ATTACHMENT 4.B Evaluation Methodology

View the file

Other files

File Type Posted
Sol_RFQ-DC-15-00234_Amd_000001.pdf PDF
RFQ_Amendment_1.pdf PDF
Sol_RFQ-DC-15-00234.pdf PDF
ATTACHMENT_2_Clauses.pdf PDF
4ATECHNICAL_EVALUATION_CRITERIA.pdf PDF
RFQ.pdf PDF
ATTACHMENT_3_Instructions_to_Contractors.pdf PDF
ATTACHMENT_1_Performance_Work_Statement.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Factor Does Not Meet At All Meets

1. Experience with measurements of water quality parameters on the Mill Creek in Cincinnati.

1.a Experience with the proposed following six analysis:

total phosphate No experience At least one week total nitrate, No experience At least one week ph No experience At least one week conductivity No experience At least one week turbidity No experience At least one week dissolved oxygen No experience At least one week

1. b Experience with Testing on Mill Creek No experience At least one year

1.c Fully equipped lab within one hour of transportation time of Mill Creek

Lab located further than one hour of transportation time of

Mill Creek

Lab within one hour of transportation time of Mill Creek

2. Experience with volunteer citizen groups performing analyses on Mill Creek in Cincinnati

2.a Previous experience working with volunteer citizens in collecting water samples and lab analysis.

No experience

Any Collaborations lasting longer than one month.

2.b Previous experience with volunteer citizens associated with Mill Creek No experience At least one year

2.c Previous experience with supervising laboratory technicians in water sampling lab analysis. No experience At least one year

3. Quality Assurance Plan and Data Management Plan

3.a Inclusion of appropriate collection and analysis procedures/plans. Lack of plan All six plans

3.b Data management procedures/plans. Lack of plan Complete Plan

4. Ability to collaborate with the Butler Water

Reclamation Facility for laboratory analysis

4.a Previous collaborative efforts with

Butler Water Reclamation Facilty No experience At least one month

4.b Previous interactions with personnel of

Butler Water Reclamation Facility No experience At least one month

*Note

1.b Experience during one year will be defined as any testin glasitn gone month or longer for each year.

2.a Mulitple Collaborations will be considereid to be separate experiences. Ex Two different collaborations during the same year will be considered as two separate experiences.

2.b Multiple collaborations will be considered to be separate experiences. Ex Two different collaborations during the same year will be considered as two separate experiences.

2.c Multiple collaborations will be considered to be separate experiences. Ex Two different collaborations during the same year will be considered as two separate experiences.

4.a Each experience lasting at least one month will be considered as separate even if occuring in th esame calendar year.

4.b Each experience lasting at least one month will be considered as separate even if occuring in th esame calendar year.