RobDrawFncReplcmntPh2_-_DRAWINGS.pdf
PDF 28 MB Posted
- Attached to
- ROBERTSON DRAW FENCE REPLACEMENT PH2 Federal contract opportunity
- Solicitation number
- 140L3623R0007
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF25-16e_Performance_Bond.pdf | ||
| Past_Performance_Questionnaire.pdf | ||
| SF25A-16e_Payment_Bond.pdf | ||
| SF24-16e_Bid_Bond.pdf | ||
| RobDrawFncReplcmntPh2_-_SUPPLEMENTAL_SPECS.pdf | ||
| RobDrawFncReplcmntPh2_-_STATEMENT_OF_WORK.pdf | ||
| RobDrawFncReplcmntPh2_-_SOI.pdf | ||
| General_Decision_Number_MT20230065_01062023.pdf | ||
| Sol_140L3623R0007.pdf | ||
| 10_-_DI-137_Release_of_Claims.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WORK LOCATION
ROBERTSON DRAW FENCE REPLACEMENT SITE MAP3
GENERAL NOTES:
1. ON-SITE CONSTRUCTION WORK CANNOT OCCUR BETWEEN APRIL 1 AND JULY 15.
2. THE CONTRACTOR SHALL BE RESPONSIBLE TO REMOVE, HAUL AWAY, AND DISPOSE OF ALL MATERIAL AS SHOWN ON THE CONSTRUCTION DRAWINGS, AS DESCRIBED IN THE STATEMENT OF WORK AND SUPPLEMENTAL SPECIFICATIONS, AND AS DIRECTED AND APPROVED BY THE GOVERNMENT. SALVAGEABLE MATERIALS NOT USED FOR CONSTRUCTION SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND ARE THE CONTRACTOR'S RESPONSIBILITY TO REMOVE FROM FEDERAL LANDS AND PROPERLY DISPOSE OF. SEE
SPECIFICATION 02834 - WIRE FENCES AND GATES, FOR FENCE REMOVAL REQUIREMENTS.
3. ALL GATES SHALL BE ALL WIRE GATES (4-WIRE) WITH WOOD END STAYS AND WIRE STAYS IN BETWEEN. WIRE STAYS ARE ACCEPTABLE BETWEEN THE WOOD GATE STAYS UNLESS WOOD STAYS MUST BE UTILIZED TO ALLOW THE GATE TO STAY UPRIGHT TO PROPERLY FUNCTION.
4. THE NEW FENCE SHALL BE: 4-WIRE (3-BARBED WITH BOTTOM BARBLESS). ALL FENCE LINE POSTS SHALL BE HEAVY DUTY STEEL LINE POSTS (T-POSTS), AND ALL BRACE PANELS
SHALL BE STEEL.
5. SALVAGEABLE STEEL POSTS, AS APPROVED BY THE GOVERNMENT, SHALL BE ALLOWED AS DEADMEN, BUT MUST BE DRIVEN A MINIMUM OF 4-FEET IN THE GROUND, PARALLEL TO AND IN LINE WITH THE FENCE AND ATTACHED WITH ADDITIONAL DOUBLE TWISTED WIRE OF THE SAME MATERIAL AS THE BOTTOM WIRE.
6. SEE THE STATEMENT OF WORK AND SPECIFICATION 02834 - WIRE FENCES AND GATES, FOR SPECIFICATIONS RELATED TO REMOVAL AND REPLACEMENT OF THE EXISTING
FENCE LINE WITH NEW FENCE.
7. WHEN CONNECTING EXISTING FENCE TO NEW STEEL BRACE PANEL STRUCTURES, SPLICE NEW WIRE TO EXISTING WIRES TO LENGTHEN AS NEEDED TO PROPERLY TACK EXISTING WIRE TO THE NEW PANEL STRUCTURE. HAND STRETCH/TIGHTEN THE EXISTING FENCE WIRE BETWEEN THE NEW STEEL PANEL STRUCTURE AND THE FIRST STEEL LINE POST (T-POST) OF THE EXISTING FENCE. SEE STATEMENT OF WORK FOR MORE INFORMATION REGARDING CONNECTIONS MADE WITH EXISTING FENCES.
