About this file

This document is the California High-Speed Rail Authority's (Authority) Request for Qualifications (RFQ) for Independent Safety Assessor Services. The scope of work includes providing independent safety analysis of the high-speed rail system's operational railway systems, such as trainsets, track, signaling, communications, and traction power, to verify the system's safety, security, and reliability for passengers, employees, and the public. The not-to-exceed value of this six-year and five-month contract is $9.4 million. The anticipated schedule includes a virtual pre-bid conference and small business workshop on March 18, 2024, with statements of qualifications due on May 14, 2024, and a contract award anticipated in August 2024.

The RFQ provides a detailed scope of work and draft agreement. Questions regarding this procurement should be submitted to the Authority's Kristal McCain. There are no specific pricing terms, set-asides, or funding information provided in the document. The contract is a new procurement, not a renewal of an existing contract.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

California High-Speed Rail Authority

Program Delivery Office

Design Criteria Manual

Revision 5.0

September 21, 2021

California High-Speed Rail Authority Design Criteria Manual 17 September 2021/Rev. 5.0

This page left blank intentionally.

California High-Speed Rail Authority

Rail and Operations Delivery Branch

DESIGN CRITERIA MANUAL

PD-ROD-DCM Rev. 5.0

9/28/2021

9/27/2021

9/27/2021

9/27/2021

W R Burns 12/23/2021

DESIGN CRITERIA MANUAL (Revision 5.0) Signatures of Chapter Authors/Representatives

Chapter # DCM Chapter Author/

Representative Signature Date

01 DCM Overview Dominique Rulens

Sept 2021

02 Basis of Design Dominique Rulens

03 Train Operation Paul Hebditch

Infrastructure Management *

Ross Newson

05 Safety and Security Chris Hendrickson

Reliability, Availability and Maintainability

Marion Boucly

Electromagnetic Compatibility

Eric Scotson

08 HSR Trainsets Richard Frankhuizen

09 Trackwork Douglas McLeod

10 Traction Power System Ryan Scott

11 Overhead Contact System Ryan Scott

Communication and Signaling

Thomas Newey

13 Grounding and Bounding Eric Scotson

Chapter # DCM Chapter Author/

Representative Signature Date

Corrosion/Stray Current Control

Mike Berman

15 Architectural James Deane

16 Landscaping James Deane

17 Mechanical Systems James Deane

18 Electrical System James Deane

19 Ventilation System James Deane

20 Fire Protection and Alarm James Deane

Building Management Systems

James Deane

Design Survey and Mapping

Anthony Valdiosera

23 Trackway Clearances Douglas McLeod

24 Track Geometry Douglas McLeod

25 Intrusion Protection Chris Ingle

26 Roadways and Site Works Anthony Valdiosera

27 Drainage Anthony Valdiosera

Chapter # DCM Chapter Author/

Representative Signature Date

28 Utilities Anthony Valdiosera

29 Geotechnical Tom Lee

30 Seismic Matt Bowers

Structural (Aerial and Elevated Structures)

Mark Chen

Structural (Other Structures)

Eric Abrahamson

33 Tunneling Stephen Klein

34 Sustainability** Maeri Machado

35 Environmental*** Scott Rothenberg

36_App-A Abbreviations and Acronyms

John Chow

37_App-B Design Terms John Chow

38_App-C Interfaces between Track and Systems and HSR Trainsets

Dominique Rulens

*Note: Author Ross Newson is no longer working on the project. The chapter for Infrastructure Management is acknowledged by the supervisor Simon Whitehorn on the author’s behalf.

**Note: The signature for Sustainability is made by Kitti Hsiang.

***Note: The signature for Environmental is made by Scott Rothenberg.

Revision History – Design Criteria Manual

Revision Date Description

0 Mar 2012 Initial Release

0.1 Dec 2012 Construction Package 1 - Executed Version

1 Dec 2013 Rolling Stock/High-Speed Rail Trainset Procurement

2 Feb 2014 Revision 2

3 Feb 2016 Revision 3

3.6 27 Apr 2018 Excerpt for Train Performance Specification

4.0 31 Aug 2018 Excerpt for Federal Railroad Administration

4.1 5 Feb 2019 Interim excerpt for internal use

4.2 6 March 2019 Interim for internal use

4.3 19 April 2019 Interim for internal use

4.3.1 04 June 2019 Interim for internal use (revised Chapter 34 only)

4.4 28 June 2019 Federal Railroad Administration

4.4.1 13 Sept 2019 Revised for ADA accessibility compliance

4.5 20 Dec 2019 Interim for internal use

5.0 21 Sep 2021 Issue for Federal Railroad Administration

17 September 2021/Rev. 5.0 Page | i

TABLE OF CONTENTS

Chapter 1 Design Criteria Manual Overview

Chapter 2 Basis of Design

Chapter 3 Train Operation

Chapter 4 Infrastructure Management

Chapter 5 Safety and Security

Chapter 6 Reliability, Availability, and Maintainability

Chapter 7 Electromagnetic Compatibility

Chapter 8 HSR Trainsets

Chapter 9 Trackwork

Chapter 10 Traction Power System

Chapter 11 Overhead Contact System

Chapter 12 Communication Systems and Train Control

Chapter 13 Grounding and Bonding

Chapter 14 Corrosion/Stray Current Control

Chapter 15 Architectural

Chapter 16 Landscaping

Chapter 17 Mechanical Systems

Chapter 18 Electrical System

Chapter 19 Tunnel Ventilation

Chapter 20 Fire Protection and Alarm

Chapter 21 Building Management System

Chapter 22 Design Survey and Mapping

Chapter 23 Trackway Clearance

Chapter 24 Track Geometry

Chapter 25 Intrusion Protection

Chapter 26 Roadways and Site Works

Chapter 27 Drainage

Chapter 28 Utilities

Chapter 29 Geotechnical

Chapter 30 Seismic

Chapter 31 Structural (Aerial and Elevated Structures)

