ATTACHMENT_3_Instructions_to_Contractors.pdf
PDF 8 KB Posted
- Solicitation number
- RFQ-DC-15-00234
About this file
ATTACHMENT 3 Instructions
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_RFQ-DC-15-00234_Amd_000001.pdf | ||
| RFQ_Amendment_1.pdf | ||
| Sol_RFQ-DC-15-00234.pdf | ||
| ATTACHMENT_2_Clauses.pdf | ||
| ATTACHMENT_4.B._Evaluation_Factors.pdf | ||
| 4ATECHNICAL_EVALUATION_CRITERIA.pdf | ||
| RFQ.pdf | ||
| ATTACHMENT_1_Performance_Work_Statement.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTRUCTIONS TO CONTRACTORS
1. Contractor shall submit a quote on Standard Form 18
2. A quote
3. Contractor shall submit a technical response no longer than ten pages to include front and back.
EVALUATION FACTORS
1. Experience with measurements of water quality parameters on the Mill Creek in
Cincinnati
Experience during one year will be defined as any testing lasting one month or longer for each year.
2. Experience with volunteer citizen groups performing analyses on Mill Creek in
Cincinnati
Mulitple Collaborations will be considereid to be separate experiences. Ex Two different collaborations during the same year will be considered as two separate experiences.
3. Quality Assurance Plan and Data Management Plan
The Data Management Plan must detail quality assurance, data record keeping, data storage and data security.
4. Ability to collaborate with the Butler Water Reclamation Facility for Laboratory
Analysis
Each experience lasting at least one month will be considered as separate even if occuring in th esame calendar year.
File details come from the government source that posted it. Updated .