8. THERE MAY BE ADDITIONAL PANEL STRUCTURES TO BE REPLACED AND/OR INSTALLED NEW THAT ARE NOT SHOWN ON THE CONSTRUCTION DRAWINGS. ADDITIONAL ITEMS INSTALLED SHALL BE PAID FOR BY THE ACTUAL QUANTITY INSTALLED PER THE UNIT BID PRICE OF THE ITEM AT THE APPROVAL OF THE GOVERNMENT.
9. CONTRACTOR IS RESPONSIBLE FOR ALL PUBLIC AND PRIVATE UTILITY LOCATES. COORDINATE WITH MONTANA 811 AND ANY OTHER NECESSARY ENTITIES.
3P: 3-POST CORNER
X: STRESS PANEL
O: END PANEL
NEW 4-WIRE, BARBED WIRE, ALL STEEL FENCE LINE
EXISTING FENCE LINE
EXISTING ROAD
BASE BID SHEET 4 - REMOVE & REPLACE FENCE4
X
3P
X
3P X
X
X
X
X
X
X
O
O
O
O
O
3P: 3-POST CORNER
X: STRESS PANEL
O: END PANEL
NEW 4-WIRE, BARBED WIRE, ALL STEEL FENCE LINE
EXISTING FENCE LINE
BASE BID SHEET 5 - REMOVE & REPLACE FENCE5
O: END PANEL
= : WIRE GATE
NEW 4-WIRE, BARBED WIRE, ALL STEEL FENCE LINE
EXISTING FENCE LINE
EXISTING ROAD
4P: 4-POST CORNER
BASE BID SHEET 6 - REMOVE & REPLACE FENCE6
O: END PANEL
= : WIRE GATE
NEW 4-WIRE, BARBED WIRE, ALL STEEL FENCE LINE
EXISTING FENCE LINE
EXISTING ROAD
ADDITIVE ALTERNATE 1 SHEET 7 - REMOVE & REPLACE FENCE7
X
X
O=O
3P
O =O4P
EXISTING ROAD
3P: 3-POST CORNER
X: STRESS PANEL
O: END PANEL
= : WIRE GATE
NEW 4-WIRE, BARBED WIRE, ALL STEEL FENCE LINE
EXISTING FENCE LINE
ADDITIVE ALTERNATE 1 SHEET 8 - REMOVE & REPLACE FENCE8
3P
3P
3P
O=O O
X
X
X X
X
X
X
X
O=O
X
X
X X
X
O
O=O
3P: 3-POST CORNER
X: STRESS PANEL
O: END PANEL
= : WIRE GATE
NEW 4-WIRE, BARBED WIRE, ALL STEEL FENCE LINE
EXISTING FENCE LINE
ADDITIVE ALTERNATE 2 SHEET 9 - REMOVE & REPLACE FENCE9
X
X
4P
3P
X
O=O
3P: 3-POST CORNER
X: STRESS PANEL
O: END PANEL
= : WIRE GATE
4P: 4-POST CORNER
NEW 4-WIRE, BARBED WIRE, ALL STEEL FENCE LINE
EXISTING FENCE LINE
ADDITIVE ALTERNATE 2 SHEET 10 - REMOVE & REPLACE FENCE10
11 17
2 POST END PANEL
h3
TYPE A
TERM I NA TE WIRES ON
STEEL BRACE POST
D c ----------- ::e:
II
u
TYPE B
h3
H3
3 POST STRESS PANELS
6 TO 8 FT.
LENGTH -----TERMINATE WIRES o,N-----
1 FT. _.
SPACING I-
D c a::
A
II
II
II
II
TYPE A
h3
GENERAL NOTES:
1. ALL STEEL BRACE POSTS WILL BE CAPPED BY
GOVERNMENT.
2. SEE SPECIFICATIONS FOR THE FOLLOWING:
I. RA TIO OF STEEL TO WOOD LINE POSTS
II. POST SPACING, LENGTH & DEPTH IN GROUND
Ill. TYPE OF WIRE TO BE UTILIZED
IV. SPACING BETWEEN WIRES
3. DRAWING IS NOT DRAWN TO SCALE
STEEL BRACE POST
D i: ::::t:t:::::::::::::t1�:::::::::::::tt== A
II
II
II
II
II
II
II
II
II
II
II
II
u
II
II
II
II
II
u
TYPE B
KEY NOTES:
r.;\ STEEL LINE POST SHALL BE 5-1/2 FT.
