RFQ27007133 – Thorp Hall Electrical Room Renovations

This construction documents package pertains to the renovation of the electrical infrastructure at Rhode Island College's Thorp Hall, located at 600 Mt. Pleasant Avenue, Providence, Rhode Island. The project scope encompasses comprehensive upgrades to the basement-level electrical systems, including demolition of obsolete electrical switchgear and equipment, removal of hazardous flooring materials, and installation of new electrical distribution equipment housed in a new 220-square-foot electrical room. A new 130-square-foot telecommunications/data room will also be constructed to support building communications systems. Additional work includes installation of new masonry partitions, hollow metal doors and frames, concrete and masonry repairs, infill of unused exterior louvers, new lighting systems with emergency fixtures, fire alarm upgrades, and modifications to fire protection and mechanical systems. The project is designed to maintain existing electrical system operations throughout construction to minimize disruptions to building occupants. The construction documents, dated October 19, 2026, incorporate input from multiple engineering disciplines, including MEP Building Engineering Resources, Inc. (Warwick, RI), B+AC LLC (Chelsea, MA), Universal Environmental Consultants (Framingham, MA), and Building Technology Consulting LLC (Bridgewater, MA).

The electrical service upgrade accommodates a new 150-kilovolt-ampere pad-mounted transformer, which does not trigger fire-rating requirements for the new electrical room. The project includes comprehensive site work involving utility trenching between Weber Hall and Thorp Hall, with coordination required around existing buried condensate piping at estimated depths of 2–3 feet below grade. A temporary transformer and associated connections will be required during construction to serve the building once the existing main switchboard assembly is removed and until the permanent transformer is operational; the electrical contractor bears all costs and rental charges for this temporary equipment for a minimum period of six months. The construction documents specify compliance with the Rhode Island State Building Code 2025 and the International Building Code 2021, with structural work requiring shop drawing review and approval before execution. The existing basement is fully sprinklered, and the sprinkler system will be adjusted to accommodate the new layout. The project emphasizes coordination among all trades, verification of existing conditions before construction, and adherence to detailed specifications for structural materials, electrical systems, fire protection, mechanical systems, and telecommunications infrastructure.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MEP

Bulding Engineering Resources, Inc Warwick, RI N. Easton, MA ber-engineering.com

STRUCTURE

B+AC, LLC

Chelsea, MA bplusac.com

ENVIROMENTAL

Universal Environmental Consultants Framingham, MA uecenv.com

TELECOMMUNICATIONS

Building Technology Consulting LLC Bridgewater, MA buildingtechc.com

RENOVATION TO

RIC THORP HALL

ELECTRICAL ROOM

RIC THORP HALL ELECTRICAL ROOM RENOVATIONS

CONSTRUCTION DOCUMENTS

19 OCTOBER 2026

THORP HALL

600 MT PLEASANT AVE

PROVIDENCE, RI 02908

COMMON ABBREVIATIONS

ALUMNIUM

CONCRETE

RIGID INSULATION

CONCRETE BLOCK

BRICK

EARTH

ENGINEERED WOOD (MDF, HDF, ETC.)

POROUS FILL (GRAVEL, CRUSHED

STONE, ETC.)

GLASS, HORIZONTAL SURFACE

METAL (STEEL, ETC.)

PLASTIC

PLYWOOD

RUBBLE

GYPSUM/PLASTER

EXISTING, UNEXCAVATED

CERAMIC TILE, HORIZONTAL SURFACE

WOOD (EDGE GRAIN)

WOOD (END GRAIN)

WOOD (FACE GRAIN)

SHINGLE

CERAMIC TILE, VERTICAL SURFACE

GLASS, VERTICAL SURFACE

GLASS, SPECIALTY

COMMON DRAFTING PATTERNS

A10.00 A1A1

SIM

COMMON SYMBOLS

+100'-0"

A

SIM

A10.00 A1A1

A10.00

A1

A1

A1

A1

/A1 A10.00

EXTERIOR ELEVATION

BUILDING SECTION

WALL SECTION

CALLOUT

DETAIL SECTION

INTERIOR ELEVATION

VIEW REFERENCE

NOTE

NAME

EL. ELEVATION

LEVEL / ELEVATION

SPOT ELEVATION

S0A

DRAWING NOTE

BREAK LINE

ROOM

WINDOW

0COLUMN HEAD

REVISION

DOOR

PARTITION/WALL

WALL HEIGHT

CENTER LINE

SIM

A10.00 A1A1

SIM

A10.00 A1A1

SIM

A10.00 A1A1

ROOM NAME

DRAWING INDEX

LOCATION MAP

PROJECT NARRATIVE

Thorp Hall is an existing residence hall located on the Rhode Island College campus in Providence, Rhode Island. The project consists of upgrades to the building's electrical infrastructure within the basement level to replace aging electrical equipment, improve system reliability, and support the continued operation of the residence hall.

The existing electrical service area contains obsolete electrical and mechanical equipment, abandoned infrastructure, and underutilized space. The project will include demolition of existing electrical switchgear, equipment pads, partitions, lighting, and other unused systems to prepare the area for renovation and new construction. Existing hazardous flooring materials will be removed as part of the work.

The renovated space will accommodate a new electrical room containing replacement electrical distribution equipment and a new telecommunications/data room to support the building's communications systems. The proposed layout has been developed to allow much of the new infrastructure to be installed while existing systems remain operational, minimizing disruptions to building occupants during construction.

Renovation work includes new masonry partitions, hollow metal doors and frames, repairs to existing concrete and masonry surfaces, infill of unused exterior louvers, new lighting, and associated modifications to the building's fire alarm, fire protection, and mechanical systems. Walls, ceilings, and floors within the project area will be repaired and refinished to provide a clean, durable, and maintainable environment for the new

Upon completion, the project will provide a modern electrical service area that improves reliability, enhances maintainability, and supports the long-term needs of the residence hall and the Rhode Island College campus.

NN

50'

SITE UTILITIES PLAN

SITE WORK

1.

2.

EXCAVATE, BACKFILL AND COMPACT THE SITE AS REQUIRED TO COMPLETE THE WORK SHOWN ON THE DRAWINGS, INCLUDING THE UTILITY TRENCH BETWEEN WEBER HALL AND

THORP HALL.

LOAM AND SEED DISTURBED AREA

TRENCH AS CLOSE TO THE ROAD

AS POSSIBLE

65'-0"

ALIGN

TRANSFORMER LOCATION

APPROXIMATE LOCATION OF EXISTING BURIED

CONDENSATE LINE, EXACT LOCATION UNKNOWN,

EXTENT OF AREA MARKED, ESTIMATED DEPTH 2-3 FEET

BELOW GRADE.

COORDINATE AND ADJUST NEW DUCTBANK TO ALLOW

FOR CROSSING THE LINE.

MAIN ELECTRICAL ROOM

SWITCHBOARD Approx. 12'x3'

101A

100B

103A

BASEMENT

ELECTRICAL ROOM

VESTIBULE

TEL/DATA

65' - 6"

16 "

CODE AND LIFE SAFETY LEGEND

EXIT PATH OF TRAVEL

SMOKE BARRIER/SEPARATION

100100 34" 44"

0" 0"

EXIT ACCESS CORRIDOREXIT ACCESS CORRIDOR

OCCUPANT LOAD

REQUIRED WIDTH WIDTH PROVIDED

EXIT ACCESS STAIR/DOOREXIT ACCESS STAIR/DOOR

OCCUPANT LOAD

REQUIRED WIDTH WIDTH PROVIDED

100' - 0"100' - 0"

1-HOUR FIRE SEPARATION

2-HOUR FIRE SEPARATION

3-HOUR FIRE SEPARATION

OCCUPANCY

1.5-HOUR FIRE SEPARATION

FUNCTION OF SPACE

150 SF

0 OCC.

PROJECT AREA

8'

THE PROJECT CONSISTS OF REPLACING THE ELECTRICAL EQUIPMENT IN THE UNOCCUPIED

BASEMENT AS WELL AS UPGRADING THE TELECOMMUNICATIONS EQUIPMENT.

THE EXISTING BASEMENT IS FULLY SPRINKLERED. THE SPRINKLER SYSTEM WILL BE ADJUSTED

TO SUIT THE NEW LAYOUT.

THE RETAINING WALLS ON THE PERIMETER ARE 16" THICK CONCRETE CONSTRUCTION. THE

CONCRETED SLAB TO THE FLOOR ABOVE IS 9" THICK.

THE NEW ELECTRICAL SERVICE IS LESS THAN 150 kVA. THEREFORE THE NEW ELECTRICAL

ROOM DOES NOT NEED TO BE FIRE RATED.

LIFE SAFETY UPGRADES INCLUDE:

NEW LIGHTING INCLUDES EMERGENCY LIGHTING FIXTURES

FIRE ALARM UPGRADES

MAIN ELECTRICAL ROOM: 220 SF

TEL/DATA ROOM: 130 SF

5 4 3 2 1

A

B

C

Drawing Title

Revisions

Project Information

Project Location

D

G0.01G0.01

PROJECT INFORMATION

R

EN

O

VA

TI

O

N T

O

R

IC

T H

O R

P H

AL

L

EL

EC

TR

IC

AL

R

O O

M

RIC THORP HALL ELECTRICAL ROOM

RENOVATIONS

CONSTRUCTION DOCUMENTS

19 OCTOBER 2026

THORP HALL

600 MT PLEASANT AVE

PROVIDENCE, RI 02908

IDID TERMTERM

CMU CONCRETE MASONRY UNIT

CONT. CONTINUOUS

COORD. COORDINATE

DWG DRAWING

DEMO DEMOLISH

ETR EXISTING TO REMAIN

EXG EXISTING

ELEC ELECTRICAL

EQUIP EQUIPMENT

HM HOLLOW METAL

N/A NOT APPLICABLE

PTN PARTITION

PNT PAINT

REQ. REQUIRED

RCP REFLECTED CEILING PLAN

SCHED. SCHEDULE

STRUCT. STRUCTURAL

SIM SIMILAR

TYP TYPICAL

TEL TELPHONE

UNO UNLESS NOTED OTHERWISE

Sheet NumberSheet Number Sheet NameSheet Name

GENERAL

G0.00 COVER

G0.01 PROJECT INFORMATION

STRUCTURE

S0.01 STRUCTURAL DRAWINGS

ARCHIETCTURE DEMO

AD1.00 DEMOLITION PLANS

ARCHIETCTURE

A1.00 PROPOSED PLANS

A8.00 INTERIOR/EXTERIOR ELEVATIONS

A9.00 DOOR & FRAME TYPES AND SCHEDULE

FIRE PROTECTION

FP1.01 FIRE PROTECTION PLAN, LEGEND & DETAILS

MECHANICAL

M0.01 MECHANICAL LEGEND, NOTES & SCHEDULES

M1.01 MECHANICAL DEMOLITIONS AND NEW WORK PLANS

M2.01 MECHANICAL DETAILS

ELECTRICAL

E0.01 ELECTRICAL LEGEND, NOTES & FIXTURE SCHEDULES

ES1.01 ELECTRICAL SITE PLAN

ES1.02 ELECTRICAL SITE DETAILS

ED1.01 ELECTRICAL FLOOR PLAN - DEMOLITION

E1.01 ELECTRICAL PROPOSED PLANS

E2.01 ELECTRICAL RISER DIAGRAM

E2.02 ELECTRICAL PANEL SCHEDULES

FIRE ALARM

FA1.01 FIRE ALARM PROPOSED PLANS

TELECOMMUNICATION

TC0.01 TECHNOLOGY - LEGEND AND NOTES SHEET

TC1.00 TECHNOLOGY - GROUND FLOOR - EXISTING CONDITIONS

TC1.01 TECHNOLOGY - EXISTING CONDITIONS - DETAILS SHEET

TC2.00 TECHNOLOGY - GROUND FLOOR - NEW WORK

TC2.01 TECHNOLOGY - NEW WORK - DETAILS SHEET

G0.01 SCALE: 1/4" = 1'-0"

