RFQu 25_752_001 RFC No_ 1.pdf

PDF 66 KB Posted

Attached to
RFQu 25-752-001 CM at Risk Allgood ES HVAC Replacement and Renovations
Solicitation number
PE-64410-NONST-2025-000000080
Issued by
Dekalb County, Georgia

About this file

This document is a Request for Qualifications (RFQu) for Construction Management at Risk for the Allgood Elementary School HVAC Replacement and Renovations project in Dekalb County, Georgia. The anticipated scope includes the replacement of major building systems and major renovations at Allgood Elementary School. The projected construction timeline has a Notice to Proceed date of February 2025 and a Substantial Completion date of July 2027. The current student capacity at Allgood Elementary School is 87%. The RFQu outlines the project approach, schedule, personnel, and other qualifications that will be evaluated on a 100-point scale, with 20 points allocated to the project approach.

The RFQu does not provide any details on pricing terms, set asides, incumbents, funding requirements or sources, or other financial information. The document focuses solely on the technical qualifications and capabilities required for the construction management at risk services for this project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Qualifications (RFQu) for

Construction Management at Risk Allgood ES HVAC Replacement and Renovations

DCSD Project No. 201-36 RFQu 25-752-001

Request for Clarification (RFC No. 1

Request for Qualifications (RFQu) for Construction Management at Risk Allgood ES HVAC Replacment and Renovations RFQu 25-752-001 RFC No.1 Page 1 of 1

Item Answer

RFC 1.1 Exhibit A (Blank Score Card) for the Allgood Elementary School HVAC Replacement and Renovations RFP shows the “Project Approach” as 15 points while the RFP says 20 points for the same section (5.1.3). Can you please confirm which is correct?

The RFP is the governing factor for evaluating this solicitation. Exhibit A is an example of the scoring sheet.

RFC 1.2 Under 5.1.3.3 Schedule, it says that the anticipated construction Notice to Proceed is January 2024 with a Substantial Completion of Date of June 2026.

Under 2.0 Scope of Services, D., the Target Schedule shows the Construction as Fall 2025-Fall 2027. Can you please confirm the correct dates for Notice to Proceed and Substantial Completion.

The correct Notice to Proceed date is February 2025 and the Substantial Completion date is July 2027. Please reference Revised page 5 and Revised page 10 included as attachments with this Addendum.

RFC 1.3 What is the current percentage of student capacity at Allgood ES? The current percentage of student capacity is 87%