About this file
This is a Risk Assessment document for Insurance Requirements related to construction services, prepared for Orlando International Airport (MCO) in Florida. The document provides guidelines and requirements for insurance coverage that contractors must maintain during capital improvement projects at the airport. The assessment outlines mandatory insurance policies including general liability, workers' compensation, property damage, and other specialized coverages required to protect the airport, airlines, and project stakeholders during all phases of construction activities. The document establishes minimum coverage limits, certificate of insurance requirements, and conditions under which contractors must maintain continuous insurance protection throughout project execution and any warranty or post-completion periods.
The risk assessment identifies specific insurance requirements tailored to construction activities at a major commercial airport, including provisions for protecting against operational disruptions to airline activities and ensuring adequate coverage for the complex, multi-stakeholder environment at MCO. The document likely specifies additional insured requirements, waiver of subrogation clauses, and proof of insurance submission procedures that contractors must follow. These insurance mandates are critical given the Airline Technical Representative role's focus on coordinating capital improvement projects—such as APM replacement, baggage system upgrades, and terminal optimization—where construction activities directly interface with ongoing airline operations and passenger services.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Risk Assessment for Insurance Requirements - Construction Project number and name
Estimated Project Value $
Date Sent to Risk:
☐Scope of Services or description provided ☐Risk Ins. & Indemnification Template Used ☐Cranes needed to perform work (Vertical or Horizontal) ☐Access to surface or roof 3 stories above ground (Vertical or Horizontal) ☐Work will require holding storing, using, or distributing materials monitored by EPA ☐Work will be conducted within the Aircraft Operations Area (AOA) ☐Work will be conducted within 50 feet of a railroad or 10 feet of an APM rail ☐Agreement estimated to exceed 12 months ☐Includes design or engineering services The following insurance requirements for Construction to incorporate into General Conditions of bid / contract:
Type of Insurance Policy Minimum Limits
Commercial General Liability: $ each Occurrence, per Project
Maximum Deductible or Self-insured Retention: ☐$10,000 or ☐$100,000 Coverage shall include Products & Completed Operations and Contractual liability
Automobile Liability: $ Combined Single Limit
Maximum Deductible or Self-insured Retention: ☐$10,000 or ☐$100,000
Worker’s Compensation Statutory Limit Employers’ Liability:
Each accident/ Disease-policy limit/ Disease-each employee ☐$500,000 or ☐$1,000,000
Include if checked:$ per claim
☐Pollution Liability Coverage:
| Maximum Deductible or Self-insured Retention: |
| $100,000 |
☐Other:
If exceeding 12 months; Risk Type:
Risk Assessment Performed By:
Date Returned: