This is an Agency Specific Requirements (ASR) document for a warehouse lease serving the VA Southern Nevada Health Care System.

The lessor must provide a single-floor warehouse facility totaling approximately 60,610 net usable square feet (NUSF) or 81,824 rentable square feet (RSF), located within a specified delineated area in Southern Nevada. The facility must accommodate 75-90 parking spaces, including five reserved for VA use and five ADA-compliant van-accessible spaces. Key functional areas include a loading dock with 12 truck bays, bulk and unit items storage (totaling approximately 36,295 NSF), staff and administrative areas with offices, workstations, training rooms, and support facilities. The warehouse must maintain specific environmental conditions with positive airflow, humidity between 20-60%, and temperatures of 66-75 degrees Fahrenheit. Clear ceiling heights of 30 feet in bulk storage and 10 feet in unit storage are required, with minimum 8-foot corridor widths to accommodate material handling equipment.

The lessor is responsible for all tenant improvements including architectural design services, HVAC systems with centralized cooling (no evaporative cooling permitted), plumbing fixtures, electrical systems with backup power for security and fire systems, flooring (sealed concrete in loading areas, epoxy in storage areas, seamless non-wax in unit storage), interior signage, janitorial services, pest control, building maintenance, and physical security systems including intrusion detection and 24-hour fire/intrusion alarm monitoring. The lessor must install a concrete foundation (minimum 6 inches thick, 3,000 PSI) for a 30-yard compactor with 45-foot clearance and 30-foot overhead height clearance. Accessibility must comply with ABAAS or more stringent local standards. Design must reference multiple VA design guides including the VA Design Guide for Sterile Processing and Logistics Service, Leased Design Narrative, Room Data Matrix, Program for Design, and various VA design manuals for HVAC, electrical, lighting, plumbing, signage, and physical security standards.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Warehouse Lease– ASR Package

VA Southern Nevada Health Care System

Warehouse Lease

AGENCY SPECIFIC REQUIREMENTS

Table of Contents

DELINEATED AREA

SPACE REQUIREMENTS

Parking

General Design Criteria

Conceptual Plan Area Table

General Considerations

Room Specifics

Finish Schedule

Building Entrances and Exits

Partitions

Flooring

Ceilings

Doors and Hardware

Plumbing Fixtures, Trim, and Equipment

Legionella Mitigation

Fire Extinguishers

Electrical, Lighting and Mechanical

General

Raceways and Receptacles

Lighting Fixtures

Audio Visual Systems

Warehouse Cooling

ADMINISTRATIVE REQUIREMENTS

Pest Control

Frequency of Building Maintenance

Janitorial Service

Waste Management

Lessor Responsibilities for Compactor Installation

SIGNAGE REQUIREMENTS

Exterior Signs

Interior Signs

References

Telecommunications

General Requirements

Telecommunications Room Requirements

PHYSICAL SECURITY

ATTACHMENTS

Attachment A – VA Leased Design Narrative (LDN)

Attachment B – Room Data Matrix (RDM)

Attachment C – Conceptual Floor Plan

Attachment D – Program For Design (PFD)

Attachment E – Room Templates for Leased Space

DELINEATED AREA

VASNHS is requesting a replacement lease to be located within the boundaries provided in the map below.

Approximate Borders of Delineated Area:

North: Beginning at the intersection of Speedway Blvd and N Hollywood Blvd, continuing on Speedway Blvd past E N Belt Rd to the intersection of Range Rd and I-215 N (Bruce Woodbury Beltway), continuing on I-215 N (Bruce Woodbury Beltway) and ending at the intersection of I-215 N (Bruce Woodbury Beltway) and N 5th St.

South: Beginning at the intersection of N 5th St and E Cheyenne Ave, continuing to the intersection of E Cheyenne Ave and Civic Center Dr, continuing on Civic Center Dr as it becomes E Alexander Rd, continuing onto Puebla St and Las Vegas Blvd N and ending at the intersection of Las Vegas Blvd N and N Hollywood Blvd.

East: Beginning at the intersection of Las Vegas Blvd N and N Hollywood Blvd, continuing on N Hollywood Blvd, and ending at the intersection with Speedway Blvd.

West: Beginning at the intersection of I-215 N (Bruce Woodbury Beltway) and N 5th St, continuing along N 5th St, and ending at the intersection with E Cheyenne Ave.

SPACE REQUIREMENTS

Lessor to comply with VA PG-18-12 Design Guide Sterile Processing and Logistics Service (hereafter referred to as “DG”), VA Leased Design Narrative (attachment A) (hereafter referred to as “LDN”) and Room Data Matrix (attachment B) (hereafter referred to as “RDM”), for building tenant improvement for a warehouse.

Space must be a single-floor space, and all space must be on the ground floor.

Location should be minimum 400 walkable feet from the following establishments:

marijuana dispensary, firearm store, shooting range and gentleman’s club/strip club.

Parking Provide total 75 minimum – 90 maximum parking spaces, 5 of which are reserved for exclusive VA use. Of the parking spaces, provide 5 handicap parking stalls with aisles on both sides. Compliance with the Architectural Barriers Act Accessibility Standards (ABAAS) is mandatory, but if there are local accessibility standards that apply in the project’s jurisdiction, the most stringent requirements must be followed. One of the handicap stalls must be sized to meet VA requirements for van accessible parking as noted in VA Barrier Free Design Standard. For the reserved GOV spaces, secure parking is desired. Provide a “Reserved for GOV” parking sign; exact verbiage to be provided during design.

General Design Criteria Lessor shall provide architectural design services in accordance with the DG, LDN, RDM and Room Templates for Leased Space (attachment E). Reference Building Requirements for Leased Spaces - Office of Construction & Facilities Management for required documents. In case of any conflict with this ASR document, reference DG, LDN and RDM with due approval from the CO.

Other Applicable Standards: all available at links:

i) Interagency Security Committee Policy for Leased Facilities.

ii) VA PG-18-14 Room Finishes, Door & Hardware Schedule Chapter 284 (Logistics Service).

iii) VA PG-18-10 Design Manuals – Structural Design Manual.

iv) VA PG-18-10 Design Manuals - Signage Design Manual.

v) VA Directive 0730/5

Lessor’s Designer will provide room-by-room layouts outlining workstations, media-mounts, casework, bookcases, and room furniture locations so Lessors MEP design https://vatilms.va.gov/vatilms/criteria-viewer/80110?type=application%2Fpdf&title=Sterile%20Processing%20Service%20and%20Logistics%20Service&name=dgSPS-Log.pdf https://vatilms.va.gov/vatilms/criteria-viewer/80110?type=application%2Fpdf&title=Sterile%20Processing%20Service%20and%20Logistics%20Service&name=dgSPS-Log.pdf https://www.cfm.va.gov/til/sDetail/Div32ExtImprov/SD321723-01.pdf https://www.cfm.va.gov/til/sDetail/Div32ExtImprov/SD321723-01.pdf https://www.cfm.va.gov/til/etc/dsBarrFree-2025-05.pdf https://www.cfm.va.gov/til/rTemplate/LeasingCBOCw.asp https://www.cfm.va.gov/til/leasing.asp https://www.cfm.va.gov/til/leasing.asp https://www.cfm.va.gov/realProperty/VASupplementChapterDocs/Chapter_19_5_20_2024.pdf https://vatilms.va.gov/vatilms/room-criteria https://vatilms.va.gov/vatilms/room-criteria https://www.cfm.va.gov/til/dManual/dmStruct.pdf https://vatilms.va.gov/vatilms/criteria-viewer/90050?type=application%2Fpdf&title=Signage%20and%20Wayfinding&name=dmSignage-2025-02-19.pdf https://www.va.gov/vapubs/Search_action.cfm team can determine plumbing, electrical power, and data drop locations. A racking plan, showing the proposed rack widths and heights, aisle widths between racks, and acceptable racking height intervals must also be prepared.

Conceptual Plan Area Table Note: all areas are approximate as reflected in the Conceptual Floor Plan (attachment C)

Room Size Tolerances: allowable room size variance from stated program requirements is +/-5%.

Room Qty Area Net Area

CALCULATION AREA

LUM Staging Area 1 40 40 Bulk Items Storage Area 1 4500 4500 Unit Items Storage Area 1 620 620 Number of Truck Bays 12 0 0

15 5,160 NSF (5,676 GSF)

LOADING DOCK AREA

Staff Toilet 1 60 60 Receiving Dock 12 200 2400 Breakdown Room 1 360 360 Full Gas Cylinder Storage 1 40 40 Empty Gas Cylinder Storage 1 40 40 Flammable Storage 1 60 60

17 2,960 NSF (3,256 GSF)

WAREHOUSE AREA

Receiving / Issue Room 1 900 900 Equipment Prep / Staging Storage Room 1 500 500 Bulk Items Storage Room 1 35675 35675 Unit Items Storage Room 1 780 780 Receiving Breakdown / Inspection Room 1 400 400 Clean Storage Room 1 1600 1600

6 39,855 NSF (43,841 GSF)

STAFF AND ADMINISTRATIVE AREA

Waiting 1 80 80 Female Staff Toilet 3 60 180 Male Staff Toilet 3 60 180 Housekeeping Aides Closet (HAC) 4 60 240 Telecommunications Room (TR), 2 130 260 Staff Training Room 1 545 545 Office 9 100 900 Administration Support Workstation 75 56 4200 Female Staff Locker Room 1 100 100 Male Staff Locker Room 1 100 100 Staff Breakroom 2 120 240

Copy / Supply Room 1 100 100 Net Square Feet (NSF) Total 55,100 NSF

Net Usable Square Footage (NUSF) Total 60,610 NUSF

Rentable Square Feet (RSF) 81,824 RSF

General Considerations Provide direct controlled access from the Loading Dock Area to the Warehouse Area.

Minimum internal corridor clear width shall be 8’-0”; and minimum clear door width shall be 48” for single leaf door or 72” for double leaf to allow for adequate pallet and material handling equipment access. Provide minimum clearance of 30’-0” from finished floor level to the underside of the structural element or building system (plumbing, HVAC, etc.) in Bulk Storage areas. Provide a minimum clearance of 10’-0” from finished floor level to underside of the structural element, building system (plumbing, HVAC, etc.) or finished ceiling in the Unit Items Storage.

Locate Staff and Administrative Area in an adjacent and easily accessible section from the Loading Dock and Warehouse Area.

Room Specifics Clean/Sterile Supply, Breakout Rooms, And Bulk Storage/Warehouse:

Expendable supply storage locations are required to meet specific environmental criteria as outlined in the VA HVAC Design Manual. These criteria encompass pressure, temperature, humidity, and other HVAC parameters. The standards for clean/sterile supply areas, breakout rooms, and bulk storage or warehouse spaces include maintaining positive air flow, humidity levels between 20% and 60%, and temperatures ranging from 66 to 75 degrees Fahrenheit.

Finish Schedule The Lessor or Lessor’s designer to reference the Program for Design (PFD) (attachment D), DG, LDN and RDM required for finishes, STC ratings, ceiling heights, door size and type, hardware sets, HVAC space ventilation, number of electrical receptacles, lighting controls and fixture types, and number of standard density work area outlets for each room type.

Lessor to schedule re-carpeting and re-painting of the facility as requested by VA during the duration of the lease.

Manufacturer’s trade names and numbers used herein are only to identify colors, finishes, textures and patterns. Products of other manufacturers that meet equal or better requirements of the technical specifications will be acceptable upon approval in writing by the contracting officer for finish requirements.

The items below are specific to the administrative area in addition to the room data matrix where required:

https://vatilms.va.gov/vatilms/criteria-viewer/93686?type=application%2Fpdf&title=HVAC&name=dmHVAC-2025-09.pdf

Window Coverings:

• Provide roller shades, MechoShade or approved equal, for all exterior windows.

Blackout shades shall be provided for windows within Conference Rooms, Classrooms, or other Multipurpose Rooms for presentations.

• Type: manual, single roller except at locations with blackout shades where double rollers are required.

• Shade Cloth: ThermoVeil.

Acoustic Ceiling Tile:

• Noise Reduction Coefficient (NRC): ASTM C423, minimum 0.55 unless specified otherwise.

• Ceiling Attenuation Class (CAC): ASTM E413, 40-44 range unless specified otherwise.