Table of Contents

17 September 2021/Rev. 5.0 Page | ii

Chapter 32 Structural (Other Structures)

Chapter 33 Tunneling

Chapter 34 Sustainability

Chapter 35 Environmental

Chapter 36 (Appendix A): Acronyms and Abbreviations

Chapter 37 (Appendix B): Design Terms

Chapter 38 (Appendix C) Interfaces between Track and Systems and HSR Trainsets

Design Criteria Manual

Chapter 1:

Design Criteria Manual Overview

Revision Date Description

0 Mar 2012 Initial Release, Revision 0

1 May 2013 Revision 1

2 Sep 2015 Revision 2

3 Feb 2016 Revision 3

3.6 27 Apr 2018 Excerpt for Train Performance Specification

4.0 31 Aug 2018 Issue for Federal Railroad Administration

4.1 28 Feb 2019 Interim version

4.2 6 March 2019 Interim for internal use

4.3 19 April 2019 Interim for internal use

4.4.1 11 Sep 2019 Revised for ADA accessibility compliance

4.5 20 Dec 2019 Federal Railroad Administration

5.0 17 Sep 2021 Issue for Federal Railroad Administration

17 September 2021/Rev. 5.0 P a g e | 1-i

TABLE OF CONTENTS

Chapter 1 Design Criteria Manual Overview ................................................ 1-1

1.1 INTRODUCTION ......................................................................................................... 1-1

1.1.1 Purpose and Scope .............................................................................................. 1-1

1.1.2 Regulations, Codes, Standards, and Guidelines .............................................. 1-2

1.1.3 Definitions ............................................................................................................. 1-2

1.1.4 Design Standard Classifications ........................................................................ 1-2

1.1.5 Revisions .............................................................................................................. 1-3

1.1.6 Design Criteria Manual Document Structure .................................................... 1-3

1.1.6.1 Design Criteria Manual Organization ............................................................... 1-3

1.1.6.2 Reading the Design Manual ............................................................................ 1-4

1.1.6.3 Design Criteria Manual Chapters .................................................................... 1-4

1.1.6.4 Design Criteria Manual Chapter Sections ....................................................... 1-6

1.2 DESIGN CRITERIA ELEMENTS ................................................................................ 1-6

1.2.1 General Design Criteria ....................................................................................... 1-6

1.2.2 Train Operator ...................................................................................................... 1-7

1.2.3 Safety and Security .............................................................................................. 1-7

1.2.4 Reliability, Availability, and Maintainability ....................................................... 1-7

1.2.5 High-Speed Rail Trainsets ................................................................................... 1-7

1.2.6 Track and Railway Systems ................................................................................ 1-7

1.2.7 Civil Works (Infrastructure) ................................................................................. 1-8

1.3 APPLICATION OF DESIGN CRITERIA ELEMENTS ................................................. 1-8

1.3.1 HSR Earthworks Configurations ........................................................................ 1-8

1.3.2 HSR Aerial Structure Configurations ................................................................. 1-8

1.3.3 HSR Trench Structure Configurations ............................................................... 1-9

1.3.4 HSR Tunnel and Support Structure Configurations ......................................... 1-9

1.3.5 HSR Stations and Support Structure Sites ..................................................... 1-10

1.3.6 HSR Buried Structure Sites ............................................................................... 1-10

1.3.7 HSR Trackwork Sites ......................................................................................... 1-10

1.3.8 HSR System Facilities and Wayside Sites ....................................................... 1-10

1.3.9 High-Speed Rail Trainset (On-Board) ............................................................... 1-11

1.3.10 HSR Operations and Maintenance Facilities and Support Structure

Sites ..................................................................................................................... 1-11

1.3.11 Non-HSR Earthworks Sites ............................................................................... 1-11

1.3.12 Non-HSR Elevated Structure Sites ................................................................... 1-11

1.3.13 Non-HSR Trench Structure Sites ...................................................................... 1-12

1.3.14 Non-HSR Buried Structure Sites ...................................................................... 1-12

1.3.15 Third Parties ....................................................................................................... 1-12

1.3.16 Other Criteria (Placeholder) .............................................................................. 1-12

1.4 DISCIPLINE INTERFACES ...................................................................................... 1-12

1.5 ATTACHMENT A - COMPLEMENTARY INFORMATION ....................................... 1-13

Tables

Table 1-1 Example Interface Table .......................................................................................................... 1-13

Figures

Figure 1-1 California High-Speed Rail System Elements .......................................................................... 1-1

Figure 1-2 Design Criteria Manual Organization ........................................................................................ 1-4

Chapter 1 Design Criteria Manual Overview 1

1.1 INTRODUCTION 2

This Design Criteria Manual (DCM) chapter describes the general organization of Design Criteria 3 documentation and to provide information allowing to use it properly. 4

1.1.1 Purpose and Scope 5

The California High-Speed Rail Program (CHSR Program) will deliver major California High-Speed Rail 6 System (CHSR System) elements as separate projects, applying different strategies for functionally 7 delivering each of the major elements of a high-speed rail system. The major elements include (1) Train 8 Operator, (2) High-Speed Rail Trainsets, (3) Track and Systems, and (4) Civil Works as presented in 9 Figure 1-1. Each major high-speed rail element is unique and requires a delivery approach that is tailored 10 to its characteristics and that, when combined, fit together into a commercially successful model. 11

Figure 1-1 California High-Speed Rail System Elements

The three main purposes of the Design Criteria Manual (DCM) are to provide the following: 12

• Program Requirements: The DCM provides the CHSR Program requirements that serve as the 13 Basis of Design for all four CHSR System Elements identified in Figure 1-1. Program requirements 14 are described in this chapter in Section 1.2. 15

• Civil Works Design Criteria: The DCM establishes criteria, guidelines, and requirements (design 16 criteria) for the design of the Civil Works (projects) presented in Figure 1-1. The DCM also identifies 17 and specifies provisions required by the Track and Systems, High-Speed Rail Trainsets, and Train 18 Operator projects to be implemented by Civil Works projects, for example undertrack conduits, axle 19 loads, maintenance access, etc. Additionally, the DCM provides Civil Works discipline design criteria 20 that may be designed and constructed by Track and Systems, High-Speed Rail Trainset, and Train 21 Operator projects, for example sound walls. 22

• Provisions and Design Decisions: The DCM informs the three elements of Track and Systems, 23 High-Speed Rail Trainset, and Train Operator of any provisions included into the Civil Works projects 24 for their future use. The DCM also identifies and describes any design decisions (constraints) and 25 interfaces affecting the Track and Systems, High-Speed Rail Trainset, and Train Operator projects. 26 Actual Track and Systems, High-Speed Rail Trainset, and Train Operator project design criteria are 27 provided as performance requirements in the respective procurement documents. 28

Chapter 1 – Design Criteria Manual Overview

17 September 2021/Rev. 5.0 P a g e | 1-2

The DCM translates into technical requirements the performance and objectives described in California 1 Proposition 1A per United States (US) laws, codes, and standards, as well as per international high-2 speed railroad standards, requirements, and good practices. 3

The DCM presents high-speed rail design criteria, interfaces, and constraints to designers and 4 contractors and provides future high-speed rail operators and maintainers of the line assurance on the 5 maintainability and operability of the high-speed rail line. In addition to essential technical requirements, 6 the DCM identifies and describes the main interfaces between the different technical disciplines. 7

The criteria, guidelines, and requirements for the train operator, high-speed rail trainsets, and track and 8 systems are defined outside of this DCM. However, the interfaces and interaction of these disciplines with 9 others are covered in chapter 38 of the DCM (Appendix C), Interfaces Between Track and Systems and 10 HSR Trainsets, describing only the content that is needed for other disciplines to include in their design. 11

The intended use of the DCM is for final design of the Civil Infrastructure supporting the CHSR System 12 along the dedicated high-speed rail corridor, unless indicated otherwise. 13

1.1.2 Regulations, Codes, Standards, and Guidelines 14

This section lists the international, federal, state, and industry‐specific, regulations, codes, standards, and 15 guidelines that have been used in development of these design criteria. 16

In addition, the regulations, codes, standards, and guidelines pertaining to each area of design are listed 17 at the beginning of the associated DCM chapter. 18

These lists of regulations, codes, standards, and guidelines may not include all those applicable. It is the 19 final designer's responsibility to determine any additional regulations, codes, and standards that are 20 applicable. 21

Additional, applicable requirements by authorities having jurisdiction over the design, construction, and 22 operation of the facility has to be identified and applied as required for approval. 23

See Chapter 2 Basis of Design for precedence of Regulations, Codes, Ordinances, and Standards for the 24 CHSR Program. 25

1.1.3 Definitions 26

This section of the DCM will include all definitions needed to have a precise understanding of each 27 specific chapter. All the definitions are then compiled in DCM Chapter 37. 28

Definition: System = an integrated set of elements, subsystems, or assemblies that accomplish a defined 29 objective. 30

Definition: Design Criteria = criteria that designers shall meet in designing the system. 31

Definition: Civil Works = in the context of this DCM is defined as the design and construction of elements 32 such as the high-speed rail guideway, roadways, bridges, stations and other buildings, utilities, and any 33 provisions made for the CHSR System train operator, high-speed rail trainsets, and track and systems as 34 defined in this DCM. 35

1.1.4 Design Standard Classifications 36

The following terms are used to classify the design criteria: 37

• “Shall” - Indicates a mandatory requirement that must be strictly implemented; a waiver from a 38 mandatory requirement is permissible only with approval of a design variance. 39

• “Will” - Indicates a course of action performed by a party other than the designer. 40

17 September 2021/Rev. 5.0 P a g e | 1-3

• “May” - Indicates a permissible course of action within the limits of the standards; a design variance is 1 not required if it is not exercised. 2

• “Should” - Indicates a preferred course of action; a design variance is not required if it is not 3 exercised. 4

• “Recommended” - A standard to be equaled or exceeded where there are no major physical, cost, or 5 schedule constraints; designers shall use “recommended” values to the extent practical. 6

• “Minimum/Maximum” - Represent limits; designers shall make every effort to avoid the use of 7 “minimum/maximum values.” These values may be acceptable where constraints make the use of 8 “recommended” values impracticable. 9

1.1.5 Revisions 10

Revisions of the design criteria, in part or in whole, will be issued by the California High-Speed Rail 11 Authority (Authority) or its representative. It is the responsibility of the final designer to base their design 12 on the latest applicable version of these design criteria. Refer to the contract general provisions for 13 related requirements. 14

Each chapter of the DCM includes a table on its cover that indicates the specific chapter's revision 15 history. In addition, the entire DCM includes a table after the title page that indicates the compiled DCM's 16 revision history. Proposed revisions to the CHSR System DCM may be submitted to the Authority at any 17 time. 18

1.1.6 Design Criteria Manual Document Structure 19

This DCM is organized by DCM chapters. 1 chapter is presenting the structure of the document, 1 chapter 20 is describing the basis for the design of the California High Speed Rail program, 33 chapters are 21 describing design criteria from a specific engineering discipline's perspective and 3 appendices are 22 supplemental information. 23

1.1.6.1 Design Criteria Manual Organization 24

The DCM has been organized as a simple two-dimensional Cartesian coordinate system (DCM grid) to 25 aid the final designer in more clearly communicating the applicable design criteria, as figuratively 26 presented in Figure 1-2. 27

The DCM grid X axis identifies the DCM chapters. DCM chapter describes the design criteria from a 28 specific engineering discipline, for example, structural or drainage criteria. For the full list of DCM 29 chapters, refer to Section 1.1.6.3. 30

The DCM grid Y axis identifies the sections within DCM chapter, organizing the design in a standard DCM 31 chapter structure supporting consistency and ease of use. The DCM chapter sections describe common 32 design criteria elements (i.e., typical detail) and the application of these design criteria elements to 33 configurations and sites (i.e., typical arrangement). For more details regarding DCM chapter sections, 34 refer to Section 1.1.6.4. For more details on configurations and sites, refer to Section 1.3. 35

Coordination between DCM chapters and engineering disciplines is supported by interfaces. The main 36 focus of the interfaces is between the four CHSR System Elements, as identified in Figure 1-1. For more 37 details on interfaces, refer to Section 1.4. 38

17 September 2021/Rev. 5.0 P a g e | 1-4

Figure 1-2 Design Criteria Manual Organization

1.1.6.2 Reading the Design Manual 1

In order to ease the reading and the understanding of the DCM, the matrixial organization of the 2 requirements, as described in the previous section, allows the designer to head directly to the chapter 3 describing the engineering discipline for which they need information and to scroll down or go to the 4 general design criteria that has to be fulfilled everywhere in Section 2 of the chapter or to the application 5 of the concerned engineering discipline to other technical domains in Section 3. 6

A resume of the interface between the concerned engineering discipline and the other domains is 7 provided in the Interface table in Section 4 of the chapter, which allows the designer to cross check 8 references with other disciplines. 9

For example, the general requirements concerning the Overhead Contact System (OCS) will be in 10 Chapter 11, Section 11.2 “Design Criteria Elements,” while the characteristic of installing OCS on aerial 11 structures will be described also in Chapter 11, Section 11.3.2 “HSR Aerial Structure Configuration” under 12 Chapter 11, Section 11.3 “Application of Design Criteria Elements.” 13

The main advantage of this organization is to provide the same section/subsection structure in all the 14 chapters based on a clear breakdown structure that is easily identifiable by the designers. 15

1.1.6.3 Design Criteria Manual Chapters 16

The DCM is structured into the following chapters: 17

• Introduction/General: 18

– DCM Overview - Chapter 1 19

– Basis of Design - Chapter 2 20

• Operations and Maintenance: 21

– Train Operation - Chapter 3 22

– Infrastructure Management - Chapter 4 23

• System Safety and Security: 24

– Safety and Security - Chapter 5 25

17 September 2021/Rev. 5.0 P a g e | 1-5

• Reliability, Availability, and Maintainability (RAM) and Electromagnetic Compatibility (EMC): 1

– Reliability, Availability, and Maintainability - Chapter 6 2

– Electromagnetic Compatibility - Chapter 7 3

• Trainsets: 4

– High-Speed Rail Trainsets - Chapter 8 5

• Track and Systems 6

– Trackwork - Chapter 9 7

– Traction Power System - Chapter 10 8

– Overhead Contact System - Chapter 11 9

– Communication and Signaling - Chapter 12 10

– Grounding and Bonding - Chapter 13 11

– Corrosion/Stray Current Control - Chapter 14 12

• Architectural and Landscaping 13

– Architectural - Chapter 15 14

– Landscaping - Chapter 16 15

• Mechanical, Electrical, and Plumbing (MEP) Systems 16

– Mechanical Systems - Chapter 17 17

– Electrical Systems - Chapter 18 18

– Ventilation Systems - Chapter 19 19

– Fire Protection and Alarm - Chapter 20 20

– Building Management Systems - Chapter 21 21

• Civil and Structural 22

– Design Survey and Mapping - Chapter 22 23

– Trackway Clearance - Chapter 23 24

– Track Geometry - Chapter 24 25

– Intrusion Protection - Chapter 25 26

– Roadways and Site Works - Chapter 26 27

– Drainage - Chapter 27 28

– Utilities - Chapter 28 29

– Geotechnical - Chapter 29 30

– Seismic - Chapter 30 31

– Structural (Aerial and Elevated Structures) - Chapter 31 32

– Structural (Other Structures) - Chapter 32 33

– Tunneling - Chapter 33 34

• Environmental 35

– Sustainability - Chapter 34 36

– Environmental - Chapter 35 37

• Appendices 38

– Appendix A: Acronyms and Abbreviations - Chapter 36 39

– Appendix B: Design Terms - Chapter 37 40

– Appendix C: Interfaces between Track and Systems and HSR Trainsets - Chapter 38 41

17 September 2021/Rev. 5.0 P a g e | 1-6

1.1.6.4 Design Criteria Manual Chapter Sections 1

The DCM chapters follow a standard breakdown as presented below. The "X" represents the individual 2 DCM chapter number. This DCM chapter follows largely the same structure. For more information on 3 content described in Section X.2, Section X.3, and Section X.4, refer to Section 1.2, Section 1.3, and 4 Section 1.4 in this chapter, respectively. 5