\}_/ CERTIFIED 1.33 LBS/FT MINIMUM AND
COLORED ACCORDING TO SPECIFICATIONS
0 BRACE RAIL BANDS ATTACH 4 TO 6 IN.
BELOW TOP WIRE HEIGHT
0 BRACE RAIL BAND ATTACH 3 IN. MAXIMUM
ABOVE GROUND SURFACE
THINK SAFETY FIRST
V DESIGN omCE:EMDDO
DESIGNED BY: BF DATE: 02/13/2020
AUT0CAO NAME:2021 STEEL 0RAWINGS.DWG
DRAWN BY: BF DATE: 02/13/2020
CHECKE0 BY: GS DATE: 02/26/2020
APPROVED BY: GS DATE: 02/26/2020
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
BARBED WIRE FENCE PANELS (STEEL)
MILES CITY FIELD OFFICE MONTANA
SHEET 12 OF 17
3-POST CORNER PANEL
GENERAL NOTES:
II
II
II
II
II
II
II
II
II
II
II
II
u
TYPE A
TYPE A
BRACE POST TYPE B
STEEL BRACE POST
TOP
WIRE
LOCATION
FLATTEN APPROX. 1-1/2 IN. ON
BOTH ENDS OF THE BRACE RAIL
AND DRILL/PUNCH A HOLE IN THE
FLATTENED PART FOR 3/8 IN.
BOLT
KEY NOTES:
I I I I I I I I I
II
II
u
TYPE B
TYPE B
4 TO 6 IN.
I
TOP
WIRE
LOCATION
1. NUMBER OF WIRES, TYPE OF WIRE, AND WIRE
SP ACING SAME AS FOR FENCE.
STEEL LINE POST SHALL BE 5-1 /2 FT. CERTIFIED 0 1.33 LBS/FT MINIMUM AND COLORED ACCORDING
2. DRAWING IS NOT DRAWN TO SCALE.
AUT0CAD NAME:2021 STEEL DRAWINGS.DWG """ REVISION ..,,,.,...,
DESIGNED BY: BF DATE: 02/18/2020
DRAW N BY: BF DATE: 02/18/2020
CHECKED BY: GS DATE: 02/26/2020
TO SPECIFICATIONS
f"i\. BRACE RAIL BANDS ATTACH 4 TO 6 IN. BELOW
\::.../ TOP WIRE HEIGHT
0 STEEL BRACE POST WILL BE CAPPED BY THE
GOVERNMENT
0 3/8 IN. GALVANIZED GRADE 5 CARRIAGE BOLT
TYP.
THINK SAFETY FIRST
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
CORNER PANELS (STEEL) SHEET OFV
1-DES
I
GN
o m c E:
E
MD
D O
.;......;._-+---+--+-----i
APPROVED BY:GS DATE:02/26/2020 MILES CITY FIELD OFFICE MONTANA
13 17
1 FT.
SPACING
H3 h3
1 FT.
SPACING
MECHANICAL
GATE CLOSER
MECHANICAL
GATE CLOSER
FOUR WIRE GATE
TYPE A
i------+-ANEL POST SPACING 16.5 FT.----i
I
GTH I
I I I I I I
2, 3 IN. 0 GATE STAYS
FOUR WIRE GATE
TYPE B
'----ANEL POST SPACING 16.5 FT.----i
I I I I I I I I I I I I
2, THREE WIRE GATE
TYPE A
i----ANEL POST SPACING 16.5 FT.----i
2, 3 IN. 0 GATE STAYS
KEY NOTES:
u
H2 h2
6 TO 8 FT.
LENGTH
H2 h2
GENERAL NOTES:
1. CONSTRUCT END PANEL ON EACH SIDE OF GATE AS
REQUIRED IN THE SPECIFICATIONS.