• Light Reflectance (LR): minimum 0.75.

• Fire Performance: ASTM E119, Class A.

• Metal suspension system: ASTM C635, exposed grid, heavy duty, 15/16”; caulk wall to grid intersection in color to match grid.

• Tile: lay-in, 2’x2’, white.

Pattern Assumptions:

• Assume two accent paint walls per room.

• Assume 15% accent tile in all tile locations.

• Assume 25% accent floor patterns.

Building Entrances and Exits Public doors shall be capable of being remotely locked and unlocked from the reception desk in the main lobby. Secondary public entrance doors shall prevent unauthorized access.

Means of egress doors that do not function as entrances shall be provided with delayed action and alarmed emergency egress hardware. Means of egress shall not be obstructed by the installation of security devices such as guard stations, screening equipment, or other security devices. The main public entrance to the leased space shall contain an Automatic Door Operator (ADO) on each door leading from the building exterior into the main waiting/reception area.

Partitions Internal walls / partitions in areas where material is stored or distributed shall be constructed of concrete masonry units or similar impact resistant construction to minimize damage from material handling equipment. Wall protection including wall and corner guards shall be provided in high traffic areas. Extend walls to the structure above where a secure area is required. Metal cage material may also be specified for secure areas.

Sound protection must comply with the STC provided ratings shown on room criteria.

Wall details must be submitted for review by VA for STC rating compliance.

Provide fire and/or smoke rated partitions that comply with published UL, FM Global, or IBC designs. Extend all layers of gypsum board, on both sides of studs, from floor to underside of structure above on the following partitions:

1) Fire rated partitions

2) Smoke barriers

3) Sound rated partitions

4) Corridor partitions as required by building code.

Flooring Floor surface shall be smooth and level to facilitate movement of materials using hand powered and automated material handling equipment. Floor finishes in the Warehouse Area shall be selected based on an analysis of the static and live loads expected. Sealed concrete finishes shall be used on the loading docks, Receiving and Issue, Flammable Storage, and Gas Cylinder Storage. Epoxy based flooring finish shall be used in all warehouse storage areas. Consider the use of colored flooring to identify high traffic areas from static storage areas in the warehouse to alert staff of potential hazards associated with the movement of materials. In Unit Items Storage, seamless and non-wax flooring with an integral cove base shall be specified. Flooring in staff areas; offices, workstations, conference, and other support areas shall be per the room data matrix (RDM).

Ceilings Warehouse areas typically do not require a ceiling and are open to the structure above.

Clean / Unit Storage shall be provided with a suspended ceiling system with a non-porous surface that is easily cleanable. Staff and Administrative areas as well as support spaces shall comply with the room data matrix (RDM).

Doors and Hardware Contractor to provide a keying system which matches the existing system currently in use at the main facility campus. Cores to be built by the contractor to VA requirements and turned over to the VA for install. All locksets shall be mortise type where required by VA design and security criteria.

Use door closers only where required by code and/or VA criteria, unless noted otherwise.

For future flexibility for storage rooms, all storage rooms shall be equipped with door closers. Door closers should not be allowed to stay open in the door’s fully open position.

Provide door protection, vision panels, and hand-free power operated mechanisms on doors in high traffic / high transaction areas.

Provide card reader system for the entrances to the facility. Locations to be determined during design. System shall be compatible with the existing facility’s system, Identiv uTrust TS Scramblepad HF/LF Terminal PoE Wiegand Reader. Provide all cabinets, power supplies, door contacts, and other hardware and software associated with this system.

Plumbing Fixtures, Trim, and Equipment Lessor shall provide Plumbing systems in accordance with LDN and RDM. Utilize and incorporate the latest edition of VA Plumbing Design Manual as needed.

The items below are in addition to the LDN and RDM where required:

Water closets, urinals, sinks and lavatories shall be vitreous China. Waterless urinals are not permitted. Service sinks (mop sink/basin) shall be floor mounted.

Faucets and showerheads shall be chromed brass, or stainless steel; plastic trim is not permitted. Faucets shall be laminar flow; aerators are not permitted. Electronic hands-free controls shall be provided at all hand-washing sinks and lavatories.

Provide high/low drinking fountain and a standalone water bottle filler. Drinking fountain must be wall-hung, self-contained, electric wheelchair accessible. Hot water re-circulation pump shall be all bronze, with timer-based controls.

Legionella Mitigation There are currently no EPA enforceable regulations governing the levels of Legionella bacteria in potable water systems; however, EPA has issued a Maximum Contaminant Level Goal (MCLG) of 0 ppm [mg/L]. Municipal water supplies and wells can carry Legionella, so it is a given that the bacteria will be introduced into the facility potable water system at some time. The A/E will consider the following design recommendations:

Provide means to easily remove and disinfect all outlet devices such as showerheads and faucets, etc. Utilize self-draining showerheads.

1) Provide a 3⁄4" ball valve at the end of each piping section as a means to drain heated (above 140 °F [60 C̊]) flushing hot water that will be used for initial and supplemental disinfection. Ball valve shall be within 50 feet [15.24 meters] of a floor sink, floor drain, sink, or lavatory.

2) Mix hot/cold water as near the showerhead and faucets as possible.

Eliminate all dead legs in the piping system.

3) Subsequent to piping disinfection required per IPC, and as part of the commissioning process, disinfect the potable water systems against Legionella by one of the following methods:

• Thermal Eradication: Flush 145°F water through all outlets for a period of at least 30 minutes.

• Chlorine: Flush free chlorine at a level of 2 parts per million (PPM) or greater for a period of at least 2 hours. Further information can be found in ASHRAE paper CH-03-3-2.

https://www.cfm.va.gov/til/dManual/dmPlbg.pdf

Fire Extinguishers Portable fire extinguishers recessed in cabinets shall be provided, inspected, and maintained by the Lessor in accordance with National Fire Protection Association (NFPA) 10, Standard for Portable Fire Extinguishers.

Recessed cabinets shall be provided in occupied areas and conspicuously marked. Size fire extinguisher cabinets to accommodate a 2.5 gallon [9.5 liters] pressurized water extinguisher.

