RFQ27007133 Thorp Hall Specifications.pdf

PDF 10 MB Posted

Attached to
RIC Electrical Upgrade Thorp Hall
Solicitation number
RFQ27007133
Issued by
Providence County, Rhode Island

About this file

This is a Project Manual for the Thorp Hall Electrical Room Renovations at Rhode Island College, a state-funded capital project administered by the State of Rhode Island Board of Education, Capital Projects Administration, and the User Agency at Rhode Island College. The project encompasses sitework enabling installation of new electrical service to Thorp Hall, new electrical service and associated mechanical upgrades, architectural work within the electrical room, telecommunications infrastructure, and asbestos-containing material (ACM) abatement of flooring. The work is a single prime contract awarded on a stipulated price basis, with contract formation occurring upon issuance of the Purchase Order by RI State Purchasing. The project involves demolition and removal work, architectural alterations, electrical installations per specifications and drawings, and network/IT wiring to be performed by Panduit PCI Certified vendors and technicians. The contractor must coordinate extensively with the User Agency given continuous facility occupancy during construction, including adherence to strict working hour restrictions (regular hours 7:00 a.m. to 4:00 p.m. Monday through Friday, with disruptive activities prohibited during certain periods), maintenance of two-week look-ahead schedules submitted by noon on Thursdays, and provision of walk-off mats and barriers to separate work areas from occupied spaces.

The contract requires the contractor to include all premium time wages and second or third shift costs within the base bid price. A Schedule of Values must be submitted on AIA Form G702/G703 before the first Application for Payment is accepted, with monthly progress payments thereafter. The contract includes a 0.5 percent warranty inspection retainage held for twelve months from Substantial Completion, with release contingent upon verification that all systems function properly. Applications for Payment require certified monthly payroll records, RIC Waiver of Lien Forms, digital photographs, updated construction schedules, and a Minority Utilization Report. The agreement form is AIA Document A101-2017 as amended by the State of Rhode Island, with General Conditions per AIA Document A201-2007 as amended by the state. Prevailing wage rates apply per Rhode Island Department of Labor requirements, with employee rates adjusted annually on July 1 per Davis Bacon wage determinations. The design team includes LLB Architects, Building Engineering Resources, INC. (mechanical and electrical engineer), Building Technology Consulting LLC (telecommunications engineer), B+AC (structural engineer), and Universal Environmental Consultants (environmental consultant). Bonds required include Performance Bond and Payment Bond per AIA A312 2010, with specific bonding amounts to be indicated in the Notice of Tentative Award from RI State Purchasing.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

Thorp Hall Electrical Room Renovations Providence, Rhode Island

LLB Architects October 19, 2026

LLB Architects Rhode Island College October 19, 2026 Thorp Hall Electrical Room

Title Page May 28, 2019 Template 00 01 01 Page 1

00 01 01 – TITLE PAGE

Owner:

State of Rhode Island Board of Education, Rhode Island College, and State of Rhode Island

User Agency:

Capital Projects Administration Rhode Island College 600 Mount Pleasant Avenue Welcome Center Suite 300 Providence, RI 02908 Phone: (401) 456-9885

Design Agent:

LLB Architects 161 Exchange Street Pawtucket, RI 02860

401.421.7715

Electrical and Mechanical Engineer:

Building Engineering Resources, INC.

Office Commons 95 351 Centerville Rd Warwick, RI 02886 T 401.384.7682

Telecommunication Engineer:

Building Technology Consulting LLC Bridgewater, MA 02324 William Hooley whooley@buildingtechc.com 508.819.1550

Structural Engineer:

B+AC

578 Main Street, Ste 103 Malden, MA 02148

617.702.4740

Environmental Consultant:

Universal Environmental Consultants 12 Brewster Rd Framingham, MA 01702 508.628.5486 mailto:whooley@buildingtechc.com https://www.avconsultingteam.com/pages/contact

LLB ARCHITECTS TABLE OF CONTENTS

RIC THORP HALL ELECTRICAL ROOM RENOVATIONS

CONSTRUCTION DOCUMENTS Document 00 01 10

DOCUMENT 00 01 10 – TABLE OF CONTENTS

1.1 TABLE OF CONTENTS

Document/Section No. Document/Section Title

Issue

Date

Latest

Revision

Date

INTRODUCTORY INFORMATION

Document 00 00 00 Project Manual Cover 10.19.2026

Document 00 00 10 Title Page 10.19.2026

Document 00 01 10 Table of Contents 10.19.2026

PART A – PROCUREMENT AND CONTRACTING REQUIREMENTS

Document 00 01 15 List of Drawings 10.19.2026

Document 00 40 00 State Procurement Documents 10.19.2026

Document 00 43 00 Bid Bond 10.19.2026

AIA 101-2017

AIA 201-2007

Document 00 50 00 Contracting Forms 10.19.2026

Document 00 51 00 Notice of Award 10.19.2026

Document 00 52 00 Agreement Form 10.19.2026

Document 00 55 00 Notice to Proceed 10.19.2026

Document 00 61 00 Bond Forms 10.19.2026

Document 00 62 00 Certificates and Other Forms 10.19.2026

Document 00 65 00 Closeout Forms 10.19.2026

Document 00 72 00 General Conditions 10.19.2026

Document 00 73 43 Prevailing Wage Rates 10.19.2026

Document 00 91 13 Addenda and Modifications 10.19.2026

PART B – SPECIFICATIONS

DIVISION 1 – GENERAL REQUIREMENTS

Section 01 10 00 Summary 10.19.2026

Section 01 14 00 Coordination of Work with User Agency 10.19.2026

Section 01 17 90 Utility Planning and Interruptions 10.19.2026

Section 01 20 00 Price and Payment Procedures 10.19.2026

Section Waiver of Lien Form Material 10.19.2026

MBE Compliance Form 10.19.2026

Section 01 23 00 Alternates 10.19.2026

Section 01 26 00 Requests for Information 10.19.2026

Section 01 30 00 Administrative Requirements 10.19.2026

Section 01 33 00 Submittal Procedures 10.19.2026

Section 01 35 16 Alteration Project Procedures 10.19.2026

Section 01 35 24 Managing Fire Protection System Impairment 10.19.2026

Section 01 40 00 Quality Requirements 10.19.2026

Section 01 50 00 Temporary Facilities and Controls 10.19.2026

Section 01 60 00 Product Requirements 10.19.2026

Section 01 71 00 Examination and Preparation 10.19.2026

Section 01 74 13 Cleaning 10.19.2026

Section 01 74 19 Construction Waste Management and Disposal 10.19.2026

Section 01 78 00 Closeout Procedures and Submittals 10.19.2026

DIVISION 2 – EXISTING CONDITIONS

Section 02 41 00 Demolition 10.19.2026

DIVISION 3 – CONCRETE

Section 03 05 13 Concrete Sealers 10.19.2026

DIVISION 4 – MASONRY

Section 04 42 20 Concrete Masonry Units 10.19.2026

DIVISION 5 - METALS

Section 05 50 00 Metal Fabrications 10.19.2026

DIVISION 6 – WOOD, PLASTICS, AND COMPOSITES

Section 06 10 00 Rough Carpentry 10.19.2026

DIVISION 7 – THERMAL AND MOISTURE PROTECTION

Section 07 84 10 Penetration Firestopping 10.19.2026

Section 07 92 00 Joint Sealants 10.19.2026

DIVISION 8 - OPENINGS

Section 08 11 10 Hollow Metal Doors and Frames 10.19.2026

Section 08 71 00 Door Hardware 10.19.2026

Section 08 90 00 Fixed Louvers 10.19.2026

DIVISION 9 - FINISHES

Section 09 21 10 Gypsum Board Assemblies 10.19.2026

Section 09 22 16 Non-Structural Metal Framing 10.19.2026

Section 09 90 00 Painting and Coatings 10.19.2026

Section 09 90 23 Interior Painting Schedule 10.19.2026

DIVISION 10 – SPECIALTIES – NOT USED

DIVISION 11 – EQUIPMENT – NOT USED

DIVISION 12 – FURNISHINGS – NOT USED

DIVISION 13 – – NOT USED

DIVISION 14 – CONVEYING EQUIPMENT - NOT USED

DIVISION 21 – FIRE PROTECTION

Section 21 00 00 Fire Protection 10.19.2026

DIVISION 22 – PLUMBING – NOT USED

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

Section 23 00 00 Heating, Ventilating, and Air Conditioning (HVAC) 10.19.2026

DIVISION 24 – 25

[Not Used]

DIVISION 26 – ELECTRICAL

Section 26 00 00 Electrical 10.19.2026

DIVISION 27 – COMMUNICATION

Section 27 00 00 Communications General GMP 10.19.2026

Section 27 05 26 Grounding and Bonding GMP 10.19.2026

Section 27 05 28 Pathways for Communications Systems GMP 10.19.2026

Section 27 05 53 Identification for Telecommunications Systems GMP 10.19.2026

Section 27 08 13 Testing Copper Cables GMP 10.19.2026

Section 27 08 23 Testing Fiber Optic Cables GMP 10.19.2026

Section 27 10 00 Structured Cabling GMP 10.19.2026

Section 27 11 00 Communications Equipment Room and Fittings GMP 10.19.2026

Section 27 13 23 Communications Optical Fiber Backbone Cabling

GMP

10.19.2026

Section 27 15 00 Communications Horizontal Cabling GMP 10.19.2026

DIVISION 28 – 30 – NOT USED

DIVISION 31 – EARTH MOVING

Section 31 00 00 Earth Moving 10.19.2026

DIVISION 32 – EXTERIOR IMPROVEMENTS

Section 32 31 14 PVC Coated Chain Link Fences and Gates 10.19.2026

APPENDIX

Hazmat Report Thorp Hall 10.19.2026

Abatement Plan Thorp Hall 10.19.2026

END OF DOCUMENT 00 01 10

October 19, 2026 Thorp Hall Electrical Room

List of Drawings 00 01 15 Page 1

00 01 15 – LIST OF DRAWINGS

GENERAL

G0.00 COVER

G0.01 PROJECT INFORMATION

STRUCTURE

S0.01 STRUCTURAL DRAWINGS

ARCHITECTURAL DEMOLITION

AD1.00 DEMOLITION PLANS

ARCHITECTURAL

A1.00 PROPOSED PLANS

A8.00 INTERIOR/EXTERIOR ELEVATIONS

A9.00 DOOR & FRAME TYPES AND SCHEDULE

FIRE PROTECTION

FP1.01 FIRE PROTECTION PLAN, LEGEND & DETAILS

MECHANICAL

M0.01 MECHANICAL LEGEND, NOTES, & SCHEDULES

M1.01 MECHANICAL DEMOLITIONS AND NEW WORK PLANS

M2.01 MECHANICAL DETAILS

ELECTRICAL

E0.01 ELECTRICAL LEGEND, NOTES & FIXTURE SCHEDULES

ES1.01 ELECTRICAL SITE PLAN

ES2.01 ELECTRICAL SITE DETAILS

ED1.01 ELECTRICAL FLOOR PLAN - DEMOLITION

E1.01 ELECTRICAL PROPOSED PLANS

E2.01 ELECTRICAL RISER DIAGRAM

E2.02 ELECTRICAL PANEL SCHEDULES AND DETAILS

FA1.01 FIRE ALARM PROPOSED PLANS

TECHNOLOGY

TC0.01 TECHNOLOGY – LEGEND AND NOTES SHEET

TC1.00 TECHNOLOGY – GROUND FLOOR – EXISTING CONDITIONS

TC1.01 TECHNOLOGY – EXISTING CONDITIONS – DETAILS SHEET

TC2.00 TECHNOLOGY – GROUND FLOOR – NEW WORK

TC2.01 TECHNOLOGY – NEW WORK – DETAILS SHEET

END OF SECTION

August 14, 2026 Thorp Hall Electrical Room

Available Information 00 03 00 Page 1

00 31 00 – AVAILABLE INFORMATION

PART 1 - GENERAL

EXISTING CONDITIONS

1. Not Applicable

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION (NOT USED)

Hazardous Materials Inspection Report 00 31 26 Page 1

00 31 26 – EXISTING HAZARDOUS MATERIAL INFORMATION

PART 1 - GENERAL

HAZARDOUS MATERIALS

1. Hazardous Materials Report (see Appendix)

2. Asbestos Abatement Plan (see Appendix)

PART 2 - PRODUCTS (NOT USED)

Geotechnical Data 00 31 32 Page 1

00 31 32 – GEOTECHNICAL DATA

PART 1 - GENERAL

GEOTECHNICAL INFORMATION

A. Not Applicable

PART 2 - PRODUCTS (NOT USED)

State Procurement Documents 00 40 00 Page 1

00 40 00 – STATE PROCURMENT DOCUMENTS

Procurement documents are provided under separate cover.

Bid Bond 00 43 00 Page 1

00 43 00 – BID BOND

See AIA Document A310-2010, example attached as the following page.

Bid Bond 00 43 00 Page 2

Bid Bond 00 43 00 Page 3

Contracting Forms 00 50 00 Page 1

00 50 00 – CONTRACTING FORMS

PART 1 - GENERAL

COPYRIGHT

A. Contractor is responsible for obtaining a valid license to use all copyrighted documents specified or included in the Project Manual.

AGREEMENT AND CONDITIONS OF THE CONTRACT

A. See Section 00 5200 for the Agreement form to be executed.

B. See Section 00 7200 for the General Conditions.

FORMS

A. Use the following forms for the specified purposes unless otherwise indicated elsewhere in the Contract Documents.

B. Bond Forms:

1. Performance Bond and Payment Bond Forms: AIA A312

C. Release of Lien:

1. Release of Liens Form: AIA G706A

2. RIC Waiver of Liens Form 01 20 00

D. Insurance certificate, supplementary attachment:

1. ACORD Certificate of Insurance Form: AIA G715

REFERENCE STANDARDS

A. AIA G706A – Release of Liens: 1994.

B. AIA A312 - Performance Bond: 2010 and Payment Bond: 2010.

C. AIA G715 – ACORD Certificate of Insurance: 1991.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION (NOT USED)

Notice of Award 00 51 00 Page 1

00 51 00 – NOTICE OF AWARD

RI State Purchasing shall issue the Notice of Tentative Award.

Agreement Form 00 52 00 Page 1

00 52 00 – AGREEMENT FORM

PART 1 - GENERAL

AGREEMENT FORM

A. The Agreement Form to be utilized on this project is AIA Document A101-2017 as amended by the state https://ridop.ri.gov/vendor-resources/public-works-aia-custom-state-rhode-island-documents.

B. Agreement made as of the date of issue of the Purchase Order for this Work.

C. This Agreement is entered into as of the date of the applicable Purchase Order and is assumed as executed once the Purchase Order is issued.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION

EXECUTION OF THE AGREEMENT

A. Following the issuance of the Notice of Tentative Award, the user Agency, Design Team and Contractor shall convene a Pre-Award Conference. Meeting minutes from the Pre-Award Conference and acceptance of the minutes by the Contractor shall be incorporated into the Contract.

B. The User Agency will transmit the A101-2017 to the Contractor for signature. The Contractor will sign and return the contract to the User Agency, who then transmits it to the RI State Purchasing Office for final signatures.

END OF SECTION

October 19, 2026 https://ridop.ri.gov/vendor-resources/public-works-aia-custom-state-rhode-island-documents

Notice to Proceed 00 55 00 Page 1

00 55 00 – NOTICE TO PROCEED

RI State Purchasing shall issue the Purchase Order. The User Agency shall issue the Notice to Proceed, per AIA A101-2017 as amended by the state §3.1.

Bond Forms 00 61 00 Page 1

00 61 00 – BOND FORMS

The RI State Purchasing Notice of Tentative Award indicates the required bonding forms for this project.

Certificates and Other Forms 00 62 00 Page 1

00 62 00 – CERTIFICATES AND OTHER FORMS

PART 1 - GENERAL

ARCHITECT PROVIDED CERTIFICATES AND PROJECT FORMS

A. LLB Request for Submittal Review Form

USER AGENCY PROVIDED FORMS

A. Not applicable

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION (NOT USED)

Closeout Forms 00 65 00 Page 1

00 65 00 – CLOSEOUT FORMS

PART 1 - GENERAL

CLOSEOUT FORMS

A. The following forms are required as part of the closeout documentation:

1. Transmittal on Contractor’s letter head for each package of documents transmitted.

2. Upon Substantial Completion, the User Agency shall provide copies of the AIA Documents indicated in Section 01 74 19.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION (NOT USED)

General Conditions 00 72 00 Page 1

00 72 00 – GENERAL CONDITIONS

PART 1 - GENERAL

GENERAL CONDITIONS

A. The General Conditions to be utilized on this project are AIA Document A201-2007 as amended by the state.

https://ridop.ri.gov/vendor-resources/public-works-aia-custom-state-rhode-island-documents

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION

EXECUTION OF THE GENERAL CONDITIONS

A. The User Agency will transmit the A201-2007 as amended by the state to the Contractor. The contractor shall initial and return to the User Agency, who then transmits it to the RI State Purchasing Office.

B. Any conflicts with the general provisions included in the project manual, and the A201-2007 as amended by the state, the provisions in form A201-2007 as amended by the state will take precedence.

Prevailing Wage Rates 00 73 43 Page 1

00 73 43 – PREVAILING WAGE RATES

The State of Rhode Island Department of Labor, Division of Professional Regulation General Decision Modification document is an integral part of the Bid Documents for use in fulfilling prevailing wage rate requirements. A copy is available linked to the web site of the State of Rhode Island Department of Administration, Division of Purchases. Contractors working on RI Prevailing Wage projects must adjust employee hourly rates every July 1 in accordance with updated Davis Bacon rates. These rates may be obtained at the following website:

https://sam.gov/content/wage-determinations

The Division of Purchases Web Site Address is: http://www.purchasing.ri.gov/RIVIP/Info.asp

The link for the US Government prevailing wage tables is:

http://www.purchasing.ri.gov/bidinfo/geninfo/geninfo.aspx

Applicable Rhode Island labor laws may be found at: http://www.dlt.ri.gov/pw/

END OF SECTION

October 19, 2026 https://sam.gov/content/wage-determinations http://www.purchasing.ri.gov/RIVIP/Info.asp http://www.purchasing.ri.gov/bidinfo/geninfo/geninfo.aspx http://www.dlt.ri.gov/pw/

Addenda and Modifications 00 91 13 Page 1

00 91 13 – ADDENDA AND MODIFICATIONS

PART 1 - GENERAL

A. As of the time of publication of this Project Manual, no Addenda had been issued.

B. Should Addenda be issued during the Bid Period, they will augment this Document and become a part of the Project Manual.

