PHVI_Proposal_Attach_5.doc
DOC document 27 KB Posted
- Solicitation number
- RITA-RS-14-01
About this file
Attachment 5 PROJECT DELIVERABLES (SAMPLE)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q A_Phase_VI_Jan_2014.docx | DOCX document | |
| PHVI_Proposal_Attach_7.doc | DOC document | |
| PHVI_Proposal_Attach_4.doc | DOC document | |
| PHVI_Proposal_Attach_3.doc | DOC document | |
| PHVI_Proposal_Attach_9.pdf | ||
| PHVI_Proposal_Attach_6.xls | XLS spreadsheet | |
| PHVI_Proposal_Attach_8.xlsx | XLSX spreadsheet | |
| PHVI_Proposal_Attach_2.doc | DOC document | |
| PHVI_Proposal_Attach_10.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RITA-RS-14-01
Full Proposal
Attachment 5
SAMPLE SAMPLE SAMPLE SAMPLE
PROJECT DELIVERABLES
1. Conduct kick-off Team meeting and determine experimental procedure to measure residual stress. Report on results due to DOT within three (3) months of the effective date of the Agreement. (Del – 1A)
2. Create Project Website. Due to DOT within three (3) months of effective date of Agreement.
3. Conduct analytical and finite element analysis to calculate residual stress, and align experimental results with the mechanical modeling. Report on results due to DOT within six (6) months of the effective date of the Agreement. (Del – 2A)
4. Measure material properties, residual stress, prepare free films and adhesion test panels, and establish mechanical modeling of the residual stress of the multi-layer coatings. Report on results due to DOT within nine (9) months of the effective date of the Agreement. (Del – 3A)
5. Conduct adhesion and free film degradation test and residual stress relaxation testing. Report on results due to DOT within Twenty One (21) months of the effective date of Agreement. (Del – 7A)
6. An understanding of multi-layer pipeline coating disbondment mechanism(s) due to residual stress development resulting from coating manufacturing/extrusion process and characteristics of surface anchor profile and surface preparation methods will be established. Report due to DOT within Twenty Four (24) months of the effective date of the Agreement. (Del – 8A)
7. Strategy to reduce multi-layer pipeline coating disbondment will also be recommended. Report due to DOT within Twenty Four (24) months of the effective date of the Agreement. (Del – 8B)
8. Quarterly status and progress reports and final project report will be prepared and submitted in accordance with ArticleVI.F.2, 3, and 4 of the Basic Agreement. (QPR – 1 through 7, FR – 1)
9. Paper submission to conference presentations and publication to peer review journals. Due to DOT within Twenty Four (24) months of the effective date of the Agreement.
SAMPLE SAMPLE SAMPLE SAMPLE