STEEL LINE POST SHALL BE 5-1 /2 FT. CERTIFIED
0 1.33 LBS/FT MINIMUM AND COLORED TO MATCH
SPECIFICATIONS
2. DRILL STEM MECHANICAL GA TE CLOSER CONSTRUCTION
BASED ON DESIGN IN SPECIFICATIONS AND DRAWINGS
3. ALL STEEL BRACE POSTS WILL BE CAPPED BY THE
GOVERNMENT
4. DRAWING IS NOT DRAWN TO SCALE
r,:;\ BRACE RAIL BANDS ATTACH 4 TO 6 IN. BELOW TOP
\::.../ WIRE HEIGHT
r;\ BRACE RAIL BAND ATTACH 3 IN. MAXIMUM ABOVE
\::..../ GROUND SURFACE
THINK SAFETY FIRST
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
WIRE GATES (STEEL) SHEET OF
CHECKED BY: GS DATE: 02/ 26/ 2020
1.:'.t-P.:::PROVED:::=...:.:BY.:...:,cs=-------=[),l(=--JE:=---0..::.2/,::..:
26:..::,/ 2
.,..-jo 1--+---t----t MILES CITY FIELD OFFICE MONTANA
14 17
OPEN POSITIO� \ \
STEEL BRACE POST '�,,
STEEL
BRACE
RAIL
C
B
I A l
NOTE:
GATE LOO
1. STEM ON GA TE CLOSER SHALL
BE INSERTED SECURELY INSIDE
AND FLUSH WITH THE TOP OF
THE STEEL BRACE POST
2. GA TE CLOSER SHALL PROVIDE A
COVER FOR THE STEEL BRACE
POST TOP
3. SPACING BETWEEN WIRES ON
GA TE SHALL BE SAME AS FENCE
4. DRAWING IS NOT DRAWN TO
SCALE
I I
I I I I I
AUT0CAD NAME: DRIU. STEM GATE.DWG MARK REVISION N'PRCMD
DESIGN OFFICE: EMDOO
GALVANIZED
FLANGED NUTS
TOP VIEW
,....._ _____ �---i!��d===
MIN. 3 IN.
PIPE COVER� ¢ WOOD
(SEE NOTE 2) POST
STEEL
BRACE
POST
SIDE VIEW
GATE LOOP
SEE NOTE 2
6 IN.
MIN.
�3/16 IN.
STEEL CABLE
LOOP
THINK SAFETY FIRST
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
• ��----1---------1
DESIGNED BY: BF DATE:02/13/2020
DRAWN BY: BF DATE: 02/13/2020 DRILL STEM MECHANICAL GATE CLOSER SHEET OF
CHECKED BY: GS DATE: 02/28/2020
N'PROVEO BY:Gs DATE:02/28/2020 MILES CllY FIELD OFFICE MONTANA
15 17
DEADMAN
----------L----------
GENERAL NOTES:
D c a::=------t,-H-.... __ A
D c a:=
A
12-1
2 GA.
GAL V. BAR BLESS
WIRE DOUBLE
TWISTED
I/
/��/ 5-1
2 FT. STEEL LINE
{ / POST MINIMUM OF 4 FT.
t/ IN TO THE GROUND, DRIVEN PARALLEL AND
IN LINE WITH THE
FENCE.
12-1
2 GA.
GAL V. BARBLESS
WIRE DOUBLE
TWISTED
DEADMAN
1. FOR DEADMAN, USE DOUBLE TWISTED WIRE OF THE SAME MATERIAL AS BOTTOM WIRE OF
FENCE AND A ROCK
MIN. WEIGHT 50 LBS.
OR STEEL LINE POST DEADMAN WHEN SPACE
BETWEEN BOTTOM WIRE AND GROUND SURFACE EXCEED 20 INCHES.
2. SEE SPECIFICATIONS FOR THE FOLLOWING:
I. POST SPACING, LENGTH & DEPTH IN GROUND
II. SPACING BETWEEN WIRES
3. DRAWING IS NOT DRAWN TO SCALE.
l h1 \j v�LINE POST
WOOD OR
STEEL LINE
POST
THINK SAFETY FIRST
DRAWN BY: er DAlE:02/13/2020
CHECKED BY: GS DAlE: 02/26/2020
APPROVED BY: GS DAlE: 02/26/2020
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
DEADMAN AT MINOR DEPRESSION
MILES CllY FIELD OFFICE MONTANA
SHEET 16 OF 17
..l N gi o E I
N
0 1 _I a, v�
N
1'-6" (457 mm)
2 X 6 X 2'-6" ( 51 mm x 152 mm x 7 62 mm)
2-40d NAILS AT EACH JOINT . M ORT ISE ONE MEMBER T O GET M IN . 2 1/ 2 " ( 64 mm) NAIL
PENETRAT ION INT O RECEIV ING PIECE .
2 X 6 X 3'-Q" ( 51 mm x 152 mm x 914 mm)
2 X 6 X 3'-6" (51 mm x 152 mm x 1067 mm)
E
FIGURE FOUR-SIDE
BRACE POST
FIGURE FOUR - PLAN VIEW
40d NAILS mm x 152 mm)
NOTE:
CU T T O FIT
INSIDE O F
BRACES
2 x 6 x 4'-0" (51 mm x 152 mm x 1219 mm)
ROCK JACK-PLAN
SET IN HOLE DU G T O ROCK
ROCK JACK-FRONT
' 4'-0" 1. THE METRIC CONVERSIONS ARE PROVIDED IN PARENTHESIS
FOLLOWING THE ENGLISH UNITS."'z ( 1219 mm)
1-
------....:::R=O=C=K::::::::::J=A=C=K=-=S=l=D=-E..:(;_RO C
KS;;,..;;.IN;_P;.;;LA;_C;.;;E.:..) -----------"""'T'---------------1
REV IEW ED A LWAYS TH INK SAFElY
� DESIG NED B�Y�O�TH�E=R�S __________ _
z _,,, A P
P ROVED ______________ & METRIC CONVERSION ADDED 9/30/97 LJP
� -D-
RA_ W_
N _B _Y_: -----...-
S
C _A _L -
E :_ N O N
E
=----1-F-OR
_ M_ A_T _ U_ P
_ D_A-TE
----+7- /_ 3_ 1_/ _09-+--R-TH--1
� DATE : A PRI L 2 6, 1997
U NITED STATES DE PARTMENT O F THE INTERIOR
BU REAU O F LAND MANAG EM ENT
FIGURE FOUR AND
ROCK JACK
�I-
SI_A _
N
-DA_
R
_D_D _IT_A_
IL-D R
_ A_W _
IN
_G...._
N O
_. _ 0_ 2_8_2- 4-- 5-------1-
REV ___
N _0-1
.---D- E _ S
C
RI
- PT_ I _
ON
---+-D-AT- E--II-A-PP_
R O
_V _ED
-I z _____________________ ___, ________ ....., __ ___, ____ ..._ _______________ __.
SHEET : 17 of 17
| Drawings-FINAL-RobDrawFncReplacement-Ph2-12162022 |
| RD Fence Replacement - 1 - Cover-Cover Sheet |
| Sheets and Views |
| Cover Sheet |
| RD Fence Replacement - 2 - Project Maps-Project Maps |
| Sheets and Views |
| Project Maps |
| RD Fence Replacement - 3 - Site Map-Site Map |
| Sheets and Views |
| Site Map |
| RD Fence Replacement - 4 - BaseBid1-Base Bid 1 |
| Sheets and Views |
| Base Bid 1 |
| RD Fence Replacement - 5 - BaseBid2-BASE BID 2 |
| Sheets and Views |
| BASE BID 2 |
| RD Fence Replacement - 6 - BaseBid3-BASE BID 3 |
| Sheets and Views |
| BASE BID 3 |
| RD Fence Replacement - 7 - AddAlt1-1-ADD ALT 1 1 |
| Sheets and Views |
| ADD ALT 1 1 |
| RD Fence Replacement - 8 - AddAlt1-2-ADD ALT 1 2 |
| Sheets and Views |
| ADD ALT 1 2 |
| RD Fence Replacement - 9 - AddAlt2-1-Add Alt 3 PS1 |
| Sheets and Views |
| Add Alt 3 PS1 |
| RD Fence Replacement - 10 - AddAlt2-2-Add Alt 3 PS2 |
| Sheets and Views |
| Add Alt 3 PS2 |
| STANDARD DRAWINGS-COMBINED |
| a. Barbed wire fence (all steel) |
| b. Fence Panels (Drill Stem) |
| c. Corner Panels (Steel) |
| d. Wire Gates (Drill Stem) |
| e. DRILL STEM GATE METAL MECHANICAL GATE CLOSER (1) |
| f. Deadman at Minor Depression |
| g. Figure Four and Rock Jack |
| paneltxt: |
| Text2: |
| Text1: |
| gatetxt: |
| GATELOOP: |
| deadmantxt: |
File details come from the government source that posted it. Updated .