C. Such Addenda and Modifications when issued, with reference to the Project Manual, the General Conditions, Supplemental General Conditions, Drawings or Specifications, shall be inserted following this page and become integral parts of the Contract Documents.

Summary 01 10 00 Page 1

01 10 00 – SUMMARY

PART 1 - GENERAL

PROJECT

A. The Project consists of the construction of the following types of work:

1. Sitework enabling the installation of the new electrical service to Thorp Hall.

2. New electrical service to Thorp Hall and associated mechanical upgrades.

3. Architectural work in the electrical room.

4. Telecommunications work.

5. Abatement of ACM containing flooring.

CONTRACT DESCRIPTION

A. Contract Type: A single prime contract based on a Stipulated Price as described in Document 00 50 00 – Contracting Forms.

DESCRIPTION OF WORK

A. Scope of demolition and removal work is shown on drawings.

B. Scope of alterations work is shown on drawings and/or as specified herein.

C. Site modifications: new work and demolition as shown on drawings

D. Architectural scope: as shown on architectural drawings and per specifications.

E. Electrical Work: as shown on electrical drawings and per specifications.

F. Telecommunications: as shown on telecommunication drawings and per specifications.

SCHEDULE

A. Refer to RFP.

ITEMS TO BE SALVAGED

A. None

SUBCONTRACTOR CERTIFICATION REQUIREMENTS

A. Network/IT wiring to be installed by Panduit PCI Certified vendor and technicians. This includes wire runs and terminations.

B. See individual Specification sections.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION (NOT USED)

Coordination of Work with Owner 01 14 00 Page 1

01 14 00 – COORDINATION OF WORK WITH USER AGENCY

PART 1 - GENERAL

SECTION INCLUDES

A. Contractor Use of Site and Premises.

B. Utility and Building Services Outages and Shutdowns.

C. Construction Requirements in Occupied Buildings.

D. Construction Activities in Occupied Spaces.

E. Time Restrictions and Working Hours.

F. Schedule Coordination.

CONTRACTOR USE OF SITE AND PREMISES

A. Construction Operations: Limited to areas noted on Drawings. Coordinate with Site Utilization Requirements. Include in the Base Bid all costs of this coordination, including all premium time wages that may be required to meet these requirements and project schedule. Cost of all work done during second or third shifts or on weekends and holidays shall be included in the bid price.

Contractor is responsible for protection and restoration of existing conditions including, but not limited to hardscape, landscape and lawns.

B. Arrange use of site and premises to allow:

1. Adjacent projects to progress as planned for the User Agency.

2. Use of street and adjacent properties by the Public.

3. Continued operation of the facility.

C. For activities requiring closure of parking lots, roadways and/or walkways, seven (7) days’ notice is required. Refer to Section 01 50 00 Temporary Facilities and Controls for further information.

D. Provide access to and from site as required by law and by User Agency:

1. Maintain appropriate egress for workforce and users of the facility.

2. Do not obstruct roadways, sidewalks, or other public ways without permit. Provide necessary signage and barriers to direct pedestrians around work areas.

3. Barriers and signage must be provided by the contractor to the satisfaction of the User Agency to separate the work area from occupied areas. Efforts must be taken to limit dust, noise and odors from escaping the work area. Proper separation and protection of interior spaces shall be established and maintained during the project, to the satisfaction of the User Agency.

4. Contractor is responsible for cleaning construction dust and/or debris from public areas and daily or at the request of the User Agency. Work areas within the building shall be kept tidy at all times.

5. Contractor shall provide and maintain walk-off mats at all entrances to the work site from occupies areas.

UTILITY AND BUILDING SERVICES OUTAGES AND SHUTDOWN:

A. Prevent accidental disruption of utility services to other facilities. Contractor is responsible for restoration and damages resulting from unplanned disruptions to utilities.

B. For life safety systems interruptions or shutdowns, including but not limited to fire sprinklers and fire alarm system, seven (7) days’ written notice to User Agency and authorities having jurisdiction shall be provided. Contractor to utilize Fire Sprinkler and Alarm System Impairment Notification Forms found in Section 00 73 02. Contractor is responsible for providing Fire Alarm Technician or support

Coordination of Work with Owner 01 14 00 Page 2 personal to provide the necessary bypassing or fire watch as required for fire sprinkler or other life safety shutdowns.

C. Electrical, plumbing, network and other utility shutdowns shall be scheduled off hours. Contractor shall provide written request for utility shutdown at least 72 hours in advance.

D. When construction activities impact ventilation, heating or air conditioning to occupied building spaces, the contractor shall provide the necessary equipment to maintain proper ventilation rates and a temperature of 68° heating and 72° cooling. Prior to the decommissioning of equipment, the contractor shall submit a plan for temporary HVAC services, including unit location, utility connection, ductwork tie in and other logistical considerations.

E. Refer to Section 01 17 90 Utility Shutdowns for more information.

CONSTRUCTION REQUIREMENTS FOR OCCUPIED BUILDINGS:

A. User Agency intends to continuously occupy the facility. Work areas will be made available as mutually agreed to during project scheduling.

B. The Building and surrounding areas will be occupied during construction. The Contractor shall be solely responsible for initiating, maintaining and supervising safety, security and protection programs and shall comply with all applicable laws, ordinances, rules and regulations concerning safety of people and the protection of property.

C. Barriers and signage must be provided by the contractor to the satisfaction of the User Agency to separate the work area from occupied areas. Appropriate signage, approved by the User Agency, shall be placed at all potential entrances to the Project Site and maintained throughout the project.

D. Efforts must be taken to limit dust, noise and odors from escaping the work area. Proper separation and protection of interior spaces shall be established and maintained during the project, to the satisfaction of the User Agency. Contractor shall provide and maintain walk-off mats and plastic barriers at work site entries.

E. Contractor shall provide appropriate masking of building supply air intakes to protect indoor air quality and limit transfer of odors. Contractor to coordinate with User Agency regarding shut down of appropriate units as work continues.

F. Contractor to provide air scrubbing and/or negative air machines to prevent odors from escaping the Project Site.

G. During the progress of the Work, the Contractor shall so conduct his work that as little inconvenience as possible is caused to the occupants. At the close of the work each day, the Contractor shall pick up and stow all equipment and miscellaneous material leaving the site in a neat and safe condition.

H. The Contractor shall repair or replace, at his own expense, with new any item, surface, or object that is damaged by the Contractor or damaged because of the Contractor's actions during the course of the Work and during any guarantee period.

I. Site and building conditions shall be restored to their condition as they were at the start of the Work.

Before commencing work, the Contractor shall report any existing damage to the Architect in writing to assure that the Contractor will not be liable for preexisting damage.

J. Contractor is responsible for cleaning construction dust and/or debris from public areas and daily or at the request of the User Agency. Work areas within the building shall be kept tidy at all times.

K. Refer to Section 01 50 00 – TEMPORARY FACILITIES AND CONTROLS for more information.

CONSTRUCTION ACTIVITIES IN OCCUPIED SPACES

Coordination of Work with Owner 01 14 00 Page 3

A. The Project Site is defined as the immediate rooms under construction at a given time. Any work in vertically or horizontally adjacent classrooms, hallways, MEP/IT/FP spaces and grounds outside the footprint indicated on the Site Utilization Plan shall be considered as being outside the Project Site.

Areas outside the project site are identified as Occupied Spaces.

B. The safety of building occupants and construction workers is paramount. All construction activities within Occupied Spaces shall be marked with cones and caution tape. Computer generated signage shall be provided indicating the path of travel around construction zones, and shall also be posted at stairwell doors indicating where internal construction activities may take place.

C. Activities which require work in Occupied Spaces shall be specifically and clearly indicated on the Two-Week Look-Ahead and confirmed with the User Agency at least two (2) business days in advance.

D. Sufficient time to clean up work zones shall be allocated at the end of the shift. All construction activities within the building shall be thoroughly vacuumed, wet mopped and cleaned to the satisfaction of the User Agency at the end of each shift.

E. Use of exterior occupied spaces will be permitted during off-hours as permissible provided such use is coordinated with the User Agency at least 72 hours in advance.

F. All construction materials, tools and debris must be removed from occupied building spaces once construction activities have ended for the day. Occupied spaces must be returned to original conditions to the greatest extent possible by 8am weekdays. If it is not feasible to do as such, notify the User Agency immediately. With approval, the area shall be cordoned off with cones and caution tape and computer generated signage shall be posted to the satisfaction of the User Agency.

TIME RESTRICTIONS AND WORKING HOURS

A. Include in the Base Bid all costs of this coordination, including all premium time wages that may be required to meet these requirements and project schedule. Cost of all work done during second or third shifts or on weekends and holidays shall be included in the bid price.

B. Disruptive Activities & Work Restrictions The College uses the following categories to indicate work activities allowable during certain time periods:

1. No Work: on site work is prohibited to take place during this time. Workers are prohibited from the site without prior notification to the User Agency. In order to ensure the safety of occupants and preserve the educational experience, work MAY NOT take place during the time periods specified in Paragraph C, below.

2. Quiet Work: vibration producing work may not occur. Work that generates noise or odors that would escape the project site and cause disruption to occupant in adjacent Occupied Spaces is prohibited. Disallowed activities include but are not limited to: demolition of block and concrete, use of jackhammers, saw cutting, hammer drilling, connecting to building structure, mechanical fastening and other work activities which provides loud noises or vibrations that are constant in nature. Use of heavy solvents, odious paints and other irritants which cannot be contained through mechanical or physical barriers prohibited. Work in Occupied Spaces prohibited unless specific, written authorization is requested and granted.

a. It is the sole discretion of the User Agency to determine if activities are considered disallowed during quiet work periods. The designation of disallowed activities is contingent on location within the job site and the activities of the occupants.

b. The contractor my request a “disturbance test” which may allow for some disallowed activities to take place during quiet work times. Contractor may request with 24 hour notice to run a limited test to determine if a specific activity in a set location can be performed during quiet work periods. The User Agency will observe the impact on the occupied areas

Coordination of Work with Owner 01 14 00 Page 4 and determine if the activity take place. Waivers resulting from disturbance tests will be valid for a set period of time, based on construction activities and occupant usage.

3. No Restrictions: normal construction activities may take place. No restrictions on noise or vibrations. Utility shutdowns may occur following proper notifications.

a. This project’s unrestricted hours are 10pm-8am Sunday-Friday and weekends between 5pm

Friday and 8am Monday.

C. Working Hours

1. Contractor is expected to plan and execute the work on schedule within the parameters indicated above. Regular working hours for contractors are between 7:00 a.m. and 4:00 p.m., Monday through Friday. Work that is to take place outside of these timeframes are to be reflected on the Two Week Look-Ahead.

2. Contractor is permitted to work holidays, nights and weekends if it is communicated two (2) business days in advance.

3. In the event of adverse weather, the College is open unless a State of Emergency is called by the Governor. The College is not responsible for lost time due to weather. Contractor to communicate with Project Manager regarding the college’s status.

SCHEDULE COORDINATION

A. The contractor shall provide, in writing, via email, by noon on Thursdays the two week project look ahead which lists in detail the planned activities, locations of disturbance, scheduled subcontractors and working hours for the forthcoming Sunday-Saturday. The same shall be provided for the second week, but as a working draft. The document shall list out any utility shutdowns or other activities which require review and approval of the User Agency. Failure to provide the Look Ahead may result in a reduction of payment of general requirements line item in the following pay requisition.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION (NOT USED)

Utility Shutdowns 01 17 90 Page 1

01 17 90 – UTILITY PLANNING AND INTERRUPTIONS

PART 1 - GENERAL

SECTION INCLUDES

A. This section details the minimum coordination requirements for system connections and service interruptions that may be required for new construction and renovation projects.

