This is an Addendum 1 to a Request for Qualifications (RFQ1 2026*31) issued by the State of Colorado for the Roaring Judy SFU Hatchery Modernization Design project. The addendum addresses three key questions raised during the procurement process and clarifies requirements outlined in the original solicitation. The project requires a qualified design firm to develop modernization plans for the hatchery facility, including a small-scale hydrogeological assessment focused on evaluating the impact of increased flow rates from two specific well locations that Colorado Parks and Wildlife plans to modify. The Statement of Qualifications was due on March 20, 2026, and the procurement process includes evaluation of firm qualifications and technical capabilities for this design scope.

The addendum clarifies minimum qualifications requirements by modifying the Professional Engineer or Architect licensure requirement, now allowing the Project Manager to hold a PE license issued anywhere in the United States, provided that all design drawings issued for construction are stamped by a Professional Engineer or Licensed Architect with a valid Colorado license. The addendum also removes all Service Disabled Veteran Owned Small Business (SDVOSB) set-aside language and preferential scoring provisions, designating this requirement as not applicable to this professional services RFQ. No cost estimates or price proposals are required as part of the Statement of Qualifications submittal, as pricing is not a consideration factor in this qualifications-based selection process.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum 1

RFQ1 2026*31

Roaring Judy SFU Hatchery Modernization Design

Questions and Answers:

1) We are fully committed to meeting all minimum qualifications requirements outlined in

Section 4.1.4. Our proposed Project Manager submitted an application for Colorado licensure; however, approval may be granted shortly after the SOQ deadline. We are certain he will obtain his Colorado license prior to the contract award, and we can include proof that his application has been submitted. Please confirm that this is acceptable.

a) The intent of the requirement for the Project Manager being a registered PE or architect was to ensure proper oversight of the project from a technical standpoint.

As long as the Project Manager is a registered PE in the United States and all drawings are stamped by a Professional Engineer or Architect registered in the State of Colorado that will be acceptable.

b) See addendum below to clarify this requirement.

2) The RFQ states that preferential scoring could be given to firms that include SDVOSBs in their price. It also references a bid or contract price exceeding $500,000. However, the RFQ does not appear to request a budget or cost estimate for this scope of work. Please confirm you are not asking for cost estimates in our Statement of Qualifications submittals due 3/20/26.

a) This requirement only applies to non-Professional services advertisements where price is a consideration. For this RFQ, this requirement does not apply. See Addendum below.

3) #9 in the scope of work list states “Hydrogeological Assessment of Proposed well changes and impact on adjacent wells.” However, at the pre-proposal meeting, it was suggested that this work is not included in this contract. Please confirm.

a) During the meeting it was stated that CPW was not going to evaluate all the wells on the property, but that selected firm would need to evaluate the impact of additional flow rates from two well locations near the project site. The intent is to do a small-scale Hydrogeological Assessment for the 2 well locations that CPW plans on increasing flows at.

Addendums:

Section 4.1.4 Minimum Qualifications.

Original: “issued by the State of Colorado Board of Registration” Changed to: “issued within the United States”

Add: “All design drawings issued for construction shall be stamped by a Professional Engineer (PE) or Licensed Architect with a valid license issued by the State of Colorado Board of Registration.”

Section 4.2.5 Service Disabled Veteran Owned Small Businesses (SDVOSBs).

Remove: All language.

Replace with: Not Applicable