NASA MSL Project - Bid Sheet
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base
| BASE BID | |
| MSL | |
| GC Price Proposal Form |
| CONSTRUCTION | |||
| Spec Division | Spec Description | Price Proposal | |
| 01 | General Requirements/General Conditions | ||
| 02 | Existing Conditions | ||
| 03 | Concrete | ||
| 04 | Masonry | ||
| 05 | Metals | ||
| 06 | Wood, Plastics, & Composites | ||
| 07 | Thermal & Moisture Protection | ||
| 08 | Openings | ||
| 09 | Finishes | ||
| 10 | Specialties | ||
| 11 | Equipment | ||
| 12 | Furnishings | ||
| 13a | Special Construction | ||
| 13b | Drawings RQ & Spec 132754 (Allowance) | <-- WISE3R Allowance. Will provided as part of the amendment for the WISE3R. | |
| 14 | Conveying Equipment | Note that this work will be sole sourced and the allowance will cover the for the sole source. | |
| 21 | Fire Suppression | ||
| 22 | Plumbing | ||
| 23a | Heating, Ventilating, & Air Conditioning | ||
| 23b | Building Controls (Only) | ||
| 23c | Bldg Control Integration into Campus BAS (Only) | ||
| 26 | Electrical | ||
| 27 | Communications | ||
| 28 | Electronic Safety & Security | ||
| 31 | Earthwork | ||
| 32 | Exterior Improvements | ||
| 33 | Utilities | ||
| 43 | Process Gas | ||
| TOTAL BASE BID | $ - 0 | ||
| TOTAL OPTIONS (NET): | $ - 0 | ||
| TOTAL EVALUATED PRICE: | $ - 0 |
NAME SIGNATURE DATE
Options
| OPTIONS | |
| MSL | |
| OPTIONS as per Spec Section 012360 |
| Option # | Option Title | Days Option Open from Award Date | Overall DEDUCT Costs | Overall ADD Costs |
| Deduct Options | ||||
| 1 | Delete Cove Light Fixtures | 90 | ||
| 2 | Delete Terrazzo & Stair Tread | 90 | ||
| 3 | Delete Glass Marker Boards | 90 | ||
| 4 | Delete Vibration Points | 90 | ||
| 5 | Delete 10 VCC & Ductwork | 90 | ||
| 6 | Delete BIM Requirements | 90 | ||
| 7 | Delete COBie Requirements | 90 | ||
| 8 | Downgrade to LEED USGBC Silver Rating | 180 | ||
| 9 | Delete Clean Rooms | 240 | ||
| 10 | Remove BAS Integration Requirement | 90 |
Add Options
| 1 | Parking Lot | 240 |
| 2 | Cleanroom Capability | 90 |
| 3 | Telecom Cabling & Equipment | 240 |
| 4 | AV Cabling & Equipment | 240 |
| 5 | Security Cabling & Equipment | 240 |
| 6 | Provide Trane BAS system | 90 |
Sub-total: $ - 0 $ - 0
TOTAL OPTIONS BID (NET): $ - 0
VE Sheet
Value Engineering Suggestions
| MSL |
| GC Price Proposal Form |
Please list below any Value Engineering suggestions you would like to make to the Government.
The Value amounts you provide are for comparison purposes only and will NOT be used to adjust your bid. Any VE suggestions the Government wishes to pursue will be addressed after contract award as changes to the contract.
| VE Scope | Value ($) | |
| 1 | ||
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| 6 | ||