B. Requirements.

C. Outage Types.

D. Outage Planning.

E. Outage Requirements.

F. Scheduling.

G. Outage Coordination

REQUIREMENTS

A. If a project or contract work requires the shutdown or de-energizing of any campus utility or building system, Contractor shall notify, in writing, the User Agency’s Project Manager at least ten (10) calendar days in advance of the planned outage. User Agency’s Project Manager shall be responsible for contacting Facilities Operations and scheduling a meeting to review the shutdown. (Refer to Scheduling section).

B. In general, Contractors are not allowed to operate valves open or closed, or energize and de-energize switches without prior coordination and approval from the User Agency. Exceptions to this policy are for new construction or within buildings that are closed for total renovation, where the utilities affected are within the construction zone and have been verified ahead of time not to have an adverse effect on other building or campus operations.

C. Chilled water, high temperature hot water and steam shutdowns can be scheduled only during off-peak seasons with limited exceptions such as an emergency repair.

D. Contractors shall coordinate to have the building fire alarm system disabled prior to performing any work, such as cutting or welding that may cause inadvertent operation of the fire alarm system, (“Hot Work”) and arrange for it to be enabled at the completion of the work.

E. “Hot work” permits are required prior to any cutting and welding operations within buildings; follow all policy safety precautions.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION

OUTAGE TYPES

A. There are three general types of outages, depending upon the impact that the work will have on existing building infrastructure and campus utilities. The level of planning and detail coordination required varies for each, as noted below.

1. Independent Outages:

a. Independent outages typically have no impact on existing campus utilities, operating communications infrastructure, building occupants or building systems. Examples include

Utility Shutdowns 01 17 90 Page 2 work within new building construction or “gut” building renovations, or installation of new campus utilities not yet in service.

b. For independent outages, the Contractor shall contact the User Agency’s Project Manager to coordinate the outage scheduling, as well as outage notification, to other College departments and building Users affected by this work. Facilities Operations support is not required for this type of outage.

2. Minor Outages:

a. Minor outages typically have a limited impact on existing campus utilities, including operating communications infrastructure within the project site or running through the site;

building occupants or building systems. Examples include fire alarm zone lock-outs for welding or other “Hot work” permits, to suit the installation of new fire alarm devices, or for branch line water shut-offs to suit connections of new plumbing fixtures.

b. For Minor outages, limited College coordination is required; the Contractor shall contact the User Agency’s Project Manager to coordinate the outage scheduling with Facilities Operations and the College’s trade staff. Details of the outage work will be developed as a general scope of work.

c. Project Manager will also coordinate the outage notification to other College departments and building Users affected by this work. Minimum outage notification times are required and an outage coordination meeting prior to the outage is required to review outage scope and details (See Scheduling section).

3. Major Outages:

a. Major outages typically have a significant impact on existing campus utilities, communication systems and infrastructure, building occupants or building systems. Examples include shut down of building electrical power systems, central heating and cooling systems, shutdown of BAS and fire alarm systems, or shutdown of campus water, heating and chilled water systems.

b. For Major outages, significant coordination is required for both the Contractor and the User Agency. Determination of major outages will be made in the Project Planning phase. Details of the outage work, and general outage scheduling will be developed during the design phase as an outage checklist (OCL).

c. During the construction phase, Contractor shall coordinate outage scheduling with the User Agency’s Project Manager who will contact Facilities Operations to coordinate the required to support the outage work, as well as develop work orders for Trades support.

d. User Agency’s Project Manager will also coordinate the outage notification to other College departments and building Users affected by this work. Minimum outage notification times are required and an outage coordination meeting prior to the outage is required to review outage scope and details (See Scheduling section).

OUTAGE PLANNING

A. The Contractor will utilize the Utility & Critical System Outage Checklist deliverables provided in the Design phase and incorporate all required outages into their project construction schedule as milestone activities.

B. The Contractor shall utilize and update the draft Utility & Critical System Outage Checklist(s) (OCLs) (as developed by the Design Agent) based on their proposed project schedule and plan for construction.

C. The updated Utility & Critical System Outage checklist shall be used for required outage coordination review meetings to review and confirm the outage impacts and resources required to support the outage from the College, the project team or others. Updated outage checklists shall clearly identify:

1. Project impacts (what buildings, utility systems and/or system loads are impacted by the work).

Utility Shutdowns 01 17 90 Page 3

2. Any updates determined in the course of Contractor’s physical walkdown and verification of what systems and equipment are affected by the proposed shutdown.

3. Outage schedule (time/date of when work will be performed and outage durations), including contingency communications for work that will extend beyond schedule;

4. Required prep work to be completed or to be in place prior to support the actual outage work (install portable generator(s), pipe flushing procedures, filling and venting procedures, etc.).

5. Brief description of the actual outage work and essential tasks being performed during the outage (Switches or valves being opened/closed, piping connections, etc.);

6. Note key coordination issues that need to be included as a part of the outage (need for portable generators to maintain power, street closure(s), police details, etc.).

7. For hydronic systems, include how system draining, flushing, refilling and venting will be accomplished.

8. For building electrical system outages, include copies of the panelboard schedules for all affected electrical equipment (panelboards, switchboards, motor control centers, etc.).

9. Review and identify any potential outage impacts that may affect ongoing critical Research and Academic activities: i.e.: campus water and/or electrical services; building ventilation and exhaust systems, BAS controls, etc.

10. Listing of key contacts and phone numbers for the Contractor, Facilities Operations, Information Technology Services (ITS) DPS staff, and affected building staff.

D. As a prerequisite of outage planning and preparations, it is the responsibility of the Contractor to perform their own visual inspection and walk down to verify what utilities and systems will be physically affected by the shutdown. This effort shall be made after review of available Record documentation, and consultations with the Design Agent, User Agency’s Project Manager and Facilities Operations, as well as other affected College departments, such as Environmental Health & Safety, Informational Technology, etc. The intent of the physical inspection and walkdown is to:

1. Verify known systems and system loads that will be affected by the outage.

2. Identify any other undocumented systems and loads that may be affected by the proposed outage.

3. Verify locations of existing system isolation switches, valves, bypasses, and temporary services.

OUTAGE REQUIREMENTS

A. Facilities Operations shall be notified for all interruptions that affect building fire alarm and detection systems, fire suppression systems (fire sprinklers, kitchen hood suppression systems, dry systems, clean agent or Halon suppression systems), fire pumps and water distribution lines that connect to fire suppression systems.