A6A6 CODE PLAN - BASEMENT

Revisions

RIC THORP HALL ELECTRICAL ROOM

RENOVATIONS

CONSTRUCTION DOCUMENTS

19 OCTOBER 2026

STEEL ANGLE LINTEL SCHEDULE

MAXIMUM CLEAR

SPAN MASONRY

OPENING

WALL THICKNESS

4" WALL

1-L3-1/2x3-1/2x5/16

1-L4x3-1/2x5/16

1-L4x3-1/2x5/16

1-L5x3-1/2x5/16

3' - 0"

4' - 0"

5' - 0"

6' - 0"

8' - 0"

6" WALL

2-L3x2-1/2x5/16

2-L3x2-1/2x5/16

2-L3-1/2x2-1/2x5/16

2-L3-1/2x2-1/2x5/16

2-L3-1/2x2-1/2x5/16

8" WALL

2-L3-1/2x3-1/2x5/16

2-L4x3-1/2x5/16

2-L5x3-1/2x5/16

2-L5x3-1/2x5/16

2-L6x3-1/2x3/8

NOTES:

1. PROVIDE AND INSTALL LINTEL ANGLES FOR MASONRY OPENINGS IN ACCORDANCE WITH THE

SCHEDULE ABOVE. INSTALL LONG LEG VERTICAL. SEE ARCHT DRAWINGS FOR LOCATIONS.

2. PROVIDE 6" MINIMUM BEARING AT EACH END BUT NOT LESS THAN 1" PER FOOT OF SPAN.

FILL 2 COURSES OF MASONRY BELOW BEARING WITH MORTAR.

3. WHERE MINIMUM BEARING CANNOT BE PROVIDED, ATTACH SECURELY TO ADJACENT STRUCTURAL

MEMBERS BY BOLTING, SEATING, WELDING OR PROVIDE SEPARATE SUPPORTS.

4. WHERE LINTELS OCCUR IN EXTERIOR WALLS, MINIMUM THICKNESS SHALL BE 5/16" AND ANGLES

SHALL BE HOT-DIP GALVANIZED.

5. WHERE WALL THICKNESS EXCEEDS 8", PROVIDE 1 ADDITIONAL ANGLE FOR EACH ADDITIONAL

4" THICKNESS OF WALL.

MINIMUM

BEARING

(NOTE 2)

0 - 6"

0 - 6"

0 - 6"

0 - 6"

0 - 8"

6'' CMU PARTITION COORD W/ ARCHT. TYP

OPENING COORD W/ ARCHT. TYP

(E) WALL.TYP

4'' DIA PENETRATIONS

COORD W/ ARCHT. TYP

S0.01

D

CONC SLAB TO MATCH

EXISTING THICKNESS

#4 @ MAX 12" OC. INSERT OR DRILL WITH 6"

EMBEDMENT ON BOTH DIRECTION. WHOLE

BARS OR SPLICE MIN 12'' (E) FLXICORE 6''x16''

FILL NON-SHRINK GROUT IN

HOLLOW CROSS SECTION

NOTES:

1. FOR SQUARE AND RECTANGULAR HOLES.

2. FROM 2'-0"x2'-0" UP TO 5'-0"x5'-0".

3. 2'-0" MIN DIMENSION, 5'-0" MAX DIMENSION.

(E) FLXICORE 6''x16''

1/2'' DIA BOLTS @3' - 0'' O.C.

DRILL AND EPOXY 4'' MIN. TYP

/2

CMU PARTITION

cL

NOTE:

LOCATE AND AVOID EXISTING BARS PRIOR TO DRILLING.

L3x3x3/8 CONT ANGLE. TYP

THICKNESS

#4 @ 48"

VERTICAL REINFORCEMENT SCHEDULE

6" INTERIOR

FLOOR OR ROOF

FLOOR

NOTE A NOTE B

NOTE H

NOTE C

NOTE J

NOTE D

NOTE E

NOTE F

NOTE G

NOTE E

NOTE C

NOTES:

A. HORIZONTAL REINFORCING IN EVERY SECOND BED JOINT

DUR-O-WAL EH TRUSS TYPE REINF #9 WIRE OR

EQUIVALENT LAP REINF MIN 75x WIRE DIAMETER. SEE

SPECS ALSO.

B. VERTICAL WALL REINF: CORES CONTAINING REINFORCING

SHALL BE GROUTED SOLID. SEE PLANS, ELEVATIONS, AND

SCHEDULE FOR SIZE & SPACING.

C. SUPPLEMENTARY HORIZONTAL REINF: #4 BARS ABOVE

AND BELOW ALL OPENINGS. EXTEND REINF 24" BEYOND

CORNER OR OPENING.

D. SUPPLEMENTARY VERTICAL REINF: #4 BARS AT EACH SIDE

OF EACH OPENING, AT WALL CORNERS, AND AT WALL

ENDS. EXTEND REINF FULL HEIGHT. AT OPENINGS

REINFORCEMENT EACH SIDE OF OPENINGS SHALL NOT BE

LESS THAN 0.5x THE REINFORCEMENT INTERRUPTED BY

THE OPENING.

E. STEEL, CONCRETE, OR CONCRETE MASONRY LINTEL, SEE

LINTEL SCHEDULE.

F. HORIZONTAL REINF: 1-#5 IN BOND BEAM CHANNEL

BLOCK, CONTINUOUS, UNO.

G. HEAD RESTRAINING ANGLES, SEE SEPARATE DETAILS.

H. DOWELS FROM SLAB INTO WALL TO MATCH VERT REINF.

I. HORIZONTAL REINF: 1-#5 IN BOND BEAM ON SLABS ON

STEEL DECK.

J. PROVIDE BOND BEAM CHANNEL BLOCK AT MAXIMUM

INTERVALS OF 12 COURSES.SIZE (#) &

SPACING

BASEMENT

0' - 0"

PROVIDE DOWELS WITH 4'' EMBEDMENT AND

EPOXY. SIZE AND SPACING TO MATCH WALL

REINF. GROUT CELLS SOLID

(E) CONC SLAB

NOTE:

LOCATE AND AVOID EXISTING BARS PRIOR TO DRILLING.

5 4 3 2 1

A

B

C

Drawing Title

Revisions

Project Information

Project Location

D

S0.01

STRUCTURAL DRAWINGS

R E

N O

V A

T

IO

N T

O

R

IC

T H

O R

P H

A L L E

L E

C T

R

IC

A L R

O O

M

RIC THORP HALL ELECTRICAL ROOM

RENOVATIONS

CONSTRUCTION DOCUMENTS

14 AUGUST 2026

THORP HALL

600 MT PLEASANT AVE

PROVIDENCE, RI 02908

A GENERAL

A1 STRUCTURAL WORK SHALL CONFORM TO THE REQUIREMENTS OF THE RHODE ISLAND STATE BUILDING CODE 2025 AND THE INTERNATIONAL BUILDING CODE, A2 VERIFY AND COORDINATE ALL NEW AND EXISTING DIMENSIONS RELATED TO THIS PROJECT.

A3 TYPICAL DETAILS AND NOTES SHOWN ON STRUCTURAL DRAWINGS SHALL BE APPLICABLE TO ALL PARTS OF THE STRUCTURAL WORK EXCEPT WHERE

SPECIFICALLY REQUIRED OTHERWISE BY CONTRACT DOCUMENTS.

A4 DETAILS NOT SPECIFICALLY SHOWN SHALL BE SIMILAR TO THOSE SHOWN FOR THE MOST NEARLY SIMILAR CONDITION AS DETERMINED BY THE ARCHITECT.

A5 EXAMINE ARCHITECTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FOR VERIFICATION OF LOCATION AND DIMENSIONS OF CHASES, INSERTS, OPENINGS, SLEEVES, WASHES, DRIPS, REVEALS, DEPRESSIONS, AND OTHER PROJECT REQUIREMENTS NOT SHOWN ON STRUCTURAL DRAWINGS.

A6 THE BASE BUILDING STRUCTURE WAS DESIGNED TO RESIST THE LOADS DESCRIBED IN GENERAL NOTES DESIGN LOAD SECTION IN THE COMPLETED CONDITION

OF THE PROJECT. DURING CONSTRUCTION THE CONTRACTOR IS RESPONSIBLE TO VERIFY THE CAPACITY OF THE PARTIALLY COMPLETED STRUCTURE TO RESIST

LOADS DUE TO TEMPORARY CONDITIONS, CONSTRUCTION EQUIPMENT, STORED MATERIALS, SHORING, ETC.

A7 OPENINGS IN SLABS AND WALLS LESS THAN 12" MAXIMUM DIMENSION ARE GENERALLY NOT SHOWN ON STRUCTURAL DRAWINGS. OPENINGS SHOWN ON

STRUCTURAL DRAWINGS SHALL NOT BE REVISED WITHOUT PRIOR WRITTEN APPROVAL OF THE ARCHITECT.

A9 THE CONTRACTOR SHALL SUBMIT COMPLETE SHOP DRAWINGS FOR ALL PARTS OF THE WORK, INCLUDING DESCRIPTION OF DEMOLITION, AND

CONSTRUCTION METHODS AND SEQUENCING WHERE APPLICABLE. NO PERFORMANCE OF THE WORK INCLUDING, BUT NOT LIMITED TO, DEMOLITION OF

EXISTING STRUCTURE, OR FABRICATION OR ERECTION OF NEW STRUCTURAL ELEMENTS, SHALL COMMENCE WITHOUT REVIEW OF THE SHOP DRAWINGS BY

THE ARCHITECT.

A10 IF IN THE COURSE OF EXECUTION OF THE STRUCTURAL WORK, ANY PORTION OF THE COMPLETED STRUCTURE DOES NOT MEET THE REQUIREMENTS OF THE

CONTRACT DOCUMENTS AS DETERMINED BY THE ARCHITECT, THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE DESIGN AND IMPLEMENTATION OF

REMEDIAL ACTION TO ENSURE THAT THE COMPLETED WORK IS IN CONFORMANCE WITH THE CONTRACT DOCUMENTS. A DESCRIPTION OF THE

NON-CONFORMING WORK SHALL BE SUBMITTED ALONG WITH THE PROPOSED REMEDIAL ACTION TO THE ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO

IMPLEMENTATION.

A12 INFORMATION REGARDING EXISTING CONSTRUCTION IS BASED UPON AVAILABLE CONSTRUCTION DOCUMENTS PREPARED BY THE ARCHITECT, WHICH MAY

OR MAY NOT REFLECT ALL AS BUILT CONDITIONS. NOTIFY ARCHITECT OF ANY DISCREPANCIES DISCOVERED DURING THE COURSE OF CONSTRUCTION BEFORE

PROCEEDING WITH WORK IN THE AREA.

B STRUCTURAL STEEL

B1 ''SPECIFICATION FOR STRUCTURAL STEE BUILDINGS'', (AISC 360-16)

B2 STRUCTURAL STEEL SHALL BE NEW STEEL CONFORMING TO THE FOLLOWING:

(A) ANGLES, CHANNELS, PLATES, BASE PLATES, AND BARS ASTM A36 (Fy = 36 KSI), UNO

(B) HIGH STRENGTH BOLTS ASTM A325, UNO

N.T.S.2

STEEL ANGLE LINTEL SCHEDULE

3/16" = 1'-0"6

PARTIAL PROPOSED PLAN

D RENOVATION AND RESTORATION

D1 WORK SHALL CONFORM TO THE REQUIREMENTS OF THE BUILDING CODE STATED ABOVE.

D2 THE CONTRACTOR SHALL NOTIFY THE ARCHITECT WHEN, IN THE COURSE OF CONSTRUCTION OR DEMOLITION, CONDITIONS ARE UNCOVERED WHICH ARE

UNANTICIPATED OR OTHERWISE APPEAR TO PRESENT A DANGEROUS CONDITION.

D3 VERIFY ALL DIMENSIONS AND CONDITIONS ON THE JOB. DISCREPANCIES SHALL BE BROUGHT IMMEDIATELY TO THE ATTENTION OF THE ARCHITECT BEFORE

PROCEEDING WITH THAT PART OF THE WORK.

D4 WHERE NEW WORK WILL BE ADJACENT TO OR FRAMING INTO EXISTING CONSTRUCTION, VERIFY DIMENSIONS OF EXISTING CONSTRUCTION PRIOR TO

FABRICATION OF NEW MEMBERS.

D5 PROVIDE ALL LABOR AND MATERIAL FOR ANY FRAMING REQUIRED TO CONNECT NEW FRAMING TO EXISTING CONSTRUCTION. WHEREVER IT IS NECESSARY

TO REMOVE EXISTING CONSTRUCTION IN ORDER TO CONSTRUCT NEW WORK, THE AFFECTED AREA SHALL BE PATCHED AND REBUILT TO MATCH EXISTING

ADJACENT WORK TO SATISFACTION OF THE ARCHITECT.

D6 DETAILS SHOWN ON ANY DRAWINGS SHALL BE CONSIDERED TYPICAL FOR ALL SIMILAR CONDITIONS.

D7 NOTIFY ARCHITECT OF ANY CONTEMPLATED STRUCTURAL ALTERATION IN REASONABLE TIME TO RENDER AND DOCUMENT THE ARCHITECT'S DECISION.

D8 STRUCTURAL MATERIALS AND COMPONENTS SHALL HAVE PRIOR APPROVAL OF THE ARCHITECT.

D9 STRUCTURAL WORK ON THIS PROJECT SHALL BE PERFORMED UNDER THE SUPERVISION OF AN INSPECTOR APPROVED BY THE ARCHITECT. ALTERATIONS OR

MODIFICATIONS NOT INDICATED ON THE DRAWINGS SHALL BE APPROVED BY THE ARCHITECT IN WRITING BEFORE SUCH WORK IS INITIATED. THE

ARCHITECT WILL PERIODICALLY OBSERVE STRUCTURAL ELEMENTS TO ASSURE GENERAL COMPLIANCE WITH THE CONTRACT DOCUMENTS, BUT DETAILED

INSPECTION AND TESTING REQUIREMENTS WILL BE PREPARED BY AN INDEPENDENT TESTING AGENCY HIRED BY THE GC. DEFICIENCIES NOT INDICATED ON

THE DRAWINGS OR EXPOSED DURING CONSTRUCTION SHALL BE CORRECTED AS DIRECTED BY THE ARCHITECT.

D10 STRUCTURAL ALTERATION SHALL BE PRECEDED BY ADEQUATE SHORING AND BRACING.

B3 STRUCTURAL STEEL FRAMING SHALL BE TRUE AND PLUMB BEFORE CONNECTIONS ARE FINALLY BOLTED OR WELDED.

B4 FIELD CUTTING OF STRUCTURAL STEEL OR ANY FIELD MODIFICATIONS OF STRUCTURAL STEEL SHALL NOT BE MADE WITHOUT PRIOR WRITTEN APPROVAL BY

ARCHITECT FOR EACH SPECIFIC CASE.

B5 COORDINATE WITH ARCHITECTURAL DRAWINGS FOR PAINT AND PRIMER LOCATIONS FOR ITEMS INCLUDING BUT NOT LIMITED TO THERMAL BREAK

TREATMENT, FIRE PROOFING, AND WEATHER PROOFING.

(A) ALL CONCRETE, UNO 4000 PSI (NORMALWEIGHT)

(A) STEEL REINFORCEMENT ASTM A615 GRADE 60 (YIELD STRESS 60,000 PSI)

N.T.S.4

SLAB INFILL CONNECTION DETAIL

C CONCRETE

C1 CONCRETE WORK SHALL CONFORM TO "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE" (ACI 318-14)

C2 CONCRETE SHALL BE CONTROLLED CONCRETE, PROPORTIONED, MIXED, AND PLACED IN THE PRESENCE OF A REPRESENTATIVE OF AN APPROVED TESTING

AGENCY.

C3 UNLESS NOTED OTHERWISE, CONCRETE SHALL HAVE A MINIMUM 28-DAY COMPRESSIVE STRENGTH AND BE OF A TYPE AS FOLLOWS:

C4 REINFORCEMENT SHALL NOT BE TACK-WELDED. FIELD BENDING OF REINFORCEMENT IS NOT ALLOWED UNLESS SHOWN ON THE DRAWINGS OR APPROVED

BY THE ARCHITECT.

C5 STEEL REINFORCEMENT, UNLESS NOTED OTHERWISE, SHALL CONFORM TO THE FOLLOWING:

N.T.S.3

CMU WALL BRACING DETAIL

N.T.S.1

NON-LOAD BEARING CMU WALLS AND PARTITIONS

N.T.S.5

CMU PARTITION ANCHORAGE DETAILS

RIC THORP HALL ELECTRICAL ROOM

RENOVATIONS

CONSTRUCTION DOCUMENTS

19 OCTOBER 2026

RIC THORP HALL ELECTRICAL ROOM

RENOVATIONS

CONSTRUCTION DOCUMENTS

19 OCTOBER 2026

CONSTRUCTION DO

19 OCTOBER 2026

Revisions

RIC THORP HALL ELECTRICAL ROOM

RENOVATIONS

MEP WORK ONLY

DEMO CONCRETED PAD

DEMO CONCRETED PAD

VCT FLOORING TO BE ABATED

REFER TO ABATEMENT PLAN

EXPOSED CONCRETE

WITH RESIDUAL GLUE

DEMO LOUVERS

WINDOW ETR. DEMOLISH

TRIM ON BOTH SIDES

APPROX. LOCATION OF BUILDING

DOOR ACCESS CONTROLLER. SEE

TEL-COM DRAWINGS. EXISTING TO

REMAIN. DO NOT RELOCATE.

MEP WORK ONLY

DEMO EXISTING

LIGHT FIXTURE

EXG. WALL TO BE DEMO

EXG. WALL TO REMAIN

DEMOLITION LEGEND

EXG DOOR TO REMAIN

EXG. DOOR TO BE DEMO

EXG WALL TO BE DEMO

EXG WALL TO REMAIN

DEMOLITION LEGEND - RCP

EXG LIGHT FIXTURE TO REMAIN

EXG LIGHT FIXTURE TO BE DEMO

5 4 3 2 1

A

B

C

Drawing Title

Revisions

Project Information

Project Location

D

AD1.00AD1.00

DEMOLITION PLANS

R

EN

O

VA

TI

O

N T

O

R

IC

T H

O R

P H

AL

L

EL

EC

TR

IC

AL

R

O O

M

RIC THORP HALL ELECTRICAL ROOM

RENOVATIONS

CONSTRUCTION DOCUMENTS

19 OCTOBER 2026

THORP HALL

600 MT PLEASANT AVE

PROVIDENCE, RI 02908

AD1.00 SCALE: 1/4" = 1'-0"

11 DEMOLITION FLOOR PLAN

NN

4'

AD1.00 SCALE: 1/4" = 1'-0"

22 DEMOLITION CEILING PLAN

Revisions

RIC THORP HALL ELECTRICAL ROOM

RENOVATIONS

A8.00

D5

D2

C6

C2

REMOVED ELECTRICAL

SWITCHGEAR 101

MAIN ELECTRICAL ROOM

ALIGN

6'-3"

0'-6"

21'-11"

6" CMU, TYP. MAIN

ELECTRICAL ROOM

LOUVER OPENING (SEE

DETAIL C3-A9.00)

SWITCHBOARD Approx. 12'x3'

SEE ELEC. DRAWINGS

B2 A8.00

MEP WORK ONLY

104A

101A

100B

103A

100A

105B

105A

BASEMENT

ELECTRICAL ROOM

LOUVER OPENING (SEE

DETAIL C3-A9.00)

101B

VESTIBULE

CLEAN WINDOW AND

FRAME. PROVIDE NEW

PAINTED HARDWOOD TRIM

A8.00B6

TEL/DATA

9' -1

1/

2" 0'

-6

6' -0

0'

-5

10'-0" S3A

M6

STEAM LINE ABV.

'-6

6'-3"

RELOCATED TEL/DATA

EQUIP, SEE TC-SERIES

DRAWINGS

M6

M6

S3A

NEW LOUVER

B2 A8.00

MEP WORK ONLY

NEW LIGHT FIXTURES

THROUGHOUT PATCH SLAB

OPENING. REFER TO

STRUCTURAL

DRAWINGS.

NEW PARTITION WALL

EXISTING WALL TO REMAIN

PLAN LEGEND

GENERAL NOTES

1.

2.

3.

PATCH AND REPAIR CONCRETE SLAB WHERE DAMAGED BY REMOVAL OF

EQUIPMENT PADS AND OTHER DEMOLITION ACTIVITIES. GRIND DOWN HIGH

SPOTS AND FILL IN VALLEYS WITH LEVELERS TO CREATE A SMOOTH SURFACE

ALIGNING WITH THE EXISTING SLAB.

APPLY CONCRETE SEALER IN ROOMS 100, 101, 103, AND 105.

PAINT WALLS IN ROOMS 100, 101, 103, 104 AND 105.

5 4 3 2 1

A

B

C

Drawing Title

Revisions

Project Information

Project Location

D

A1.00A1.00

PROPOSED PLANS

R

EN

O

VA

TI

O

N T

O

R

IC

T H

O R

P H

AL

L

EL

EC

TR

IC

AL

R

O O

M

RIC THORP HALL ELECTRICAL ROOM

RENOVATIONS

CONSTRUCTION DOCUMENTS

19 OCTOBER 2026

THORP HALL

600 MT PLEASANT AVE

PROVIDENCE, RI 02908

A1.00 SCALE: 1/4" = 1'-0"

11 PROPOSED FLOOR PLAN

A1.00 SCALE: 1/4" = 1'-0"

22 PROPOSED CEILING PLAN

NN

4'

Revisions

RIC THORP HALL ELECTRICAL ROOM

RENOVATIONS

B2 A8.00

103A

PATCH, REPAIR, AND

PAINT CONCRETE WALL

PATCH, REPAIR, AND

PAINT CONCRETE WALL

LOUVER OPENING (SEE

DETAIL C3-A9.00)

ETR. FIXTURE, TYP.

