This document contains details for RFQu No. 25-752-001 CM at Risk for the Allgood Elementary School HVAC Systems Replacement and Renovations project in DeKalb County, Georgia. The project scope includes mechanical and electrical room renovations, kitchen equipment replacement, freezer/cooler replacement, site storm drainage and accessibility improvements, and miscellaneous flooring and painting work. The Construction Manager at Risk (CMaR) firm will provide pre-construction and construction phase services, including cost estimating, scheduling, and managing portable classroom installation for swing space. The estimated construction budget is $20 million, with an early release package for HVAC and electrical work targeted for spring 2025 and final GMP approval in summer 2025. Construction is scheduled for fall 2025 through fall 2027.

The CMaR firm must meet the requirements outlined in the RFQu, have experience with K-12 public school construction management at risk, and be authorized to do business in the State of Georgia with the appropriate professional registrations and licenses. The selected firm will provide a Guaranteed Maximum Price (GMP) for the project, which may include early release packages.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DeKalb County School District RFQu No. 25-752-001 CM at Risk Allgood Elementary School HVAC Systems Replacement and Renovations Project No. 201-36 August 22, 2024 Page 5 of 22

Mechanical and Electrical Room Renovations Replace Kitchen Equipment Replace Freezer/Cooler Improve Site Storm Drainage Improve Site Accessibility Miscellaneous flooring replacement and painting

B. Pre-Construction Phase Services shall include but are not limited to: attending any and all design and preconstruction conferences, assisting and cooperating with the Design Professional with respect to the design of the Project, reviewing and commenting on design documents, constructability review, advertising & conducting pre-bid conference, providing cost estimates & GMP development, preparing construction schedule and incorporating design schedule into a single project schedule, refining general requirements and general conditions, and documenting “as-is” conditions (including offsite utilities from which connections are to be made).

C. Construction Phase Services include, but are not limited to, furnishing, and paying for all management, supervision, financing, labor, materials, tools, fuel, supplies, utilities, equipment, and services of every kind and type necessary to diligently, timely and fully perform and complete the construction of the entire Project in a good and workmanlike manner in accordance with the Construction Documents.

D. Management of portable classroom installation on site for swing space to be included in CMaR scope and

GMP.

A Guaranteed Maximum Price for the Allgood Elementary School HVAC Systems Replacement and Renovations will be agreed upon and approved by the Board of Education and may include early release packages. The estimated construction budget for this project will be $20,000,000 and subject to change.

The Construction Management Firm is to provide all construction management services to deliver to the owner a safe, finished, and fully functioning middle school facility within the estimated construction budget.

Target Schedule:

Early Release Package Release for HVAC and Electrical: Spring 2025 Final GMP Approval: Summer 2025 Construction: Fall 2025 – Fall 2027

3.0 REQUIREMENTS OF CONSTRUCTION MANAGER (CM)

3.1 Firms must meet the following requirements:

3.1.1 Requirements of the Request for Qualifications (RFQu).

3.1.2 It is preferable that the CM has experience providing construction management at risk for K-12 public school programs.

3.1.3 CM’s must be authorized to do business in the State of Georgia and must possess professional service registrations, and general construction licenses in accordance with applicable statutes, regulations, and rules.

3.1.4 CM's must be knowledgeable of the requirements of Georgia Code.

E20146000 Typewritten Text Revised