B. For Research facilities, Facilities Operations shall be notified of all interruptions affecting: fume hoods, HVAC supply and exhaust systems, Potable and non-Potable water systems, electrical, heating and cooling systems and Process cooling systems.

C. The College’s Information Technology Services (ITS) office requires notification for all communications systems and infrastructure outages and interruptions that affect telephone or network services.

D. Proper Lockout/Tagout procedures shall be followed by both the Contractor and College’s staff.

SCHEDULING

A. Outage dates shall be coordinated with the College’s Academic calendar and identified blackout (no outage work) periods. Outages will occur off hours unless otherwise approved by the User Agency.

B. Independent Outages: Per the User Agency’s discretion.

Utility Shutdowns 01 17 90 Page 4

C. Minor Outages: normal workday hours; 48-hour minimum advance notice. Weekend/off-hours; 72-hour minimum advance notice. Actual outage scheduling is subject to User Agency’s staff availability.

D. Major Outages: As determined by draft Utility & Critical System Outage checklist: minimum (2) week notice after approval; (4) weeks is preferred for major shutdowns.

E. The User Agency’s Project Manager will assist the Constructor in the scheduling, as well as the notification of, related building Users and other College departments affected by this work.

F. Steam Shutdowns must be coordinated through the Project Manager. Facilities Management will perform all steam shutdowns. The contractor must provide a minimum of ten (10) calendar days’ notice to the Project Manager for a pre-scheduled shutdown. The pre-scheduling must take place as far in advance as practicable, and no later than 30 days in advance.

OUTAGE COORDINATION

A. The Project Manager shall coordinate the shutdown details required for the project with the Facilities and Operations staff, the project team, Campus Police, and the Building Users (as required by the particular system interruption).

B. A coordination meeting shall be held with representatives of the Contractor, affected building Users, and other concerned parties to review the planned outage sequences and timing. Facilities Operations staff will generally advise of what campus operations and building Users will be affected by the proposed outage or shutdown; the Project Manager is in turn responsible to contact all the affected groups to determine the proper time for the shutdown and any special requirements to be provided during the shutdown.

C. A Utility and Critical System Outage Checklist (OCL) is required to be filled out for each major outage by the Design Agent and Contractor, with support from the Project Manager. The checklist includes relevant pre-outage work required prior to the outage, sequence(s) of work to be performed during the outage, expected outage times and durations, and key contact (cell phone) information for the Contractor, Facilities Operations staff, other affected College Department staff and affected Users.

The completed checklist requires sign-off from the Facilities Operations Director.

D. The Project Manager will submit the signed outage checklist to Facilities Operations, who will then assign to the appropriate staff to perform and monitor the shutdown. The Project Manager will also formally notify all affected parties of the planned outage date(s) by e-mail and physical posting of the impacted buildings.

Price and Payment Procedures 01 20 00 Page 1

01 20 00 – PRICE AND PAYMENT PROCEDURES

PART 1 - GENERAL

SECTION INCLUDES

A. Sales tax exemption.

B. Allowances.

C. Testing and inspection allowance.

D. Unit prices.

E. Alternates.

F. Schedule of values.

G. Applications for payment.

H. Change procedures.

I. Defect assessment.

J. Warranty inspection retainage.

K. Waiver of Lien Form

L. MBE Compliance Form

TAX EXEMPTION

A. The State of Rhode Island is exempt from payment of any federal or state excise, transportation, or sales tax. Refer to A201-2007 General Conditions §3.6.2.

1. Place exemption certificate number on invoice for materials incorporated in the Work of the

Project.

2. Furnish copies of invoices to Owner.

3. Upon completion of Work, file a notarized statement with Owner that all purchases made under exemption certificate were entitled to be exempt.

4. Pay legally assessed penalties for improper use of exemption certificate number.

ALLOWANCES

A. Refer to A201-2007 §3.8 for Allowance provisions. General Contractor overhead and profit, bonding and other fees should be calculated into the Contract Sum and may not be assessed on Allowance Usage.

B. Design Agent Responsibility:

1. Consult with Contractor for consideration and selection of products, suppliers, and Installers.

2. Select products in consultation with User Agency and transmit decision to Contractor.

3. Prepare Change Order to account for the use of allowance.

C. Contractor Responsibility:

1. Assist Design Agent or its Consultants in selection of products, suppliers and installers.

2. Obtain proposals from suppliers and installers, and offer recommendations.

3. On notification on selection by Design Agent, execute purchase agreement with designated supplier and installer.

4. Arrange for and process shop drawings, product data, and samples. Arrange for delivery.

Price and Payment Procedures 01 20 00 Page 2

5. Modify the Schedule of Values to provide line items for each approved use of an allowance.

6. Promptly inspect products upon delivery for completeness, damage, and defects. Submit claims for transportation damage.

D. Schedule of Allowances: Allowances

1. Please refer to the Bid Form for the list of Allowances.

TESTING AND INSPECTION ALLOWANCE

A. All costs of regularly scheduled testing are included in the Base Bid. See Bid Form for allowance to cover costs of additional testing to be provided when directed by the User Agency.

B. See Section 01 40 00 and its attachment for testing requirements.

UNIT PRICES

A. See Section 01 22 00.

ALTERNATES

A. Alternates quoted on Bid Forms will be reviewed and accepted or rejected at the User Agency’s option. Accepted Alternates will be identified in the Purchase Order.

B. Coordinate related work and modify surrounding work as required.

C. Schedule of Alternates: See Section 01 23 00.

SCHEDULE OF VALUES

A. Refer to A201-2007 General Conditions §9.2 for Schedule of Values provisions. Contractors are encouraged to submit the Schedule of Values as soon as practical after contract commencement, but within the duration indicated in the General Conditions.

B. Schedule of Values (SOV) shall only be accepted on an original AIA Form G702 - Application and Certificate for Payment and AIA G703 - Continuation Sheet.

C. Format:

1. Utilize the Table of Contents of this Project Manual. Identify each line item with number and title of the major specification Section.

2. At a minimum, provide line items under the heading General Conditions for: Site

Mobilization, Bonds, Insurance, Permits, Construction Schedules, Temporary Facilities, Project Management & Supervision, General Cleaning, and Dumpsters & Trash Removal.

The Design Agent and User Agency reserves the right to request further breakout beyond those requested here.

3. At a minimum, provide line items under the heading Closeout for: Final Cleaning, Monetized Punchlist (zero value at start of contract), Administrative Closeout, Owner’s Manual, Project Record Documents and Warranty Retainage (.5%). The Design Agent and User Agency reserves the right to request further breakout beyond those requested here.

4. Per A101-2017 §5.5, out of state firms shall also include a “Foreign Company” line item valued at 3% of the Contract Sum.

5. Provide separate line items for Labor and Materials where the value is greater than $10,000.

6. Provide separate line items where multiple vendors or subcontractors are providing services.

7. No single line item shall exceed twenty percent (20%) of the total contract.

8. Identify each Allowance as a line item.

9. Identify each Alternate as a line item.

Price and Payment Procedures 01 20 00 Page 3

D. Submit for review and approval to the Design Agent and User Agency the Schedule of Values prior to the first Application for Payment. Indicate in the email the intended date for each progress payment, typically the last day of the month. The first Application for Payment will not be accepted until the SOV is approved.

E. Revisions:

1. Once approved, the SOV shall only be revised to accommodate changes to the Contract

Value.

2. Revise SOV to list changes to the contract value for which a revised Purchase Order has been issued. Provide a heading for the Change Order Number and list Change Order Proposals comprising said Change Order as individual lines on the SOV.

3. As Allowances are used, under the heading for the appropriate allowance, list Change Order Proposals charged to the Allowance as individual lines on the SOV. For unit cost Allowances, identify quantities taken from Contract Documents multiplied by the unit cost to achieve the total for the item.

APPLICATIONS FOR PAYMENT

A. See General Conditions §9.3 for Applications for Payment provisions. Contractors shall submit for payment on a monthly basis.

B. Prepare a draft version “pencil copy” of each application.

1. The Pencil Copy shall be distributed via email ten (10) calendar days prior to the established date for progress payment for review by Design Agent and User Agency’s representative.

2. Accompanying the Pencil Copy, Contractor shall provide a summary list of all sub-contractors who performed work on the site for the month.

3. Design Agent and User Agency’s representative shall review the Pencil Copy and request adjustments as appropriate.

4. Contractor shall make agreed revisions and prepare final for payment

C. Submitting for Payment

1. Prepare one (1) original of the approved AIA Form G702 - Application and Certificate for

Payment and AIA G703 - Continuation Sheet, accompanied by three (3) copies.

2. Individually sign and notarize and emboss with notary's official seal, the original and each of the three (3) copies. Deliver to Design Agent for further processing and distribution.

3. Applications not including original copyrighted AIA G702, and G703 Forms, will be rejected, and returned for re-submittal.

4. Applications not properly signed and notarized will be rejected, and returned for re-submittal.

D. An Application for Payment is not considered acceptable per the Prompt Payment Policy until the signed, notarized and certified AIA G702 and G703 Forms with ALL required enclosures are received. Applications submitted without the following items described in this section and its attachments will be returned for resubmittal. These items shall be sent via email to the User Agency’s Representative. Failure to provide items listed below with the Application for Payment submission will result in a delay in processing and may result in a reduction in the amount of said Application for Payment.

1. Transmittal letter as specified for Submittals in Section 01 33 00.

2. Updated construction schedule, prepared per Section 01 33 00.

3. Statement signed by the Contractor's firm principal certifying that there are no unidentified outstanding claims for delay.

Price and Payment Procedures 01 20 00 Page 4

4. Beginning with the second Application for Payment, Certified Monthly Payroll Records for all workers on site for the previous month.

a. Forms for the submission of Certified Payroll Records may be found from the Rhode

Island Prevailing Wage Website in either PDF or Excel formats. These forms must be used on monthly submittals.

5. Beginning with the second Application for Payment, Contractor's right to payment must be substantiated by documenting, on a copy of the RIC Waiver of Lien Form included in this Project Manual, that payment monies due, less retainage not exceeding five (5) percent, have been paid in full to subcontractor and suppliers for work, materials, or rental of equipment billed for under specific line item numbers in the immediately preceding application.

6. Affidavits attesting to off-site stored products with insurance certificates as requested.

7. Digital Photographs as specified in Section 01 33 00. Provide as a link.

8. Updated Submittal Log.

9. Identify Apprenticeship hours required under RIGL 37-13-3.1 for all contracts over

$1million in value.

10. A Minority Utilization Report for minority subcontractors must be included. Use the form provided.

11. Additional Substantiating Data: When the User Agency or Design Agent requires additional substantiating information from the review of the “pencil copy,” submit data justifying dollar amounts in question.

CHANGE PROCEDURES

A. Refer to AIA A201-2007 as amended by the state, General Conditions §7.

B. Submittals: Submit name of the individual authorized to receive change documents and be responsible for informing others in Contractor's employ or Subcontractors of changes to the Work.

C. Types of Change Proposals

1. Stipulated Sum Change Order: Based on Proposal Request and Contractor's Change Proposal as approved by Design Agent. All quotations shall include detailed material costs and labor hour and rate breakouts.

2. Unit Price Change Order: For contract unit prices and quantities, the Change Order will be executed on a fixed unit price basis. For unit costs or quantities of units of work which are not pre-determined, execute the Work under a Construction Change Directive. Changes in the Contract Sum or Contract Time will be computed as specified for a Time and Material Change Order.

3. Time and Material Change Order: Submit an itemized account and supporting data after completion of the change, including timeslips signed by User Agency’s representative, within the time limits indicated in the Conditions of the Contract. The Design Agent will determine the change allowable in the Contract Sum and Contract Time as provided in the Contract Documents. Only User Agency-representative-signed timeslips will be considered.

D. The Design Agent may issue a Proposal Request which includes a detailed description of a proposed change with supplementary or revised…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .