RIPD E4000-25-3-12 Deburring System rev2.docx
DOCX document 60 KB Posted
- Attached to
- Deburring System Federal contract opportunity
- Solicitation number
- W519TC25QA010
About this file
This is a Purchase Description (RIPD) for a Deburring System solicitation by the Rock Island Arsenal Joint Manufacturing and Technology Center (RIA-JMTC). The document details a highly specialized deburring machine designed to process metal parts through abrasive belt and rotary brush mechanisms, with capabilities to handle parts up to 63 inches wide and 4 inches in height. The primary system includes features such as vacuum capabilities, digital thickness readout, LED status lights, emergency stops, IOT connectivity, and automated cleaning systems.
The solicitation (Solicitation Number: W519TC25QA010) includes multiple Contract Line Item Numbers (CLINs) allowing for potential additional equipment procurement: CLIN 001 is the base deburring machine, CLIN 002 offers an additional abrasive belt head, CLIN 003 provides an option for a complete second system, and CLIN 004 allows for up to three additional machines. The procurement is specifically targeting small businesses, with the Department of the Army Materiel Command Contracting Command at Rock Island Arsenal conducting the solicitation. Training requirements include operator, programming, maintenance, and methods training for multiple personnel, and the contractor must provide comprehensive service and support capabilities.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Contractor Questions and Government Answers v5.xlsx | XLSX spreadsheet | |
| Contractor Questions and Government Answers v4.xlsx | XLSX spreadsheet | |
| B08 Contract Questions and Government Answers v2 and v3.xlsx | XLSX spreadsheet | |
| Contractor Questions and Government Answers.xlsx | XLSX spreadsheet | |
| 25-3-12 CDRL- Deburring System.docx | DOCX document | |
| 25-3-12 Evaluation Criteria.docx | DOCX document | |
| 25-3-12 Time Line Deliverable.docx | DOCX document | |
| Solicitation - W519TC25QA010.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| ROCK ISLAND ARSENAL | RIPD: E4000-20-9-01 |
| PURCHASE DESCRIPTION | DATE: 11-JAN-20 |
DEBURRING EQUIPMENT
| 1. | GENERAL SYSTEM DESCRIPTION | 2 |
| 2. | STANDARDS AND PUBLICATIONS | 2 |
| 2.1 | Clarification | 2 |
| 2.2 | National Standards and Specifications | 2 |
| 3. | DESIGN | 3 |
| 3.1 | Ownership | 3 |
| 3.2 | General Design Standards | 3 |
| 3.3 | Safety, Security and Environmental | 6 |
| 3.4 | Responsibilities | 9 |
| 4. | CLIN 001- Deburring Machine | 9 |
| 4.1 | Dimensions: | 9 |
| 4.2 | Construction | 9 |
| 4.3 | Abrasive Belt Head | 11 |
| 4.4 | Rotary Brush Heads | 11 |
| 4.5 | Electrical Cabinet/ Control System | 11 |
| 4.6 | Additional Accessories | 12 |
| 4.7 | Ranges And Capacities | 12 |
| 5. | CLIN 002 OPTION – Additional Abrasive Belt Head | 12 |
| 6. | CLIN 003 OPTION – ADDITIONAL MACHINE (WITH 2 ABRASIVE BELT HEAD) | 12 |
| 7. | CLIN 004 OPTION – Up to ADDITIONAL 3 MACHINES IN QUANTITY OF 1 MACHINE Units (With 2 Abrasive Belt Head) | 13 |
| 8. | INFORMATION TECHNOLOGY SYSTEMS AND SUPPORT | 13 |
| 8.1 | Installation IT Support: | 13 |
| 8.2 | INSPECTION/FINAL ACCEPTANCE: | 13 |
| 8.3 | Media/ Devices | 13 |
| 8.4 | INFORMATION ASSURANCE AND ACCREDITATION: | 14 |
| 9. | APPROVAL/SHIPPING | 14 |
| 9.1 | Shipping | 14 |
| 9.2 | Installation | 15 |
| 9.3 | Completion | 16 |
| 10. | TRAINING | 16 |
| 10.1 | Schedule | 17 |
| 10.2 | Location | 17 |
| 10.3 | Type | 17 |
| 11. | SERVICE | 18 |
| 11.1 | Service/Support Requirements | 18 |
GENERAL SYSTEM DESCRIPTION
· This project is to obtain a rotary abrasive brush style de-burring machine to be used at Rock Island Arsenal Joint Manufacturing Technology Center. The unit is designed to deburr and finish the edges of parts using rotary brushes that rotate in a clockwise and counterclockwise to achieve uniform rounded edges. The unit shall also include abrasive belt heads used to de-burr parts as well as assist in putting surface finishes on the parts. The desire is to be able to immediately send the parts to weld operations after they come out of this machine(s).
STANDARDS AND PUBLICATIONS
Clarification Any ambiguities, questions, requests for clarification or discrepancies between sections of this purchase description, drawings, national or industry standards discovered by the contractor in reviewing this purchase description shall be reported by the bidder in writing to the contracting officer BEFORE THE DATE SCHEDULED FOR CLOSE OF BIDDING/receipt of proposal. Submission of a proposal or bid shall be construed as evidence that such examination has been made. Therefore, later claims for labor, material, or equipment required, or for difficulties encountered, which could have been foreseen had such reasonable examination been made, may be denied.
