About this file
Davis Bacon Wage Determination
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Davis_Bacon_Wage_Determination.pdf | ||
| RFQP04171300004_-_Drawings.PDF | ||
| Steam_Line_Scope_of_Work.docx | DOCX document | |
| RFQP04171300005.pdf | ||
| RFQP04171300004_-_Drawings.PDF | ||
| Perma-Pipe_Product_Data.PDF | ||
| Perma-Pipe_Inspection_Report_02-13-2013.PDF | ||
| ncicform.rtf | RTF text file | |
| Solicitation_Cover_Letter_-_Steam_Line_Repair.docx | DOCX document | |
| RFQP04171300004_-_Steam_Pipe.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: MI130074 01/04/2013 MI74
Superseded General Decision Number: MI20120074
State: Michigan
Construction Type: Heavy
County: Washtenaw County in Michigan.
HEAVY CONSTRUCTION PROJECTS
Modification Number Publication Date 0 01/04/2013
CARP0687-006 06/01/2012
Rates Fringes
CARPENTER, Includes Form Work....$ 29.19 22.77
ELEC0252-009 06/04/2012
Rates Fringes
ELECTRICIAN......................$ 38.98 20.18
ENGI0326-008 06/01/2012
Rates Fringes
OPERATOR: Power Equipment
GROUP 1....................$ 38.59 20.30
GROUP 2....................$ 37.09 20.30
GROUP 3....................$ 35.59 20.30
GROUP 4....................$ 35.29 20.30
GROUP 5....................$ 34.47 20.30
GROUP 6....................$ 33.61 20.30
GROUP 7....................$ 32.64 20.30
GROUP 8....................$ 30.93 20.30
GROUP 9....................$ 22.59 20.30
FOOTNOTES: Tower cranes: to be paid the crane operator rate determined by the combined length of the mast and the boom.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Crane with boom & jib or leads 400' or longer
GROUP 2: Crane with boom & jib or leads 300' or longer
GROUP 3: Crane with boom & jib or leads 220' or longer
GROUP 4: Crane with boom & jib or leads 140' or longer
GROUP 5: Crane with boom & jib or leads 120' or longer
GROUP 6: Regular crane operator
GROUP 7: Backhoe/Excavator, Bobcat/Skid Loader, Boring
4/18/2013http://www.wdol.gov/wdol/scafiles/davisbacon/MI74.dvb?v=0
Machine, Broom/Sweeper, Bulldozer, Grader/Blade, Loader, Roller, Scraper, Tractor, Trencher
GROUP 8: Forklift
GROUP 9: Oiler
IRON0025-006 06/04/2012
Rates Fringes
IRONWORKER
Reinforcing.................$ 28.74 23.35 Structural..................$ 33.29 25.34
LABO0334-009 07/01/2012
Rates Fringes
Landscape Laborer
GROUP 1.....................$ 20.96 6.50
GROUP 2.....................$ 16.74 6.50
LANDSCAPE LABORER CLASSIFICATIONS
GROUP 1: Landscape specialist, including air, gas and diesel equipment operator, lawn sprinkler installer and skidsteer (or equivalent)
GROUP 2: Landscape laborer: small power tool operator, material mover, truck driver and lawn sprinkler installer tender
* LABO0499-020 08/01/2012
Rates Fringes
LABORER
GROUP 1.....................$ 27.19 13.13
GROUP 2.....................$ 27.39 13.13
GROUP 3.....................$ 27.51 13.13
LABORER CLASSIFICATIONS
GROUP 1: Common or General; Grade Checker
GROUP 2: Mason Tender - Cement/Concrete
GROUP 3: Pipelayer
PAIN0022-005 07/01/2008
Rates Fringes
PAINTER
Brush & Roller..............$ 25.06 14.75 Spray.......................$ 25.86 14.75
PLAS0514-002 11/01/2011
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 31.91 14.34
PLUM0190-010 06/01/2012
Rates Fringes
PLUMBER..........................$ 37.44 19.92
SUMI2010-072 11/09/2010
Rates Fringes
TRUCK DRIVER: Off the Road Truck............................$ 20.82 3.69
TEAM0007-006 06/01/2012
Rates Fringes
TRUCK DRIVER
Dump Truck under 8 cu.
yds.; Tractor Haul Truck....$ 24.895 .50 + a+b Dump Truck, 8 cu. yds. and over........................$ 24.995 .50 + a+b Lowboy/Semi-Trailer Truck...$ 25.145 .50 + a+b
FOOTNOTE:
a. $351.00 per week.
b. $49.90 daily.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.
The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.
0000/9999: weighted union wage rates will be published annually each January.
Non-Union Identifiers
Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION