PHVI_Proposal_Attach_4.doc

DOC document 31 KB Posted

Attached to
Commercial Remote Sensing & Spatial Information Technologies Program
Solicitation number
RITA-RS-14-01
Issued by

About this file

Attachment 4 TEAM PROJECT ACTIVITIES (SAMPLE)

View the file

Other files

File Type Posted
Q A_Phase_VI_Jan_2014.docx DOCX document
PHVI_Proposal_Attach_7.doc DOC document
PHVI_Proposal_Attach_5.doc DOC document
PHVI_Proposal_Attach_3.doc DOC document
PHVI_Proposal_Attach_9.pdf PDF
PHVI_Proposal_Attach_6.xls XLS spreadsheet
PHVI_Proposal_Attach_8.xlsx XLSX spreadsheet
PHVI_Proposal_Attach_2.doc DOC document
PHVI_Proposal_Attach_10.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RITA-RS-14-01

Full Proposal Attachment 4

SAMPLE SAMPLE SAMPLE SAMPLE

TEAM PROJECT ACTIVITIES

1. Project Discussion with Industrial partners to seek additional input;

2. Create & Maintain Project Website

3. Kick-off Team meeting and modify the research program if necessary;

3. Use analytical and finite element analysis to calculate residual stresses in a multi-layer pipeline coating systems. Identify critical coating material properties to the development of residual stresses. The residual stress calculation includes:

(a) Stress distribution along longitudinal direction of a coated pipe joint, particularly at the cutback;

(b) Stress distribution at the metal-coating interface and across the thickness direction;

4. Evaluate the existing residual stress measurement techniques- cantilever beam, instrumented ring, and others and select the most appropriate method for this research;

5. Make residual stress measurement Identify the impact of manufacturing parameters, such as processing temperatures and coating thickness on residual stresses.

The 3L polyolefin coating systems are:

I.

3L HDPE

1.FBE- 4 mil / adhesive-10 mil / HDPE-140 mil

2.FBE-10 mil / adhesive-10mil / HDPE-140 mil

II.

3L PP

1.FBE- 4 mil / adhesive-10 mil / PP-140 mil

2.FBE-10 mil / adhesive-10mil / PP-140 mil

6. Identify and measure the basic coating material properties to be used in the calculation of residual stresses;

7. Compare the calculated residual stress values with the experimental values and refine the analytical modeling to match with the experimental results on residual stresses;

8. Prepare Adhesion test panels.. The following surface preparations will be applied:

I- Anchor profile height– 3 mil, 2 mil, and 1.5 mil

II-

Anchor profile shape – angular and round

III-

Peak density – 60, 80, 100 peaks/inch

IV-

Chloride contamination, 20, 30, 40, 50 mg/m2, V- Dust level – Rating 1, 2, 3 in ISO standard 8502-3

VI-

With and without phosphoric acid wash

VII-

Chromate treatment

9. Determine the adhesion degradation rate by immersion of test panels in

(a) 3% salt solution at 60 C for one year;

(b) dry/wet cycling.

Identify the effect of various surface treatments on adhesion durability;

10. Prepare free films of single layer FBE , adhesive and multi-layer coating;

11. Immerse free films in 60 C 3% salt water to measure their ageing stability, weight and dimensional change vs. time. The total immersion time is one year;

12. Immerse residual stress samples in 3% salt water at 60C and measure the residual stress relaxation rate;

13. Establish the analytical modeling to predict the coating disbondment and identify the critical parameters to coating disbondment;

14. Attend DOT project review meeting;

15. Mid-term team meeting;

16. Final team meeting;

17. Prepare and submit Quarterly Status Reports and the Final Project Report; and

18. Publish papers and make presentation.

SAMPLE SAMPLE SAMPLE SAMPLE SAMPLE

File details come from the government source that posted it. Updated .