RLP 36C24925R0008- LaGrange CBOC.pdf

PDF 452 KB Posted

Attached to
X1AA--LaGrange CBOC
Solicitation number
36C24925R0008
Issued by

About this file

This is a VA Request for Lease Proposals (RLP) for a lease in LaGrange, Kentucky, solicitation number 36C24925R0008. The Department of Veterans Affairs seeks approximately 19,900 rentable square feet of contiguous office space with specific requirements, including zero structured parking and 130 surface parking spaces. The lease term will be 20 years, with 10 years firm, and the government can terminate with 180 days' notice.

Key proposal details include offers due by October 29, 2025, at 3:00 PM Central Time, with submission preferred via email to Angela.Bailey5@va.gov. The evaluation will be a best value tradeoff considering three factors: Technical Capability (most important), Past Performance, and Price. Technical Capability will be assessed on building design, offeror qualifications, and site quality. Offerors must provide comprehensive documentation, including financial resources, construction team qualifications, energy efficiency certifications, and compliance with various federal requirements such as seismic safety, environmental considerations, and historic preservation standards.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LESSOR______ GOVERNMENT______ VA FORM R100 (5/25)

VA REQUEST

FOR LEASE

PROPOSALS

NO.

36C24925R0008 LaGrange, KY.

Offers due by

10/29/2025

In order to be considered for award, offers conforming to the requirements of the RLP shall be received no later than 3:00pm Central Time on the date above. See “Receipt Of Lease Proposals” herein for additional information.

This Request for Lease Proposals ("RLP") sets forth instructions and requirements for proposals for a Lease described in the RLP documents. Proposals conforming to the RLP requirements will be evaluated in accordance with the Method of Award set forth herein to select an Offeror for award. The Government will award the Lease to the selected Offeror, subject to the conditions herein.

The information collection requirements contained in this Solicitation/Contract, that are not required by regulation, have been approved by the Office of Management and Budget pursuant to the Paperwork Reduction Act and assigned the OMB Control No. 3090-0086.

GLOBAL RLP

VA FORM R100 (5/25)

TABLE OF CONTENTS

GLOBAL RLP

SECTION 1 STATEMENT OF REQUIREMENTS

1.01 GENERAL INFORMATION (OCT 2023)

1.02 AMOUNT AND TYPE OF SPACE, LEASE TERM, AND OCCUPANCY DATE (OCT 2022)

1.03 AREA OF CONSIDERATION (OCT 2021)

1.04 UNIQUE REQUIREMENTS (OCT 2021)

1.05 NEIGHBORHOOD, PARKING, LOCATION AMENITIES, AND PUBLIC TRANSPORTATION (JAN 2025)

1.06 LIST OF RLP DOCUMENTS (OCT 2024)

1.07 AMENDMENTS TO THE RLP (JUN 2012)

1.08 LEASE DESCRIPTION (MAY 2025)

1.09 RELATIONSHIP OF RLP BUILDING MINIMUM REQUIREMENTS AND LEASE OBLIGATIONS (OCT 2016)

1.10 PRICING OF SECURITY REQUIREMENTS (OCT 2022)

1.11 SECURITY LEVEL DETERMINATION FOR FACILITY HOUSING OTHER FEDERAL TENANTS (APR 2011)

1.12 AUTHORIZED REPRESENTATIVES (OCT 2020)

1.13 INTENTIONALLY DELETED

1.14 NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE AND SMALL BUSINESS SIZE STANDARD (OCT 2023)

SECTION 2 ELIGIBILITY AND PREFERENCES FOR AWARD

2.01 EFFICIENCY OF LAYOUT (AUG 2011)

2.02 FLOODPLAINS (OCT 2022)

2.03 SEISMIC SAFETY – MODERATE SEISMICITY (MAY 2025)

2.04 INTENTIONALLY DELETED

2.05 ASBESTOS (MAY 2025)

2.06 ACCESSIBILITY (SEP 2013)

2.07 FIRE PROTECTION AND LIFE SAFETY (SEP 2013)

2.08 ENERGY INDEPENDENCE AND SECURITY ACT (MAY 2025)

2.09 ENVIRONMENTAL CONSIDERATIONS (SEP 2013)

2.10 DUE DILIGENCE AND NATIONAL ENVIRONMENTAL POLICY ACT REQUIREMENTS - RLP (OCT 2023)

2.11 NATIONAL HISTORIC PRESERVATION ACT REQUIREMENTS - RLP (OCT 2023)

SECTION 3 HOW TO OFFER

3.01 GENERAL INSTRUCTIONS (JUN 2012)

3.02 RECEIPT OF LEASE PROPOSALS (OCT 2024)

3.03 PRICING TERMS (OCT 2022)

3.04 BUDGET SCOREKEEPING; OPERATING LEASE TREATMENT (APR 2011)

3.05 INTENTIONALLY DELETED

3.06 ADDITIONAL SUBMITTALS (OCT 2024)

3.07 TENANT IMPROVEMENTS INCLUDED IN OFFER (OCT 2020)

3.08 INTENTIONALLY DELETED

3.09 INTENTIONALLY DELETED

3.10 HIGH-PERFORMANCE BUILDING RATING CERTIFICATION FOR TENANT INTERIORS (MAY 2025)

3.11 OPERATING COSTS REQUIREMENTS INCLUDED IN OFFER (JUN 2012)

3.12 INTENTIONALLY DELETED

SECTION 4 METHOD OF AWARD

4.01 NEGOTIATIONS (OCT 2023)

4.02 HUBZONE SMALL BUSINESS CONCERN PRICE PREFERENCE WAIVER (OCT 2023)

4.03 INTENTIONALLY DELETED

4.04 OTHER EVALUATION FACTORS (OCT 2023)

4.05 EVALUATION FACTOR DESCRIPTIONS (OCT 2023):

4.06 EVALUATION FACTOR DESCRIPTIONS (OCT 2023):

4.07 DOCUMENTATION REQUIREMENTS (OCT 2023)

4.08 PRESENT VALUE PRICE EVALUATION (OCT 2024)

4.09 AWARD (OCT 2024)

SECTION 5 ADDITIONAL TERMS AND CONDITIONS

5.01 INTENTIONALLY DELETED

5.02 QUESTION AND ANSWER PERIOD

RLP NO. 36C24925R0008, LESSOR______ GOVERNMENT______ VA FORM R100 (5/25)

REQUEST FOR LEASE

PROPOSALS NO.

