estimated Quantity Unit Unit Price Line Item Amount
1 01505(1) MOBILIZATION 1 Lump Sum $ $
2 02834(1A) FENCE REMOVAL FOR REPLACEMENT 634 Rod $ $
3 02834(1B) NEW BARBED WIRE FENCE ALL STEEL (4‐WIRE) 634 Rod $ $
4 02834(1C) FOUR‐POST BARBED WIRE STEEL CORNER PANEL 2 Each $ $
5 02834(1D) THREE‐POST BARBED WIRE STEEL CORNER PANEL 6 Each $ $
6 02834(1E) THREE‐POST BARBED WIRE STEEL STRESS PANEL 9 Each $ $
7 02834(1F) TWO‐POST BARBED WIRE STEEL END PANEL 12 Each $ $
8 02834(1G) BARBED WIRE GATE (4‐WIRE) 4 Each $ $
Total Additive Alternate 1 (All or Nothing): $
ADDITIVE ALTERNATE 2: SEE DRAWING SHEET 9 OF 17, AND DRAWING SHEET 10 OF 17
Item Number Specification Identifier Description Estimated Quantity Unit Unit Price Line Item Amount
1 01505(1) MOBILIZATION 1 Lump Sum $ $
2 02834(1A) FENCE REMOVAL FOR REPLACEMENT 775 Rod $ $
3 02834(1B) NEW BARBED WIRE FENCE ALL STEEL (4‐WIRE) 775 Rod $ $
4 02834(1C) FOUR‐POST BARBED WIRE STEEL CORNER PANEL 1 Each $ $
5 02834(1D) THREE‐POST BARBED WIRE STEEL CORNER PANEL 6 Each $ $
6 02834(1E) THREE‐POST BARBED WIRE STEEL STRESS PANEL 15 Each $ $
7 02834(1F) TWO‐POST BARBED WIRE STEEL END PANEL 8 Each $ $
8 02834(1G) BARBED WIRE GATE (4‐WIRE) 3 Each $ $
Total Additive Alternate 2 (All or Nothing): $
Total Project Cost (Sum of: Base Bid + Add Alt 1 + Add Alt 2): $
* Fill out Bid Schedule in its entirety. Government may elect to award the Base Bid and/or any combination of Option Bids subject to the availability of funds.
SCHEDULE OF ITEMS
Robertson Draw Fence Replacement Phase 2