National Standards and Specifications The following specifications in effect on the Date of Invitation for Bid/Request for Proposal form a part of this purchase description. In the case of conflicting requirements, the more stringent shall apply. This may not be an all-encompassing list. The contractor shall conform to all local and federal codes and standards applicable to the equipment they are providing based on location and purpose of equipment. It is not the responsibility of the government to make modifications to ensure compliance.
Occupational Safety and Health Act of 1970 (OSHA).
American Society of Testing and Materials (ASTM).
American Society of Mechanical Engineers (ASME).
American National Standards Institute (ANSI).
National Electrical Manufacturers Association Standards (NEMA).
Electronic Industries Association (EIA).
Institute of Electrical and Electronics Engineers (IEEE).
American Code for Information Exchange (ASCII).
American Welding Society (AWS).
American Gear Manufacturers Association (AGMA).
National Fire Protection Association (NFPA).
1.1.1.1 NFPA-70 National Electrical Code
NFPA-79 Electrical Standard for Industrial Machinery.
International Standards Organization (ISO).
DESIGN
Ownership This equipment is a standard product of the manufacturer and shall require either no change or minor design changes to meet requirements of these specifications. Therefore, ownership of the design will remain with the manufacturer.
General Design Standards DEVIATION FROM PRODUCT: Modifications to the manufacturer’s standard design to achieve requirements as specified in this document are only permissible as dictated by good design practice. For example, mounting a 20-hp motor in a power train designed and normally using a 10-hp motor would not be acceptable.
UNITS OF MEASURE: Dimensions and capacities in this purchase description are given in the English-US (in-lb) system. All dials, gauges, and drawings shall be in the English-US system or both the English-US and the metric systems, unless otherwise specified in this document.
ID DATA PLATE: The equipment shall include a main data plate which will include the following data as a minimum requirement (additional information is acceptable): Manufacturer Name, Manufacturer’s Dunns and Bradstreet Number, Manufacturer’s Model Number, Manufacturer’s Serial Number, Year of Manufacture, Contract Number, Machine Weight. This information is necessary for compliance with the governments Unique Identification Program (UID).
DATA PLATES: All instruction, data, and identification plates and labels attached to this equipment and its controls shall be manufactured of corrosion and oil resistant metal or plastic material. All wording shall be in the English language using plain, bold face lettering. Lettering shall be permanent and have a contrasting background.
ITEM UNIQUE IDENTIFICATION (IUID) REGISTRATION: The contractor shall register the equipment in the IUID Registry (as one single system). IUID registration requires the contractor to input Cage Code, Model Number, and Serial Number into a Government Database to allow for asset and inventory tracking. IUID Registry of the equipment shall be performed at http://dodprocurementtoolbox.com/site/uidregistry/. Training for IUID is available in https://wawftraining.eb.mil. IUID registration of this equipment is required prior to final payment in the Wide Area Work Flow (WAWF). The contractor shall also affix a machine readable 2-dimensional (2-D) matrix representing the IUID registry to the machine. The IUID 2-D matrix may be included on the ID Data Plate outlined in paragraph 3.2.4.
UTILITY CONNECTION: Equipment supplied to the Rock Island Arsenal will have single point shut-off for each utility supplied to a system. This means that equipment constituting a single system shall be wired to a single main electrical disconnect point, plumbed to a single pneumatic shut-off valve, etc… This will be referred to as the “point of first connection”. Each type of power source may have only one point of first connection. E.g. (1) pneumatic shut-off valve, (1) water supply shut-off valve, (1) electrical disconnect, etc… Each point of first connection shall be clearly labeled on the system and shown in the safety lockout portion of the documentation package. These points must be located on a stationary component and positioned such that they will not create a hazard to personnel during normal operation of the system. The first connection points shall be accessible from the shop floor without the use of ladders, steps, or stools. Access cannot be hampered by operation of the system.
UTILITY CONNECTION LABOR: Rock Island Arsenal shall provide only such labor and materials as will be needed to connect facility utilities to each point of first connection of the system. The supplier will be responsible for all connections beyond the point of first connection for each utility.
UTILITIES AVAILABLE: Rock Island Arsenal shall be responsible for providing the following:
1.1.1.2 Connection of 460-V, 60-Hz, 3-Ph AC electrical power to the fused or breaker type disconnect switch required in the ELECTRICAL DISCONNECT paragraph of this purchase description. Connection does not include filters, surge protection, or any peripheral equipment necessary to make the equipment functional.
Connection of approximately 80-psi compressed air to a single point for each system, if needed. Connection does not include filters, dryers, or any peripheral equipment necessary to make the equipment functional.
If, due to contractor caused problems, the equipment or components of the equipment must be moved or removed and replaced, by RIA after initial placement, the contractor shall be billed for such work at current RIA labor and overhead rates.
ELECTRICAL DISCONNECT: The equipment shall be equipped with a manual, fused or breaker type disconnect switch, readily accessible to the operator, which will deactivate the entire equipment. It shall be located no more than 6-ft 7-in from the floor to the highest point the control device. It shall be capable of being locked in the de-energized state (OFF) only.
CONDUIT: Flexible conduit is not permitted in exposed areas. All wires, cables, and hoses will be enclosed by rigid, oil-proof protection, except where flexibility is necessary for operation of the equipment. Flexible wires, cables and hoses shall be arranged to prevent draping or tripping hazards.
SERVICE ACCESS: Components subject to periodic adjustment, replacement, or servicing shall be readily accessible. Meaning that experienced personnel can access the part after no more than 30-min of labor. If any special tools or equipment are necessary to access these components, said equipment will be supplied as part of the system and provided with a proper storage location within the system.
DEFLECTION: The system shall recover from distortion and deflection at no load. The machine and its components shall be sufficiently rigid that work piece finish and tolerances are not impaired by machine vibration.
NEW EQUIPMENT: The equipment furnished under this purchase description shall be new and unused.
COMPONENT ENVIRONMENT: Under no circumstances shall a component be used in an application not recommended by the component manufacturer. Components shall not be subjected to conditions of operation beyond the recommendations of the manufacturer, such as excessive heat, lack of lubrication, over-loading.
REPLACEMENT COMPONENTS: All replaceable components shall be manufactured to definite standards for tolerance, clearance, and finish, enabling components to be field installed without further machining.
CASTINGS AND FORGINGS: All castings and forgings shall be free of defects, scale, and mismatching. No process such as welding, peening, plugging, or filling shall be used for reclaiming any defective part for use in this equipment without the prior written consent of the contracting officer.
SURFACE BUILDING AND COATINGS: Welding, brazing, soldering, coating or plating shall be employed only where specified in the original design. These operations may not be employed as a means of reclaiming a defective part.
FASTENING DEVICES: All screws, pins, bolts, and similar parts shall be installed in such a manner as to prevent change in tightness. Those devices subject to removal or adjustment shall not be swaged, peened, staked, or otherwise permanently deformed. They shall not be installed using permanent bonding adhesives.
CLEANING AND DEBURRING: All surfaces of castings, forgings, molded parts, stampings, and welded components shall be cleaned and free from sand, dirt, fins, flash, scale, flux, and other harmful or extraneous materials. All edges shall be either rounded or beveled unless sharpness is required to perform a necessary function. Except as specified herein, the condition and finish of all surfaces shall be commensurate with the manufacturer’s commercial practice.
PAINTING: All unfinished surfaces of the equipment shall be painted with a lead free and chromium free commercial grade of metal primer and a minimum of one finish coat. The color shall be in accordance with the manufacturer’s standard commercial practice, or as necessary to maintain compliance with OSHA regulations, as applicable.
FILTRATION/REGULATION: Equipment requiring filtered or regulated energy sources shall be supplied with the components necessary to perform this function. E.g. the equipment shall be supplied with a Filter, Regulator, Lubricator (FRL) device, if filtered, lubricated, regulated pressurized air is required for the efficient, proper operation of the equipment. These devices shall be located on the equipment side of the lockout devices at the points of first connections.
Equipment which requires compressed air shall have a regenerative type desiccant or refrigerated compressed air dryer capable of drying air down to 35°F pressure dew point, minimum, from air entering the equipment at 110°F, and capable of supplying air to the rated standard cubic feet per minute (SCFM) of the equipment. The unit shall purge condensate automatically. In the case of the latter, the refrigerant used shall not be a Class I or Class II, ozone depleting substance. The air dryer shall be connected and/or piped to the equipment by the contractor.
MOTORS:
1.1.1.3 All motors shall be rated for continuous duty.
1.1.1.4 Motors shall not operate in an overload condition during normal operation of the equipment and shall be equipped with overload protection.
1.1.1.5 Each motor shall bear an identification plate containing the identity of the manufacturer, model number, serial number, input voltage, amperage, horsepower, phase, frequency, duty cycle, and frame size or mounting identification.
1.1.1.6 Motor starters and controls shall operate at no greater than 120-VAC. It is preferred that they operate at 24-VDC.
1.1.1.7 Motor starters shall provide drop-out protection. This means that, in the event of a loss of power, the equipment shall be re-energized only by the deliberate action of the operator. Manual or mechanical motor starters shall not be deemed acceptable.
DIALS AND GAUGES: All scales, dials, and gauges shall be manufactured of corrosion and oil resistant material. All wording shall be in the English language using plain, bold face lettering. Lettering shall be permanent and have a contrasting background.
HANDWHEELS: Hand-wheels turned in a clockwise rotation shall produce a linear motion, of the controlled component, to the right, away, or upwards. If rotary motion is produced by the hand-wheel, clockwise rotation of the hand-wheel shall produce clockwise movement of the controlled component.
CONTROL LEVERS: Control levers shall move in the same direction as the motion of the controlled component.
FOUNDATION: The requirement for a separate foundation or floor alteration is not permissible. The system shall be capable of being installed on an existing concrete floor without modification to the system or the floor, except for installation of anchor bolts.
Safety, Security and Environmental SECURITY: The RIA-JMTC is an Army installation subject to Department of Defense safeguards, various precautions, and plant protection measures. All of the below requirements will be necessary of contractors visiting RIA to satisfy requirements of this purchase description; Additional requirements will be placed on contractors requiring access to the Army Network, or Common Access Card (CAC), as specifically detailed below. At all times during the execution of this work, contractor personnel will maintain adequate plant protection devises to minimize espionage, sabotage, and other malicious destruction and damage. The contractor shall comply with all security requirements of the Rock Island Arsenal. Rock Island Arsenal island-wide Force Protection levels may be adjusted/changed at any time, which may cause possible delays and will directly affect procedures for accessing the island.