36C24925R0008

September 22, 2025

GLOBAL RLP VA FORM R100

SECTION 1 STATEMENT OF REQUIREMENTS

1.01 GENERAL INFORMATION (OCT 2023)

A. This Request for Lease Proposals (RLP) sets forth instructions and requirements for proposals for a Lease described in the RLP documents.

The Government will evaluate proposals conforming to the RLP requirements in accordance with the Method of Award set forth below to select an Offeror for award. The Government will award the Lease to the selected Offeror, subject to the conditions below.

B. Included in the RLP documents is a lease template setting forth the lease term and other terms and conditions of the Lease contemplated by this RLP and a VA Proposal to Lease Space (VA Form 1364) on which Offeror shall submit its offered rent and other price data, together with required information and submissions. The Lease paragraph titled “Definitions and General Terms” shall apply to the terms of this RLP.

C. Do not attempt to complete the lease template. Upon selection for award, VA will transcribe the successful Offeror’s final offered rent and other price data included on the VA Form 1364 into the lease and transmit the completed Lease, including any appropriate attachments, to the successful Offeror for execution. Neither the RLP nor any other part of an Offeror’s proposal shall be part of the Lease except to the extent expressly incorporated therein. The Offeror should review the completed Lease for accuracy and consistency with his or her proposal, sign and date the first page, initial each subsequent page of the Lease, and return it to the Lease Contracting Officer (LCO).

D. The Offeror's executed Lease shall constitute a firm offer. No Lease shall be formed until the LCO executes the Lease and delivers a signed copy to the Offeror.

E. Offeror may not use Federal agency name(s) and/or acronym(s), e.g., VA, in the entity name that owns and/or leases the Space to VA.

1.02 AMOUNT AND TYPE OF SPACE, LEASE TERM, AND OCCUPANCY DATE (OCT 2022)

A. The Government is seeking a minimum 19,900 of American National Standards Institute/Building Owners and Managers Association

(ANSI/BOMA) Occupant Area (ABOA) square feet (SF) of contiguous space within the Area of Consideration set forth below. See Section 2 of the Lease for applicable ANSI/BOMA standards.

B. The Space shall be located in a modern quality Building of sound and substantial construction with a facade of stone, marble, brick, stainless steel, aluminum or other permanent materials in good condition and acceptable to the LCO. If not a new Building, the Space offered shall be in a Building that has undergone, or will complete by occupancy, modernization or adaptive reuse for the Space with modern conveniences.

C. The Government requires zero structured/inside parking spaces and 130 surface/outside parking spaces, reserved for the exclusive use of the

Government. These spaces must be secured and lit in accordance with the Security Requirements set forth in the Lease. Offeror shall include the cost of this parking as part of the rental consideration.

D. As part of the rental consideration, the Government may require use of part of the Building roof for the installation of antenna(s). If antenna space is required, specifications regarding the type of antenna(s) and mounting requirements are included in the agency requirements information provided with this RLP.

E.

The Government may provide vending machines within the Government's leased area under the provisions of the Randolph-Sheppard Act (20 USC 107 et. seq.). If the Government chooses to provide vending facilities, the Government will control the number, kind, and locations of vending facilities and will control and receive income from all automatic vending machines. Offeror shall provide necessary utilities and make related alterations. The cost of the improvements is part of Tenant Improvement (TI) costs. The Government will not compete with other facilities having exclusive rights in the Building. The Offeror shall advise the Government if such rights exist.

F. The lease term shall be 20 Years, 10 Years Firm, with Government termination rights, in whole or in parts, effective at any time after the Firm

Term of the Lease by providing not less than 180 days’ prior written notice.

G. The Lease Term Commencement Date will be upon acceptance of the Space.

RLP NO. 36C24925R0008, LESSOR______ GOVERNMENT______ VA FORM R100 (5/25)

1.03 AREA OF CONSIDERATION (OCT 2021)

The Government requests Space in an area bounded as follows:

North: Highway 146 South: Blakemoore LN /Moody LN/Elder Park Lane East: Latimer Ave/Hwy 712/Radcliff Rd/ Hwy 53 West: Highway 393

Buildings with Property boundary(ies) on the boundary streets are deemed to be within the delineated Area of Consideration.

1.04 UNIQUE REQUIREMENTS (OCT 2021)

The offered Building and/or Property must have the following features as a minimum requirement:

A. All requirements as referenced in the lease documents and the Agency Specific Requirements (Exhibit B)

1.05 NEIGHBORHOOD, PARKING, LOCATION AMENITIES, AND PUBLIC TRANSPORTATION (JAN 2025)

A. Neighborhood and Parking. Inside City Center: Space shall be located in a prime commercial office district with attractive, prestigious, and professional surroundings with a prevalence of modern design and/or tasteful rehabilitation in modern use. Streets and public sidewalks shall be well maintained. Parking facilities with an adequate availability of parking spaces open to the general public to accommodate employees and visitors shall be located within the immediate vicinity of the Building but generally not exceeding a walkable 2640 feet of the employee entrance of the offered Building as determined by the LCO. These parking facilities do not substitute for the required parking under Paragraph 1.02(C).

B. Neighborhood and Parking. Outside City Center: Space shall be located 1) in an office, research, technology, or business park that is modern in design with a campus-like atmosphere; or, 2) on an attractively landscaped site containing one or more modern office Buildings that are professional and prestigious in appearance with the surrounding development well maintained and in consonance with a professional image.