NEW HYDRONIC UNIT HEATER. SEE

MECH. DRAWINGS

100B104A

4" WALL BASE, TYP. WALL

TYPE S3A

PAINTED GWB

B2 A8.00

101B

PATCH, REPAIR, AND

PAINT CONCRETE WALL

CLEAN WINDOW AND

FRAME. PROVIDE NEW

PAINTED HARDWOOD

TRIM

4" WALL BASE, TYP. WALL

TYPE S3A

PAINTED GWB

PAINTED CMU WALL

EXG. STEAM PIPE

PENETRATION THROUGH

WALL

NEW 6" CMU, TYP

SWITCH

BOARD101A

NEW LOUVER (SEE DETAIL

C3-A9.00)

SEE STRUCT. DRAWINGS FOR

CONNECTION DETAIL

SEE STRUCT. DRAWINGS FOR

CONNECTION DETAIL

NEW ELEC. DISCONNECT

SWITCH, SEE E-SERIES

DRAWINGS

NEW LOUVERS

ELEC. EQUIP, ETR, TYP

105A

5 4 3 2 1

A

B

C

Drawing Title

Revisions

Project Information

Project Location

D

A8.00A8.00

INTERIOR/EXTERIOR ELEVATIONS

R

EN

O

VA

TI

O

N T

O

R

IC

T H

O R

P H

AL

L

EL

EC

TR

IC

AL

R

O O

M

RIC THORP HALL ELECTRICAL ROOM

RENOVATIONS

CONSTRUCTION DOCUMENTS

19 OCTOBER 2026

THORP HALL

600 MT PLEASANT AVE

PROVIDENCE, RI 02908

A8.00 SCALE: 1/4" = 1'-0"

D5D5 INTERIOR ELEVATION - NORTH

A8.00 SCALE: 1/4" = 1'-0"

D2D2 INTERIOR ELEVATION - EAST

A8.00 SCALE: 1/4" = 1'-0"

C2C2 INTERIOR ELEVATION - WEST

A8.00 SCALE: 1/4" = 1'-0"

C6C6 INTERIOR ELEVATION - SOUTH

A8.00 SCALE: 1/4" = 1'-0"

B2B2 INTERIOR SECTION

A8.00 SCALE: 1/4" = 1'-0"

B6B6 EXTERIOR ELEVATION

Revisions

RIC THORP HALL ELECTRICAL ROOM

RENOVATIONS

EXTERIORINTERIOR

NEW 2"

BLANK OFF

PANEL

EXG.

CONCRETE

WALL

NEW 4"

LOUVER

CAULKING

9 1/2" 2"

LOUVER

4"

A9.00 A3

EXTERIORINTERIOR

A9.00 B3

NEW 4" LOUVER

EXG. CONCRETE

WALL

NEW 2" BLANK

OFF PANEL

EXTERIORINTERIOR

CONT. SILL

PAN

FLASHING

NEW 2"

BLANK OFF

PANEL

EXG.

CONCRETE

WALL

NEW 4"

LOUVER

CAULKING

9 1/2" 2"

LOUVER

4"

SEE PARTITION TYPES

1 3/4"

2" U

N O

3/ 8"

SEE DOOR SCHED.

FIELD FINISHED WELDED

HM FRAME W/ ANCHOR

COORD. RATING w/SCHED.

SEALANT EACH SIDE, TYP.;

RATING PER SCHED.

GROUT PER STRUCT. DWGS.

REINFORCEMENT BAR; SEE

STRUCT. DWGS.

CMU, SEE STRUCT. DWGS.

3/

4"

2" UNO

3/8"

SEE DOOR SCHED.

FIELD FINISHED WELDED HM

FRAME w/ANCHOR; COORD.

RATING w/SCHED.

SEALANT EACH SIDE, TYP.;

RATING PER SCHED.

GROUT PER STRUCT. DWGS

REINFORCEMENT BAR; SEE STRUCT.

DWGS

CMU, SEE STRUCT. DWGS.

DOOR FRAME ANCHOR

COORD. w/PTN & DOOR SCHED.

ON RATING REQ.

SE

E

PA

RT

IT

IO

N T

YP

ES

REFER TO SCHED.

RE

FE

R

TO

S

CH

ED

HM:1

0'-2" REFER TO SCHED. 0'-2"

0' -2

RE

FE

R

TO

S

CH

ED

HM:A

B1

A1

B2

B1

HARDWARE SET 16.0

3 EA

1 EA

1 EA

1 EA

1 EA

HINGE (HEAVY WEIGHT)

STOREROOM LOCK

SMALL FORMAT INTER CORE

DOOR CLOSER

DOOR STOP

T4A3786 QTY AND OPTIONS PER SPECS.

72 R8204 RNJ

33600006N

351 P10 OR O ARM PER SPECS.

RM860 or R850 AS CONDITIONS REQ.

US26D

US32D

EN

US26D

MK 087100

SA 087100

MC 087100

SA 087100

RO 087100

3 EA SILENCER 608 RO 087100

3/

4"

SEE DOOR SCHED.

FIELD FINISHED WELDED HM

FRAME w/ANCHOR; COORD.

RATING w/SCHED.

DOOR FRAME ANCHOR

5/8" GWB, BOTH SIDES TYP.

3-5/8" MTL STUD 16" O.C.

SE

E

PT

N

. T

YP

ES

SEE DOOR SCHED.

FIELD FINISHED WELDED HM

FRAME w/ANCHOR; COORD.

RATING w/SCHED.

DOOR FRAME ANCHOR

5/8" GWB, BOTH SIDES TYP.

3-5/8" MTL STUD 16" O.C.

1 3/4"

0'-5 1/2"

TYPE "M6"

SIDE A SIDE B

TYPE "S3A"

SIDE A SIDE B

4 7/8"

5/8" 3 5/8" 5/8"

5/8" GYPSUM WALL

BOARD, BOTH SIDES

3-5/8" METAL STUDS,

16" O.C.

6" x 8" x 16" CMU BLOCK

EXTEND TO SLAB

ABOVE

SEAL AROUND ALL PIPE

PENETRATIONS, TYP.

4" COVE BASE, BOTH

SIDES TYP.

0' -2

HARDWARE SET 10.0

3 EA

1 EA

1 EA

1 EA

1 EA

HINGE, FULL MORTISE

RIM EXIT DEVICE

SMALL FORMAT INTER CORE

SURFACE CLOSER

WALL STOP

TA2714 NRP 4-1/2" X 4-1/2"

12 43 72 8843 ETNJ

33600006N

351 P10

US26D

US32D

EN

US26D

(HI-7) MCKINNEY

(ED-5) SARGENT

(CY-4) MEDECO

(CL-6) SARGENT

(ST-3) ROCKWOOD

NEW

TRANSFORMER

FRONT ACCESS

FROM ROAD

2'-6" MIN.2'-6" MIN.

2' -0

" M

IN

TRANSFORMER FENCE - PLAN

-0

' M

AX

9' -6

'-0

12"

4"

10'-0" MAX

9'-6"

TRANSFORMER FENCE - SIDE ELEVATION

2 7/8" DIA. POST,

TYP.

1 5/8" DIA. TOP

RAIL, TYP.

1 5/8" DIA.

BOTTOM RAIL,

TYP.

9 GA. 2" FABRIC

DOME CAP

CONC. FOOTING

AT CORNERS

TENSION

BANDS 1' O.C.,

TYP.

'-0

12"

4"

11'-11"

TRANSFORMER FENCE - FRONT/BACK ELEVATION

2 7/8" DIA. POST,

TYP.

1 5/8" DIA. TOP

RAIL, TYP.

1 5/8" DIA.

BOTTOM RAIL,

TYP.

9 GA. 2" FABRIC

DOME CAP

CONC. FOOTING

AT CORNERS

TENSION

BANDS 1' O.C.,

TYP.

1 5/8" BRACE RAIL

EQ

EQ

3/8" TRUSS W/

TURNBUCKLES

3" BOX HINGES

GATE

LATCH

NOTES:

1. CONCRETE FOOTINGS 3000 PSI

2. GATES ON SIDES FACING AND OPPOSITE OF ROAD

3. COORDINATE WITH ACTUAL EQUIPMENT SIZE

4. SUBMIT SHOP DRAWINGS FOR APPROVAL

1 5/8" BRACE RAIL

EQ

EQ

11'-11"

2' -0

" M

IN

CONCRETE FOOTING

LOCATIONS

5 4 3 2 1

A

B

C

Drawing Title

Revisions

Project Information

Project Location

D

A9.00A9.00

DOOR & FRAME TYPES AND

SCHEDULE

R

EN

O

VA

TI

O

N T

O

R

IC

T H

O R

P H

AL

L

EL

EC

TR

IC

AL

R

O O

M

RIC THORP HALL ELECTRICAL ROOM

RENOVATIONS

CONSTRUCTION DOCUMENTS

19 OCTOBER 2026

THORP HALL

600 MT PLEASANT AVE

PROVIDENCE, RI 02908

DOOR & FRAME SCHEDULE

DOOR NUMBERDOOR NUMBER ROOM LOCATIONROOM LOCATION

DIEMNSIONS (INCHES)DIEMNSIONS (INCHES) DOORDOOR FIREFIRE

RATINGRATING

DETAILSDETAILS FRAMEFRAME HARDWAREHARDWARE

SETSET REMARKSREMARKSWIDTHWIDTH HEIGHTHEIGHT THICK.THICK. TYPETYPE MATERIALMATERIAL FINISHFINISH HEADHEAD JAMBJAMB TYPETYPE MATERIALMATERIAL FINISHFINISH

100A BASEMENT 48" 84" 1 3/4" HM:1 HM PNT ETR ETR HM:A HM PNT 10.0

100B BASEMENT 48" 84" --- N/A ETR ETR ETR ETR N/A ETR ETR

101A MAIN ELECTRICAL ROOM 36" 84" 1 3/4" HM:1 HM PNT HM:A HM PNT 16.0

101B MAIN ELECTRICAL ROOM 36" 84" 1 3/4" HM:1 HM PNT HM:A HM PNT 16.0

103A ELECTRICAL ROOM 48" 84" --- N/A ETR ETR ETR ETR N/A ETR ETR

104A TEL/DATA 36" 84" 1 3/4" HM:1 HM PNT HM:A HM PNT 16.0

105A VESTIBULE 48" 84" --- N/A ETR ETR ETR ETR N/A ETR ETR EXG DOOR; REFURBISH AND PAINT

105B VESTIBULE 36" 84" --- N/A ETR ETR ETR ETR N/A ETR ETR EXG DOOR; REFURBISH AND PAINT

A9.00 SCALE: 3" = 1'-0"

B3B3 HEAD DETAIL - LOUVER - NEW

A9.00 SCALE: 3/4" = 1'-0"

C3C3 LOUVER - NEW

A9.00 SCALE: 3" = 1'-0"

A3A3 SILL DETAIL - LOUVER - NEW

A9.00 SCALE: 3" = 1'-0"

B1B1 TYP. DR DTL - HM - MASONRY - HEAD DETAIL

A9.00 SCALE: 3" = 1'-0"

A1A1 TYP. DR DTL - HM - MASONRY - JAMB DETAIL

A9.00 SCALE: 1/2" = 1'-0"

C2C2 DOOR TYPES

A9.00 SCALE: 1/2" = 1'-0"

C1C1 DOOR FRAMES

A9.00 SCALE: 3" = 1'-0"

A2A2 TYP. DR DTL - HM - MTL STUD - JAMB DETAIL

A9.00 SCALE: 3" = 1'-0"

33 TYP. DR DTL - HM - MTL STUD - HEAD DETAIL

A9.00 SCALE: 3" = 1'-0"

A6A6 PARTITION TYPES

A9.00 SCALE: 1/4" = 1'-0"

C6C6 TRANSFORMER FENCE DETAILS

MAIN ELECTRICAL ROOM

BASEMENT

ELECTRICAL ROOM

VESTIBULE

TEL/DATA

ETR

ETR

ETR

ETRETR

ETRETRETR

ETR

ETR

1"

1"

1"

1" 1"

1"

1"

1"

NEW UPRIGHT

SPRINKLER

(TYPICAL FOR 6)

ETR FIRE SERVICE,

BACKFLOW PREVENTER

& WET ALARM VALVE.

ETR FIRE MAIN

AT CEILING

5 4 3 2 1

A

B

C

Drawing Title

Revisions

Project Information

Project Location

D

RE

N

O

VA

TI

O

N T

O T

O

RI

C

TH

OR

P

HA

LL

E

LE

CT

RI

CA

L

RO

OM

RIC THORP HALL ELECTRICAL ROOM RENOVATIONS

CONSTRUCTION DOCUMENTS

14 AUGUST 2026

THORP HALL

600 MT PLEASANT AVE

PROVIDENCE, RI 02908

66 Main Street N. Easton, MA 02356 T 508.230.0260 F 508.230.0265 ber@ber-engineering.com

351 Centerville Road

T 401.384.7682 www.ber-engineering.com

BUILDING ENGINEERING RESOURCES, INC.

E RB

Warwick, RI 02886

Office Commons 95

FP1.01

FIRE PROTECTION

PLAN, LEGEND & DETAILS

SCALE: 1/4" = 1' - 0"1 FIRE PROTECTION FLOOR PLAN

EXISTING PIPING TO BE REMOVED

EXISTING TO REMAIN (INDICATED AS LIGHT LINE)

CONNECT TO EXISTINGCTE

RE

FIRE PROTECTION LEGEND

NEW WORK PIPING (INDICATED AS HEAVY LINE)

ETR

WET SPRINKLER PIPEWSWS

CONT CONTINUATION

UPRIGHT WET SPRINKLERU

HANGER ROD

LOCKING NUT

SUPPORT NUT

BAND HANGER

CLEVIS HANGER

PIPE

4 INCH AND LARGER 3 INCH AND SMALLER

HANGER ROD SCHEDULE

PIPE SIZE ROD SIZE

UP TO 2" 3

8" DIA.

2" &3"

4" AND 5"

6" - 8" 3 4"

10" & 12" 7 8"

8"

2" DIA.

HANGER ROD SPACING

PIPE SIZE MAX. ALLOWABLE SPACING

1" 7'

4"

2"

2" 10'

2" 11'

9' 8'

3" - 12" 12'

FIRE PROTECTION SYSTEMS

TYPICAL PIPE HANGER DIAGRAM2

NTS

BRANCHLINE PIPING

EXPOSED UPRIGHT SPRINKLER

EXPOSED UPRIGHT

SPRINKLER

(TYPICAL)

1" OUTLET

1" x 1/2"

REDUCER

NTS

Revisions

RIC THORP HALL ELECTRICAL ROOM

RENOVATIONS

EQUIPMENT DESIGNATION

TAG LEGEND

NUMBER

EQUIPMENT

(REQUIRING

POWER)

EQUIPMENT DESIGNATION

NUMBER

EQUIPMENT

(NON-POWERED)

T-

REGISTERS,

GRILLES &

DIFFUSERS

DESIGNATION

BALANCE TO CFM INDICATED

TYPICAL FOR #

1. HVAC GENERAL NOTES, LEGENDS, SYMBOLS AND DETAILS ARE APPLICABLE TO ALL "M" SERIES DRAWINGS.

2. PROVIDE LABOR, MATERIALS AND EQUIPMENT NECESSARY TO COMPLETE THE WORK OF THIS SECTION.

COMPLY WITH ALL APPLICABLE FEDERAL AND STATE LAWS, AND ALL LOCAL CODES, BY-LAWS AND ORDINANCES. REQUEST INSPECTIONS FROM AUTHORITIES HAVING JURISDICTION. OBTAIN ALL PERMITS AND PAY FOR ALL FEES AND INSPECTION CERTIFICATES AS APPLICABLE AND/OR REQUIRED. ALL PERMITS AND CERTIFICATES SHALL BE TURNED OVER TO THE OWNER UPON COMPLETION OF THE WORK. ALL WORK, EQUIPMENT AND MATERIALS SHALL CONFORM TO THE BUILDING CONSTRUCTION RULES AND

REGULATIONS.

3. DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED TO INDICATE CAPACITY, SIZE, AND APPROXIMATE

LOCATIONS AND GENERAL ARRANGEMENT. DETERMINE EXACT LOCATIONS OF SYSTEMS AND

COMPONENTS IN FIELD.

4. COORDINATE WORK OF THIS SECTION WITH THAT OF OTHER SECTIONS AND EXISTING CONDITIONS FOR RENOVATION WORK. ALL WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED IN PROJECT SCOPE.

DUCTWORK AND PIPING OFFSETS AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST.

5. REFER TO HVAC LEGENDS, DETAILS, SCHEDULES, FLOW DIAGRAMS, CONTROLS, AND SPECIFICATIONS FOR

ADDITIONAL REQUIREMENTS.

6. SUBMIT ALL DEVICES AND EQUIPMENT FOR REVIEW AND ARCHITECT/ENGINEER'S APPROVAL PRIOR TO

PURCHASE.

7. ABATEMENT WORK: SPECIFIC REFERENCE IS MADE TO DIVISION 2 - ASBESTOS ABATEMENT. MECHANICAL SCOPE OF WORK DOES NOT INCLUDE ABATEMENT OF ASBESTOS-CONTAINING MATERIALS (ACM) AS SUCH WORK MUST BE COMPLETED BY A LICENSED ASBESTOS ABATEMENT CONTRACTOR. IF DURING THE COURSE OF DEMOLITION AND/OR REMOVAL WORK THAT IS COVERED UNDER THE SCOPE OF PLUMBING DEMOLITION WORK ANY MATERIALS ARE FOUND THAT MAY BE CONSIDERED ACM'S, IMMEDIATELY STOP WORK IN THAT LOCATION AND INFORM THE G.C. SO THAT PROPER DEMOLITION SERVICES CAN BE

OBTAINED.

8. CLEANING: UPON COMPLETION ALL SHEET METAL WORK SPECIFIED UNDER THIS CONTRACT IS TO BE CLEANED. ALL EQUIPMENT IS TO BE CLEANED, ALL TRIM INSTALLED, ALL PROTECTIVE OIL, TAPE OR OTHER MATERIALS USED TO PROTECT WORK ARE TO BE REMOVED. ALL DUCTS, FANS, AND EQUIPMENT SHALL BE THOROUGHLY CLEANED INSIDE AND OUTSIDE AND BLOWN OUT TO PREVENT AND DEBRIS FROM DAMAGING FAN SHIELDS OR DEBRIS HANGING THROUGH REGISTERS OR DIFFUSERS WHEN SYSTEMS ARE PLACED IN OPERATION. ALL TEMPORARY CONNECTIONS REQUIRED FOR BLOWING OUT THE SYSTEMS, CHEESECLOTH FOR ALL DUCT OPENINGS, AND ANY OTHER EQUIPMENT OR LABOR FOR CLEANING, SHALL BE PROVIDED BY THE HVAC CONTRACTOR. ANY DAMAGE TO CEILINGS BY THE HVAC CONTRACTOR SHALL BE RECTIFIED BY

THEM AT NO ADDITIONAL CHARGE TO THE OWNER.

9. ALL WORK COMPLETED AS PART OF THIS CONTRACT SHALL BE GUARANTEED FOR A PERIOD OF (1) YEAR

FROM THE DATE OF ACCEPTANCE BY THE OWNER UNLESS SPECIFIED FOR A LONGER DURATION.

10.REFER TO THE CONTROL DIAGRAMS, SEQUENCES & SPECIFICATIONS FOR ALL ASSOCIATED AUTOMATIC

TEMPERATURE CONTROLS WORK TO BE INCLUDED AS PART OF THIS CONTRACT. FOR NEW HVAC

EQUIPMENT AND SYSTEM CONTROLLERS, COORDINATE A SUITABLE LOCATION WITH THE OWNER'S PROJECT MANAGER WITHIN THE BUILDING. COORDINATE NETWORK INTERFACE OF NEW CONTROLLERS WITH THE EXISTING FACILITIES ENERGY MANAGEMENT SYSTEM INFRASTRUCTURE. WHERE CENTRAL BUILDING AUTOMATION SYSTEM IS NOT PROVIDED, REMOTE CONTROL PANELS SHALL BE PROVIDED FOR

EACH INSTANCE OF ROOF MOUNTED PACKAGED EQUIPMENT.

11. ALL ROOF AND GRADE MOUNTED EQUIPMENT LOCATED EXTERIOR TO THE BUILDING SHALL BE INSTALLED, ANCHORED, AND SUPPORTED IN ACCORDANCE WITH BUILDING DESIGN WIND SPEED CONDITIONS.

EQUIPMENT SUPPORT DESIGN SHALL BE DELEGATED DESIGN BY STRUCTURAL ENGINEER UNDER THIS

CONTRACT. SUBMIT DESIGN CALCULATIONS FOR APPROVAL.

12. ACCESS PANELS SHALL BE PROVIDED IN ALL HARD SUSPENDED CEILINGS AND WALLS FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, CONTROLS, ETC. THAT REQUIRE MAINTENANCE AND INSPECTION.

COORDINATE LOCATION WITH FINAL EQUIPMENT LAYOUT.

13. ALL PIPING, DUCTS, AND CONTROLS IN FINISHED ROOMS SHALL BE INSTALLED TIGHT TO STRUCTURE

ABOVE HARD SUSPENDED CEILING OR ABOVE ACOUSTICAL CEILING. ANY COMPONENTS PASSING

VERTICALLY THROUGH A FINISHED SPACE SHALL BE CONCEALED IN A FURRED CHASE. EQUIPMENT ABOVE CEILING REQUIRING MAINTENANCE ACCESS SHALL NOT BE LOCATED GREATER THAN 4'-0" ABOVE THE

CEILING PLANE.

14.SLEEVES SHALL BE PROVIDED FOR ALL DUCT AND PIPING PENETRATIONS THROUGH WALLS, FLOORS, CEILINGS AND ROOF ASSEMBLIES.

15. ALL PIPE AND DUCT PENETRATIONS OF FIRE AND/OR SMOKE RATED ASSEMBLIES SHALL BE FIRE-STOPPED AROUND PENETRATION. AIR GAP AROUND PENETRATIONS THROUGH NON-RATED ASSEMBLIES SHALL BE

FILLED WITH MINERAL WOOL CAULKED WITH NON-HARDENING SEALANT.

16. ALL EQUIPMENT WITH ROTATING OR MOTORIZED COMPONENTS (FANS, PUMPS, COMPRESSORS, ETC.)

SHALL BE PROVIDED WITH SPRING VIBRATION MOUNTS OR HANGERS.

GENERAL NOTESHVAC DEMOLITION GENERAL NOTES

1. REFER TO ALL DRAWINGS FOR GENERAL DESCRIPTION OF AREAS REQUIRING DEMOLITION.

2. DEMOLITION SHALL BE COORDINATED WITH OWNER, ARCHITECT, GENERAL CONTRACTOR, CONSTRUCTION

MANAGER AND ENGINEER.

3. REFER TO DRAWING AND GENERAL CONTRACTOR INSTRUCTIONS FOR ALL EXISTING EQUIPMENT AND

MATERIALS THAT SHALL REMAIN THE PROPERTY OF THE OWNER.

4. ITEMS OF VALUE WHICH ARE NOT DIRECTED TO BE RETURNED TO THE OWNER, SHALL BECOME THE

PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED FROM SITE AND LEGALLY DISPOSED OF. STORAGE

OR SALE OF ITEMS ON THE PROJECT SITE IS PROHIBITED.

5. DEMOLITION SHALL BE COORDINATED WITH OWNER, ARCHITECT, GENERAL CONTRACTOR, CONSTRUCTION

MANAGER AND ENGINEER.

6. PROVIDE MECHANICAL DEMOLITION TERMINATION; CUT, VALVE AND CAP. DROP MECHANICAL DISTRIBUTION TO

FLOOR. REMOVAL OF SYSTEM EQUIPMENT SHALL BE BY THE HVAC CONTRACTOR.

7. PROVIDE 2 WEEKS NOTICE TO OWNER OPERATIONS FOR SHUT DOWN OF ANY SERVICES AND/OR SYSTEMS.

8. PERSONNEL PROTECTION: ENSURE THE SAFE PASSAGE OF PERSONS IN AND AROUND THE BUILDING DURING

DEMOLITION. PREVENT INJURY TO PERSONS AND DAMAGE TO PROPERTY. PROVIDE ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE. IMMEDIATELY REPAIR DAMAGED PROPERTY TO THE CONDITION BEFORE

BEING DAMAGED. TAKE EFFECTIVE MEASURES TO PREVENT WINDBLOWN DUST.

9. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT INTERRUPT UTILITIES SERVING OCCUPIED AREAS WITHOUT

FIRST OBTAINING PERMISSION FROM OWNER. PROVIDE TEMPORARY SERVICES AS REQUIRED.

10. THESE DRAWINGS ARE DIAGRAMMATIC ONLY AND REFLECT OVERALL SYSTEM REMOVAL. NOT EVERY ITEM OR

COMPONENT OF A SYSTEM IS SHOWN.

11. WHERE REMOVAL OF EQUIPMENT IS INDICATED, SCOPE OF WORK SHALL INCLUDE REMOVAL OF CONTROLS WIRING, CONDUIT AND DEVICES, HANGERS, SUPPORTS, AND ALL OTHER ASSOCIATED APPURTENANCES.

12. THIS CONTRACTOR SHALL PROVIDE SHUT DOWN OF SERVICES (FANS, PUMPS, AHU's, ETC.) AND TRACING OF

ALL RISERS WITHIN BASE BID.

13. PROVIDE TEMPORARY ADHESIVE FILM CAP OVER ALL OPEN ENDED DUCTWORK AND PLUGS ON PIPING DURING

CONSTRUCTION TO PREVENT DUST AND DEBRIS FROM ENTERING SYSTEM.

DUCTWORK LEGEND

DOUBLE LINE

SYMBOL

SINGLE LINE

SYMBOL DESCRIPTION

DUCTWORK & EQUIPMENT TO BE

DEMOLISHED

ALTERNATIVE DUCTWORK & EQUIP TO BE

DEMOLISHED

AIR ENTERING OPENING

AIR LEAVING OPENING

MANUAL VOLUME DAMPER

RECTANGULAR RETURN OR EXHAUST GRILLE

VD

DUCTWORK LEGEND (CT'D)

AD ACCESS DOOR

AFF ABOVE FINISHED FLOOR

AH AIR HANDLER

AHJ AUTHORITY HAVING JURISDICTION

AHU AIR HANDLING UNIT

APD AIR PRESSURE DROP

AWT AVERAGE WATER TEMPERATURE

BHP BREAK HORSEPOWER

BTU BRITISH THERMAL UNIT

BTUH BTU/HOUR

CAP CAPACITY

COP COEFFICIENT OF PERFORMANCE

CFM CUBIC FEET PER MINUTE

CNV CONVECTOR

CRD CEILING RADIATION DAMPER

CUH CABINET UNIT HEATER

DAH DUCTLESS AIR HANDLER

dB DECIBELS

DHP DUCTLESS HEAT PUMP

DX DIRECT EXPANSION

EAT ENTERING AIR TEMPERATURE (DRY BULB)

EDB ENTERING DRY BULB TEMPERATURE

EER ENERGY EFFICIENCY RATIO

ESP EXTERNAL STATIC PRESSURE

EWB ENTERING WET BULB TEMPERATURE

EWT ENTERING WATER TEMPERATURE

°F DEGREES FAHRENHEIT

FT FEET

FT WG FEET WATER GAUGE

FLA FULL LOAD AMPS

FPM FEET PER MINUTE

HP HORSEPOWER

HSPF HEATING SEASON PERFORMANCE FACTOR

IN INCHES

IN WG INCHES WATER GAUGE

KW KILOWATTS

LAT LEAVING AIR TEMPERATURE

LDB LEAVING DRY BULB

LWB LEAVING WET BULB

MAX MAXIMUM

MBH THOUSANDS OF BTU / HOUR

MCA MINIMUM CIRCUIT AMPACITY

MIN MINIMUM

NTS NOT TO SCALE

PH PHASE

PSIG POUNDS PER SQUARE INCH GAUGE

QTY QUANTITY

RPM REVOLUTIONS PER MINUTE

SEER SEASONAL ENERGY EFFICIENCY RATIO

SP STATIC PRESSURE

SPD STATIC PRESSURE DROP

TSP TOTAL STATIC PRESSURE

TYP TYPICAL

UOI UNLESS OTHERWISE INDICATED

MOP MAXIMUM OVERCURRENT PROTECTION

ABBREVIATIONS

EBB ELECTRIC BASEBOARD

AP ACCESS PANEL

NO NORMALLY OPEN

NC NORMALLY CLOSED

ABBREVIATION

DOWNDN

VRF VARIABLE REFRIGERANT FLOW

BMS BUILDING MANAGEMENT SYSTEM

ATC AUTOMATIC TEMPERATURE CONTROL

OA OUTSIDE AIR

OAT OUTSIDE AIR TEMPERATURE (DRY BULB)

ODB OUTSIDE DRY BULB TEMPERATURE

OWB OUTSIDE WET BULB TEMPERATURE

E.C. ELECTRICAL CONTRACTOR (DIV 26)

G.C. GENERAL CONTRACTOR

M.C. MECHANICAL CONTRACTOR (DIV 23)

EF EXHAUST FAN

EH ELECTRIC HEATER

FD FIRE DAMPER

L LOUVER

RF RETURN FAN

SD SMOKE DAMPER

SF SUPPLY FAN

TF TRANSFER FAN

UH UNIT HEATER

VD VOLUME DAMPER

VFD VARIABLE FREQUENCY DRIVE

ETR EXISTING TO REMAIN

RE REMOVE EXISTING

DESCRIPTION

PIPING PLAN GENERAL NOTES

1. UOI IN FLOOR PLANS, SCHEDULES OR DETAILS; BRANCH PIPES TO TERMINAL UNITS SHALL BE AS FOLLOWS:

2. GRAVITY DRAIN COOLING COIL CONDENSATE PIPING SHALL BE PITCHED DOWNWARD TO DRAIN AT MINIMUM 1/4" PER 1'-0". CONDENSATE SHALL BE AT MINIMUM FULL SIZE OF CONDENSATE EQUIPMENT CONNECTION. PROVIDE P-TRAP W/ CLEANOUT AT ALL EQUIPMENT CONNECTIONS. COOLING COIL CONDENSATE PIPING WITHIN THE BUILDING SHALL TERMINATE ABOVE AN INDIRECT WASTE RECEIVER, WITH A MINIMUM 2" AIR GAP ABOVE THE FLOOD RIM OF THE RECEIVER. JANITORS SINKS AND LAUNDRY TUBS MAY BE USED AS RECEIVERS. WHERE THERE ARE NO JANITORS SINKS OR LAUNDRY TUBS WITHIN THE VICINITY FOR PROPER GRAVITY DRAINAGE, PROVIDE TRAPPED, VENTED, AND PRIMED INDIRECT WASTE RECEIVERS CONNECTED TO THE BUILDING

PLUMBING SYSTEM AS REQUIRED.

3. PROVIDE VENTS AT HIGH POINTS IN PIPING SYSTEMS AND DRAIN VALVES AT LOW POINTS.

4. PROVIDE AT LEAST THREE-ELBOW SWING FOR PIPE TAKE-OFFS TO TERMINAL EQUIPMENT AND RISERS.

5. BULLHEAD TEES NOT ALLOWED. PROVIDE OFFSET TAKEOFFS WITH MINIMUM 3 PIPE DIAMETERS BETWEEN.

6. PROVIDE STAINLESS STEEL BRAIDED FLEX CONNECTIONS TO ALL MECHANICAL TERMINAL EQUIPMENT WITH

ROTATING OR MOTORIZED COMPONENTS. PROVIDE DOUBLE SPHERE CONNECTOR W/ CONTROL RODS AT ALL

PUMP CONNECTIONS.

7. PROVIDE ISOLATION VALVE EXTENSIONS TO ACCOMMODATE SPECIFIED PIPING INSULATION THICKNESS.

8. ALL PIPING TESTS SHALL BE PERFORMED AND APPROVED SUBMITTAL RESPONSE RECEIVED PRIOR TO

INSULATING.

9. ISOLATION VALVES IN PIPING SYSTEMS ARE NOT SHOWN ON PLANS (FOR CLARITY) BUT ARE REQUIRED AT ALL

PIPE BRANCHES AND CONNECTIONS TO EQUIPMENT. REFER TO DETAIL SHEETS AND FLOW DIAGRAMS.

10. PROVIDE HANGERS, CLAMPS, OFFSETS, EXPANSION JOINTS, ANCHORS AND GUIDES AS NECESSARY TO PREVENT

STRESS ON PIPING.

11. CONFIRM HYDRONIC SYSTEM CAPACITY THROUGH PRE-CONSTRUCTION TESTING AND BALANCING REPORTS OF

SYSTEMS TO BE EXTENDED. REPORTS SHALL INCLUDE PIPE SIZE, FLOW RATE, SUPPLY PRESSURE AND RETURN PRESSURE. PROVIDE HYDRONIC SYSTEM FLOW (GPM) AND PIPE SYSTEM PRESSURE (PSIG) MEASUREMENTS IN PIPING SYSTEMS TO DOCUMENT PERFORMANCE AT ALL SPACES SERVED BY SYSTEM, BOTH WITHIN PROJECT

WORK SCOPE AREA AND AND AT MAJOR BRANCHES BEYOND PROJECT WORK SCOPE AREA.

GPM BRANCH PIPES

3/4" 1"

TO0.0 3.0

3.1 TO 6.5

GPM

2-1/2" 2"

1-1/4" 1-1/2"

3" 4"

40.1 65.0TO

65.1 TO 115.06.6 12.0TO

115.1 TO 240.012.1 20.0TO

TO20.1 40.0

BRANCH PIPES

ELBOW UP

ELBOW DOWN

FLOW DIRECTION

BALL VALVE

BUTTERFLY VALVE

PIPING TO BE DEMOLISHED

GATE VALVE

CAP

FLANGE OR UNION (BY PIPE SIZE)

AIR VENT - MANUAL

BALL VALVE W/ HOSE BIB, CAP AND CHAIN

PLUG VALVE

MODULATING CONTROL VALVE W/ SPRING RETURN

TWO POSITION CONTROL VALVE W/ SPRING RETURN

FLEXIBLE CONNECTOR

SYMBOL

PIPING LEGEND

BALL VALVE W/ MEMORY STOP

MV

DESCRIPTION

UNIT HEATER SCHEDULE - ELECTRIC

TAG

UNIT DATA ELECTRIC COIL ELECTRICAL DATA

MFR MODEL

NUMBER REMARKSUNIT

TYPE

MOUNTING

TYPE CFM

OUTPUT

(KW)

OUTPUT

(MBH) V PH HZ FLA

EWH-1 WALL

MOUNTED RECESSED 100 1.5 5.1 120 1 60 14.4 QMARK AWH3150FNW 1,2,3,4

REMARKS:

1. PROVIDE DISCONNECT SWITCH.

2. PROVIDE BUILT-IN THERMOSTAT STAGED.

3. PROVIDE WALL MOUNT BRACKET AND MOUNTING FRAME.

4. MIN. MOUNTING HEIGHT FROM FLOOR: 0'-10".

AUTOMATIC CONTROL DAMPER W/ ACCESS

DOOR

ACD

UNDERCUT DOOR

FAN SCHEDULE

TAG LOCATION SERVICE

FAN DATA MOTOR DATA

WEIGHT

(LBS) MFR MODEL NUMBER REMARKS

TYPE CFM

ESP

(IN WG)

OUTLET

VELOCITY

FAN

SPEED

(RPM)

EFF

DRIVE

(DIRECT OR

BELT)

SPEED

(RPM) MCA HP V PH HZ

EF-1 101- ELEC 101-ELEC INLINE 500 0.12 500 1641 50 DIRECT 1800 3.5 1/6 120 1 60 45 GREENHECK SQ-90-VG 1,2,3,4

REMARKS:

1. PROVIDE SPACE MOUNTED TEMPERATURE SENSOR AND CONTROLLER TO MAINTAIN 80°F SPACE TEMPERATURE.

2. PROVIDE CEILING HANGING BRACKET WITH VIBRATION ISOLATION.

3. BACKDRAFT DAMPER.

4. DISCONNECT SWITCH.

5. MOTOR GUARD.

CONNECT TO EXISTING

HYDRONIC HEATER SCHEDULE

TAG

HEAT

OUTPUT

(BTU/LF)

MOUNTING

(SURF. OR

LAY-IN)

PIPE DIA.

(IN)

ROOM

TEMP

(°F)

WATER DATA ELEMENT / ENCLOSURE

MFR MODEL

NUMBER REMARKSEWT

(°F)

AWT

(°F) GPM

WPD

(FT. WG)

WORKING

PRESSURE

(PSIG)

MATERIAL

PANEL

WIDTH

(IN)

LENGTH

(FT)

HUH-1/2 15650 CEILING HUNG 0.75 68 140 130 1.9 2.2 56 - - - STERLING HS-118A 1,2,3

REMARKS:

1. PROVIDE NON-FUSED DISCONNECT AND UNIT MOUNTED 3-SPEED FAN SWITCH

2. PROVIDE CEILING HANDING BRACKET, MOUNT 8' AFF

3. PROVIDE WALL MOUNTED THERMOSTAT

LIMIT OF DEMOLITION

MOTOR DATA

SPEED

(RPM) MCA HP V PH HZ

1550 1.0 (16WATT) 120 1 60

EF-2 103- ELEC WALL MOUNTED 250 0.2 676 1673 19 DIRECT 1800 3.5 1/6 120 1 60 20 GREENHECK SE1-8-440-VG103- ELEC 1,2,3,4,5

FIRE DAMPER (2 HR)FD

INDOOR SPLIT SYSTEM SCHEDULE - AIR SOURCE HEAT PUMP

INDOOR

UNIT

TAG

OUTDOOR

UNIT

TAG

REF.

TYPE

COOLING HEATING INDOOR UNIT

MFR MODEL

NUMBER REMARKSTOTAL

CAPACITY

(MBH)

SENSIBLE

CAPACITY

(MBH)

EAT

DB

(°F)

EAT

WB

(°F)

OUTDOOR DB

TEMP

(°F)

CAPACITY

@47F

(MBH)

CAPACITY

@17F

(MBH)

CAPACITY @5F

(MBH) UNIT STYLE

CFM

(H/L)

SOUND PRESSURE

@ MAX CFM

(dBA)

POWERED

FROM OD UNIT

(Y/N)

WEIGHT

(LBS)

AC-1 ACCU-1 R454B 36.0 20.4 80 67 95 40.0 23.2 20.0 WALL

MOUNT 920/705 49 Y 46 MITSUBISHI PKA-AK36NL ALL

REMARKS:

1. PROVIDE WIRED PROGRAMMABLE THERMOSTAT WITH BMS CONNECTIVITY.

2. PROVIDE 120V CONDENSATE PUMP. BLUE DIAMOND (MAXIBLUE ADVANCED) MINI CONDENSATE PUMP W/ RESERVOIR & SENSOR

3. HEATING AT 47F: EAT DB/WB: 70 DB/60 WB, OUTDOOR DB: 47F

4. HEATING AT 17F: EAT DB/WB: 70 DB/60 WB, OUTDOOR DB: 17F

5. HEATING AT 5F: EAT DB/WB: 70 DB/60 WB, OUTDOOR DB: 5F

6. DISCONNECT SWITCH.

OUTDOOR SPLIT SYSTEM SCHEDULE - AIR SOURCE HEAT PUMP

OUTDOOR

UNIT

TAG

REF.

TYPE

PERFORMANCE OUTDOOR UNIT ELECTRICAL DATA

MFR MODEL

NUMBER REMARKSNOMINAL

TONS

COOLING

EFFICIENCY

SEER2

COP

@47F

COP

@17F

COP

@5F HSPF2

MAX SOUND

PRESSURE

(dBA)

SEACOAST

COATING (Y/N)

WEIGHT

(LBS) V PH HZ MCA

ACCU-1 R454B 3.0 20.3 4.1 2.8 2.7 9.4 53 Y 224 208 1 60 34 MITSUBISHI PUZ-AK36NLHZ ALL

REMARKS:

1. REFRIGERANT PIPING BETWEEN INDOOR AND OUTDOOR UNIT TO BE SIZED BY MANUFACTURER. EQUIPMENT SELECTION SHALL ACCOUNT FOR DERATE FOR OVERALL PIPING LENGTH AND ELEVATION DIFFERENCE.

2. OUTDOOR UNIT SHALL BE MOUNTED ON WALL MOUNTED BRACKET MINIMUM 36" ABOVE GRADE.

3. FRONT WIND BAFFLE

4. SNOW/RAIN DIVERTER

5. CENTRALIZED DRAIN PAN

RFS

5 4 3 2 1

A

B

C

Drawing Title

Revisions

Project Information

Project Location

D

RE

N

O

VA

TI

O

N T

O T

O

66 Main Street N. Easton, MA 02356 T 508.230.0260 F 508.230.0265 ber@ber-engineering.com

351 Centerville Road

T 401.384.7682 www.ber-engineering.com

BUILDING ENGINEERING RESOURCES, INC.

E RB

Warwick, RI 02886

Office Commons 95

R

IC

T H

O R

P H

AL

L

EL

EC

TR

IC

AL

R

O O

M

RIC THORP HALL ELECTRICAL ROOM

RENOVATIONS

CONSTRUCTION DOCUMENTS

19 OCTOBER 2026

THORP HALL

600 MT PLEASANT AVE

PROVIDENCE, RI 02908

M0.01

MECHANICAL

LEGEND, NOTES &

SCHEDULES

Revisions

RIC THORP HALL ELECTRICAL ROOM

RENOVATIONS

MAIN ELECTRICAL ROOM

BASEMENT

ELECTRICAL ROOM

VESTIBULE

TEL/DATA

PROVIDE NEW 3/4" HWS PIPING TO EXISTING HWS PIPING AS

SHOWN.

A

NEW WORK KEYNOTES

EF

T

EWH

TEMPERATURE CONTROLLER SHALL ENERGIZE EF-1 AND

OPEN L-1 UPON A RISE IN TEMPERATURE ABOVE 80°F. ONCE

TEMPERATURE IS BELOW 80°F EF-1 SHALL DE-ENERGIZE

AND L-1 SHALL BE CLOSED.

B

BT

TEMPERATURE CONTROLLER SHALL ENERGIZE EF-2 AND

UPON A RISE IN TEMPERATURE ABOVE 80°F. ONCE

TEMPERATURE IS BELOW 80°F EF-2 SHALL DE-ENERGIZE.

C

10x10 DUCTWORK TO TERMINATE WITH WIRE MESH SCREEN.D

PROVIDE CEILING HANGING BRACKET.E

PROVIDE BACK TO BACK 12x12 TRANSFER GRILLES, ABOVE

DOOR, FOR MAKE-UP AIR PATHWAY, PRICE MODEL 620 OR

SIMILAR

F

FD

ACD

ACD

ACD

E

E

HWS

HWR

HWS

HUH

3/4" HWS

L-1

L-2

L-3

F

EF

UTILIZE OPENING FROM REMOVED GENERATOR DUCTWORK.

INFILL OPENING NO LONGER IN USE. COORDINATE WITH G.C.

G

G T H

A

H ROUTE 3/4"CONDENSATE TO INDIRECT WASTE RECEIVER

WITHIN MECHANICAL ROOM.

3/4 " H

W S

3/4 " H

W R

HUH

I PROVIDE EMERGENCY DRIP PAN WITH EMERGENCY LEAK

DETECTION BELOW PIPING CROSSING ELECTRICAL/IT ROOM.

PAN SHALL BE PITCHED AT 1/16" PER FOOT AND SHALL HAVE

EMERGENCY DRAIN DISCHARGE WHERE VISUAL INDICATION

OF LEAKS CAN BE IDENTIFIED WITHIN MECHANICAL ROOM.

COORDINATE LOCATION WITH FACULTY.

I

AC

CP

ACCU

RE

F

B

C

T

J PROVIDE WALL MOUNTED BRACKET AND MOUNT BOTTOM

OF UNIT 36" ABOVE GRADE, ENSURE UNIT DOES NOT

INTERFERE WITH ADJACENT LOUVER LOCATION.

J

H 3/4" COND CO

PROVIDE BACK TO BACK 14x8 TRANSFER GRILLES WITHIN

12" OF FINISHED CEILING AND 12" ABOVE FINISHED FLOOR.

PRICE MODEL 620 OR SIMILAR. OPENINGS REQUIRED FOR

A2L COMPLIANCE.

K

K

D

PROVIDE NEW 3/4" OUTLET DRAIN OFF VALVE, ISOLATION

VALVE, AND 3/4" COPPER PIPING TO TERMINATE WITHIN 6"

OF THE FLOOR. ROUTE PIPING DOWN ADJACENT WALL.

L

L

M

ROUTE 1" DRAIN LINE TO INDIRECT WASTE RECIVER.M

FCU

DEMO

HWS

HW

S

HW

R

REMOVE EXISTING FCU IN ITS ENTIRETY INCLUDING ALL

HANGERS, SUPPORTS, DUCTWORK, CONTROLS, AND

ASSPCOATED APPERTUNATANCES.

A

DEMOLITION KEYNOTES

REMOVE EXISTING HWS&R PIPING AS SHOWN. CAP AT

NEAREST MAIN.

B

REMOVE EXISTING LOUVER. COORDINATE WITH G.C. TO

INFILL EXISTING BUILDING OPENING AS REQUIRED.

C

C

A

B

CAP AND SEAL DUCTWORK AT DECK LEVEL, DUCTWORK

RISE ON FLOOR ABOVE TO BE ABANDONED IN PLACE.

D

D

CUH

DEMO

REMOVE EXISTING CUH IN ITS ENTIRETY. CAP EXISTING

PIPING AT CEILING AND PREP FOR NEW CONNECTION,

REFER TO NEW WORK PLAN.

E

E

HWS

HWRHWR

HWR

CAP EXISTING HWR

PIPING WITHIN

MECHANICAL ROOM.

CAP EXISTING HWS

PIPING WITHIN

MECHANICAL ROOM.

HWS

REMOVE EXISTING DUCTWORK, DAMPERS, HANGERS, AND

SUPPORTS. EXISTING LOUVER TO BE INFILL.

F

F

G

REMOVE EXISTING LOUVER AND ASSOCIATED DUCTWORK

AND DAMPER.

G

G

EXISTING HOSE BIB ON EXISTING 3" DOMESTIC COLD WATER

(V.I.F.) SHALL BE REMOVED. REFER TO NEW WORK FOR

REQUIRED MODIFICATION.

H

H

5 4 3 2 1

A

B

C

Drawing Title

Revisions

Project Information

Project Location

D

RE

N

O

VA

TI

O

N T

O T

O

66 Main Street N. Easton, MA 02356 T 508.230.0260 F 508.230.0265 ber@ber-engineering.com

351 Centerville Road

T 401.384.7682 www.ber-engineering.com

BUILDING ENGINEERING RESOURCES, INC.

E RB

Warwick, RI 02886

Office Commons 95

R

IC

T H

O R

P H

AL

L

EL

EC

TR

IC

AL

R

O O

M

RIC THORP HALL ELECTRICAL ROOM

RENOVATIONS

CONSTRUCTION DOCUMENTS

19 OCTOBER 2026

THORP HALL

600 MT PLEASANT AVE

PROVIDENCE, RI 02908

M1.01

MECHANICAL DEMOLITION

AND NEW WORK PLANS

SCALE: 1/4" = 1' - 0"1 ELECTRICAL PROPOSED FLOOR PLAN - LIGHTING

SCALE: 1/4" = 1' - 0"2 ELECTRICAL PROPOSED FLOOR PLAN - POWER

Revisions

RIC THORP HALL ELECTRICAL ROOM

RENOVATIONS

GRILLE

NTSDIRECT DRIVE CABINET EXHAUST FAN DETAIL4

PROVIDE ROUND TO RECTANGULAR

TRANSITION AS REQUIRED FOR FAN

INTEGRAL GRAVITY BACKDRAFT

DAMPER

CEILING (BY OTHERS)

ROUND/RECTANGULAR OUTLET

CEILING CABINET FAN

PROVIDE ALUMINUM RIGID

DUCTWORK TO COMMON

VENT OR TERMINATION

POINT

PROVIDE METALLIC FLEX

DUCT FOR FIRST 4"

SIDE VIEW

NTSINLINE FAN DETAIL6

FLEX CONNECTION

RUBBER & SHEAR VIBRATION

ISOLATION

TRANSITION AS REQUIRED TO

LOWER VELOCITY (700 FPM

MAX.)

SUPPORT ROD

CEILING

T

NTSHOT WATER UNIT HEATER DETAIL5

HANG FROM

ABOVE W/

VIBRATION

ISOLATORS

SEE NOTE

INSECT SCREEN

PITCH TO OUTSIDE

DN

"D"

LOUVER PLENUM

EXTERNALLY INSULATE ALL

EXPOSED PARTS AS

SPECIFIED.

NOTE: UOI, DEPTH "D" OF LOUVER

SHALL BE MINIMUM 24"

NTSLOUVER CONNECTION DETAIL7

SEAL AND CAULK

ALL AROUND

SEAL AND CAULK ALL AROUND

ACCESS DOOR

(12"x12" MINIMUM)

SOLDER BOTTOM JOINTS

AND SIDES UP 12" FROM

BOTTOM

STORM-PROOF

LOUVER

RETURN

SUPPLY

PT

PT PT

DOV

MV

NOTES:

1. DETAIL APPLIES TO SINGLE DUCT MOUNTED COILS, FAN COIL UNITS, UNIT HEATERS, WATER-SOURCE

HEAT PUMPS, ETC.

2. PIPING FOR MULTIPLE ROW COILS SHALL BE CONNECTED IN COUNTERFLOW ARRANGEMENT.

3. ACCEPTABLE TO RELOCATE MANUAL AIR VENT AND DRAIN OFF VALVE TO COIL IF CONNECTION IS

PROVIDED BY THE COIL MANUFACTURER.

4. SUBSTITUTE BUTTERFLY VALVES FOR BALL VALVES IF PIPING IS 2-1/2" NPS OR LARGER.

5. COMBINATION COIL PACK KITS ARE ACCEPTABLE IN LIEU OF INDIVIDUAL COMPONENTS SHOWN.

6. REMOVE STRAINER BASKETS AFTER INITIAL STARTUP AND SYSTEM FLUSH IS COMPLETE.

7. WHERE COIL CONNECTIONS ARE NOT IN SAME VERTICAL PLANE, SUPPLY SHALL BE THROUGH THE

BOTTOM CONNECTION.

8. WHERE WATER COIL IS INSTALLED IN A FLOOR MOUNTED CABINET TYPE UNITS, ALL VALVES SHALL

FIT WITHIN CABINET.

9. PROVIDE 12 INCH LONG SS BRAIDED HOSE FOR ALL TERMINAL EQUIPMENT W/ MOTORIZED ROTATING

EQUIPMENT.

SPACE OR UNIT MOUNTED THERMOSTAT

AS SHOWN ON THE DRAWINGS

ADJUSTABLE HANGER

WITH ROLLER

LOCKING NUT

SUPPORT NUT INSULATION

PIPE

PIPE COVERING

PROTECTION

16 GA SADDLE

GALVANIZED

INSULATION

SHIELD 12"LONG.

MIN.9 lb/cft

DENSITY RIGID

INSULATION AT

SHIELD

HEAVY DUTY

CLEVIS HANGER

(FOR 1/2" UP TO

& INCL. 3" PIPE)

(FOR 4" TO 6" PIPE)

NTSPIPE HANGER DETAIL3

NOTES:

1. SEE SPECIFICATION FOR HANGER SIZES.

2. FOR CHW SERVICE OVER 3" REPLACE SADDLE WITH 12" LONG 14 GA SHIELD WITH RIGID

INSULATION BETWEEN PIPE AND SHIELD.

PIPE SUPPORT ACROSS ROOF

NTSSPLIT SYSTEM REFRIGERANT PIPING DETAIL2

NOTES:

1. INVERTED TRAPS TO EXTEND A MINIMUM OF 7 1

2"

ABOVE THE BASE OF THE COIL. ENSURE TRAPS CLEAR

DOOR SWINGS.

2. INSULATE BOTH SUCTION AND LIQUID LINES. REFER

TO SPECIFICATIONS FOR INSULATION INFORMATION.

3. PIPING SHALL BE ANCHORED TO SATISFY PROJECT

WIND SPEED. REFER TO DELEGATED DESIGN OF WIND

SUPPORTS IN SPECIFICATIONS.

MOUNT ACCU ON 18" TALL

EQUIPMENT SUPPORT WITH

NEOPRENE ISOLATORS .

PROVIDE 4" CONCRETE

MOUNTING PAD FOR GRADE

MOUNTED UNIT

DRAIN PAN OVERFLOW

SWITCH WIRED TO UNIT

DISCONNECT

AC UNIT

CONDENSATE DRAIN & TRAP

TRAP AT BOTTOM

OF RISER

TRAP EVERY 20 FT. OF

VERTICAL RISE IN

SUCTION LINELIQUID LINE

SUCTION LINE

SCHRADER VALVE

SHUT-OFF VALVE (TYP)

INSTALL INVERTED TRAP

AT COIL CONNECTION

PER NOTE 1

INSULATED REF. PIPING

STAINLESS STEEL PIPE CLAMPS

ACCU UNIT

CORROSION RESISTANT

UNISTRUT MOUNTED TO

POLYCARBONATE BASE (MIRO

12-BS-12 AS BASIS OF DESIGN,

REFER TO DELEGATED DESIGN

OF WIND SUPPORTS FOR

SELECTION OF SUPPORTS AND

ANCHORING REQUIREMENTS)

NTS1

(TYP)

1/2" MAX

(TYP)

1/2" MAX

PARTITION

NOTE 2

PARTITION

NOTES:

1. CUT GYPSUM TO PROVIDE 1/2" GAP AROUND PENETRATING OBJECT. GAP SHALL BE FROM EDGE OF

OBJECT INSULATION. INCREASE GAP ONLY WHERE SPRING ISOLATION TRAVELS EXCEEDS 1/2".

2. TIGHTLY PACK ENTIRE GAP WITH MINERAL WOOL, GLASS FIBER, OR BACKER ROD. CAULK ENTIRE

PERIMETER OF GAP ON BOTH SIDES OF PARTITION. AT FIRE RATED PARTITIONS, ADD ADDITIONAL LAYER

OF UL-LISTED FIRE STOP INSULATION AROUND PENETRATION.

3. AT PIPING PENETRATIONS, PROVIDE SHEET METAL OR PIPE SLEEVE.

4. WHERE DUCT PENETRATION EXPOSED TO THE ROOM, PROVIDE 1-1/2"X1-1/2" SHEET METAL ANGLE

FRAME AROUND DUCT PERIMETER. 22GA MINIMUM OR SAME AS DUCT CONSTRUCTION, WHICHEVER IS

GREATER.

5. WHERE PIPING PENETRATION EXPOSED TO ROOM, PROVIDE ESCUTCHEON PLATE

6. DUCT PENETRATION SHOWN IS WHERE FIRE DAMPER IS NOT REQUIRED BY CODE.

NOTE 4

NOTE 3

NTSDUCT AND PIPING PARTITION PENETRATION DETAIL8

DUCTWORK PIPING

NTS

GRADE

FLOOR

GRAVITY OR

PUMPED

CONDENSATE LINE

FROM AIR

HANDLING UNIT(S)

WATER-TIGHT

CAP/SEAL

1" PVC OUTER DRAIN

RECEPTOR, SEE NOTE

NOTE: PITCH INTERIOR PORTION OF OUTER

RECEPTOR TO DRAIN TO OUTDOORS

CONDENSATE REMOVAL TO EXTERIOR PIPING DIAGRAM9

RUN WITHIN WALL ON

WARM SIDE OF

INSULATION

SPACE MTD

C

P

C

P

INDOOR

EVAPORATOR

REMOTE

CONDENSER

GENERAL

1. MANFACTURER PROVIDED EQUIPMENT CONTROLLER SHALL BE COMPATIBLE WITH CAMPUS BMS

SYSTEM. ALL ALARMS, OPERATING MODES, AND SPACE TEMPERATURE SET POINTS SHALL BE

MONITORED AND ACCESSIBLE WITHIN THE CAMPUS BMS SYSTEM.

2. UNLESS NOTED OTHERWISE THE FOLLOWING SHALL BE INITIAL SPACE TEMPERATURE AND

HUMIDITY SETPOINTS (ADJUSTABLE):

a. TELCOM ROOMS

COOLING OR VENTILATION 78 DEGREES F (24 HOURS), 50% MAXIMUM

HEATING 65 DEGREES F MIN (24 HRS), NO HUMIDIFICATION

3. SCHEDULES:

OCCUPIED 24 HOURS / 7 DAYS A WEEK, 365 DAYS PER YEAR

SAFETIES

1. UPON DETECTION OF HIGH WATER IN DRAIN PAN VIA YS-01, UNIT SHALL SHUTDOWN AND ALARM AT

BAS.

2. UPON DETECTION OF TT-01 SETPOINT NOT MET FOR 10 MINUTES AND OUTDOOR UNIT ON, UNIT

SHALL SHUTDOWN AND ALARM AT BAS.

3. UPON DETECTION OF EQUIPMENT FAILURE OR…