Lessor shall adhere to recurring fire extinguisher inspections in accordance with the following:

NFPA 10 7.2.1.2 Portable fire extinguishers should be inspected at least monthly, not exceeding 31 days, and more frequently if circumstances dictate. This includes a check for damage, obstructions, proper mounting, pressure gauge readings, and the presence of safety seals.

https://studylib.net/doc/27492016/nfpa-10-2022

Electrical, Lighting and Mechanical Lessor shall provide Electrical and Lighting systems in accordance with the LDN and RDM. Utilize and incorporate the latest edition of VA Electrical Design Manual and VA Lighting Design Manual as needed.

The items below are in addition to the LDN and RDM where required:

General Perform all lighting calculations based on illumination criteria per the IES Lighting Handbook, latest edition. Calculations shall include room name, room number, fixture type chosen for the room, number and type of lamps to be used in the room, required illumination level, calculated illumination level, and all assumptions used.

Raceways and Receptacles Electrical distribution components shall have copper bussing. Each panelboard shall contain 25% spare breakers. 100% emergency power with AST for all mission critical sections or can be a standby power system when serving non-health care related loads.

• Install all wiring in raceways. All wiring shall be copper. All circuits and branch circuits shall have a separate equipment grounding conductor of appropriate size per the NEC.

• No more than 3 branch circuits are allowed to run in one homerun.

• No more than 6 receptacles shall be installed on a single circuit. All receptacles shall comply with NEMA, NFPA, and UL. Duplex Receptacles shall be hospital-grade, single phase, 20 ampere, 120 volts, 2-pole, 3-wire, NEMA 5-20R, with break-off feature for two-circuit operation.

• Lessor shall provide two duplex (QUAD) outlets and adequate data drops for each computer workstation and central printer locations.

• Ground Fault Circuit Interrupter (GFCI) Duplex Receptacles shall be provided at locations within three feet of a water source such as a sink and provided at all outdoor locations. GFCI's shall be an integral unit, hospital-grade, suitable for mounting in a standard outlet box, with end-of-life indication and provisions to isolate the face due to improper wiring.

• Interior wall plates for receptacles shall be type-302 stainless steel. Outdoor receptacles shall be weatherproof.

• Medical Gas Storage and Flammable Storage shall not have receptacles.

• Provide power for charging forklifts and other equipment.

Lighting Fixtures Select fixtures and light sources with long operating lives; which utilize controlling elements (lenses, louvers, reflectors, etc.) designed to provide the best utilization of emitted light at the task location; that are appropriate for the ambient temperature; and that are not prone to dirt accumulation. In high ceiling areas, locate fixtures for maintenance access or provide access for maintenance equipment.

https://www.cfm.va.gov/til/dManual/dmElec-2025-03.pdf https://vatilms.va.gov/vatilms/criteria-viewer/90711?type=application%2Fpdf&title=Lighting%20Design&name=dmLighting-2022-01.pdf https://vatilms.va.gov/vatilms/criteria-viewer/90711?type=application%2Fpdf&title=Lighting%20Design&name=dmLighting-2022-01.pdf

Exterior lighting shall comply with energy requirements and should comply with Dark Sky principles. When required by VA, exterior lighting designs are to meet the requirements of local outdoor lighting codes. Criteria recommended in the IESNA Guideline for Security Lighting for People, Property, and Public Spaces (latest edition) shall govern the lighting design. Exterior lighting shall be coordinated with physical security, SSTV, and landscaping requirements.

Audio Visual Systems All conference rooms which have monitors and or TV’s shall have one data drop, 120 VAC duplex port and TV monitor supports. All waiting rooms and staff lounge shall have power and data port for television service connections installed.

Warehouse Cooling The lessor is responsible for installing a centralized cooling system in the warehouse.

This system is necessary to maintain a comfortable environment for staff and to ensure items in storage are preserved under optimal conditions.

Evaporative cooling methods are not permitted. Only centralized HVAC systems are acceptable to meet the facility's cooling needs.

The HVAC system must be zoned and divided into distinct sections within the warehouse. Each zone must have its own dedicated thermostat and adjustable airflow rates. These controls must be tailored to the occupancy and activity levels in each section, optimizing comfort and efficiency.

For further details and specifications, refer to the LDN for additional information.

ADMINISTRATIVE REQUIREMENTS

The lessor shall have an onsite building superintendent or a locally designated representative available to promptly respond to deficiencies and immediately address all emergency situations.

Pest Control Lessor shall coordinate application of pesticide and only apply pesticide in a manner that VA agrees is protective of the health of employees, and visitors. The Lessor shall provide additional service at the request of VA, if any signs of re-infestation appear.

• Control pests as appropriate, using Integrated Pest Management techniques, as specified in the GSA Environmental Management Integrated Pest Management Technique Guide (E402-1001).

• Provide interior and exterior extermination of insects and rodents. Use of chemicals shall conform to EPA and State requirements.

• Pest management is to be done using an integrated pest management approach that minimizes the use of toxic chemicals. Pesticide shall only be applied by persons deemed qualified by EPA and state requirements.

Frequency of Building Maintenance Lessor shall develop a written maintenance plan with VA that identifies routine maintenance for lighting, mechanical, emergency and exit lights, fire extinguishers and all building service equipment, including replacing filters at appropriate frequencies.

The Lessor shall also perform other work as necessary to meet code or to maintain a safe and healthy environment. The lessor shall address any other issues that may arise on an as-needed basis.

Janitorial Service A. The Lessor shall provide janitorial services for the leased space, public areas, entrances, and all other common areas and shall provide replacement of supplies. The janitorial services shall be provided during normal business hours.

B. The Lessor shall make careful selection of janitorial cleaning products and equipment to:

1) Use products that are packaged ecologically.

2) Use products and equipment considered environmentally beneficial and/or recycled products that are phosphate-free, non-corrosive, non-flammable, and fully biodegradable; and,

3) Minimize the use of harsh chemicals and the release of irritating fumes.

4) Examples of acceptable products may be found at www.gsa.gov/p2products.

http://www.gsa.gov/p2products

C. In addition to the janitorial services listed on the lease document, replace worn floor coverings (this includes the moving and returning of furnishings) as required.

Waste Management The VA has established specific waste management requirements for the facility. These requirements include the installation of a 30-yard self-contained compactor, two 40-yard dumpsters, and one city dumpster. The VA will be responsible for providing and managing the waste management contract, as well as procuring both the compactor and the dumpsters.

Lessor Responsibilities for Compactor Installation The lessor is required to provide a solid concrete base foundation for the self-contained 30-yard compactor. The foundation must be at least 6 inches thick and have a minimum strength of 3,000 PSI. It is essential that the concrete base is level and preferably flush with the surrounding area and shall have a minimum flatness and levelness of FF=45 and FL=35. Additionally, the base must be capable of being drilled into to allow anchoring of the compactor as needed.

A minimum of 45 feet of clear approach is necessary at the end of the concrete pad to facilitate access and operation. The site must be free from any overhead obstructions, with a minimum height clearance of 30 feet required. Furthermore, the installation must include a dedicated three-phase power supply at 480V, equipped with a lockable disconnect that is within sight of the compactor unit.

SIGNAGE REQUIREMENTS

VA Mandatory Signage is to be used at all VA properties. Additionally, leased properties must follow local lessor guidelines and city and state signage codes, laws, ordinances, and permitting regulations in which they are located.

Lessors A/E shall develop and submit a signage plan for review and approval by the Contracting Officer Representative (COR) during design development.

Interior signage systems shall include identification, directional, informational, and code required signage. The Lessor shall list during design the type, message, and locations in accordance with VA Signage Design Manual.

Lessor shall purchase and install all interior signs during construction and/or activation per the VA approved design.

Signage to be provided and installed by lessor:

• All life safety and code required signage to comply with local regulatory requirements.

• All room and wayfinding signage required by the final approved floor plan.

• Hardware and installation for the Emergency Exit Plan signage. Inserts to be provided and installed by the VA.

• For all parking to be utilized by the VA as a result of the lease, provide appropriate parking lot signage per VA Signage Design Guide Section 6; PL-12.03 parking stall designation.

• If lease includes stairwells and elevators within the leased space, provide appropriate signage per VA Signage Design Guide Section 8.

• Refer to VA Signage Design Guide Section 1 Design Elements for relevant specifications for typography, letter spacing, contrast, colors, images, and other design elements to be incorporated into all signage provided.

• Refer to VA Signage Design Guide Section 4 Exterior Signs, Section 8 Code and Life Safety Signs and Section 9 Interior Signs for planning guidelines, standard construction details and installation details.

• All message layouts and verbiages to be determined during design.

• Overall Signage Specifications:

o Font: Helvetica Bold.

o Interior Frames: Aluminum, flat surface with square corners.

o Background: Pantone 2965C.

o Cover: clear, non-glare acrylic.

Exterior Signs A complete exterior signage program to include identification, directional, informational, and regulatory signage. Exterior signage shall include all Mandatory VA signage such as no weapons signage at all VA entrances.

• Wall mounted building signs shall be prominently located to be visible from street approach in accordance with VA-approved building elevations.

• Exterior Sign Types:

o EI-09.01 Illuminated Letters and Logo

Location: minimum one exterior to be this sign type, internal halo-illuminated, fabricated metal dimensional letters and logo for facility identification.

o EN-05.01-03 Single Post Identification, Informational and Directional Sign Location: depending on project site.

Used to identify GOV reserved parking spaces, bike lockers/racks

(dependent on location), and other identified needs during the design process.

o EN-06.01-09 Wall Mounted signs Location: depending on project site.

Used to identify building numbers, separate entrances, specialty parking, bike lockers/racks, and other identified needs during the design process.

o PL-12.03 Single Post & Panel Parking Stall Designation Location: depending on parking location.

Used to: identify or control specific parking areas, spaces, or stalls.

o PL-12.04 Single Post & Panel Accessible Parking Stall Designation Location: at accessible parking stalls Used to: identify accessible parking stalls.

Interior Signs

• Interior Sign Types:

o IN-01.01.01 Emergency Exit Plan Location: as required for exiting; minimum at all decision points within the exit path (hallways); determined by final approved floor plan.

o IN-01.31 Fire Equipment Identification Sign

Location: use at all fire extinguishers.

o IN-04.01 Primary Room Identification with Insert

Location: refer to Program; most used sign type for individual rooms.

Workstations: provide similar/smaller type with acrylic hanger to go over cubicle walls identifying each workstation. Provide primary IN-

04.03 sign type for each room that has the individual workstations within.

o IN-04.02 Secondary Room Identification with Insert Location: use for building system rooms such as electrical or mechanical rooms.

o IN-07.01-.02 Room Sign with Indicator (In Use) and Paper Insert

Location: refer to Program.

o IN-08.01 No Smoking

Location: common areas including hallways, waiting, and vestibules;

determined by final approved floor plan layout.

o IN-08.02 Prohibit Instructional and Control Location: staff only area(s); determined by final approved floor plan.

o IN-09.01-.06 Restroom Identification Location: Restrooms; IN-09.03 is shown for all restrooms on the

Program; if separate Men and Women toilets are provided for the public toilets, use the appropriate sigs IN-09.01 and IN-09.02 respectively. As all restrooms are to be designed as handicap accessible, signs IN-09.04-.06 should not be used.

o IN-09.08 Pictogram and Symbol Location: Message Layout F sized to incorporate at bottom of IN-

09.01-.06 restroom identification sign for restrooms with baby changing stations.

o IN-11.01-.04 Informational or Instructional Location: refer to Program.

o IN-13.01 Perpendicular (Flag) Mount Location: use for wayfinding and to identify restrooms located in long hallways; determined by final approved floor plan layout.

o IN-14.06-.10 Wall Directional with Insert

Location: for wayfinding; at decision points in hallways; determined by final approved floor plan layout.

References All signage requirements are excerpts from the VA Signage and Wayfinding Design Guide latest edition, referenced within this document include:

01-Introduction, Acknowledgments & Design Elements

04-Exterior Signs

08-Code and Life Safety Signs

09-Interior Signs https://vatilms.va.gov/vatilms/criteria-viewer/97689?type=application%2Fpdf&title=Signage%20and%20Wayfinding&name=dmSignage-2026-03.pdf

Telecommunications Lessor shall provide architectural design services in accordance with the LDN, RDM and the following:

-VA Infrastructure Standard for Telecommunications Spaces

-VA Master Construction Specifications, Division 27 Communications

-VA Electrical Design Manual

Lessor shall coordinate with VA Communications point of contact (POC) for equipment and telecommunications room requirements.