The parking-to-square-foot ratio available on-site shall at least meet current local code requirements, or, in the absence of a local code requirement, on-site parking shall be available at a ratio of one (1) space for every 428 RSF of Space.

C. Walkability and Amenities.

1. Employee and visitor entrances of the Building must be connected to public sidewalks by continuous, accessible sidewalks.

2. A variety of employee services, such as restaurants, retail shops, cleaners, and banks, shall be located within the immediate vicinity of the Building. The primary functional entrance of the Building shall be within safely accessible, walkable 2,640-foot distance of at least seven (7) instances of amenities, two of which must be inexpensive or moderately priced fast-food or eat-in restaurants. The remaining five (5) instances must fall within at least 2 of the Diverse Use Categories shown below:

Diverse Use Category Uses

Food Retail Supermarket, Other food store with produce Community-Serving Retail Clothing store or department store selling clothes, Convenience store, Farmer’s market, Hardware store, Pharmacy, Other retail Services Bank, Gym, Health club, Exercise studio, Hair care, Laundry, Dry cleaner, Restaurant, Café, Diner (excluding establishments with only drive-throughs), Family entertainment venue (e.g., theater, sports)

Civic and Community Facilities Adult or senior care (licensed), Childcare (licensed), Community or recreation center, Cultural arts facility (museum, performing arts), Educational facility (including K–12 school, university, adult education center, vocational school, community college), Government office that serves public on-site, Place of worship, Medical clinic or office that treats patients, Police or fire station, Post office, Public library, Public park, Social services center

To be considered, amenities must be accessible from the Building by continuous sidewalks, walkways, or pedestrian crosswalks. Amenities must be existing or the Offeror must demonstrate to the Government’s reasonable satisfaction that such amenities will exist by the Government’s required occupancy date.

D. INTENTIONALLY DELETED

1.06 LIST OF RLP DOCUMENTS (OCT 2024)

A. The following documents are attached to and included as part of this RLP package:

RLP NO. 36C24925R0008, LESSOR______ GOVERNMENT______ VA FORM R100 (5/25)

DOCUMENT NAME NO. OF PAGES EXHIBIT

Lease No. 36C24926L0004 44 A Agency’s Requirements 6 B Security Requirements for Level II 16 C VA 3516, Solicitation Provisions 7 D VA 3517B, General Clauses 23 E Proposal to Lease Space (VA Form 1364) 4 F Rent Chart For VA Form 1364 1 F1 Additional Instructions for VA Form 1364 1 F2 VA Form 1217, Lessor's Annual Cost Statement 3 G VA Form 12000 for Prelease Fire Protection and Life Safety Evaluation for an Office Building (Part A or Part B) (See Section 3 for applicable requirements)

7 H

Security Unit Price List 2 I Seismic Offer Forms 6 J DOL Wage Determination 11 K TICS- TENANT IMPROVEMENT COST SUMMARY Excel L FAR 52.204-24, Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment

4 M

PAST PERFORMANCE QUESTIONNAIRE 5 N

SMALL BUSINESS SUBCONTRACTING PLAN MODEL 18 0

PROGRAM FOR DESIGN 7 P

NOTES AND SAMPLE FLOOR PLAN 3 Q

B. INTENTIONALLY DELETED

1.07 AMENDMENTS TO THE RLP (JUN 2012)

This RLP may be amended by notice from the LCO. Amendments may modify the terms of this RLP, or the terms, conditions, and requirements of the Lease contemplated by the RLP.

1.08 LEASE DESCRIPTION (MAY 2025)

A. Offeror shall examine the Lease template included in the RLP documents to understand the Government's and the Lessor's respective rights and responsibilities under the contemplated Lease.

B. The Lease contemplated by this RLP includes:

1. The term of the Lease, and renewal option, if any.

2. Terms and Conditions of the Lease, including Definitions, Standards, and Formulas applicable to the Lease and this RLP.

3. Building Shell standards and requirements.

4. Information concerning the tenant agency's buildout requirements.

5. Security Requirements.

6. A description of all services to be provided by the Lessor.

C. Should the Offeror be awarded the Lease, the terms of the Lease shall be binding upon the Lessor without regard to any statements contained in this RLP.

D.

The Lease contemplated by this RLP is a fully serviced, turnkey Lease with rent that covers all Lessor costs, including all shell upgrades, operating costs, real estate taxes, and security upgrades. Rent shall be based upon a proposed rental rate per Rentable Square Foot (RSF), limited by the offered rate and the maximum ABOA SF solicited under this RLP. The Tenant Improvements to be delivered by the Lessor shall be based upon information provided with this RLP and Lease, including Agency Specific Requirements (ASR). The Lessor shall design and build the TIs and will be compensated for the TI costs based upon turnkey pricing established under the Lease.

After award, the Lessor must prepare Design Intent Drawings (DIDs) for the leased Space conforming to the Agency Specific Requirements.

The Government will have the opportunity to review the Lessor's DIDs to determine that the Lessor's design meets the requirements of the Lease. Only after the Government approves the DIDs will the Lessor be released to proceed with buildout. The Lease also provides that the Government may modify the TI requirements, subject to the Lessor's right to receive compensation for such changes.

E. The security pricing process is described in a separate paragraph.

F. Upon completion and acceptance of the leased Space, the Space will be measured for establishing the actual annual rent, and the lease term shall commence. In instances involving an incumbent Lessor where the Government commences the lease term pending completion of TI , the Government shall withhold TI pursuant to Section 1 of the Lease until such time as the TI is completed and accepted by the Government.

RLP NO. 36C24925R0008, LESSOR______ GOVERNMENT______ VA FORM R100 (5/25)

G. Offerors are advised that doing business with the Government carries special responsibilities with respect to sustainability, fire protection and life safety, and security, as well as other requirements not typically found in private commercial leases. These are set forth both in the lease template and in the VA 3517B, General Clauses, and will be made part of the Lease.

