NASA_MSL_Project_Langley_VA_Project__Amendment_0001_RFI.pdf

PDF 121 KB Posted

Attached to
NASA Measurement Systems Laboratory
Solicitation number
RJP-NASA_MSL-0001-8-11-2015
Issued by

About this file

RFI

View the file

Other files

File Type Posted
Tab_4_NASA_MSL_Project_Langley_VA_J_ _A_Approved_August_2016_WISE3R_Redacted_FBO.pdf PDF
NASA_MSL_Project_Langley_Research_Center_Hampton_VA_Amendment_0005_FedBizOpps_Posting.pdf PDF
NASA_MSL_Project_Langley_Research_Center_Hampton_VA_Amendment_0004_17_May_2016.pdf PDF
NASA_MSL_Project_Langley_Research_Center_Hampton_VA_Amendment_0003_FedBizOpps.pdf PDF
NASA_MSL_Project_Langley_Research_Center_Hampton_VA_Project_Phase_II_Amendment_0002_28_April_2016_FBO_Package.pdf PDF
NASA_MSL_Project_Langley_Reserach_Center_Hampton_VA_Project_Specifications_ _Drawings_RFP_Phase_II.zip ZIP file
NASA_MSL_Project_Langley_Research_Center_Hampton_VA_Project_Phase_II_Project_J_ _A's_RFP.pdf PDF
NASA_MSL_Project_Langley_Research_Center_Hampton_VA_Project_Bid_Sheet_RFP.xlsx XLSX spreadsheet
MSL_PreProposalConference_September_2015_Public_FBO_Posting.pdf PDF
NASA_MSL_Project_Langley_VA_Pre_Proposal_Sign_in_Sheet.pdf PDF
NASA_MSL_Project_Amendment_0001_SF30_25_September_2015.pdf PDF
C101_The_Agreement_NASA_MSL_Project_Langley_VA.pdf PDF
NASA_MSL_Project_Langley_VA_Project_Owner_Evaluation.pdf PDF
NASA_MSL_Project_Langley_VA_Project_Subcontracting_Methodology_Form.pdf PDF
C301_Representations_ _Certifications_NASA_MSL_Project_Langley_VA_.pdf PDF
NASA_MSL_Project_Langley_VA_SF_1442.pdf PDF
C201_Solicitation_NASA_MSL_Project_Langley_VA_.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Number: RJP-NASA_MSL-0001-8-11-2015

Amendment Number: 0001

Please be advised that the Measurement Systems Laboratory (MSL) Project solicitation at the

NASA Langley Research Center located in Hampton, Virginia is hereby amended effective 25

September 2015 to incorporate the following:

Pre proposal conference sign in sheet

Pre proposal conference PowerPoint presentation

Standard Form 30 – Amendment 0001.

In response to questions submitted by potential offerors, the following is provided to supplement information contained in the solicitation. Additional information may be provided at a later date via another amendment. Questions left unanswered are due to the fact that the information is either unavailable, not releasable, or is identifiable in the solicitation package.

Should past performance evaluations/CCASS be provided with the proposal in Factor 1 following the 2 page project description?

Response: If the CCASS evaluation is completed, this may be provided with the Factor 1 information on Past Performance.

Should a completed 1442 be submitted with the proposal?

Response: The 1442 does not have to be submitted with the Phase I proposal. The 1442 will be required as part of the Phase II submittal.

http://images.google.com/imgres?imgurl=http://dorobekinsider.files.wordpress.com/2009/02/gsa-logo.jpg&imgrefurl=http://dorobekinsider.wordpress.com/2009/02/20/gsa-administrator-a-nominee-just-around-the-corner-or-will-prouty-stay-around/&usg=___9iocC6LRSBpH6AvxcjeBjlpFwM=&h=421&w=422&sz=58&hl=en&start=1&tbnid=QU0RGXzmgr2vDM:&tbnh=126&tbnw=126&prev=/images?q=gsa+logo&gbv=2&hl=en

What are the small business subcontracting goals for this solicitation? None have been stated.

Response: GSA’s Subcontracting Goals (2015)

GOALING CATEGORY GOAL

Small Business 32%

Small Disadvantaged Business (SDB) 5%

Woman-Owned Small Business 5%

HUBZone Small Business 3%

Service-Disabled Veteran-Owned Small Business 3%

The Factor 4 requirement includes completing the Subcontracting Methodology Form. It is premature to assume dollar values for work subcontracted when we have not even seen the plans for the project. Please consider moving this requirement to Phase 2.

Response: The Offeror shall submit the following: (1) proposed small business subcontracting goals for this procurement, (2) narrative describing your firm’s outreach program for small businesses, and (3) narrative describing how your firm will maximize competition and select subcontractors that provide best value. The Subcontracting Methodology Form shall be submitted as part of the Phase II submission.

The relevant project information requested on page 8 & 9 of the solicitation states a two page maximum, except for photos. Can the maximum be increased to three pages, due to the amount of information requested?

Response: A maximum of three pages is allowed. Photos count as separate pages.

The safety information requested on pages 12 & 13 of the solicitation states a one page limit.

Can the limit be increased to four pages, since each of the three OSHA 300A forms requested will take one page each, plus the letter from the insurance company regarding the EMR will take one page?

Response: This is acceptable.

The safety information requested also asks for OSHA 300A forms and EMR’s from significant subcontractors. Can this requirement be eliminated from the Phase I response as subcontractor pricing & selection will be performed in Phase II? Whiting-Turner’s safety information will be provided as required.

Response: This is acceptable.

The required Subcontracting Methodology Form asks for projected dollar values to be provided for the various types of business subcontracts. We are okay with submitting projected percentages for those subcontracts, but feel it is too early to submit the requested dollar values, since we do not know the full value of the project. Please confirm the projected dollar values for the various businesses can be submitted with the Phase II response?

Response: The Offeror shall submit the following: (1) proposed small business subcontracting goals for this procurement, (2) narrative describing your firm’s outreach program for small businesses, and (3) narrative describing how your firm will maximize competition and select subcontractors that provide best value. The Subcontracting Methodology Form shall be submitted as part of the Phase II submission.

File details come from the government source that posted it. Updated .