X.1 Introduction 6

X.1.1 Scope 7

X.1.2 Regulations, Codes, Standards, and Guidelines 8

X.1.3 Definitions and Classifications 9

X.2 Design Criteria Elements 10

X.3 Application of Design Criteria Elements 11

X.3.1 HSR Earthworks Configurations 12

X.3.2 HSR Aerial Structure Configurations 13

X.3.3 HSR Trench Structure Configurations 14

X.3.4 HSR Tunnels and Support Structure Configurations 15

X.3.5 HSR Stations and Support Structure Sites 16

X.3.6 HSR Buried Structure Sites 17

X.3.7 HSR Trackwork Sites 18

X.3.8 HSR System Facilities and Wayside Sites 19

X.3.9 HSR Rolling Stock (On-Board) 20

X.3.10 HSR Operations and Maintenance Facilities and Support Structure Sites 21

X.3.11 Non-HSR Earthworks Sites 22

X.3.12 Non-HSR Elevated Structures Sites 23

X.3.13 Non-HSR Trench Structure Sites 24

X.3.14 Non-HSR Buried Structures 25

X.3.15 Third Parties 26

X.3.16 Other Criteria (Placeholder) 27

X.4 Interfaces 28

X.4.1 Interfaces with California High-Speed Rail System Requirements 29

X.4.2 Interfaces with Train Operator 30

X.4.3 Interfaces with Trainsets 31

X.4.4 Interfaces with Track and Systems 32

X.4.5 Interfaces with Civil and Structural 33

X.4.6 Interfaces with Stations 34

X.4.7 Interfaces with Third Parties 35

1.2 DESIGN CRITERIA ELEMENTS 36

The “Design Criteria Elements” section of the DCM chapters describe the applicable design criteria for the 37 33 engineering disciplines as defined in the above Section1.1.6.3. 38

1.2.1 General Design Criteria 39

The “General Design Criteria” section describes the design criteria that apply to several technical 40 breakdown structure elements (e.g., earthworks, aerial structures, stations). Examples of applicable 41 design criteria are design speeds, double track alignments, walkways. 42

17 September 2021/Rev. 5.0 P a g e | 1-7

1.2.2 Train Operator 1

The DCM includes minimum necessary provisions to cover train operation needs in advance of awarding 2 the California HSR System Train Operator, this includes for example: 3

• Trip Travel Times 4

• Design and Operating Speeds 5

• Comfort Hypothesis 6

The California High Speed Rail Authority will award the Train Operator contract through a performance-7 based procurement. 8

Designers shall Refer to DCM Chapter 3 “Train Operation” for detailed design criteria. 9

1.2.3 Safety and Security 10

Safety and Security of persons and property shall be embedded in the design, construction and 11 implementation of the California HSR System. 12

The design, construction, testing, start‐up, and operation of the California HSR System shall comply with 13 applicable safety and security laws, regulations, requirements, and railroad industry practices. 14

Designers shall Refer to DCM Chapter 5 “Safety and Security” for detailed design criteria. 15

1.2.4 Reliability, Availability, and Maintainability 16

The CHSR Program shall develop a Reliability, Availability and Maintainability (RAM) approach as defined 17 in the DCM. 18

The RAM activities shall be tailored to the objectives of the specific CHSR Systems. 19

The RAM Program Plan and the objectives in the Program RAM Metrics shall capture these activities. 20

Designers shall Refer to DCM Chapter 6 “Reliability, Availability, and Maintainability” for detailed design 21 criteria. 22

1.2.5 High-Speed Rail Trainsets 23

The DCM includes minimum necessary provisions to cover CHSR System High Speed Rail Trainsets 24 needs in advance of awarding the California HSR System contract to Design, manufacture and maintain 25 the HSR trainsets, this includes for example: 26

• Trainset Length 27

• Trainset Static and Dynamic Envelopes 28

• Trainset Maximum Axle and Train Live Loads 29

The California High Speed Rail Authority will award the HSR Trainsets contract through a performance-30 based procurement. 31

Designers shall refer to DCM Chapter 2 “ Basis of Design” and Chapter 8 “High-Speed Rail Trainsets” for 32 detailed design criteria. 33

1.2.6 Track and Railway Systems 34

The DCM includes minimum necessary provisions to cover California HSR System Track and Railway 35 Systems needs in advance of awarding the California HSR Track and Railway Systems contract to 36 Design, Build and maintain the HSR Track and Railway Systems, this includes for example: 37

• Track geometry and Trackwork 38

17 September 2021/Rev. 5.0 P a g e | 1-8

• Traction Power 1

• Overhead Contact System 2

• Automatic Train Control and Communications Systems 3

The California High Speed Rail Authority will award the HSR Track and Railway Systems contract through 4 a performance-based procurement. 5

Designers shall Refer to the applicable DCM Track and Railway Systems chapters 4 and 7 to 14 for 6 detailed design criteria. 7

1.2.7 Civil Works (Infrastructure) 8

The Civils Works chapters will provide the design criteria necessary to: 9

• engineer the infrastructure supporting the Track and Railway System (guideway, aerial structures, 10 tunnels and concomitant technical disciplines); 11

• allow for operation and maintenance of the system (stations, passenger facilities, depots, accesses); 12

• clear the necessary right-of-way (utilities and road diversion and relocation, intrusion protection) 13

• protect and preserve the environment 14

• provide a sustainable and safe system. 15

Designers shall refer to the DCM Civil Works chapters 13 to 35 for detailed design criteria. 16

1.3 APPLICATION OF DESIGN CRITERIA ELEMENTS 17

In the following sections concerned technical disciplines incorporates the content from their design in 18 order for the chapter discipline to reach its own due performance. This chapter outlines the organization 19 of the DCM, and the following sections present the 16 technical domains. The DCM Chapter 37, 20 “Appendix B - Design Terms” presents the design terms used in the following sections. 21

1.3.1 HSR Earthworks Configurations 22

The “High-Speed Rail (HSR) Earthworks Configuration” section provides the design criteria for 23 construction of the high-speed rail guideway on the ground, (embankment or in a cut). The section covers 24 also earth retaining system. HSR earthworks configurations include: 25

• HSR Embankment 26

• HSR Cut 27

• HSR Retained Embankment 28

• HSR Retained Cut 29

This section describes the following design elements: foundation stratum, prepared subgrade, sub-30 ballast, drainage, system elements such as undertrack conduits, OCS pole foundations, access control, 31 intrusion protection, walkways, maintenance access. 32

These lists are not exhaustive. Designers and contractors shall coordinate with the Authority to define the 33 final lists. 34

1.3.2 HSR Aerial Structure Configurations 35

The “High-Speed Rail (HSR) Aerial Structure Configuration” section provides the design criteria for the 36 high-speed rail guideway on an HSR aerial structure, which has a clear span greater than 20 feet over 37 other rights-of-way, natural features, and/or other obstacles. An HSR aerial structures include the 38 following: 39

17 September 2021/Rev. 5.0 P a g e | 1-9

• HSR Viaducts 1

• HSR Bridges 2

• HSR Underpasses 3

• HSR Grade Separations 4

This section describes the following design elements: high-speed rail superstructures, substructures, 5 bearings, expansion joints, drainage, system elements in interface with HSR Aerial Structures such as 6 cable troughs, OCS poles and traction power gantry provisions, embedded conduits and/or sleeves, 7 trackside equipment, grounding and bonding, tracks, intrusion protection, utilities, walkways, emergency 8 access and egress stairways, maintenance access. 9

These lists are not exhaustive. Designers and contractors shall coordinate with the Authority to define the 10 final lists. 11

1.3.3 HSR Trench Structure Configurations 12

The “High-Speed Rail (HSR) Trench Structure Configuration” section provides the design criteria for high-13 speed rail guideway within a trench structure. 14

This section describes the following design elements: high-speed rail base slabs, walls, struts, drainage, 15 system elements such as cable troughs, embedded conduits, OCS pole mounting provisions, access 16 control, intrusion protection, walkways, emergency access and egress stairways, maintenance access. 17

These lists are not exhaustive. Designers and contractors shall coordinate with the Authority to define the 18 final lists. 19

1.3.4 HSR Tunnel and Support Structure Configurations 20

The “High-Speed Rail (HSR) Tunnel and Support Structures Configuration” section describes the design 21 criteria applicable to the high-speed rail guideway in enclosed or below-ground configurations, including 22 the following: 23

• HSR Cut-and-Cover Tunnels 24

• HSR Bored Tunnels 25

• HSR Mined Tunnels 26

• HSR Cross Passages 27

• HSR Tunnel Portals 28

• HSR Tunnel Portal Facilities 29

• HSR Tunnel Ventilation Structures 30

• HSR Emergency Access Shafts and Adits 31

This section describes the following design elements: high-speed rail excavated, bored or mined tunnels 32 and tunnel diameters, pre-cast or cast-in-place concrete, waterproofing, invert, drainage, system 33 elements such as cable troughs, embedded conduits, OCS pole mounting provisions, walkways, 34 emergency access and egress including cross passages, provisions for standpipes, mechanical 35 ventilation, or mechanical and electrical systems, maintenance access. 36

These lists are not exhaustive. Designers and contractors shall coordinate with the Authority to define the 37 final lists. 38

17 September 2021/Rev. 5.0 P a g e | 1-10

1.3.5 HSR Stations and Support Structure Sites 1

The “High-Speed Rail (HSR) Stations and Support Structures Site” section describes the design criteria 2 applicable to the locations where high-speed rail trains load or unload passengers, in aboveground or 3 belowground configurations, including the following: 4

• HSR At-Grade Stations 5

• HSR Aerial Stations 6

• HSR Underground Stations 7

• HSR Station Parking Garages 8

This section describes the following design elements: high-speed rail station platforms, buildings, 9 pedestrian bridges, passenger areas, parking, passenger information systems, mechanical, electrical, 10 and plumbing systems, station operation rooms, ticketing. 11

These lists are not exhaustive. Designers and contractors shall coordinate with the Authority to define the 12 final lists. 13

1.3.6 HSR Buried Structure Sites 14

The “High-Speed (HSR) Buried Structures Site” section describes the design criteria applicable to the 15 high-speed rail guideway within the CHSRA right-of-way configuration, typically along earthworks 16 configurations, including the following: 17

• HSR Culverts 18

• HSR Box Culvert Bridges 19

• HSR Wildlife Crossings 20

This list is not exhaustive. Designers and contractors shall coordinate with the Authority to define the final 21 list. 22

1.3.7 HSR Trackwork Sites 23

High-Speed Rail Trackwork are part of the Track and Systems project. However, Civil designer and 24 contractors shall include the civil works necessary for those elements, including the following: 25

• HSR Ballasted Track 26

• HSR Non-Ballasted Track 27

• HSR Special Trackwork 28

This list is not exhaustive. Designers and contractors shall coordinate with the Authority to define the final 29 list. 30

1.3.8 HSR System Facilities and Wayside Sites 31

HSR System Facilities and Wayside sites are part of the track and System project. However, Civil 32 designer and contractors shall include the civil works necessary for those elements, including the 33 following: 34

• HSR Traction Power Facilities 35

• HSR Automatic Train Control Wayside Facilities 36

• HSR Communication Wayside Facilities 37

This list is not exhaustive. Designers and contractors shall coordinate with the Authority to define the final 38 list. 39

17 September 2021/Rev. 5.0 P a g e | 1-11

1.3.9 High-Speed Rail Trainset (On-Board) 1

Train set acquisition is part of the HSR train set contract. However the Civil designers and contractors 2 shall include all necessary provisions into the civil infrastructure to allow their operation on the CHSR 3 program. 4

1.3.10 HSR Operations and Maintenance Facilities and Support Structure Sites 5

The choice of Operation and a Maintenance method is part of Operation and Maintenance contracts. 6 However Civil designer and contractors shall include the civil works necessary for those elements, 7 including the following: 8

• HSR Administrative Facilities 9

• HSR Operating Facilities 10

– HSR Operations Control Center 11

– HSR Station Control Rooms 12

• HSR Maintenance Facilities 13

– Maintenance of Equipment Facilities 14

– Maintenance of Infrastructure Facilities 15

• HSR Safety and Security Facilities 16

– Command Posts 17

– Access Points 18

This list is not exhaustive. Designers and contractors shall coordinate with the Authority to define the final 19 list. 20

1.3.11 Non-HSR Earthworks Sites 21

The “Non-High-Speed Rail (HSR) Earthworks Sites” section describes the design criteria applicable to 22 earthworks not supporting high-speed rail track, including: 23

• Approaches to Non-HSR Elevated Structures Sites 24

• Service Roads 25

• Access Roads 26

This list is not exhaustive. Designers and contractors shall coordinate with the Authority to define the final 27 list. 28

1.3.12 Non-HSR Elevated Structure Sites 29

The “Non-High-Speed Rail (HSR) Elevated Structure Sites” section describes the design criteria 30 applicable to structures not supporting high-speed rail track, including the following: 31

• Non-HSR Overheads 32

• Non-HSR Railroad Separation 33

• Non-HSR Pedestrian Overpass 34

• Non-HSR Lid over HSR Trench Structure 35

This list is not exhaustive. Designers and contractors shall coordinate with the Authority to define the final 36 list. 37

17 September 2021/Rev. 5.0 P a g e | 1-12

1.3.13 Non-HSR Trench Structure Sites 1

The “Non-High-Speed Rail (HSR) Trench Structures Sites” section describes the design criteria 2 applicable to trenches for non-high-speed rail functions. 3

Designers and contractors shall coordinate with the Authority to define the final list of concerned 4 structures. 5

1.3.14 Non-HSR Buried Structure Sites 6

The “Non-High-Speed Rail (HSR) Buried Structures Sites” section describes the design criteria applicable 7 to embedded structures not supporting high-speed rail track and going under third-party roadways, 8 railroads, etc., including, but not limited to the following: 9

• Non-HSR Culverts 10

• Non-HSR Box Culvert Bridges 11

• Non-HSR Wildlife Crossings 12

This list is not exhaustive. Designers and contractors shall coordinate with the Authority to define the final 13 list. 14

1.3.15 Third Parties 15

The “Third Parties” section describes the design criteria applicable to high-speed rail third parties, 16 including but not limited to the following: 17

• Shared Corridor 18

• Host Railroads 19

• Utilities 20

This list is not exhaustive. Designers and contractors shall coordinate with the Authority to define the final 21 list. 22

1.3.16 Other Criteria (Placeholder) 23

This section is a placeholder for design criteria that do not fall into any of the categories described above. 24

Designers and contractors shall coordinate with the Authority to define the final list of concerned 25 structures. 26

1.4 DISCIPLINE INTERFACES 27

The CHSR Program will deliver major CHSR System elements as separate projects. The interface section 28 in the DCM chapters describes the applicable interfaces with other DCM chapters. 29

Due to the nature of large transportation projects, the execution of the Civil Works comes first, requiring to 30 cover provisions for the future train operator, high-speed rail trainsets, and track and systems elements. 31 For example, Civil Designers and Contractors shall take into account high-speed rail trainset static and 32 dynamic envelopes, traction power gantry loads, maintenance access, and other interface. 33

Civil Designers and contractors shall provide an integrated product through a strong management of 34 interfaces. 35

Interfaces help in coordinating the various engineering disciplines throughout the complete System life-36 cycle, including preliminary engineering, final design, construction, integration, inspection, and testing. 37

17 September 2021/Rev. 5.0 P a g e | 1-13

Interfaces are particularly helpful in configuration management, supporting impact assessment of the 1 configuration changes. Therefore, the DCM chapters contain an interfaces section. Interfaces. The 2 interface tables group the items as follows: 3

• Interfaces with California High-Speed Rail System Requirements 4

• Interfaces with Train Operator 5

• Interfaces with Trainsets 6

• Interfaces with Track and Systems 7

• Interfaces with Civil and Structural 8

• Interfaces with Stations 9

• Interfaces with Third Parties 10

Table 1-1 presents an example of an Interface table. An unique ID and name identify each interface. An 11 interface register allows to manage Interface IDs. 12

Table 1-1 Example Interface Table

ID Interface Name

Requirement

Discipline

Requirement

DCM Section

Provision

Discipline

Provision

DCM Section

ID #1 Interface #1 Discipline #1 Section # Discipline #m Section #

ID #2 Interface #2 Discipline #2 Section # Discipline #m Section #

ID #3 Interface #3 Discipline #3 Section # Discipline #m Section #

ID #n Interface #n Discipline #.. Section # Discipline #m Section #

Each interface has two parts, one part describes the interface requirements (e.g., the high-speed rail 14 trainset dynamic envelope), and the other part describes the interface provision (e.g., the corresponding 15 structure gauge). For example, DCM Chapter 8, “Trainsets”, describes the high-speed rail trainset 16 dynamic envelope, while DCM Chapter 23, “Trackway Clearance” Describes the structure gauge. Both 17 DCM chapters will identify this interface and provide cross-references to each other. 18

The interface section does not provide the total list of interfaces. 19

The Final Designer shall identify all interfaces. 20 and the Final Designer shall manage them following the Interface Management process 21

The contract defines the interface process to implement. 22

The Final Designer and the contractors shall baseline the list of interfaces. 23

The Final Designer and the contractor shall manage the changes to the baseline following the 24 configuration management process. 25

1.5 ATTACHMENT A - COMPLEMENTARY INFORMATION 26

Specific information are bought to the attention of the Designers and contractors in attachment to a 27 specific DCM chapter. This specific information shall be used accordingly. 28

Design Criteria Manual

Chapter 2:

Basis of Design

Revision Date Description

0 Mar 2012 Initial Release, Revision 0

1 May 2013 Revision 1

2 Sep 2015 Revision 2

3 Feb 2016 Revision 3

3.6 27 Apr 2018 Excerpt for Train Performance Specification

4.0 31 Aug 2018 Excerpt for Federal Railroad Administration

4.1 Apr 2019 2019 review and revision

4.2 6 March 2019 Interim for internal use.

4.3 19 April 2019 Interim for internal use.

4.4.1 13 Sep 2019 Revised for ADA accessibility compliance

4.5 20 Dec 2019 Interim for internal use

5.0 17 Sep 2021 Issue for Federal Railroad Administration

17 September 2021/Rev. 5.0 P a g e | i

TABLE OF CONTENTS

Chapter 2 Basis of Design ............................................................................. 2-1

2.1 INTRODUCTION ......................................................................................................... 2-1

2.1.1 Background .......................................................................................................... 2-1

2.1.2 Project Description .............................................................................................. 2-1

2.1.3 Project Development Process ............................................................................ 2-2

2.1.3.1 System Design Approach ................................................................................ 2-2

2.1.4 Regulations, Codes, Standards, and Guidelines .............................................. 2-3

2.1.4.1 Regulations and Codes ................................................................................... 2-3

2.1.4.2 Standards and Guidelines ............................................................................... 2-4

2.1.5 Other California High-Speed Rail System Documents ..................................... 2-6

2.1.6 Precedence of Conflicting Requirements .......................................................... 2-7

2.1.6.1 Precedence by Jurisdiction .............................................................................. 2-7

2.1.6.2 Precedence by Type of Requirement .............................................................. 2-7

2.1.6.3 Precedence of California High-Speed Rail System Requirements ................. 2-7

2.1.7 Design Variances ................................................................................................. 2-7

2.1.8 Definitions ............................................................................................................. 2-8

2.1.9 Professional Licensing Requirement ................................................................. 2-9

2.1.10 Units of Measurement .......................................................................................... 2-9

2.1.11 Subdivisions and Milepost ................................................................................ 2-10

2.1.11.1 Subdivisions ................................................................................................... 2-10

2.1.11.2 Milepost .......................................................................................................... 2-10

2.1.11.3 Stationing ....................................................................................................... 2-12

2.1.12 Track Identification ............................................................................................ 2-12

2.1.13 Design Development .......................................................................................... 2-13

2.1.14 High-Speed Rail Project Section Limits ........................................................... 2-13

2.1.15 Safety and Reliability ......................................................................................... 2-15

2.2 DESIGN CRITERIA ELEMENTS .............................................................................. 2-15

2.2.1 System Performance.......................................................................................... 2-15

2.2.1.1 System Capacity and Ridership .................................................................... 2-15

2.2.1.2 Trip Travel Times ........................................................................................... 2-16

2.2.2 General Requirements ....................................................................................... 2-16

2.2.2.1 Safety and Security ........................................................................................ 2-16

2.2.2.2 Reliability, Availability, and Maintainability .................................................... 2-16

2.2.2.3 Electromagnetic Compatibility ....................................................................... 2-18

2.2.2.4 Network and Computer Security .................................................................... 2-18

2.2.2.5 Asset Management ........................................................................................ 2-18

2.2.3 Train Operation ................................................................................................... 2-18

2.2.3.1 Train Operator ............................................................................................... 2-18

2.2.3.2 Operating Plan ............................................................................................... 2-18

2.2.3.3 Shared-Use Tracks, Right-of-Way, and Facilities.......................................... 2-19

2.2.3.4 Shared Use/Compatibility on Tracks ............................................................. 2-20

2.2.3.5 Policy Consideration ...................................................................................... 2-21

2.2.3.6 Operating and Design Speed ........................................................................ 2-21

2.2.3.7 Trains per Hour .............................................................................................. 2-22

2.2.3.8 Operating Headway ....................................................................................... 2-22

2.2.3.9 Operating Hours ............................................................................................ 2-22

2.2.3.10 Passenger Comfort ........................................................................................ 2-22

2.2.4 High-Speed Rail Trainsets ................................................................................. 2-22

2.2.4.1 Trainset Length .............................................................................................. 2-23

2.2.4.2 Axle Load ....................................................................................................... 2-23

2.2.4.3 Passengers per Trainset ................................................................................ 2-23

2.2.4.4 Trainset Braking Performance ....................................................................... 2-23

2.2.4.5 Pantograph .................................................................................................... 2-23

17 September 2021/Rev. 5.0 P a g e | ii

2.2.4.6 Spatial Provisions .......................................................................................... 2-23

2.2.4.7 Trainsets Control and Communication .......................................................... 2-23

2.2.5 Track and Systems ............................................................................................. 2-23

2.2.5.1 Trackwork ...................................................................................................... 2-23

2.2.5.2 Traction Power ............................................................................................... 2-24

2.2.5.3 Overhead Contact System ............................................................................. 2-24

2.2.5.4 Automatic Train Control ................................................................................. 2-24

2.2.5.5 Communication Systems ............................................................................... 2-25

2.2.5.6 Grounding and Bonding ................................................................................. 2-25

2.2.6 Civil Works (Infrastructure) ............................................................................... 2-25

2.2.6.1 Trackway Clearance ...................................................................................... 2-26

2.2.6.2 Track Geometry ............................................................................................. 2-26

2.2.6.3 Intrusion Protection ........................................................................................ 2-26

2.2.6.4 Seismic Design .............................................................................................. 2-26

2.2.6.5 Aerial Structures ............................................................................................ 2-27

2.2.6.