1.09 RELATIONSHIP OF RLP BUILDING MINIMUM REQUIREMENTS AND LEASE OBLIGATIONS (OCT 2016)

The Lease establishes various requirements relating to the Building shell. Such requirements are not deemed TIs. There are certain Building requirements that are established as minimum requirements in this RLP. If the Lessor's Building does not meet the requirements at the time of award, the Lessor may still be awarded the Lease. However, as a condition of award, the Government will require Lessor to identify those Building improvements that will bring the Building into compliance with RLP requirements. Upon award of the Lease, completion of those Building improvements will become Lease obligations.

1.10 PRICING OF SECURITY REQUIREMENTS (OCT 2022)

A. The proposed Lease contains an attachment with the security requirements and obligations for the Building, which are based on the facility security level (FSL). The Federal Government determines the facility’s FSL rating, which ranges from FSL I to FSL IV. The FSL is based on client agency mix, required size of space, number of employees, use of the space, location, configuration of the site and lot, and public access into and around the facility.

B. The security requirements attached to this Lease includes a list of security countermeasures that must be installed in the leased Space. The

Offeror shall use the Security Unit Price List to provide the Government with itemized costs of these security countermeasures.

C. There shall be no charge to the Government for any items that already exist in the offered Building or facility.

1.11 SECURITY LEVEL DETERMINATION FOR FACILITY HOUSING OTHER FEDERAL TENANTS (APR 2011)

If an Offeror is offering Space in a facility currently housing a Federal agency, the security requirements of the facility may be increased and the Offeror may be required to adhere to a higher security standard than other Offerors competing for the same space requirement. If two or more Federal space requirements are being competed at the same time, an Offeror submitting on both or more space requirements may be subject to a higher security standard if the Offeror is determined to be the successful Offeror on more than one space requirement. It is incumbent upon the Offeror to prepare the Offeror’s proposal accordingly.

1.12 AUTHORIZED REPRESENTATIVES (OCT 2020)

With respect to all matters relating to this RLP, only the Government's LCO designated below shall have the authority to amend the RLP and award a Lease. The Government shall have the right to substitute its LCO by notice, without an express delegation by the prior LCO.

Lease LCO:

Hollie Dickey 1639 Medical Center Parkway 615-225-3427 Hollie.Dickey@va.gov

As to all other matters, Offerors may contact the Alternate Government Contact designated below.

Alternate Government Contact:

Angela Bailey 1639 Medical Center Parkway 615-225-3407

Angela.Biley5@va.gov

1.13 INTENTIONALLY DELETED

1.14 NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE AND SMALL BUSINESS SIZE STANDARD (OCT 2023)

A. The North American Industry Classification System (NAICS) code for this acquisition is 531120 (Exception).

B. The small business size standard for the applicable NAICS code is found HTTPS://WWW.SBA.GOV/SIZE-STANDARDS/.

https://www.sba.gov/size-standards/

RLP NO. 36C24925R0008, LESSOR______ GOVERNMENT______ VA FORM R100 (5/25)

SECTION 2 ELIGIBILITY AND PREFERENCES FOR AWARD

2.01 EFFICIENCY OF LAYOUT (AUG 2011)

A. In order to be acceptable for award, the offered Space must provide for an efficient layout as determined by the LCO.

B. To demonstrate potential for efficient layout, VA may request the Offeror to provide a test fit layout at the Offeror’s expense. The Government will advise the Offeror if the test fit layout demonstrates that the Government's requirement cannot be accommodated within the Space offered.

The Offeror will have the option of increasing the ABOA square footage offered, if it does not exceed the maximum ABOA square footage in this RLP offer package. If the Offeror is already providing the maximum ABOA square footage and cannot house the Government's space requirements efficiently, then the Government will advise the Offeror that the offer is unacceptable.

2.02 FLOODPLAINS (OCT 2022)

A Lease will not be awarded for any offered Property located within a 1-percent-annual-chance floodplain (formerly referred to as 100-year floodplain) unless the Government has determined that there is no practicable alternative. An Offeror may offer less than its entire site in order to exclude a portion of the site that falls within a floodplain, so long as the portion offered meets all the requirements of this RLP and does not impact the Government’s full use and enjoyment of the Premises. If an Offeror intends that the offered Property that will become the Premises for purposes of this Lease will be something other than the entire site as recorded in tax or other property records the Offeror shall clearly demarcate the offered Property on its site plan/map submissions and shall propose an adjustment to property taxes on an appropriate pro rata basis. For such an offer, the Government may determine that the offered Property does not adequately avoid development in a 1-percent-annual-chance floodplain.

In addition, a Lease will not be awarded for any offered Property adjacent to a 1-percent-annual-chance floodplain, where such an adjacency would, as determined by the Government, restrict ingress or egress to the Premises in the event of a flood, unless there is no practicable alternative.

2.03 SEISMIC SAFETY – MODERATE SEISMICITY (MAY 2025)

In accordance with the Earthquake Hazards Reduction Act of 1977, the following apply:

A. The Government intends to award a Lease to an Offeror of a Building that is in compliance with the Seismic Standards. If an offer is received which is in compliance with the Seismic Standards and the other requirements of this RLP, then other offers which do not comply with the Seismic Standards will not be considered. If none of the offers is in compliance with the Seismic Standards, the LCO will make the award to the Offeror whose offer meets the other requirements of this RLP and provides the best value to the Government, taking into account price, seismic safety and any other evaluation factors specified in this RLP.

B. An offered Building will be considered to be in compliance with the Seismic Standards if it meets one of the following conditions:

1. The offer includes a representation that the Building will have less than 10,000 ABOA SF of Space leased to the Federal Government upon commencement of the lease term (Seismic Form D),

2. The offer includes a Seismic Certificate certifying that the Building is a Benchmark Building (Seismic Form A).

3. The offer includes a Seismic Certificate based on a Tier I Evaluation showing that the Building meets the Seismic Standards (Seismic

Form B). The submission must include the checklists and backup calculations from the Tier 1 Evaluation.

4. The offer includes a Seismic Certificate based on a Tier 2 or Tier 3 Evaluation showing that the Building complies with the Seismic

Standards (Seismic Form B). If the certificate is based on a Tier 2 or Tier 3 Evaluation, the data, working papers, calculations and reports from the evaluation must be made available to the Government.

5. The offer includes a commitment to retrofit the Building to satisfy all of the Basic Safety Objective requirements of ASCE/SEI 41 (Seismic

Form C, Part 1). If the Offeror proposes to retrofit the Building, the offer must include a Tier 1 report with all supporting documents, a narrative explaining the process and scope of retrofit, and a schedule for the seismic retrofit. The Offeror shall provide a construction schedule, concept design for the seismic upgrade, and supporting documents for the retrofit, including structural calculations, drawings, specifications, and geotechnical report to the Government for review and approval prior to award. The documentation must demonstrate the seismic retrofit will meet the seismic standards and be completed within the time frame required.

6. The offer includes a pre-award commitment to construct a new Building, using local building codes (Seismic Form C, Part 2).

C. The LCO may allow an Offeror to submit a Seismic Certificate after the deadline for final proposal revisions. However, the LCO is not obligated to delay award in order to enable an Offeror to submit a Seismic Certificate.

D. Definitions. For the purpose of this paragraph:

1. “ASCE/SEI 31” means the American Society of Civil Engineers standard, Seismic Evaluation of Existing Buildings. You can purchase ASCE/SEI from ASCE at (800) 548-2723 or by visiting HTTP://WWW.ASCE.ORG/PUBLICATIONS/.

http://www.asce.org/publications/

RLP NO. 36C24925R0008, LESSOR______ GOVERNMENT______ VA FORM R100 (5/25)

2. “ASCE/SEI 41” means American Society of Civil Engineers standard, Seismic Rehabilitation of Existing Buildings. You can purchase ASCE/SEI from ASCE at (800) 548-2723 or by visiting HTTP://WWW.ASCE.ORG/PUBLICATIONS/.

3. “Benchmark Building” means a building that was designed and built, or retrofitted, in accordance with the seismic provisions of the applicable codes specified in Section 1.3.1 of RP 8.

4. Engineer” means a professional engineer who is licensed in Civil or Structural Engineering and qualified in the structural design of buildings. They must be licensed in the state where the property is located.

5. “RP 8” means “Standards of Seismic Safety for Existing Federally Owned and Leased Buildings ICSSC Recommended Practice 8 (RP

8),” issued by the Interagency Committee on Seismic Safety in Construction as ICSSC RP 8 and the National Institute of Standards and Technology as NIST GCR 11-917-12. RP 8 can be obtained from HTTPS://WWW.NIST.GOV/PUBLICATIONS/.

6. “Seismic Certificate” means a certificate executed and stamped by an Engineer on the appropriate Certificate of Seismic Compliance form included with this RLP together with any required attachments.

7. “Seismic Standards” means the requirements of RP 8 Section 2.2 for Life Safety Performance Level in ASCE/SEI 31 or the Basic Safety

Objective in ASCE/SEI 41, unless otherwise specified.

8. “Tier 1 Evaluation” means an evaluation by an Engineer in accordance with Chapters 2.0 and 3.0 of ASCE/SEI 31. A Tier 1 Evaluation must include the appropriate Structural, Nonstructural and Geologic Site Hazards and Foundation Checklists.

9. “Tier 2 Evaluation” means an evaluation by an Engineer in accordance with Chapter 4.0 of ASCE/SEI 31.

10. “Tier 3 Evaluation” means an evaluation by an Engineer in accordance with Chapter 5.0 of ASCE/SEI 31.

2.04 INTENTIONALLY DELETED

2.05 ASBESTOS (MAY 2025)

A. The Government requires space with no asbestos-containing materials (ACM), or with undamaged, nonfriable ACM. For purposes of this paragraph, “space” includes the 1) space offered for lease; 2) common building area; 3) ventilation systems and zones serving the space offered;

and 4) the area above suspended ceilings and engineering space in the same ventilation zone as the space offered. Notwithstanding the preceding, if no offers are received for such space, the Government may consider space with thermal system insulation ACM (e.g., wrapped pipe or boiler lagging), which is not damaged or subject to damage by routine operations.

B. ACM is defined as any material with a trace or more of asbestos quantity present.

C. Space with ACM of any type or condition may be upgraded by the Offeror to meet conditions described in sub-paragraph A by abatement

(removal, enclosure, encapsulation, or repair) of ACM not meeting those conditions. If any offer involving abatement of ACM is accepted by the Government, the successful Offeror will be required to successfully complete the abatement in accordance with OSHA (29 CFR § 1910.1001, 29 CFR § 1926.1101), EPA (40 CFR Part 61 - National Emission Standards for Hazardous Air Pollutants and Part 763), state, and local regulations and guidance prior to occupancy.

D. Management Plan and Reinspection Report Submittals. If space is offered which contains ACM, the Offeror shall submit a current asbestos-related management plan or operations and maintenance plan, along with a current asbestos re-inspection report (performed within the past 5 years) that includes a list of all ACM and their condition for acceptance by the Government prior to lease award. The management plan or operations and maintenance plan, and re-inspection report shall conform to generally accepted industry practice in accordance with OSHA (29 CFR § 1910.1001, 29 CFR § 1926.1101), EPA (40 CFR Part 61 - National Emission Standards for Hazardous Air Pollutants and Part 763).

