RFQ27007133 Thorp Electrical Upgrade SOW.pdf
PDF 268 KB Posted
- Attached to
- RIC Electrical Upgrade Thorp Hall
- Solicitation number
- RFQ27007133
- Issued by
- Providence County, Rhode Island
About this file
This is a Scope of Work document for Request for Quote RFQ27007133 issued by Rhode Island College for an electrical upgrade project at Thorp Hall, a residence hall on the college's East Campus in Providence, Rhode Island. The project scope includes demolition and removal of existing switchgear, electrical panels, and data closets, followed by furnishing and installation of new main distribution panels, electrical panels, transformers, and data equipment, along with construction of new electrical and data closets. Additional work includes installation of new conduit, wiring, and electrical systems as indicated on project drawings and specifications. A mandatory pre-bid conference is scheduled for November 20, 2026, at 10:00 a.m. at the Forman Center, Room 130. The contract will commence immediately upon issuance of the purchase order, with substantial completion required by August 6, 2027, and final completion by August 27, 2027, with the PO closing date of September 25, 2027. The electrical panel replacement outside Thorp Hall is scheduled for late March through September 2027, while interior dorm room work will occur after May 15, 2027, when students vacate the building.
The base bid price includes a $10,000 allowance for unforeseen conditions such as additional abatement or unexpected modifications. Liquidated damages are set at $200 per day for contract delays. Bonding requirements include both bid surety bonds and payment and performance bonds. The awarded vendor must maintain general liability insurance with combined single limits of $1,000,000 per occurrence and $1,000,000 general aggregate, workers' compensation insurance of $100,000 per accident, and automobile liability insurance of $1,000,000 per occurrence. The contract will be executed using the AIA A101-2017 Standard Form of Agreement and AIA A201-2007 General Conditions of the Contract for Construction, both with State of Rhode Island revisions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ27007133 Thorp Hall Specifications.pdf | ||
| RFQ27007133_Nov_16_26_solicitation_doc.pdf | ||
| RFQ27007133 Thorp Hall Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2021-1.A Page 1 of 3 Revised 01/17/2023
AGENCY SOLICITATION SPECIFICATIONS
RFQ – REQUEST FOR QUOTE PUBLIC WORKS
HEADER
TITLE: RFQ27007133 RIC Electrical Upgrade Thorp Hall
DESCRIPTION:
Rhode Island College is seeking a vendor to upgrade the electrical systems at Thorp Hall located in the residence hall area of the campus. The project includes demolition and removal of the existing switchgear, panels, and data closet as well as furnishing and installation of the new equipment and all required hardware and electrical.
PRE-BID CONFERENCE: YES
Mandatory: NO 11/20/26 @ 10:00 am Location: Rhode Island College, Forman Center – Room 130 – East Campus - 736 Cole Rd, Providence, RI 02908
BONDING REQUIREMENTS
Bid Surety Bond Required: YES Payment and Performance Bond Required: YES
CONTRACT TERMS
The initial contract period will begin upon issuance of purchase order .
Insurance Requirements (#14 in Instructions to Vendors on Requirements tab) In accordance with this solicitation, or as outlined in Section 13.19 of the General Conditions of Purchase, found at https://rules.sos.ri.gov/regulations/part/220-30-00-13 and General Conditions
- Addendum A found at https://www.ridop.ri.gov/documents/general-conditions-addendum-a.pdf, the following insurance coverage shall be required of the awarded vendor(s):
General Requirements:
14a) ☒ Liability - combined single limit of $1,000,000 per occurrence, $1,000,000 general aggregate and $1,000,000 products/completed operations aggregate.
14b) ☒ Workers compensation - $100,000 each accident, $100,000 disease or policy limit and $100,000 each employee.
14c) ☒ Automobile liability - $1,000,000 each occurrence combined single limit.
https://rules.sos.ri.gov/regulations/part/220-30-00-13 https://www.ridop.ri.gov/documents/general-conditions-addendum-a.pdf
2021-1.A Page 2 of 3 Revised 01/17/2023
AIA Contract
Rhode Island custom AIA contract designated below outlining the scope and special terms and conditions covering the work, executed by an authorized representative of your company.
Vendor shall obtain the Rhode Island custom AIA contract at:
https://documentsondemand.aia.org/?filter=Rhode.
9a) ☒ AIA A101-2017 Standard Form of Agreement Between Owner and Contractor with State of Rhode Island revisions dated 7-25-19.
9g) ☒ AIA A201-2007 General Conditions of the Contract for Construction with State of Rhode Island Revisions dated 9-10-19.
SECTION A. BACKGROUND
Rhode Island College is looking to replace the existing electrical systems for Thorp Hall that better suit the needs of the building.
SECTION B: SCOPE OF WORK AND REQUIREMENTS
A. The project consists of the demolition and construction of the following work:
a. Demolition: Removal of the existing electrical systems and data closet.
b. Furnish and Installation: Furnish and install a new panels, main distribution panel, transformer, and data closet and all required hardware and electrical.
c. Building new electrical closet and data closet for the new equipment.
B. This work on the Rhode Island College Thorp Electrical Upgrades Project, includes but is not limited to:
a. Mobilize to the site
b. Demo existing switchgear, electrical panels, and data closet as well as any other existing walls and equipment as indicated on drawings and specs.
c. Abatement as per Abetment Plan.
d. Furnish new main distribution panel, electrical panels, transformer, and data equipment as well as only other equipment as indicated on drawings and specs.
e. Build the new electrical and data closets.
f. Install new electrical and data equipment.
g. Install new conduit, wiring, and electrical as required and indicated on drawings and specs.
C. Items to be Salvaged:
a. Refer to plans for items to be removed and reset, removed and stockpiled, or existing to remain.
D. Utility Outages and Shutdown:
a. Prevent accidental disruption of utility services to other facilities.
b. Include temporary power during construction for street lights and sign.
c. Coordinate necessary shutdowns with Capital Projects PM.
d. Include temporary transformer if the lead time for the new transformer goes beyond the Final Completion date.
E. The electrical panel replacement which is outside can be ordered and installed late
March/early April and should be completed by September 2027. As, the majority of the https://documentsondemand.aia.org/?filter=Rhode
2021-1.A Page 3 of 3 Revised 01/17/2023 work that takes place in the dorm rooms can occur after May 15, 2027, the students will not be occupying the building.
SECTION C: CONTRACT TIME
Start of construction: Immediately upon Issuance of Purchase Order
Substantial completion: August 6, 2027
Final completion: August 27, 2027
PO Closing Date: September 25, 2027
SECTION D: ALLOWANCES
The Base Bid Price includes the cost of Allowances.
ALLOWANCE #1 Unforeseen Conditions; The allowance may be used for unforeseen conditions discovered, such as additional abatement needed, or unexpected electrical, basement, or earthwork modifications.
ALLOWANCE #1: $10,000.00
TOTAL ALLOWANCES: $10,000.00
SECTION E: LIQUIDATED DAMAGES
$ ___200.00_____________ per day
SECTION F: ALTERNATES
N/A
| SECTION A. BACKGROUND |
| SECTION B: SCOPE OF WORK AND REQUIREMENTS |
| SECTION C: CONTRACT TIME |
| SECTION D: ALLOWANCES |
| SECTION E: LIQUIDATED DAMAGES |
| SECTION F: ALTERNATES |
File details come from the government source that posted it. Updated .