General Requirements Each patch panel will be labeled as directed by the Contracting Officer or Contracting Officer’s Representative.

Data cables are not to pass within 6 inches of fluorescent lights, speakers, or motors mounted above the ceiling.

Intrusion Detection System: Provide connectivity for an intrusion detection system with control panels at each entrance to the space as well as other location designated by the Contracting Officer.

Telecommunications Room Requirements The items below are in addition to the LDN and RDM where required:

1. Automatic door closure installed.

2. Room Door Hinges will be “sealed” to prevent tampering and face room interior.

3. Room door should have a sign specifying “Authorized Personnel Only” https://www.cfm.va.gov/til/telecom/OIT-ISTS.pdf https://vatilms.va.gov/vatilms/reports/PG-18-1%20Master%20Construction%20Specifications/VA%20Specs https://www.cfm.va.gov/til/dManual/dmElec-2025-03.pdf

PHYSICAL SECURITY

Lessor shall be responsible for security monitoring, including duress alarms and intrusion detection. Fire and intrusion detection system monitored 24 hours per day which alarms at the closest Police and Fire Department.

Fire alarm system as required in VA leased space and shall be designed such that they are not affected by vacancies in adjacent spaces. Reference 3.1.1 Fire Alarm Systems of the lease for additional requirements.

Emergency power backup is required for all alarm systems, fire detection systems, entry control devices, lighting, etc., and special equipment. Alarms require immediate and uninterrupted power.

The Government reserves the right, prior to the submission of final revised proposals, to require additional security measures to meet specific tenant occupancy requirements, as may be determined by the Government’s building security assessment or any type of Government risk assessment evaluation of the proposed building, location, and tenant mix. Utilize and incorporate the latest edition of VA Physical Security and Resiliency Design Manual (PSDM) as needed. Refer section 5.9: Loading Dock and Service Entrances of the PSDM for additional requirements.

https://vatilms.va.gov/vatilms/criteria-viewer/93024?type=application%2Fpdf&title=Physical%20Security%20and%20Resiliency&name=dmPhySec-2025-06.pdf https://vatilms.va.gov/vatilms/criteria-viewer/93024?type=application%2Fpdf&title=Physical%20Security%20and%20Resiliency&name=dmPhySec-2025-06.pdf

ATTACHMENTS

Attachment A – VA Leased Design Narrative (LDN)

SECTION 1

INTRODUCTION

Section 1 - Page 1

1. INTRODUCTION

2. GENERAL REQUIREMENTS

2.1 General

2.2 Codes

2.3 Standards

2.4 References

2.5 Pricing Standards

3. PLANNING AND DESIGN CRITERIA

3.1 Room Data Matrix

4. TECHNICAL NARRATIVE

4.1 Site/Civil

4.1.1 Pedestrian, Vehicle Access & Circulation

4.1.2 Parking

4.1.3 Site Grading

4.2 Architecture

4.2.1 General Criteria

4.2.2 Accommodations for Care of Patients of Size

4.2.3 Acoustics

4.2.4 Equipment/Accessories/Furnishings

4.2.5 Signage and Wayfinding

4.2.6 Critical Dimensions

4.2.7 Entry Canopies

4.2.8 Elevators

4.2.9 Slab Depressions and Thickened Slabs

4.2.10 Millwork

4.2.11 Joint Sealant Systems

4.2.12 Doors and Frames

4.2.13 Hardware

4.2.14 Pharmacy Dispensing Windows

4.2.15 Radiation Shielding

4.2.16 Radio Frequency Shielding and Magnetic Shielding

4.3 Interior Design

4.3.1 General Criteria

4.3.2 Acoustic Ceiling Tile

4.3.3 Concrete Floor Treatment

4.3.4 Fiberglass-Reinforced Panels

4.3.5 Painting

4.3.6 Wall Protection

4.3.7 Window Shades

4.3.8 Privacy Curtains / Screens

4.3.9 Flooring, Carpet

4.3.10 Special Architectural Conditions for Surgical and Endovascular Services

4.4 Mechanical

4.4.1 References

4.4.2 HVAC Design Basis

Section 1 - Page 2

4.4.3 Air Handling Units (AHUs)

4.4.4 Exhaust Systems

4.4.5 Cooling System

4.4.6 Humidification System

4.4.7 HVAC Piping Systems

4.4.8 Air Distribution and Duct Systems

4.4.9 HVAC Insulation Systems

4.4.10 Testing, Adjusting and Balancing

4.4.11 Automatic Temperature Control Systems

4.4.12 Temperature, Humidity and Pressure Monitoring

4.4.13 Special Conditions

4.5 Plumbing

4.5.1 References

4.5.2 Plumbing Design Basis

4.5.3 Medical Gases

4.5.4 Special Conditions

4.6 Electrical

4.6.1 Standby Generator

4.6.2 Special Conditions

4.7 Lighting

4.7.1 General

4.7.2 Indoor Lighting Specifics

4.7.3 Lighting Controls

4.7.4 LED Drivers

4.7.5 Special Conditions

4.8 Telecommunications

4.8.1 Scope of Work

4.8.2 Pathways

4.8.3 Spaces

4.8.4 Telecommunications Bonding and Grounding

4.8.5 Equipment Racks and Equipment Cabinets

4.8.6 Power Distribution Units and Uninterruptable Power Supplies

4.8.7 Telecommunications Infrastructure Plant

4.8.8 Special Systems

5. Hardware Groups and Modifiers

Section 1 - Page 3

SECTION 1 - INTRODUCTION

1.1 The purpose of this Leased Design Narrative is to consolidate the governing codes, standards, references, and guidelines in a document that provides performance-based standards for a VA leased warehouse.

1.2 This document, and the associated Room Data Matrix (RDM), provides performance-based standards for rooms/functions that are a part of the project’s Program for Design. If there are standards covered by this document, or room types in the RDM, that are not a part of a specific project’s Program for Design, those standards are considered not applicable to that specific project. However, standards added to the grey “additional requirements” boxes in this document are project specific and are applicable.

1.3 Commonly Used Acronyms and Definitions:

PFD Program for Design

Net square feet (NSF) listing of all spaces and rooms that are to be included in a construction project.

VA Veterans Affairs

VHA Veterans Health Administration

VISN Veterans Integrated Services Network

RDM Room Data Matrix

SECTION 2

GENERAL REQUIREMENTS

VA Leased Design Narrative

Section 2 - Page 1

SECTION 2 – GENERAL REQUIREMENTS

2.1 General

2.1.1 The codes and standards listed below indicate minimum performance requirements.

Minimum requirements or standards may be exceeded by site specific project design.

2.1.2 Compliance is required with applicable codes and standards throughout the process of design, construction, acceptance, and on-going maintenance of the facility.

2.1.3 Design and construction of the warehouse shall be in compliance with the requirements of the GSA Form L201WH Global Lease as well as the codes and standards listed below. This Leased Design Narrative covers construction materials and standards not fully addressed by the codes, standards, and references below.

2.2 Codes

2.2.1 All VA leased warehouse facilities are to conform to the most recent applicable codes, which include but is not limited to following:

2.2.1.1 State and local codes as required by the local Authority Having Jurisdiction

(AHJ).

2.2.1.2 National Fire Protection Association (NFPA), NFPA 101 Life Safety Code and those codes and standards referenced by NFPA 101. (NFPA 99 Health Care

Facilities Code, etc.)

2.2.1.3 NFPA 70B Standard for Electrical Equipment Maintenance, NFPA 70E

Workplace Electrical Safety, NFPA 75 Standard for the Fire Protection of

Information Technology.

2.2.1.4 Architectural Barriers Act Accessibility Standards (ABAAS), current edition.

2.2.1.5 International Building Code (IBC): The latest edition shall be used for structural, wind load and seismic design.

Additional Code information:

• Applicable to NFPA 99, the facility is considered Category (Insert determined category from risk assessment or insert table that shows different categories for different departments.)

2.3 Standards

2.3.1 All leased facilities are to conform to the following standards:

2.3.1.1 Facility Security Level (FSL) shall be as outlined in GSA Form L201WH Global

Lease.

2.3.1.2 Sustainability standards shall be as outlined in GSA Form L201WH Global Lease.

2.3.1.3 ASHRAE Standard 12, Minimizing the Risk of Legionellosis Associated with

Building Water Systems, current edition.

2.3.1.4 ASHRAE Standard 188, Legionellosis: Risk Management for Building Water

Systems, current edition.

2.3.1.5 ASHRAE Standard 62.1, Ventilation for Acceptable Indoor Air Quality, current edition (referred to as ASHRAE 62.1 herein)

Section 2 - Page 2

2.3.1.6 ANSI/ASHRAE/IES Standard 90.1-2019 -- Energy Standard for Buildings

Except Low-Rise Residential Buildings

2.3.1.7 Sheet Metal and Air Conditioning Contractors National Association (SMACNA)

Standard, HVAC Duct Construction Standards - Metal and Flexible.

2.3.1.8 Illuminating Engineering Society North America (IESNA) Handbook - latest edition

2.3.1.9 VA Signage Design Manual PG 18-12

2.3.1.10 VA HVAC Design Manual

2.4 References

2.4.1 The following guides, manuals, and other references developed by VA are for reference only:

2.4.1.1 VA Enterprise Facility IT Support Infrastructure Standard, most current.

2.5 Pricing Standards

2.5.1 Building Shell Definition

2.5.1.1 Building shell is the complete enveloping structure, the base building systems, the complete HVAC system, and the finished common areas (building common and floor common) of a building that adjoin the occupant areas.

2.5.1.2 Any demolition cost necessary shall be included in the building shell rental rate.

2.5.1.3 Third-party green building certification do not change what elements are considered part of building shell or tenant improvements. Instead, building elements may be required to have certain attributes, such as low volatile organic compound emissions.

2.5.1.4 Section 3 of the L201WH provides minimum requirements of the shell. Any further requirements identified in this LDN to items in Section 3 shall remain shell unless specifically designated as TI.

2.5.1.5 The following table shows the Shell requirements of the Base Building and the Occupant Areas.

Section 2 - Page 3

Base Building Occupant Areas

Base structure and building enclosure components

(windows with exterior finishes) and any required enhancements (canopies, progressive collapse, etc.)

are complete.

Broom-clean concrete floor slab, with a flat and level floor.

Base building electrical and plumbing systems (e.g., central fire alarm, chiller plant, cooling tower) are complete and functional.

Gypsum wallboard, spackled and prime painted, on exterior perimeter walls and tenant demising walls, without suite entry door.

Entire HVAC system is complete and functional. Conditioned space per the RDM.

All common areas, such as lobbies, elevators, fire egress corridors and stairwells, garages, and service areas are complete.

Suspended acoustical ceiling system including grid and lay-in tiles (or other building standard). Lighting luminaires should be installed in the ceiling grid for an open office plan at the rate of fixtures per 80

USF. Lighting controls with ambient lighting adjusted per daylight availability, occupancy, vacancy, or other building automation system signals.

Building common restrooms are complete and operational.

Tappable domestic water riser, service sanitary drain, sanitary vent, ready for extension to tenant demised areas.

All electrical power distribution panels and circuit breakers available in electrical closets, with capacities at 120/208 volt, 3- phase, 4-wire and 277/480 volt, 3-phase, 4-wire.

Any portion of a code required alternate power source

(emergency generator, Essential Electrical System, etc.), required to support building life safety requirements including but not limited to transfer switches and distribution.

Designated connection point to the central fire alarm system for extension to tenant demised areas.

All fire alarm devices necessary required by tenant layout and AHJ.

Fire suppression system ready for extension to tenant demised areas.

Sprinkler mains and distribution piping in a protection layout (open plan) with heads turned down, concealed with an escutcheon or trim plate, are installed.

Conduit pathways to distribution backboard within a demarcation room for connection to tenant telecommunications MCR or TR.

All security requirements designated as “Shell” in the

Facility Security Level (FSL) Appendix are complete.

Proposed and required exterior site (property) improvements required for VA’s use of the premises and local municipality required off-site improvements are complete.

Section 2 - Page 4

2.5.2 Tenant Improvement Definitions

2.5.2.1 TIs are the finishes and fixtures that typically take space from the shell condition to a finished, usable condition. The resulting space is complete and meets applicable building codes.

2.5.2.2 TIs are typically items in addition to the items listed in the table above.

2.5.2.3 Section 5 of the L201WH provides minimum requirements of the TI. Any further requirements identified in this LDN to items in Section 5 shall remain

TI unless specifically designated as Shell.

2.5.2.4 Typical Tenant Improvements include:

2.5.2.4.1 Electrical wiring, outlets, and horizontal conduit, including cable trays and hooks, within the demised premises. Telephone jacks, data, jacks, and horizontal conduit, including cable trays and hooks, within the demised premises.

2.5.2.4.2 Carpeting or other floor covering; raised access flooring.

2.5.2.4.3 Plumbing fixtures withing the demised premises and all distribution, drainage and vent piping connecting to the building core – except for common bathrooms.

2.5.2.4.4 Partitioning and wall finishes

2.5.2.4.5 Doors, sidelights, frames, and hardware.

2.5.2.4.6 Millwork

2.5.2.4.7 Window treatments

2.5.2.4.8 Adjustments or repositioning of fire sprinkler to avoid conflict with partitioning; additional sprinklers required by code to meet layout.

2.5.2.4.9 VA required signage on site, in the common areas and within the demised premises.

2.5.2.4.10 Additional lighting over the open office layout at a rate of fixtures per 80

USF.

2.6 CPM Schedule Requirements

CPM Schedules must include the following milestones.

2.6.1 Permits Received

2.6.2 Structure Complete (steel erection)

2.6.3 Dry-in (skin and windows)

2.6.4 Conditioned Space (HVAC equipment startup)

SECTION 3

PLANNING AND DESIGN CRITERIA

Section 3 - Page 1

SECTION 3 – PLANNING AND DESIGN CRITERIA

3.1. Room Data Matrix

3.1.1. A collection of typical rooms within leased space.. It lists the required finishes, STC ratings, ceiling heights, door size and type, hardware sets, HVAC space ventilation, number of electrical receptacles, lighting controls and fixture types, and number of standard density work area outlets for each room type.

3.1.2. The Lessor shall associate rooms listed on the program for design with the room data matrix by room name. Use department level room names and types when available, otherwise use general room/space for like room function.

3.1.3. FGI Equivalent for ASHRAE 170 – Where HVAC space ventilation requirements are omitted, ASHRAE 170 Tables 8-1 and 8-2 shall be followed. Column “FGI Equivalent for ASHRAE 170” lists the equivalent room name for use in the tables.

3.1.4. FGI Equivalent for Table 1.2-5 “Minimum Sound Isolation” - Where Column “STC” in the Room Data Matrix states “See FGI”, Column “FGI Equivalent for Table 1.2-5 Minimum Sound Isolation” lists the equivalent room name for use in FGI Table 1.2-5.

3.1.5. Additional Requirements in this LDN take precedence over the standard in the RDM.

SECTION 4

TECHNICAL NARRATIVE

Section 4 - Page 1

SECTION 4 – TECHNICAL NARRATIVE

4.1 Site/Civil

4.1.1 Pedestrian and Vehicle Access & Circulation

4.1.1.1 Minimum traffic lane width is 12 feet, and minimum sidewalk width is 4 feet. Curves for traffic lanes and radii at intersections must be adequately sized to prevent vehicles from encroaching on an opposing lane of traffic.

4.1.1.2 Primary pedestrian access and circulation paths shall comfortably accommodate two-way wheelchair traffic.

4.1.1.3 An accessible route must be provided from the public right-of-way abutting the site to the accessible building entrance.

4.1.1.4 For one way traffic lanes that are used as fire and emergency equipment access the minimum width shall be 20 feet.

4.1.1.5 Provide a service/loading area designed to accommodate truck (WB-62) maneuverability.

4.1.1.6 Service area shall accommodate vehicles that pick-up trash and recycled materials.

4.1.2 Physical Security

4.1.2.1 The physical security requirements are listed in the FSL Appendix as developed by the ISC process.

4.1.3 Parking

4.1.3.1 Parking lots with 90-degree stalls must have minimum parking stall dimensions of 9 feet by 18 feet, and a minimum drive aisle width of 24 feet. Angled parking must have one-way drive aisles with the same stall sizes as 90-degree parking. Angled parking drive aisle width must comply with a published design standard for a designated parking angle.

4.1.3.2 The total amount of accessible parking spaces provided shall be 6% of the total required spaces unless more is required by local code.

4.1.4 Roadway & Walkway Cross Slopes

4.1.4.1 Roads and walks should have a typical cross slope of 2% unless adequate surface drainage is provided by other slope conditions.

Additional Site/Civil Requirements:

4.2 Architecture

4.2.1 General Criteria

4.2.1.1 Refer to Appendix: Room Data Matrix for Door, Hardware and Acoustic requirements listed by Room Type.

4.2.2 Acoustics

4.2.2.1 Refer to the Room Data Matrix-Interior Construction for information.

4.2.3 Signage and Wayfinding

4.2.3.1 Refer to VA Signage Design Guide in Section 2.4 for signage standards and

Section 4 - Page 2 requirements.

4.2.4 Critical Dimensions

4.2.4.1 Refer to Room Data Matrix – Interior Construction for required ceiling heights by room type.

4.2.5 Slab Depressions and Thickened Slabs

4.2.5.1 At new construction, provide slab depression and thickened slabs as required to provide flush threshold installation for equipment requiring recessed installation or additional structure as recommended by equipment manufacturer. At these equipment locations, concrete slab levelness shall be level and true to meet vendor requirements and shall have a minimum flatness and levelness of FF=45 and

FL=35. At existing construction, provide ramp to meet ABAAS.

4.2.6 Millwork

4.2.6.1 Quality compliance to conform to Architectural Woodwork Institute (AWI) and

Woodwork Institute (WI) quality standards.

4.2.6.2 Wood Veneer Casework Construction: Combination of custom wood casework and countertops to conform to program and functional requirements. (Location: Lobby, Reception)

4.2.6.2.1 Construction: Flush overlay construction with concealed hinges. AWI custom grade.

4.2.6.3 Plastic Laminate Casework Construction: Custom plastic laminate casework to conform to program and functional requirements.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .