RFQu_25-057-RM_Addednum_2_.pdf
PDF 129 KB Posted
- Solicitation number
- RFQu 25-057-RM
- Issued by
- Polk County, Lake Harbor CDP, Florida
About this file
This is Addendum #2 to a Request for Qualifications (RFQu 25-057-RM) issued by the Kissimmee Utility Authority (KUA) and the Board of County Commissioners of Osceola County, Florida, for professional engineering consulting and project inspection services for the construction of two 69kV underground transmission circuits. The addendum, issued on July 21, 2025, provides clarifications and modifications to the original solicitation regarding scope of work details, submittal requirements, and professional experience documentation. The original proposal due date of July 29, 2025, has been extended to Tuesday, August 5, 2025, at 2:00 p.m. local time as a one-time extension with no further extensions permitted. The scope of work details are referenced in Section 4, pages 145-147 and 149 of the original RFQu. The addendum removes the page count limitation for bidder responses and eliminates the restriction limiting resume evaluation to four professionals, allowing evaluation of all resumes submitted.
The addendum addresses nine substantive questions and clarifications from prospective bidders regarding various contract requirements and compliance issues. Notably, Kissimmee Utility Authority design criteria documents will not be provided prior to contract award or as part of the public bid process; these will be furnished to the selected Engineer of Record post-award. Several bidders raised concerns regarding indemnification language in Sections 12, 12.1, and 26 of the RFQu, questioning compliance with Florida Statute 725.08; responses to these questions direct bidders to submit exceptions through the Statement of Compliance and Exceptions form. Questions regarding professional standards of care, release language for final payment, and transition structure framing requirements were similarly addressed, with schematic pictures provided regarding framing configuration expectations. Bidders must acknowledge receipt of this addendum by providing a signed acknowledgment with their bid response, and all information contained in the addendum is incorporated into the solicitation document with the same force and effect as the original bidding and agreement documents.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P a g e 1 | 4
TO: All Proposers FROM: Ramandeep Mann, MBA, CPPB, NIGP-CPP DATE: July 21, 2025 RE: RFQu 25-057-RM, Professional Services Request For Qualifications For Engineering Consulting And Project Inspection
Services For The Construction Of Two 69kv Underground Transmission Circuits Funded In Part By Grant Award ED24ATL0G0322 Awarded To The Kissimmee Utility Authority And The Board Of County Commissioners Of Osceola County, Florida, By The Economic Development Administration, U.S. Department Of Congress (“Project”).
ADDENDUM #2
Bidders are hereby notified that this addendum shall be made a part of the above-named Request for Qualification and agreement documents. The items listed below are issued to add, modify, and/or clarify the solicitation document and agreement documents. The items shall have the same force and effect as the original bidding and agreement documents, and cost involved shall be included in the bid pricing. Bids, to be submitted, shall confirm with the addition and revision listed herein. Return this sheet with your bid response.
I. QUESTIONS
Q1. Can you give any additional information regarding a scope of work tailored to the consulting & inspection services?
A1. This is detailed in Section 4. Read page 145, 146, 147, and 149.
Q2. Hello, thanks you for the opportunity to provide underground qualifications for RFQu 25-057-RM Engineering Consulting Services. In order for our team to provide the best possible qualifications response, could we please request an extension of one week, August 5, 2025?
A2. A one-time extension of one week will be granted. No further extensions will be granted.
Q3. Hello, within the RFQ, on page four under Section E. Specific Submittal Format, 1. Introduction "TAB 1" (5 Points), the section states that "this section is not included in the overall page count." Will you please clarify if
P a g e 2 | 4 bidders` responses to this RFQ have a page limitation. If so, what is the limitation or page count for bidders` responses? Thank you.
A3. The page count limitation is hereby removed.
Q4. Hello, can you please clarify on the requirements listed under section 3.
Assigned Professional Experience "TAB 3", item d). It states, "No more than four (4) resumes will be evaluated." We will be proposing with an organizational chart with eight team members listed. This does not include our subcontractor resumes. Based on the wording in item d), will only four out of the eight resumes that we provide will be evaluated? Please clarify.
A4. The limitation on resumes to be evaluated is hereby removed.