E. The Government reserves the right to review Offeror’s existing records for compliance.

2.06 ACCESSIBILITY (SEP 2013)

The Lease contemplated by this RLP contains requirements for Accessibility. In order to be eligible for award, Offeror must either:

A. Verify in the Lease proposal that the Building, offered Space, and areas serving the offered Space meet the Lease accessibility requirements, or

B. Include as a specific obligation in its Lease proposal that improvements to bring the Building, offered Space, and areas serving the offered

Space into compliance with Lease accessibility requirements will be completed prior to acceptance of the Space.

2.07 FIRE PROTECTION AND LIFE SAFETY (SEP 2013)

The Lease contemplated by this RLP contains Building requirements for Means of Egress, Automatic Fire Sprinkler System, and Fire Alarm System. In order to be eligible for award, Offeror must either:

http://www.asce.org/publications/ https://www.nist.gov/publications/standards-seismic-safety-existing-federally-owned-and-leased-buildings-icssc

RLP NO. 36C24925R0008, LESSOR______ GOVERNMENT______ VA FORM R100 (5/25)

A. Verify in the Lease proposal that the Building in which Space is offered meets the Means of Egress, Automatic Fire Sprinkler System, and Fire Alarm System requirements of the Lease; or

B. Include as a specific obligation in its Lease proposal that improvements to bring the Building into compliance with Lease requirements will be completed prior to acceptance of the Space.

2.08 ENERGY INDEPENDENCE AND SECURITY ACT (MAY 2025)

A. The Energy Independence and Security Act (EISA) establishes requirements for Government leases relating to energy efficiency standards and potential cost-effective energy efficiency and conservation improvements.

B. Subject to the exceptions below, unless one of the statutory exceptions listed in sub-paragraph C below applies, GSA may award a lease for a Building only if the Building has earned the ENERGY STAR® label conferred by the U.S. Environmental Protection Agency (EPA) within the most recent year prior to the due date for final proposal revisions. The term “most recent year” means that the date of award of the ENERGY STAR® label by EPA must not be more than 1 year prior to the due date of final proposal revisions. For example, an ENERGY STAR® label awarded by EPA on October 1, 2023, is valid for all lease procurements where final proposal revisions are due on or before September 30, 2024. Notwithstanding the above, buildings that meet any of the following are considered as equivalent to having an Energy Star label in the most recent year, provided they achieve an ENERGY STAR® label within 18 months after occupancy by the Government:

1. All new Buildings being specifically constructed for the Government, provided they achieve an ENERGY STAR® label within 18 months after occupancy by the Government, and received the “Designed to Earn the Energy Star®” certification prior to construction;

2. All existing Buildings that have had an Energy Star® label but are unable to obtain a label in the most recent year (i.e., within 12 months prior to the due date for final proposal revisions) because of insufficient occupancy;

3. Newly built Buildings that have used Energy® Star’s Target Finder tool and either achieved a “Designed to Earn the Energy Star®” certification or received an unofficial score (in strict adherence to Target Finder’s usage instructions, including the use of required energy modeling) of 75 or higher prior to the due date for final proposal revisions and who are unable to obtain a label in the most recent year because of insufficient occupancy; or

4. An existing Building that is unable to obtain a label because of insufficient occupancy but that can produce an indication, through the use of energy modeling or past utility and occupancy data input into Energy Star’s® Portfolio Manager tool or Target Finder, that it can receive an unofficial score of 75 or higher using all other requirements of Target Finder or Portfolio Manager, except for actual data from the most recent year.

C. Subject to subparagraph D below, EISA allows a Federal agency to lease Space in a Building that does not have an ENERGY STAR® Label if:

1. No Space is offered in a Building with an ENERGY STAR® Label that meets RLP requirements, including locational needs;

2. The agency will remain in a Building it currently occupies;

3. The Lease will be in a Building of historical, architectural, or cultural significance listed or eligible to be listed on the National Register of

Historic Places; or

4. The Lease is for 10,000 RSF or less.

D. If one or more of the statutory exceptions applies, and the offered Space is not in a Building that has earned the ENERGY STAR® Label within one year prior to the due date for final proposal revisions, Offerors are required to include in their lease proposal an agreement to renovate the Building for all energy efficiency and conservation improvements that it has determined would be cost effective over the Firm Term of the Lease, if any, prior to acceptance of the Space (or not later than one year after the Lease Award Date of a succeeding or superseding lease). Such improvements may consist of, but are not limited to, the following:

1. Heating, Ventilating, and Air Conditioning (HVAC) upgrades, including boilers, chillers, and Building Automation System (BAS)

/Monitoring/Control System (EMCS).

2. Lighting Improvements.

3. Building Envelope Modifications.

E. The term "cost effective" means an improvement that will result in substantial operational cost savings to the landlord by reducing electricity or fossil fuel consumption, water, or other utility costs. The term "operational cost savings" means a reduction in operational costs to the landlord through the application of Building improvements that achieve cost savings over the Firm Term of the Lease sufficient to pay the incremental additional costs of making the Building improvements.

RLP NO. 36C24925R0008, LESSOR______ GOVERNMENT______ VA FORM R100 (5/25)

F. Instructions for obtaining an ENERGY STAR® Label are provided at HTTP://WWW.ENERGYSTAR.GOV/BUILDINGS/FACILITY-OWNERS- AND-MANAGERS/EXISTING-BUILDINGS/EARN-RECOGNITION/ (use “Portfolio Manager” to apply). The ENERGY STAR® Building Upgrade Manual (HTTP://WWW.ENERGYSTAR.GOV/BUILDINGS/FACILITY-OWNERS-AND-MANAGERS/EXISTING-BUILDINGS/SAVE-ENERGY/) and Building Upgrade Value Calculator (HTTP://WWW.ENERGYSTAR.GOV/BUILDINGS/TOOLS-AND-RESOURCES/BUILDING-UPGRADE- VALUE-CALCULATOR) are tools which can be useful in considering energy efficiency and conservation improvements to Buildings.

G. If one or more of the statutory exceptions applies, and the offered Space is not in a Building that has earned the ENERGY STAR® Label within one year prior to the due date for final proposal revisions, the successful Offeror will be excused from performing any agreed-to energy efficiency and conservation renovations, and benchmarking with public disclosure (as provided in (I) below, if it obtains the ENERGY STAR® Label prior to the Government’s acceptance of the Space (or not later than one year after the Lease Award Date for succeeding and superseding leases).

H. If no improvements are proposed, the Offeror must demonstrate to the Government using the ENERGY STAR® Online Tools why no energy efficiency and conservation improvements are cost effective. If such explanation is unreasonable, the offer may be rejected.

I. As described in Section 3 of the Lease, successful Offerors meeting one of the statutory exceptions above must agree to benchmark and publicly disclose the Building’s current ENERGY STAR® score, using EPA’s Portfolio Manager online software application. See the Lease for additional details.

J. All new Buildings being specifically constructed for the Government must achieve the ENERGY STAR® Label within 18 months after occupancy by the Government.

K. As part of the cost effective upgrades specified under sub-paragraph D above, existing lighting systems must be upgraded to meet or exceed the stated lighting specifications in the Lease unless, with respect to upgrades otherwise in excess of the minimum stated requirements, Offeror can demonstrate, using the Building Upgrade Value Calculator discussed above, that such additional upgrades are not cost effective over the Firm Term of the Lease.

2.09 ENVIRONMENTAL CONSIDERATIONS (SEP 2013)

A. The Government requests space with no known hazardous conditions or recognized environmental conditions that would pose a health and safety risk or environmental liability to the Government.

B. Upon request by the Government, Offeror must provide all known previous use of the Building.

C. Offeror must indicate in its written offer any known hazardous conditions or environmental releases with/from the offered Space, Building or

Property.

2.10 DUE DILIGENCE AND NATIONAL ENVIRONMENTAL POLICY ACT REQUIREMENTS - RLP (OCT 2023)

A. Environmental Due Diligence.

1. At the direction of the LCO, the Offeror must provide, at the Offeror’s sole cost and expense, a current Phase I Environmental Site Assessment (ESA), using the American Society for Testing and Materials (ASTM) Standard E1527-21 and timeline, as such standard may be revised from time to time. In accordance with ASTM standards, the study must be performed by an environmental professional with qualifications that meet ASTM standards. This Phase I ESA must be prepared with a focus on the Government being the “user” of the Phase I, as the term “user” is defined in E1527-21. Failure to submit the required study may result in dismissal from consideration.

2. If the Phase I ESA identifies any recognized environmental conditions (RECs), the Offeror will be responsible for addressing such RECs, at its sole cost and expense, including performing any necessary Phase II ESA (using ASTM Standard E1903-11), performing any necessary cleanup actions in accordance with federal and state standards and requirements and submitting a proposed schedule for complying with these obligations. The Government will evaluate whether the nature of any of the RECs, the results of the Phase II, any completed cleanup, and the proposed schedule meet the Government’s needs.

B. National Environmental Policy Act.

1. While the Offeror is responsible for performing all environmental due diligence studies of the offered Property, the Government is responsible for compliance with NEPA, whether in whole or in part, on its own or with the assistance of the Offerors. NEPA requires federal agencies to consider the effects of their actions on the quality of the human environment as part of the federal decision-making process and, to that end, the Government’s obligations may, and in some cases will, be augmented by the Offerors as described in greater detail in the RLP.

2. The Government may either request information from the Offerors to help it meet its obligations under NEPA or share information provided in response to this provision with federal, state and local regulatory agencies as part of its compliance responsibilities under NEPA and other applicable federal, state and local environmental laws and regulations. Further consultation with these regulatory agencies may be necessary as part of the NEPA process.

3. The Offerors are advised that the Government may be required to release the location of each offered site and other building specific information in public hearings or in public NEPA documents. By submitting an offer in response to this RLP and without the need for any further documentation, the Offeror acknowledges and consents to such release.

http://www.energystar.gov/buildings/facility-owners-and-managers/existing-buildings/earn-recognition/energy-star-certification http://www.energystar.gov/buildings/facility-owners-and-managers/existing-buildings/earn-recognition/energy-star-certification http://www.energystar.gov/buildings/facility-owners-and-managers/existing-buildings/save-energy/comprehensive-approach/energy-star http://www.energystar.gov/buildings/tools-and-resources/building-upgrade-value-calculator http://www.energystar.gov/buildings/tools-and-resources/building-upgrade-value-calculator

RLP NO. 36C24925R0008, LESSOR______ GOVERNMENT______ VA FORM R100 (5/25)

4. The Government reserves the right to reject any offer where (i) the NEPA-related documentation provided by the Offeror for the offered

Property is inadequate, (ii) the offer entails unacceptably adverse impacts on the human environment, (iii) the identified adverse impacts cannot be readily mitigated, or (iv) the level of NEPA analysis is more extensive than is acceptable to the Government.

5. An Offeror must allow the Government access to the offered Property to conduct studies in furtherance of NEPA compliance. This requires research and field surveys to assess the potential impacts to the natural, social and cultural environments. Any recent studies previously conducted by the Offeror may be submitted to be included in the NEPA process.

6. The Government will not proceed with Lease award until the NEPA process is complete as evidenced by the Government’s issuance of a completed CATEX, EA or Environmental Impact Statement (EIS). Upon Lease award, any mitigation measures, whether optional or mandatory, identified and adopted by the Government will become Lease obligations. All costs and expenses for development of design alternatives, mitigation measures and review submittals for work to be performed under the Lease will be the sole responsibility of Lessor.

2.11 NATIONAL HISTORIC PRESERVATION ACT REQUIREMENTS - RLP (OCT 2023)

A. The Government is responsible for complying with section 106 of the National Historic Preservation Act of 1966, as amended, 54 U.S.C. §

306108 (Section 106). Section 106 requires federal agencies to consider the effects of their actions on historic properties prior to expending any federal funds on the undertaking. The Government is responsible for identifying whether any historic properties exist in, on, under, or near the offered Property that could be affected by the leasing action. Historic properties include both above-grade (i.e., buildings and historic districts) and below-grade (i.e., archeological sites) resources. The Government is responsible for assessing effects to identified historic properties and for consulting with the State Historic Preservation Officer (SHPO), the Tribal Historic Preservation Officer (THPO), if applicable, any local Historic Preservation or Landmarks Commission, and other interested parties, if applicable, in accordance with the implementing regulations set forth at 36 C.F.R. part 800 (Protection of Historic Properties).

B. An Offeror must allow the Government access to the offered Property to conduct studies in furtherance of the Section 106 compliance. This requires research and field surveys to assess the potential presence of historic properties that may be affected by construction activity, both above- and below-grade. Compliance also may require below-grade testing to determine the presence of archeological resources and possible artifact recovery, recordation and interpretation mitigation measures.

C. Demolition or destruction of a historic property by an Offeror in anticipation of an award of a Government lease may disqualify the Offeror from further consideration.

D. The Government reserves the right to reject any offer where documentation for the offered Property is inadequate or otherwise indicates preservation concerns or adverse effects to historic properties that cannot be minimized or reasonably mitigated, or where the level of NHPA analysis is more extensive than is acceptable to the Government.

E. If the Government determines that the leasing action could affect historic property, the Offeror of any Property that the Government determines could affect historic property will be required to retain, at its sole cost and expense, the services of a preservation architect who meets or exceeds the Secretary of the Interior’s Professional Qualifications Standards for Historic Architecture, as amended and annotated and previously published in the Code of Federal Regulations, 36 C.F.R. part 61, and the GSA’s Qualification Requirements for Preservation Architects and Other Specialists. These standards are available at: HTTPS://WWW.GSA.GOV/REAL-ESTATE/HISTORIC-PRESERVATION/HISTORIC- PRESERVATION-POLICY-TOOLS/. The preservation architect will be responsible for developing preservation design solutions and project documentation required for review by the Government, the SHPO, the THPO, if applicable, and other consulting parties in accordance with Section 106. For Tenant Improvements and other tenant-driven alterations within an existing historic building, the preservation architect must develop context-sensitive design options consistent with the Secretary of the Interior’s Standards for the Treatment of Historic Properties. Where new construction or exterior alterations, or both, are located within a historic district, may be visible from historic properties or may affect archeological resources, compliance may require tailoring the design of the improvements to be compatible with the surrounding area. Design review may require multiple revised submissions, depending on the complexity of the project and potential for adverse effects to historic properties, to respond to comments from the Government and the other consulting parties. Within GSA, the Regional Historic Preservation Officer is solely responsible for corresponding with the SHPO, the THPO, if applicable, and any other consulting party. All design costs and expenses relating to satisfying the requirements of this paragraph will be borne solely by the Offeror.

https://www.gsa.gov/real-estate/historic-preservation/historic-preservation-policy-tools/preservation-tools-resources/proof-of-competency-other-documentation https://www.gsa.gov/real-estate/historic-preservation/historic-preservation-policy-tools/preservation-tools-resources/proof-of-competency-other-documentation

RLP NO. 36C24925R0008, LESSOR______ GOVERNMENT______ VA FORM R100 (5/25)

SECTION 3 HOW TO OFFER

3.01 GENERAL INSTRUCTIONS (JUN 2012)

Offeror shall prepare a complete offer, using the forms provided with this RLP, and submit the completed lease proposal package to the Government as indicated below.

3.02 RECEIPT OF LEASE PROPOSALS (OCT 2024)

A.

Traditional method – Paper, E-mail.

1. Offeror is authorized to transmit its lease proposal as an attachment to an email. Offeror's email shall include the name, address and telephone number of the Offeror, and identify the name and title of the individual signing on behalf of the Offeror. Offeror's signed lease proposal must be saved in a generally accessible format (such as portable document format (pdf)), which displays a visible image of all original document signatures and must be transmitted as an attachment to the email. Only emails transmitted to, and received at, the VA email address identified in the RLP will be accepted. Offeror submitting a lease proposal by email shall retain in its possession, and make available upon VA's request, its original signed proposal. Offeror choosing not to submit its proposal via email may still submit its lease proposal by United States mail or other express delivery service of Offeror's choosing.

2. In order to be considered for award, offers conforming to the requirements of the RLP shall be received in one of the following ways:

a. No later than 3:00PM Central Time Zone on the date specified below at the following designated office and address:

Date: October 29, 2025

Office: Network Contracting Office NCO9, ATTN: Angela Bailey

Address: 1639 Medical Center Parkway, Ste 204

b. No later than 3:00PM Central Time Zone on the date specified below at the following email address:

Date:

October 29, 2025

Email Address: ANGELA.BAILEY5@VA.GOV

*** THE PREFERRED SUBMISSION METHOD IS BY EMAIL***

3. Offers sent by United States mail or hand delivered (including delivery by commercial carrier) shall be deemed late if delivered to the address of the office designated for receipt of offers after the date and time established for receipt of offers.

4. Offers transmitted through email shall be deemed late if received at the designated email address after the date and time established for receipt of offers unless it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one Working Day prior to the date specified for receipt of proposals.

5. Offers delivered through any means authorized by the RLP may be also deemed timely if there is acceptable evidence to establish that it was received at the Government installation designated for receipt of proposals and was under the Government’s control prior to the time set for receipt of proposals; or if it was the only proposal received.

B. There will be no public opening of offers, and all offers will be confidential until the Lease has been awarded. However, the Government may release proposals outside the Government such as to support contractors to assist in the evaluation of offers.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .