Text version
NASA Revitalization Project Measurement Systems Laboratory (MSL) Langley Research Center Hampton, Virginia
Design-Bid-Build Pre-Proposal Conference
U.S. General Services Administration
National Aeronautics and Space Administration
September 16, 2015
Agenda 10:00 AM – 12:00 PM
Introductions of Government & Project Contractors Purpose of Pre-Proposal Conference NASA Revitalization Plan Design Overview for
Measurement Systems Laboratory (MSL) Pre-Proposal Overview Phase 1 Timeline Questions & Answers
2 GC: TBD
Speaker: Anthony (Tony) Dell’Arciprete, GSA
Introduction: Gov’t Representatives U.S. General Services Administration Anthony Dell’Arciprete Program Manager Ray Porter Contracting Officer Anthony Teti Contracting Officer Brett Molash Project Engineer
U.S. National Aeronautics & Space Administration William Abrams Project Manager Floyd Quintana Program Manager
GC: TBD
Introduction: Project Contractors
A/E Firm: AECOM Ed Weaver Program Manager
Construction Management Firm: Hill International Jim Beckett Project Executive Christopher Reilly Senior Project Manager
Purpose: Pre-Proposal Conference Speaker: Anthony Dell’Arciprete, GSA
Design-Bid-Build Services in Request for
Proposal (RFP) Measurement Systems Laboratory (MSL)
NASA Revitalization Plan Overview Speaker: Floyd Quintana, NASA
NASA Revitalization Plan
NASA Revitalization Plan Overview
Creating Langley’s Future…It’s Langley creates innovative solutions to the grand challenges of earth science, space exploration and flight in all atmospheres, for the benefit of all humankind.
8 GC: TBD
“Mother Center”
NACA
National Aeronautics Lab Unitary Plan Birth of Space Program
Heritage
New Town Revitalize Langley Lab Consolidation Diversified Portfolio Repair by Replacement Recapitalization
Present
Enables full spectrum of R&D Promotes collaboration and productivity Flexible and adaptive to changing mission needs Environmentally sustainable Embraces future work environments
Future
Aging Infrastructure Poses Risk to Mission Agency-wide, more than 80 percent of NASA’s infrastructure and facilities by value are beyond their design life – thus more likely to be unsuitable for current and future missions.
Aging, Apollo-era legacy infrastructure is inefficient and costly to maintain and operate.
Assets over 40 years old (typical design life is 30 years) pose a risk to
NASA’s unique research and development mission.
Risk severity rises as assets age beyond 40.
To control risk, control the share and average age of assets >40
Maintenance backlog continues to grow.
Whitlow—”NASA Facility Strategy Presentation” at the 2011 Facilities Engineering Conference
LaRC’s oldest building is 80 years old and the Center average is around 44 years old—We are proactively revitalizing the Center’s core infrastructure to meet future missions.
Figures of Merit Relevance to the NASA Mission
Supports Multiple NASA Mission Directorates (current and future) Ability to Sustain/Develop Core Competency
Utilization Usage rates Enables our competitiveness/Reimbursable opportunities
Cost of Ownership Maintenance and Utility Costs Deferred Maintenance / Facility Condition Assessment (FCA)
Linkage to Master Plan Central to Core Campus Sustainability / Energy Efficiency
Overarching Revitalization Decisions
Sustain / enhance essential in-house experimental capability
Enable multi-disciplinary integrated systems capability
Incorporate Computational Simulation as a cross-cutting capability in everything we do
Continually assess the needs of NASA’s missions and divest of facilities (even large ones) when it no longer makes sense for the mission and the national good
Summary of Investments & Savings Provides new state-of-the-art, sustainable, energy efficient
R&D facilities Sustains, enhances and creates our essential experimental capability to meet future agency missions by providing more efficient and effective facilities and labs
By 2030 the Center Revitalization Plan:
Saves nearly $100M Maintenance and Utilities Eliminates $141M Deferred Maintenance Reduces our footprint by 1.21M sq. ft.
Achieves approximately 600K sq. ft. of new building space Reduces the current replacement value (CRV) by approximately $1B
Plan requires investments which will be funded through Agency Construction of Facilities (CoF) and Recapitalization funds, Program dollars and LaRC’s CMO
Headquarters Building (AOB1) Langley Headquarters Office of the Director
Houses multiple organizations Office of Human Capital Chief Financial Officer Office of Procurement Office of Chief Counsel
Integrated Engineering Services Building (IESB)
Engineering Design Studio Brings different technical groups together during the design process
Flight Mission Support Facility Provide a facility to monitor and inform team while mission in flight
Training and Learning Classrooms Conference Facilities Cafeteria
Computational Research Facility (CRF)
Current Status:
Initiated Pre-Design Study –
March 2013 Completion B1194 deemed not appropriate New site and design completed
Future Work:
FY15 – Begin Construction
FY Start Description Justification (Demo’s No Earlier Than)
Cost Savings
($M)
Computational/Office: Data Center and High Density Office Space
Relevant to all MDs; Core campus;
consolidation of IT capability; energy efficient; Demo B1209 and repurpose B1268
M+U: $0.6
DM: $1.3
CRV: $10.9
Goal: Re-ViTALize LaRC Transform the Center to enable LaRC to make vital contributions to NASA missions – both current and future – by establishing a stimulating work environment, modernizing infrastructure and investing in new capabilities to meet the accelerating pace of science and technology trends.
Revitalization success through strategic workforce partnerships with GSA and USACE enables LaRC to focus our critical hires toward the Agency Mission.
AOB1
IESB
CRF
MSL
ViTAL – Vibrant Transformation to Advance Langley
ALDF Demo
B1192 Demo
Current Investment Timeline
2004 2010 2011 2015
AOB1
2013 2016
IESB CRF MSL
ViTAL – Vibrant Transformation to Advance Langley
New Town focus on modernizing aging facilities
Master Plan approach for future campus development
ViTAL integrated facility strategy to meet NASA mission
Revitalization Office established to execute ViTAL plan
Master Plan Update incorporates ViTAL plan
Continued Progress and Planning
2018+
Concept Design Overview Speaker: Ed Weaver, AECOM
Guiding Themes / Key Drivers
Sustainability Interior Environment Campus Setting / Context Presence
Campus Context - Buildings
Roles and Responsibilities Speaker: Chris Reilly, Hill International
Construction Management Overview
Open, Timely Communications Commitment to Issue Resolution Proactive Quality Program Viable Schedule Used as a Tool Risk Management Partnering
SAFETY!
ePM Systems Proliance
RFIs Submittals Correspondence
Proposal Overview Speakers: Anthony Dell’Arciprete, GSA Ray Porter, GSA Anthony Teti, GSA
2 Phase Source Selection Process
Proposal Overview: Phase 1
Phase 1:
Past Performance on Similar Project Project Team Qualifications Safety Subcontracting Methodology
GC:TBD
Proposal Overview: Phase 1
Past Performance Past Performance on Similar Projects
Construction Firms
Proposal Overview: Phase 1 --continued
Project Team Qualifications:
Offeror’s Principal-In-Charge/Project Executive Construction Project Manager Construction Superintendent Construction MEP Coordinator Quality Control Manager Safety Coordinator BIM Coordinator & Document Manager LEED Accredited Professional (AP)
Proposal Overview: Phase 1 --continued
Safety Subcontracting Methodology
Notification of Technical Rating to All Firms Develop the Advisory Shortlist Offerors on the Advisory Short List will be invited to participate in Phase 2
Proposal Overview: Phase 2 Phase 2:
Project Management and Delivery Plan Interactive Discussions Project Labor Agreement Price
Timeline Speaker: Ray Porter, GSA 10/1/2015: Proposals are Due 2:00PM to
Ray Porter GSA 10 Hard Copies Required, No Fax/PDFs
11/23/2015: GSA Will Notify Offerors 12/1/15: Phase 2 Criteria Will be Sent 3/2016: Anticipated Award 4/2016: Notice to Proceed (NTP) 24 Months for Construction NTP to S.C.
Questions & Answers
Thank You For Joining Us Today
U.S. General Services Administration
National Aeronautics and Space Administration
31 GC: TBD
| NASA Revitalization Project�Measurement Systems Laboratory (MSL)�Langley Research Center �Hampton, Virginia |
| Agenda 10:00 AM – 12:00 PM |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| NASA Revitalization Plan Overview |
| NASA Revitalization Plan Overview |
| Creating Langley’s Future…It’s |
| Aging Infrastructure Poses Risk to Mission |
| Figures of Merit |
| Overarching Revitalization Decisions |
| Summary of Investments & Savings |
| Headquarters Building (AOB1) |
| Integrated Engineering Services Building (IESB) |
| Computational Research Facility (CRF) |
| ViTAL – Vibrant Transformation to Advance Langley |
| ViTAL – Vibrant Transformation to Advance Langley� |
| Slide Number 18 |
| Slide Number 19 |
| Slide Number 20 |
| Roles and Responsibilities |
| Roles and Responsibilities |
| Roles and Responsibilities |
| Slide Number 24 |
| Slide Number 25 |
| Slide Number 26 |
| Slide Number 27 |
| Slide Number 28 |
| Slide Number 29 |
| Timeline |
| Questions & Answers |
File details come from the government source that posted it. Updated .