Q5. Would the Authority please revise Section 13 of the General Conditions, Special Instructions and Insurance Requirements Section to clarify that the release upon final payment applies only to payment-related claims, since not all potential claims may be known at the time of final payment?
A5. Submit your exceptions with Statement of Compliance and Exceptions form.
Q6. As currently worded in Section 1d. General Conformity on page 87 and in Section 7. Warranty on page 89, the Authority is asking to assume the highest professional standards in performing its work. While vendor is committed to serving its clients, we are only required to do so in accordance with the professional standard of care, which is the degree of care and skill ordinarily exercised by consultants performing the same or similar services in the same locality at the time the services are provided. The relationship currently described in the proposal exceeds the Standard of Care to be provided by Design Professionals. Would the Authority consider modifying this language to comply with the foregoing language?
A6. Submit your exceptions with Statement of Compliance and Exceptions form.
Q7. We request the Authority to address problematic indemnity language in Section 26. Contractor/Bidder Railroad Notification/Coordination Obligation on page 98 of the RFQ as it does not comply with Florida Statute 725.08 by requiring a defense. Will the Authority please consider rewording this language to conform with the statute and deleting the requirement to “defend"?
A7. Submit your exceptions with Statement of Compliance and Exceptions form.
Q8. As currently worded, we believe that the indemnity provisions in Section 12 and Section 12.1 on page 113 of the RFQ are not in compliance with FL
P a g e 3 | 4
Statute 725.08 and is unenforceable. Would the Authority consider rewording same to conform with the statute? Suggested language per FL Statutes 725.08: “The design professional shall indemnify and hold harmless the Authority, and its officers and employees, from liabilities, damages, losses, and costs, including, but not limited to, reasonable attorneys` fees, to the extent caused by the negligence, recklessness, or intentionally wrongful conduct of the design professional and other persons employed or utilized by the design professional in the performance of the contract.”
A8. Submit your exceptions with Statement of Compliance and Exceptions form.
Q9. We would like to inquire whether the Kissimmee Utility Authority (KUA) has published utility design, construction, or service standards that are available for reference by consulting engineers. Specifically, we are interested in any guidelines, specifications, standard details, or procedural documents that govern the planning, design, and installation of electric utility infrastructure within KUA’s service area. Access to these standards will help ensure our designs are aligned with KUA’s requirements and facilitate coordination throughout the project development process A9. KUA has several design criteria documents that will be provided to the selected Engineer of Record (EOR) for incorporation into the design. The KUA criteria documents will not be provided prior to Contract award or broadcast as part of this public bid.
Q10. We are seeking clarification regarding the framing requirements for a proposed transition structure at both ends of the underground line.
Specifically, we would like to confirm whether the framing configuration is intended to differ at each end—given that one end interfaces with a riser pole and the other with a substation termination structure—or whether the same framing is to be applied at both ends, as suggested in Section I.1.i.2 of the referenced documentation RFQu 25-057-RM.
A10. The attached provided pictures are schematic representations of KUA’s expectations for either end at this time. Actual framing will be as dictated by design, as determined by EOR and agreed to and approved by KUA.”
II. DUE DATE EXTENSION
The due date has been extended to Tuesday, August 5, 2025 at 2:00 p.m. local time.
P a g e 4 | 4
III. ATTACHMENTS
Pictures
Bidder(s) must acknowledge receipt of this amendment by signing this form below and returning it with your bid response.
Acknowledgment is hereby made of Addendum #2 to project RFQu 25-057-RM, Professional Services Request For Qualifications For Engineering Consulting And Project Inspection Services For The Construction Of Two 69kv Underground Transmission Circuits Funded In Part By Grant Award ED24ATL0G0322 Awarded To The Kissimmee Utility Authority And The Board Of County Commissioners Of Osceola County, Florida, By The Economic Development Administration, U.S.
Department Of Congress (“Project”).
Bidder Signature Date
Bidder Printed Name Company Name
This addendum is issued to provide additional information, clarification, corrections, additions, deletions and/or to answers questions concerning the above referenced solicitation. All information provided in this addendum is incorporated into the solicitation document as if set forth therein. All other parts of the solicitation have been maintained as originally distributed.
This addendum supersedes any verbal or other instructions given to any proposer qualified to respond pursuant to the requirements set forth in the solicitation document.
File details come from the government source that posted it. Updated .