1.1.1.8 Access and General Protection/Security Policy and Procedures: The contractor and any associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by the installation Director of Emergency Services. All contractor employees must comply with all personal identity verification requirements (IAW FAR clause 52.204-9) as directed by Department of Defense (DoD), Headquarters Department of the Army (HQDA), and any local policy. If the Force Protection Condition (FPCON) changes, the Government may require changes in contractor installation access, security matters, or security processes.
Access to RIA: Contractor and all subcontractor employees performing work at RIA shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) and any applicable installation, facility access screening and local security policies and procedures. The JMTC Representative/ COR shall provide guidance to complete the Access Control Records Check request Form though the Rock Island Arsenal Directorate of Emergency Services.
1.1.1.8.1 Random Antiterrorist Measures Program (RAMP) participation: Contractor personnel are subject to RAMP security program (i.e. vehicle searches, wearing of ID badges, etc.). Contractor shall comply with any, and all instructions issued by the Rock Island Arsenal Police Department. The RAMP is discussed in the RIA-JMTC Anti-Terrorism Training.
1.1.1.8.2 During FPCONs levels of Charlie or Delta, services may be discontinued/postponed due to a higher National or local security threat. Services will resume when FPCON Level is reduced to Bravo, or lower. FPCON levels are described in Anti-Terrorism Level I Training.
1.1.1.8.3 Contractor personnel shall return all Installation Badges and access passes as soon as possible prior to contract completion. RIA-JMTC electronic keys and access passes are accountable items, shad shall be returned within 24-hours of no longer being needed. Items will be returned to the COR, or paced in a drop box at a RIA-JMTC access point.
1.1.1.9 Security Training: The contractor shall complete the following training:
1.1.1.9.1 Anti-Terrorism, Level I: All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete Anti-Terrorism (AT) Level I Awareness training. The COR will be provided a copy of the Rock Island Arsenal –Joint Manufacturing and Technology Center (RIA-JMTC) AT Level I Awareness Training and assure that the training is complete. The contractor shall sign a memorandum of record for each contractor employees and subcontractor employee to the RIA-JMTC Operations Center prior issuing any electronic keys, or access pass being authorized.
1.1.1.9.2 iWatch (See Something, Say Something) Training: The Contractor and all associated subcontractors shall complete iWatch Training. iWatch Training shall be provided during the Anti-Terrorism Training.
1.1.1.10 For Contractors requiring Common Access Card (CAC): Before CAC issuance, the contractor employee requires a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks onsite, or remotely or (2) Remote access via logon, to a DoD network using DoD-approved remote access procedures, or (3) Physical access to multiple DoD facilities or multiple Non-DoD Federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6-months, or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management. Contractors needing a NACI or equivalent investigation or higher investigation will coordinate this investigation through their COR. Contractor personnel shall turn in CAC cards upon completion of their contractual obligations, or at the request by the COR, or at the request of the Contracting Officer.
FEDERAL MARIJUANA LAWS REMAIN UNCHANGED: Note: Rock Island Arsenal is under the exclusive federal jurisdiction of the United States. Under federal law, marijuana is still defined as a Schedule I drug, and possession and use of marijuana is still illegal. Any person using or in possession of marijuana on Rock Island Arsenal may be criminally prosecuted in federal district court. In addition, such individuals may be permanently barred from entering Rock Island Arsenal.
REAL ID: Starting 03-May-2025 all personnel entering Rock Island Arsenal will be required to show a Real ID form of identification.
FIRE PREVENTION AND PROTECTION: The contractor shall comply with all fire prevention measures prescribed in the installation Fire Regulations, a copy of which is on file in the office of the Contracting Officer. A written fire permit shall be obtained from the installation Fire Marshall for use of open flame devices, such as torches, portable furnaces, tar kettles, or gas and electric welding and cutting equipment, in, on, or within 15-ft of the building. The contractor shall be liable for any fire loss to the Government properly attributable to negligence on the part of the contractor, including failure to comp1y with fire prevention measure described by the terms of this purchase description.
INDUSTRY AND REGULATIONS: The equipment shall comply with the most current of all local, state, and federal laws and regulations listed in Standards and Publications.
MATERIAL EXCLUSIONS: The equipment shall not contain polychlorinated biphenyl (PCB), ozone depleting substances (Class I or Class II), or asbestos materials.
SAFETY REGULATION COMPLIANCE: The contractor shall comply with standard OSHA and RIA safety standards, including conforming to confined space work requirements when applicable.
SAFETY LOCKOUTS: Each point of first connection shall be designed and constructed to allow the utility to be completely isolated from the equipment. This isolation shall be insured by application of a standard key locking padlock. The device(s) shall only be lockable in the de-energized (OFF) condition.
LOSS OF PRESSURE: Hydraulic and pneumatic circuits shall be designed such that loss of pressure, or pressure surges, shall not cause a hazard. Means shall be provided to prevent operation of the equipment with insufficient pressure, if such operation could cause a hazard.
TRAPPED ENERGY: Means shall be provided for the controlled release of stored energy. This energy may be in the form of, but not limited to, air and hydraulic pressure accumulators, capacitors, springs, counter balances and flywheels. When appropriate, a label shall be affixed to the stored energy source to identify the hazard.
WORKING RANGE: Hydraulic and pneumatic components shall be selected, which cannot be adjusted outside the safe working range of the circuit and/or equipment.
ACCUMULATORS: Gas charged accumulators operating above 200-psi charging pressure shall be charged with inert gas.
BRAKES: Braking systems shall be designed to “fail-on”. This means, energy supplied to the brake shall be used to disengage the brake. Loss of energy shall therefore cause the brake to activate.
EMERGENCY STOP: The system will incorporate a clearly identified, red, mushroomed, control button with a yellow backing plate at every operator work station. Upon momentary operation, any emergency stop button shall de-energize all machine motions and override all other controls without creating additional hazards. All motion stopped shall be restarted by the deliberate action of the operator (requiring manual reset). No other red mushroomed buttons shall be allowed on the equipment. It is preferred that there is no other red buttons of any type.
CONTROL GUARDS: Controls shall be guarded against accidental operation.
OPERATOR REACH: Controls shall be within reach and located such that the operator, when in the normal operating position, is not required to reach past moving parts, which may cause injury.
Responsibilities SITE INSPECTION: Any site inspections and/or measurements, which must be taken in order to determine the suitability of the proposed location or to perform the design of the system, are the sole responsibility of the contractor. This may begin prior to completing the bidding process. Rock Island Arsenal will support this function through the POC (point of contact) by guiding personnel, facilitating security registration, and providing general assistance. The contractor will be responsible for providing any and all equipment necessary for this process.
CLIN 001- Deburring Machine Equipment: The supplier shall furnish all equipment normally considered by him to be standard for his machine unless identified in this requirement to be of specific manufacture. The following equipment shall be provided in addition to the equipment specified in other sections of this purchase description, which may not be standard. The inclusion of standard equipment in this paragraph is inadvertent and should not be construed to allow duplication.
Dimensions:
DOOR ACCESS: The equipment shall be shipped either assembled or disassembled to pass through a door 12-ft wide by 12-ft high, and shall not exceed 25-ft in length.
COMPONENT WEIGHT: The maximum weight of any one piece shall not exceed 25,000-lbs.
Construction
The equipment shall be a belt style table deburring machine. The operation of the machine shall be such that the parts are loaded onto the table and then passed beneath a roller type abrasive belt head before then passing under a series of clockwise and counterclockwise rotary heads used to round off and edge finish the parts as well as removing any burrs left from the previous laser cutting process.
FRAME: The machine’s frame shall be constructed of heavy steel and properly ribbed in order to minimize vibration and eliminate deflection of the operational process.
ACCESS: The machine shall include access doors on both sides of the unit in order to allow ease of access for changing abrasives and rotary heads as well as other maintenance functions inside of the unit.
TABLE: The conveyor table shall be constructed of heavy plate steel and be precision machined mounted on top of four synchronized screw jacks used for part movement through the machine. The belt system shall include holes for the vacuum system. The feed table shall include a Variable Frequency Drive. The table shall have vacuum capabilities to be used for keeping small parts in place during operations.
HEIGHT ADJUSTMENT: The table shall include the capability to adjust the height threshold between the table and the abrasive belt and rotary heads. The height adjustment shall be .004” up to at least 4” DIGITAL READ-OUT: The machine shall include a digital thickness readout in inches.
VACUUM CLEAN: The system shall include an automatic inner vacuum table cleaning cycle that initiates every machine stop.
BRAKES: The unit shall include brakes that stop the grinding belts and heads when the limit switch is triggered or when the emergency stop is activated.
OPERATION: Operation of the unit shall be performed via buttons with light indicators. The unit shall include a motor load meter.
LIGHTING: The unit shall include LED lights that show the operational status of the machine.
DOOR SAFETY SWITCH: If at any time during operation, access doors are opened on the unit, the machine will cease operation.
EMERGENCY STOP: There shall be an emergency stop at both the infeed and outfeed side of the unit.
CONSTANT PASS LINE: The machine shall have a constant height when adjusting to different material thicknesses. The height of the conveyor shall stay constant while the rest of the machine compensates.
CONVEYOR CLEANING BRUSH: The unit shall include a rotating conveyor cleaning brush under the conveyor.
SMALL PARTS MAGNET: The machine shall have an approximately 12in wide magnetic strip integrated into the conveyor to be used for small components to keep them in place.
IOT CAPABLE: The unit shall have IOT connectivity.
Abrasive Belt Head ROLLER: The equipment shall include a roller able to handle the requirements of the grinding and de-burring processes. This roller is used as the method to hold the abrasive belt for grinding operations.
MOTOR: The unit should have a frequency controlled motor to determine the speed of the belt.
ADJUSTMENT: Fine adjustment of this head shall be possible. Adjusting the head allows for changing of pressure or to account for abrasive belt thicknesses. The unit shall have a dial indicator for readout on the operator side of the equipment.
BELT CHANGEOVER: The unit shall be designed in such a way that removing the consumable abrasive belts is easy for the operator but that the abrasive belts are secure onto the contact roller. The unit shall also include a method of tensioning the abrasive belts via air to automatically compensate for belt stretch. The unit shall have the means to correct mistracking of the abrasive belt.
HEAD MOVEMENT: The head shall move down to engage the abrasive head against the parts once it reaches full speed. The head shall automatically move back into the up position if the emergency stop is engaged. The head shall be placed in the up position when not being utilized. This movement shall be pneumatically controlled.
Rotary Brush Heads FUNCTION: The unit shall have a secondary mechanism that consists of a system of at least 8 rotary brush abrasive heads mounted on a manifold where 4 of the brushes rotate in a clockwise direction while the other 4 rotate in a counter-clockwise direction. There shall be a main drive that then rotates this entire manifold so that all of the abrasive brush heads have the ability to make contact with the parts passing underneath.
HEIGHT ADJUSTMENT: The unit shall have motorized height control of the rotary brush heads to account for wear of the heads.
REPLACEMENT: The head shall be designed in such a way that brushes are easily replaced. This can be via a quick release pin or equivalent method.
MOTOR: The unit shall have a frequency controlled variable motor to control speed.
Electrical Cabinet/ Control System LOAD METER: The unit shall be equipped with a load meter that identifies the motor load OPERATOR SCREEN FUNCTIONS: The screen shall at minimum have the following capabilities:
1.1.1.11 Positioning material thickness and read-out
1.1.1.12 Feed and speed readout
1.1.1.13 Alarm readout
1.1.1.14 Maintenance controls
1.1.1.15 Recipe Storage
CABINET: The electrical cabinet shall be UL certified.
Additional Accessories DUST EXTRACTION: The contractor shall be responsible for providing a dust extraction/ collection unit that matches the capability and capacity of the equipment being provided.
HOUR METER: The unit shall include an hour meter that tracks equipment runtime for maintenance and production planning.
SAFETY FINGER SWITCH: The unit shall include a safety finger switch on the in-feed side of the equipment.
LED LIGHTS: The unit shall include lights on the front and back of the machine to display machine status.
CONSUMABLES: The unit shall come with a set of the rotary brushes as well as a set of adjustable brushes for laser oxide removal. The unit shall also include a set of abrasive belts to be included with the machine.
Ranges And Capacities Maximum Working Width: At minimum 63 inches Work Height of Opening: 0-4 inches Abrasive Belt Speed: 1000-3000 SFM minimum Abrasive Belt Dimensions: 64 x 85 inches minimum Rotary Brushes: 1200-3400 SFM minimum Brush Head Manifold Rotation: 5-9 RPM minimum Conveyor Feed: 1-24 feet per minute minimum Dust Collector Extraction Capacity: 3,600 CFM minimum CLIN 002 OPTION – Additional Abrasive Belt Head
This CLIN represents the machine including an additional Abrasive belt head with specifications the same as what is listed in section 4.3 of the RIPD.
CLIN 003 OPTION – ADDITIONAL MACHINE (WITH 2 ABRASIVE BELT HEAD)
This CLIN represents a complete 2nd system with all components outlined in section 4 and 5 of this RIPD. This includes everything including a 2nd dust collector etc.
CLIN 004 OPTION – Up to ADDITIONAL 3 MACHINES IN QUANTITY OF 1 MACHINE Units (With 2 Abrasive Belt Head)
This CLIN represents a complete system with all components outlined in sections 4 and 5 of this RIPD. This includes everything including dust collectors etc. The amount of auxiliary components will correlate to the amount of additional machines being requested. This option would be for 1,2 or 3 additional machines to be funded in increments of 1 unit for a maximum of 3 additional units under this CLIN.
INFORMATION TECHNOLOGY SYSTEMS AND SUPPORT
Installation IT Support:
PERSONNEL: RIA-JMTC will not provide the technician credentials to access the workstation. Access to the workstation will be provided by the RIA-JMTC IT Support Staff escort. Removable Media e.g., CD/DVD/USB/SD/External hard drive will be scanned prior to use. Programs and software must be ran from RIA-JMTC approved/provided media or CD/DVD(s). Contractor Devices will not be allowed to connect to the RIA-JMTC network nor will they be allowed to connect to RIA-JMTC equipment other than to scan and transfer media.
Operating System:
The system shall be equipped with a Windows Based Operating System.
INSPECTION/FINAL ACCEPTANCE:
LICENSING: The software/ hardware license shall not have an internet connection. A license dongle or license file must be provided for offline use.
Media/ Devices REMOVABLE MEDIA: Removable media consists of the following: CD, DVD, USB, SD, and External Hard Drives. Removable media shall be scanned prior to use. Programs and software must be ran from RIA-JMTC approved/ provided media or CD/ DVD(s).
CONTRACTOR DEVICES: Contractor Devices will not be allowed to connect to the RIA-JMTC network and they will not be allowed to connect to RIA-JMTC equipment other than to scan and transfer media.
NON-GOVERNMENT OWNED SYSTEMS OR DEVICES: The contractor shall comply with AR 25-1 and AR 25-2. The contractor shall not install or connect non-Government-owned computing systems or devices to Government networks without the COR’s coordination and obtaining the proper authorization from the appropriate Information System Security Manager (ISSM), ensuring that all software has a Government Assess Only Authorization. The non-Government-owned computing systems or devices include, but are not limited to, personal or Contractor-owned thumb drives e.g., memory sticks, flash drives, Universal Serial Bus (USB) drives, jump drives, pen drives, removable or external hard drives, Personal Digital Assistants (PDA), PC Cards/Express Cards, MP3 players, cell phones, digital media, floppy disks, compact disc (CD)/digital video disk (DVD) burners, optical recordings, photo flash cards, laptops, or any devices that can store data.
INFORMATION ASSURANCE AND ACCREDITATION:
Non-Government-Owned computing systems or devices: The Contractor shall comply with AR 25-1 and AR 25-2. The Contractor shall not install or connect non-Government-owned computing systems or devices to Government networks without a government representative coordinating and obtaining proper authorization from the appropriate Information System Security Manager (ISSM), ensuring that all software has a Government Assess Only Authorization. The non-Government-owned computing systems or devices include, but are not limited to, personal or Contractor-owned thumb drives e.g., memory sticks, flash drives, Universal Serial Bus (USB) drives, jump drives, pen drives, removable or external hard drives, Personal Digital Assistants (PDA), PC Cards/Express Cards, MP3 players, cell phones, digital media, floppy disks, compact disc (CD)/digital video disk (DVD) burners, optical recordings, photo flash cards, laptops, or any devices that can store data.COMPONENT SPECIFICATION System Accreditation and Re-Accreditation: The Contractor shall assist in providing system accreditation documentation such as required artifacts and shall answer technical questions required for registration for accreditation. All documents shall be IAW Chapter 5, and Appendices D and E, AR 25-2, Information Systems Security (dated 3 August 2007) and DOD Instruction 8510.01, Risk Management Framework (RMF) Program or future DOD regulation that supersedes these regulations. The Contractor shall assist in performing yearly reviews of the accreditation, or whenever changes/additions are made to the system. The Contractor will assist in preparing risk assessments, as required.
APPROVAL/SHIPPING
Shipping RESPONSIBILITY: The contractor is responsible for delivery of the equipment to the Rock Island Arsenal. Adequate preserving of equipment surfaces, packing, marking, and skidding of materials for shipment shall be the responsibility of the contractor. If special lifting devices, such as hooks or eyes, are required for ease of handling, they shall be supplied with the equipment. Any special devices shall be returned to the contractor upon request only if they will not be required for future movement of the equipment, and at the contractor’s expense.
SHIPPING SCHEDULE: Be aware, the Rock Island Arsenal will only off-load equipment arriving between 6:00 am and 12:00 am (noon), local time on Mondays through Thursdays except holidays. For information concerning holidays, the contractor should consult the contracting officer. There is no place to stage transporting vehicles awaiting the arrival of contractors. All equipment shall be delivered at the same time, meaning the same day (multiple trucks are acceptable) unless pre-authorized to deliver on multiple days by the RIA-JMTC contracting officer.
RECEIVER: All shipments to Rock Island Arsenal including installation tools and/or replacement parts, as well as the original shipment of the equipment, shall be marked “ATTN: Mr. Robert Mcclure TARA-LGC”. Items not correctly marked are subject to being returned at the vendor’s expense.
ARRIVAL INSPECTION: Upon receipt of equipment at Rock Island Arsenal, a preliminary inspection shall be performed to determine condition and/or count. This inspection shall be performed by Rock Island Arsenal personnel.
Installation SITE PREPARATION REQUIREMENTS: The contractor shall be solely responsible for any necessary site inspections required for determining the specifications of work that must be completed prior to final system installation. The contractor will then provide detailed information of any preparation work that the vendor must perform prior to system installation to Rock Island Arsenal.
PREPARATION EXECUTION SUPPORT: Rock Island Arsenal will support the preparation portion of the installation by providing utilities to the points of first connection.
LABOR AND MATERIAL: The supplier is solely responsible for providing all labor, materials, hardware, tools, and equipment necessary for complete installation/start-up of this system except as specifically listed in this document as being provided by the Rock Island Arsenal.
1.1.1.16 Any lubricants, coolants, oils etc. required for initial start-up and operation shall be the responsibility of the contractor to provide.
1.1.1.17 Any anchoring mechanisms/materials shall be the responsibility of the contractor to provide. If RIA-JMTC is installing the foundation, JMTC will be responsible for the installation of the contractor provided anchoring mechanisms in preparation for machine placement.
1.1.1.18 Any decking, stairs, rail systems, or other specialized operator/machine interfaces shall be provided by the contractor for use at the install location SUPERVISION: Supervision of the installation process will be the responsibility of the contractor. Rock Island Arsenal shall retain the right to periodic inspection and evaluation of the process, as it deems necessary.
OFF-LOADING/PLACEMENT: Off-loading of the equipment from the delivery vehicle, and placement of the equipment in position for the installation is the responsibility of the contractor. The contractor shall not be allowed to use government equipment to accomplish this work.
OFF-LOADING/PLACEMENT OPTION: At the request of the contractor, Rock Island Arsenal will perform the off-loading and placement of the equipment.
1.1.1.19 Any special requirements or precautions to be observed shall be the responsibility of the contractor to provide.
1.1.1.20 The contractor or his representative may be present during this process; however, such person will be responsible for being present upon arrival of the equipment at Rock Island Arsenal. Off-loading and placement shall not be delayed to allow arrival of the contractor or his representative.
1.1.1.21 If, due to contractor caused difficulties, the equipment or components of the equipment must be moved, removed or replaced by Rock Island Arsenal after initial placement, the contractor shall be billed for such work at current Rock Island Arsenal labor and overhead rates.
LIABILITY: In any case, the equipment remains the property of the contractor, and the contractor shall assume all responsibility and liability for the equipment and the work performed upon it. The government shall be held harmless for any damage done to the equipment at any time up until final acceptance of the equipment by Rock Island Arsenal, except in the case of intentional damage and/or gross negligence on the part of Rock Island Arsenal personnel.
SET-UP: The contractor shall be responsible for set-up and connection of the equipment beyond connections of the utilities to the points of first connection.
SECURITY: The RIA-JMTC is an Army installation subject to Department of Defense safe guards, various precautions, and plant protection measures. At all times during the execution of this SOW, the contractor will maintain adequate plant protection devises to minimize espionage, sabotage, and other malicious destruction and damage. The contractor shall comply with all security requirements of the Rock Island Arsenal. Rock Island Arsenal Island-wide Force Protection levels may be adjusted/changed at any time, which may cause possible delays and will directly affect procedures for accessing the Island.
Delivery Hours or Service Hours: Service calls, equipment installation, training, and equipment delivery (where the contractor offloads) will only be allowed from 0600 – 1530, Monday through Thursday, except for Government Holidays. Deliveries of items where the contractor has opted for Government “off-loading option”, must be received before 1200 hours. These hours are subject to change, however, the Government will notify the contractor of such changes. The vendor will contact the designated Performance Certifier/ COR to obtain an electronic key for their representative (i.e. delivery driver) in order to have access to the facility. Deliveries and service calls outside the normal hours stated above will be coordinated with the Performance Certifier/ COR to address any emergency situations."
Completion Final acceptance of the equipment shall occur after the following:
1.1.1.22 Set-up completion by the contractor.
1.1.1.23 Successful completion of performance testing at Rock Island Arsenal.
1.1.1.24 Final inspection approval by the government representative or inspector. This is to verify full compliance with this description to include amendments and modifications to the final contract. The government representative shall perform any and all tests he deems necessary to insure compliance with this description and industry standards to include, but not limited to ease of control, convenience of operation, safe operation, and adequacy of lubrication devices.
1.1.1.25 All required training is complete.
1.1.1.26 Complete documentation packages are delivered.
TRAINING
The contractor shall provide instruction in proper operation and maintenance of the equipment without additional cost to the government. Training shall be of sufficient duration that the recipients are able to demonstrate a reasonable level of competence as determined by the equipment installer and/or the inspector. Acceptance may be delayed as a result of inadequate training.
Schedule Training shall training shall be coordinated with the Rock Island Arsenal. Daily training shall begin no later than 6:30 a.m. CST and shall continue until at least 2:15 p.m. CST. This is required to get full coverage of the 1st shift of operation at RIA-JMTC. If training does not begin until after the stated time, RIA-JMTC may at its option require additional training at a different time to compensate for the loss of training caused by the late start. This may include more time than what is represented by the delay (e.g. a 1-hr delay may require 2-hrs later to impart the knowledge lost).
Location All training shall be performed at the Rock Island Arsenal. It shall be performed using the equipment purchased in this description.
Type Each type of training shall be given independently. Rock Island Arsenal shall coordinate with the contractor to provide the proper personnel for each type of training. The following types of training shall be provided by the contractor.
OPERATOR: Training shall be provided by the contractor for (5) operators. This shall include instruction on the safe, efficient operation of the equipment delivered. The trainees supplied by RIA-JMTC shall be familiar with machine operation, but not necessarily with the style or type of controls provided with the equipment. (E.g. for a new CNC lathe, the operator will be familiar with CNC lathe operation, but may have no experience with a Fanuc control system.)
PROGRAMMING: If the equipment includes a programmable controller, programmer training shall be provided, separate from the operator training for (2) personnel. If programming is normally performed by the operator only, then this training may be combined with the operator training.
MAINTENANCE: Mechanical and electrical control and diagnostic maintenance training shall be provided by the contractor. This shall include information on troubleshooting and preventive maintenance procedures. This shall be provided for (2) personnel.
METHODS: Methods Training shall be provided by the contractor. The Methods Division of JMTC traditionally workload parts across various machines within the JMTC factory. The contractor shall provide a general overview of the machine capabilities during this training. This training shall define basic information such as material capable of manufacture with the machine, maximum and/or minimum part size, speeds and feeds, and accuracies of the machine provided. It shall also provide overview of the controls, instructions for basic edit commands, and accessing histories. This training shall be no longer than 4 hours, and provide training for 4 students.
SERVICE
Service/Support Requirements The contractor shall have as a minimum, a verifiable service/repair capability which meets or exceeds the following requirements:
STAFF: Staffed by qualified, English speaking personnel fully knowledgeable in the service/repair of the equipment offered.
TELEPHONE ACCESS: Telephone access to service/repair personnel shall be available for consultation during Rock Island Arsenal normal working hours. Rock Island Arsenal normal working hours are 8:00 am CST to 3:00 pm CST, Monday through Friday, except legal federal holidays.
ON-SITE RESPONSE: Physical, on-site response shall be possible within 48-hrs of notification that service/repair of the equipment is necessary.
MAINTENANCE PARTS: Parts necessary for periodic replacement such as belts, hoses, filters, and other parts normally considered as spare parts, by the manufacturer, shall be stocked and available for shipment.
PRIOR HISTORY: Said service/repair capability shall have been available to the general public prior to the issue date of this purchase description. Adequate proof of prior availability shall be provided upon request.
File details come from the government source that posted it. Updated .