RFQ27007133 – Thorp Hall Electrical Room Renovations
This construction documents package pertains to the renovation of the electrical infrastructure at Rhode Island College's Thorp Hall, located at 600 Mt. Pleasant Avenue, Providence, Rhode Island. The project scope encompasses comprehensive upgrades to the basement-level electrical systems, including demolition of obsolete electrical switchgear and equipment, removal of hazardous flooring materials, and installation of new electrical distribution equipment housed in a new 220-square-foot electrical room. A new 130-square-foot telecommunications/data room will also be constructed to support building communications systems. Additional work includes installation of new masonry partitions, hollow metal doors and frames, concrete and masonry repairs, infill of unused exterior louvers, new lighting systems with emergency fixtures, fire alarm upgrades, and modifications to fire protection and mechanical systems. The project is designed to maintain existing electrical system operations throughout construction to minimize disruptions to building occupants. The construction documents, dated October 19, 2026, incorporate input from multiple engineering disciplines, including MEP Building Engineering Resources, Inc. (Warwick, RI), B+AC LLC (Chelsea, MA), Universal Environmental Consultants (Framingham, MA), and Building Technology Consulting LLC (Bridgewater, MA).
The electrical service upgrade accommodates a new 150-kilovolt-ampere pad-mounted transformer, which does not trigger fire-rating requirements for the new electrical room. The project includes comprehensive site work involving utility trenching between Weber Hall and Thorp Hall, with coordination required around existing buried condensate piping at estimated depths of 2–3 feet below grade. A temporary transformer and associated connections will be required during construction to serve the building once the existing main switchboard assembly is removed and until the permanent transformer is operational; the electrical contractor bears all costs and rental charges for this temporary equipment for a minimum period of six months. The construction documents specify compliance with the Rhode Island State Building Code 2025 and the International Building Code 2021, with structural work requiring shop drawing review and approval before execution. The existing basement is fully sprinklered, and the sprinkler system will be adjusted to accommodate the new layout. The project emphasizes coordination among all trades, verification of existing conditions before construction, and adherence to detailed specifications for structural materials, electrical systems, fire protection, mechanical systems, and telecommunications infrastructure.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MEP
Bulding Engineering Resources, Inc Warwick, RI N. Easton, MA ber-engineering.com
STRUCTURE
B+AC, LLC
Chelsea, MA bplusac.com
ENVIROMENTAL
Universal Environmental Consultants Framingham, MA uecenv.com
TELECOMMUNICATIONS
Building Technology Consulting LLC Bridgewater, MA buildingtechc.com
RENOVATION TO
RIC THORP HALL
ELECTRICAL ROOM
RIC THORP HALL ELECTRICAL ROOM RENOVATIONS
CONSTRUCTION DOCUMENTS
19 OCTOBER 2026
THORP HALL
600 MT PLEASANT AVE
PROVIDENCE, RI 02908
COMMON ABBREVIATIONS
ALUMNIUM
CONCRETE
RIGID INSULATION
CONCRETE BLOCK
BRICK
EARTH
ENGINEERED WOOD (MDF, HDF, ETC.)
POROUS FILL (GRAVEL, CRUSHED
STONE, ETC.)
GLASS, HORIZONTAL SURFACE
METAL (STEEL, ETC.)
PLASTIC
PLYWOOD
RUBBLE
GYPSUM/PLASTER
EXISTING, UNEXCAVATED
CERAMIC TILE, HORIZONTAL SURFACE
WOOD (EDGE GRAIN)
WOOD (END GRAIN)
WOOD (FACE GRAIN)
SHINGLE
CERAMIC TILE, VERTICAL SURFACE
GLASS, VERTICAL SURFACE
GLASS, SPECIALTY
COMMON DRAFTING PATTERNS
A10.00 A1A1
SIM
COMMON SYMBOLS
+100'-0"
A
SIM
A10.00 A1A1
A10.00
A1
A1
A1
A1
/A1 A10.00
EXTERIOR ELEVATION
BUILDING SECTION
WALL SECTION
CALLOUT
DETAIL SECTION
INTERIOR ELEVATION
VIEW REFERENCE
NOTE
NAME
EL. ELEVATION
LEVEL / ELEVATION
SPOT ELEVATION
S0A
DRAWING NOTE
BREAK LINE
ROOM
WINDOW
0COLUMN HEAD
REVISION
DOOR
PARTITION/WALL
WALL HEIGHT
CENTER LINE
SIM
A10.00 A1A1
SIM
A10.00 A1A1
SIM
A10.00 A1A1
ROOM NAME
DRAWING INDEX
LOCATION MAP
PROJECT NARRATIVE
Thorp Hall is an existing residence hall located on the Rhode Island College campus in Providence, Rhode Island. The project consists of upgrades to the building's electrical infrastructure within the basement level to replace aging electrical equipment, improve system reliability, and support the continued operation of the residence hall.
The existing electrical service area contains obsolete electrical and mechanical equipment, abandoned infrastructure, and underutilized space. The project will include demolition of existing electrical switchgear, equipment pads, partitions, lighting, and other unused systems to prepare the area for renovation and new construction. Existing hazardous flooring materials will be removed as part of the work.
The renovated space will accommodate a new electrical room containing replacement electrical distribution equipment and a new telecommunications/data room to support the building's communications systems. The proposed layout has been developed to allow much of the new infrastructure to be installed while existing systems remain operational, minimizing disruptions to building occupants during construction.
Renovation work includes new masonry partitions, hollow metal doors and frames, repairs to existing concrete and masonry surfaces, infill of unused exterior louvers, new lighting, and associated modifications to the building's fire alarm, fire protection, and mechanical systems. Walls, ceilings, and floors within the project area will be repaired and refinished to provide a clean, durable, and maintainable environment for the new
Upon completion, the project will provide a modern electrical service area that improves reliability, enhances maintainability, and supports the long-term needs of the residence hall and the Rhode Island College campus.
NN
50'
SITE UTILITIES PLAN
SITE WORK
1.
2.
EXCAVATE, BACKFILL AND COMPACT THE SITE AS REQUIRED TO COMPLETE THE WORK SHOWN ON THE DRAWINGS, INCLUDING THE UTILITY TRENCH BETWEEN WEBER HALL AND
THORP HALL.
LOAM AND SEED DISTURBED AREA
TRENCH AS CLOSE TO THE ROAD
AS POSSIBLE
65'-0"
ALIGN
TRANSFORMER LOCATION
APPROXIMATE LOCATION OF EXISTING BURIED
CONDENSATE LINE, EXACT LOCATION UNKNOWN,
EXTENT OF AREA MARKED, ESTIMATED DEPTH 2-3 FEET
BELOW GRADE.
COORDINATE AND ADJUST NEW DUCTBANK TO ALLOW
FOR CROSSING THE LINE.
MAIN ELECTRICAL ROOM
SWITCHBOARD Approx. 12'x3'
101A
100B
103A
BASEMENT
ELECTRICAL ROOM
VESTIBULE
TEL/DATA
65' - 6"
16 "
CODE AND LIFE SAFETY LEGEND
EXIT PATH OF TRAVEL
SMOKE BARRIER/SEPARATION
100100 34" 44"
0" 0"
EXIT ACCESS CORRIDOREXIT ACCESS CORRIDOR
OCCUPANT LOAD
REQUIRED WIDTH WIDTH PROVIDED
EXIT ACCESS STAIR/DOOREXIT ACCESS STAIR/DOOR
OCCUPANT LOAD
REQUIRED WIDTH WIDTH PROVIDED
100' - 0"100' - 0"
1-HOUR FIRE SEPARATION
2-HOUR FIRE SEPARATION
3-HOUR FIRE SEPARATION
OCCUPANCY
1.5-HOUR FIRE SEPARATION
FUNCTION OF SPACE
150 SF
0 OCC.
PROJECT AREA
8'
THE PROJECT CONSISTS OF REPLACING THE ELECTRICAL EQUIPMENT IN THE UNOCCUPIED
BASEMENT AS WELL AS UPGRADING THE TELECOMMUNICATIONS EQUIPMENT.
THE EXISTING BASEMENT IS FULLY SPRINKLERED. THE SPRINKLER SYSTEM WILL BE ADJUSTED
TO SUIT THE NEW LAYOUT.
THE RETAINING WALLS ON THE PERIMETER ARE 16" THICK CONCRETE CONSTRUCTION. THE
CONCRETED SLAB TO THE FLOOR ABOVE IS 9" THICK.
THE NEW ELECTRICAL SERVICE IS LESS THAN 150 kVA. THEREFORE THE NEW ELECTRICAL
ROOM DOES NOT NEED TO BE FIRE RATED.
LIFE SAFETY UPGRADES INCLUDE:
NEW LIGHTING INCLUDES EMERGENCY LIGHTING FIXTURES
FIRE ALARM UPGRADES
MAIN ELECTRICAL ROOM: 220 SF
TEL/DATA ROOM: 130 SF
5 4 3 2 1
A
B
C
Drawing Title
Revisions
Project Information
Project Location
D
G0.01G0.01
PROJECT INFORMATION
R
EN
O
VA
TI
O
N T
O
R
IC
T H
O R
P H
AL
L
EL
EC
TR
IC
AL
R
O O
M
RIC THORP HALL ELECTRICAL ROOM
RENOVATIONS
CONSTRUCTION DOCUMENTS
19 OCTOBER 2026
THORP HALL
600 MT PLEASANT AVE
PROVIDENCE, RI 02908
IDID TERMTERM
CMU CONCRETE MASONRY UNIT
CONT. CONTINUOUS
COORD. COORDINATE
DWG DRAWING
DEMO DEMOLISH
ETR EXISTING TO REMAIN
EXG EXISTING
ELEC ELECTRICAL
EQUIP EQUIPMENT
HM HOLLOW METAL
N/A NOT APPLICABLE
PTN PARTITION
PNT PAINT
REQ. REQUIRED
RCP REFLECTED CEILING PLAN
SCHED. SCHEDULE
STRUCT. STRUCTURAL
SIM SIMILAR
TYP TYPICAL
TEL TELPHONE
UNO UNLESS NOTED OTHERWISE
Sheet NumberSheet Number Sheet NameSheet Name
GENERAL
G0.00 COVER
G0.01 PROJECT INFORMATION
STRUCTURE
S0.01 STRUCTURAL DRAWINGS
ARCHIETCTURE DEMO
AD1.00 DEMOLITION PLANS
ARCHIETCTURE
A1.00 PROPOSED PLANS
A8.00 INTERIOR/EXTERIOR ELEVATIONS
A9.00 DOOR & FRAME TYPES AND SCHEDULE
FIRE PROTECTION
FP1.01 FIRE PROTECTION PLAN, LEGEND & DETAILS
MECHANICAL
M0.01 MECHANICAL LEGEND, NOTES & SCHEDULES
M1.01 MECHANICAL DEMOLITIONS AND NEW WORK PLANS
M2.01 MECHANICAL DETAILS
ELECTRICAL
E0.01 ELECTRICAL LEGEND, NOTES & FIXTURE SCHEDULES
ES1.01 ELECTRICAL SITE PLAN
ES1.02 ELECTRICAL SITE DETAILS
ED1.01 ELECTRICAL FLOOR PLAN - DEMOLITION
E1.01 ELECTRICAL PROPOSED PLANS
E2.01 ELECTRICAL RISER DIAGRAM
E2.02 ELECTRICAL PANEL SCHEDULES
FIRE ALARM
FA1.01 FIRE ALARM PROPOSED PLANS
TELECOMMUNICATION
TC0.01 TECHNOLOGY - LEGEND AND NOTES SHEET
TC1.00 TECHNOLOGY - GROUND FLOOR - EXISTING CONDITIONS
TC1.01 TECHNOLOGY - EXISTING CONDITIONS - DETAILS SHEET
TC2.00 TECHNOLOGY - GROUND FLOOR - NEW WORK
TC2.01 TECHNOLOGY - NEW WORK - DETAILS SHEET
G0.01 SCALE: 1/4" = 1'-0"
A6A6 CODE PLAN - BASEMENT
Revisions
RIC THORP HALL ELECTRICAL ROOM
RENOVATIONS
CONSTRUCTION DOCUMENTS
19 OCTOBER 2026
STEEL ANGLE LINTEL SCHEDULE
MAXIMUM CLEAR
SPAN MASONRY
OPENING
WALL THICKNESS
4" WALL
1-L3-1/2x3-1/2x5/16
1-L4x3-1/2x5/16
1-L4x3-1/2x5/16
1-L5x3-1/2x5/16
3' - 0"
4' - 0"
5' - 0"
6' - 0"
8' - 0"
6" WALL
2-L3x2-1/2x5/16
2-L3x2-1/2x5/16
2-L3-1/2x2-1/2x5/16
2-L3-1/2x2-1/2x5/16
2-L3-1/2x2-1/2x5/16
8" WALL
2-L3-1/2x3-1/2x5/16
2-L4x3-1/2x5/16
2-L5x3-1/2x5/16
2-L5x3-1/2x5/16
2-L6x3-1/2x3/8
NOTES:
1. PROVIDE AND INSTALL LINTEL ANGLES FOR MASONRY OPENINGS IN ACCORDANCE WITH THE
SCHEDULE ABOVE. INSTALL LONG LEG VERTICAL. SEE ARCHT DRAWINGS FOR LOCATIONS.
2. PROVIDE 6" MINIMUM BEARING AT EACH END BUT NOT LESS THAN 1" PER FOOT OF SPAN.
FILL 2 COURSES OF MASONRY BELOW BEARING WITH MORTAR.
3. WHERE MINIMUM BEARING CANNOT BE PROVIDED, ATTACH SECURELY TO ADJACENT STRUCTURAL
MEMBERS BY BOLTING, SEATING, WELDING OR PROVIDE SEPARATE SUPPORTS.
4. WHERE LINTELS OCCUR IN EXTERIOR WALLS, MINIMUM THICKNESS SHALL BE 5/16" AND ANGLES
SHALL BE HOT-DIP GALVANIZED.
5. WHERE WALL THICKNESS EXCEEDS 8", PROVIDE 1 ADDITIONAL ANGLE FOR EACH ADDITIONAL
4" THICKNESS OF WALL.
MINIMUM
BEARING
(NOTE 2)
0 - 6"
0 - 6"
0 - 6"
0 - 6"
0 - 8"
6'' CMU PARTITION COORD W/ ARCHT. TYP
OPENING COORD W/ ARCHT. TYP
(E) WALL.TYP
4'' DIA PENETRATIONS
COORD W/ ARCHT. TYP
S0.01
D
CONC SLAB TO MATCH
EXISTING THICKNESS
#4 @ MAX 12" OC. INSERT OR DRILL WITH 6"
EMBEDMENT ON BOTH DIRECTION. WHOLE
BARS OR SPLICE MIN 12'' (E) FLXICORE 6''x16''
FILL NON-SHRINK GROUT IN
HOLLOW CROSS SECTION
NOTES:
1. FOR SQUARE AND RECTANGULAR HOLES.
2. FROM 2'-0"x2'-0" UP TO 5'-0"x5'-0".
3. 2'-0" MIN DIMENSION, 5'-0" MAX DIMENSION.
(E) FLXICORE 6''x16''
1/2'' DIA BOLTS @3' - 0'' O.C.
DRILL AND EPOXY 4'' MIN. TYP
/2
CMU PARTITION
cL
NOTE:
LOCATE AND AVOID EXISTING BARS PRIOR TO DRILLING.
L3x3x3/8 CONT ANGLE. TYP
THICKNESS
#4 @ 48"
VERTICAL REINFORCEMENT SCHEDULE
6" INTERIOR
FLOOR OR ROOF
FLOOR
NOTE A NOTE B
NOTE H
NOTE C
NOTE J
NOTE D
NOTE E
NOTE F
NOTE G
NOTE E
NOTE C
NOTES:
A. HORIZONTAL REINFORCING IN EVERY SECOND BED JOINT
DUR-O-WAL EH TRUSS TYPE REINF #9 WIRE OR
EQUIVALENT LAP REINF MIN 75x WIRE DIAMETER. SEE
SPECS ALSO.
B. VERTICAL WALL REINF: CORES CONTAINING REINFORCING
SHALL BE GROUTED SOLID. SEE PLANS, ELEVATIONS, AND
SCHEDULE FOR SIZE & SPACING.
C. SUPPLEMENTARY HORIZONTAL REINF: #4 BARS ABOVE
AND BELOW ALL OPENINGS. EXTEND REINF 24" BEYOND
CORNER OR OPENING.
D. SUPPLEMENTARY VERTICAL REINF: #4 BARS AT EACH SIDE
OF EACH OPENING, AT WALL CORNERS, AND AT WALL
ENDS. EXTEND REINF FULL HEIGHT. AT OPENINGS
REINFORCEMENT EACH SIDE OF OPENINGS SHALL NOT BE
LESS THAN 0.5x THE REINFORCEMENT INTERRUPTED BY
THE OPENING.
E. STEEL, CONCRETE, OR CONCRETE MASONRY LINTEL, SEE
LINTEL SCHEDULE.
F. HORIZONTAL REINF: 1-#5 IN BOND BEAM CHANNEL
BLOCK, CONTINUOUS, UNO.
G. HEAD RESTRAINING ANGLES, SEE SEPARATE DETAILS.
H. DOWELS FROM SLAB INTO WALL TO MATCH VERT REINF.
I. HORIZONTAL REINF: 1-#5 IN BOND BEAM ON SLABS ON
STEEL DECK.
J. PROVIDE BOND BEAM CHANNEL BLOCK AT MAXIMUM
INTERVALS OF 12 COURSES.SIZE (#) &
SPACING
BASEMENT
0' - 0"
PROVIDE DOWELS WITH 4'' EMBEDMENT AND
EPOXY. SIZE AND SPACING TO MATCH WALL
REINF. GROUT CELLS SOLID
(E) CONC SLAB
NOTE:
LOCATE AND AVOID EXISTING BARS PRIOR TO DRILLING.
5 4 3 2 1
A
B
C
Drawing Title
Revisions
Project Information
Project Location
D
S0.01
STRUCTURAL DRAWINGS
R E
N O
V A
T
IO
N T
O
R
IC
T H
O R
P H
A L L E
L E
C T
R
IC
A L R
O O
M
RIC THORP HALL ELECTRICAL ROOM
RENOVATIONS
CONSTRUCTION DOCUMENTS
14 AUGUST 2026
THORP HALL
600 MT PLEASANT AVE
PROVIDENCE, RI 02908
A GENERAL
A1 STRUCTURAL WORK SHALL CONFORM TO THE REQUIREMENTS OF THE RHODE ISLAND STATE BUILDING CODE 2025 AND THE INTERNATIONAL BUILDING CODE, A2 VERIFY AND COORDINATE ALL NEW AND EXISTING DIMENSIONS RELATED TO THIS PROJECT.
A3 TYPICAL DETAILS AND NOTES SHOWN ON STRUCTURAL DRAWINGS SHALL BE APPLICABLE TO ALL PARTS OF THE STRUCTURAL WORK EXCEPT WHERE
SPECIFICALLY REQUIRED OTHERWISE BY CONTRACT DOCUMENTS.
A4 DETAILS NOT SPECIFICALLY SHOWN SHALL BE SIMILAR TO THOSE SHOWN FOR THE MOST NEARLY SIMILAR CONDITION AS DETERMINED BY THE ARCHITECT.
A5 EXAMINE ARCHITECTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FOR VERIFICATION OF LOCATION AND DIMENSIONS OF CHASES, INSERTS, OPENINGS, SLEEVES, WASHES, DRIPS, REVEALS, DEPRESSIONS, AND OTHER PROJECT REQUIREMENTS NOT SHOWN ON STRUCTURAL DRAWINGS.
A6 THE BASE BUILDING STRUCTURE WAS DESIGNED TO RESIST THE LOADS DESCRIBED IN GENERAL NOTES DESIGN LOAD SECTION IN THE COMPLETED CONDITION
OF THE PROJECT. DURING CONSTRUCTION THE CONTRACTOR IS RESPONSIBLE TO VERIFY THE CAPACITY OF THE PARTIALLY COMPLETED STRUCTURE TO RESIST
LOADS DUE TO TEMPORARY CONDITIONS, CONSTRUCTION EQUIPMENT, STORED MATERIALS, SHORING, ETC.
A7 OPENINGS IN SLABS AND WALLS LESS THAN 12" MAXIMUM DIMENSION ARE GENERALLY NOT SHOWN ON STRUCTURAL DRAWINGS. OPENINGS SHOWN ON
STRUCTURAL DRAWINGS SHALL NOT BE REVISED WITHOUT PRIOR WRITTEN APPROVAL OF THE ARCHITECT.
A9 THE CONTRACTOR SHALL SUBMIT COMPLETE SHOP DRAWINGS FOR ALL PARTS OF THE WORK, INCLUDING DESCRIPTION OF DEMOLITION, AND
CONSTRUCTION METHODS AND SEQUENCING WHERE APPLICABLE. NO PERFORMANCE OF THE WORK INCLUDING, BUT NOT LIMITED TO, DEMOLITION OF
EXISTING STRUCTURE, OR FABRICATION OR ERECTION OF NEW STRUCTURAL ELEMENTS, SHALL COMMENCE WITHOUT REVIEW OF THE SHOP DRAWINGS BY
THE ARCHITECT.
A10 IF IN THE COURSE OF EXECUTION OF THE STRUCTURAL WORK, ANY PORTION OF THE COMPLETED STRUCTURE DOES NOT MEET THE REQUIREMENTS OF THE
CONTRACT DOCUMENTS AS DETERMINED BY THE ARCHITECT, THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE DESIGN AND IMPLEMENTATION OF
REMEDIAL ACTION TO ENSURE THAT THE COMPLETED WORK IS IN CONFORMANCE WITH THE CONTRACT DOCUMENTS. A DESCRIPTION OF THE
NON-CONFORMING WORK SHALL BE SUBMITTED ALONG WITH THE PROPOSED REMEDIAL ACTION TO THE ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO
IMPLEMENTATION.
A12 INFORMATION REGARDING EXISTING CONSTRUCTION IS BASED UPON AVAILABLE CONSTRUCTION DOCUMENTS PREPARED BY THE ARCHITECT, WHICH MAY
OR MAY NOT REFLECT ALL AS BUILT CONDITIONS. NOTIFY ARCHITECT OF ANY DISCREPANCIES DISCOVERED DURING THE COURSE OF CONSTRUCTION BEFORE
PROCEEDING WITH WORK IN THE AREA.
B STRUCTURAL STEEL
B1 ''SPECIFICATION FOR STRUCTURAL STEE BUILDINGS'', (AISC 360-16)
B2 STRUCTURAL STEEL SHALL BE NEW STEEL CONFORMING TO THE FOLLOWING:
(A) ANGLES, CHANNELS, PLATES, BASE PLATES, AND BARS ASTM A36 (Fy = 36 KSI), UNO
(B) HIGH STRENGTH BOLTS ASTM A325, UNO
N.T.S.2
STEEL ANGLE LINTEL SCHEDULE
3/16" = 1'-0"6
PARTIAL PROPOSED PLAN
D RENOVATION AND RESTORATION
D1 WORK SHALL CONFORM TO THE REQUIREMENTS OF THE BUILDING CODE STATED ABOVE.
D2 THE CONTRACTOR SHALL NOTIFY THE ARCHITECT WHEN, IN THE COURSE OF CONSTRUCTION OR DEMOLITION, CONDITIONS ARE UNCOVERED WHICH ARE
UNANTICIPATED OR OTHERWISE APPEAR TO PRESENT A DANGEROUS CONDITION.
D3 VERIFY ALL DIMENSIONS AND CONDITIONS ON THE JOB. DISCREPANCIES SHALL BE BROUGHT IMMEDIATELY TO THE ATTENTION OF THE ARCHITECT BEFORE
PROCEEDING WITH THAT PART OF THE WORK.
D4 WHERE NEW WORK WILL BE ADJACENT TO OR FRAMING INTO EXISTING CONSTRUCTION, VERIFY DIMENSIONS OF EXISTING CONSTRUCTION PRIOR TO
FABRICATION OF NEW MEMBERS.
D5 PROVIDE ALL LABOR AND MATERIAL FOR ANY FRAMING REQUIRED TO CONNECT NEW FRAMING TO EXISTING CONSTRUCTION. WHEREVER IT IS NECESSARY
TO REMOVE EXISTING CONSTRUCTION IN ORDER TO CONSTRUCT NEW WORK, THE AFFECTED AREA SHALL BE PATCHED AND REBUILT TO MATCH EXISTING
ADJACENT WORK TO SATISFACTION OF THE ARCHITECT.
D6 DETAILS SHOWN ON ANY DRAWINGS SHALL BE CONSIDERED TYPICAL FOR ALL SIMILAR CONDITIONS.
D7 NOTIFY ARCHITECT OF ANY CONTEMPLATED STRUCTURAL ALTERATION IN REASONABLE TIME TO RENDER AND DOCUMENT THE ARCHITECT'S DECISION.
D8 STRUCTURAL MATERIALS AND COMPONENTS SHALL HAVE PRIOR APPROVAL OF THE ARCHITECT.
D9 STRUCTURAL WORK ON THIS PROJECT SHALL BE PERFORMED UNDER THE SUPERVISION OF AN INSPECTOR APPROVED BY THE ARCHITECT. ALTERATIONS OR
MODIFICATIONS NOT INDICATED ON THE DRAWINGS SHALL BE APPROVED BY THE ARCHITECT IN WRITING BEFORE SUCH WORK IS INITIATED. THE
ARCHITECT WILL PERIODICALLY OBSERVE STRUCTURAL ELEMENTS TO ASSURE GENERAL COMPLIANCE WITH THE CONTRACT DOCUMENTS, BUT DETAILED
INSPECTION AND TESTING REQUIREMENTS WILL BE PREPARED BY AN INDEPENDENT TESTING AGENCY HIRED BY THE GC. DEFICIENCIES NOT INDICATED ON
THE DRAWINGS OR EXPOSED DURING CONSTRUCTION SHALL BE CORRECTED AS DIRECTED BY THE ARCHITECT.
D10 STRUCTURAL ALTERATION SHALL BE PRECEDED BY ADEQUATE SHORING AND BRACING.
B3 STRUCTURAL STEEL FRAMING SHALL BE TRUE AND PLUMB BEFORE CONNECTIONS ARE FINALLY BOLTED OR WELDED.
B4 FIELD CUTTING OF STRUCTURAL STEEL OR ANY FIELD MODIFICATIONS OF STRUCTURAL STEEL SHALL NOT BE MADE WITHOUT PRIOR WRITTEN APPROVAL BY
ARCHITECT FOR EACH SPECIFIC CASE.
B5 COORDINATE WITH ARCHITECTURAL DRAWINGS FOR PAINT AND PRIMER LOCATIONS FOR ITEMS INCLUDING BUT NOT LIMITED TO THERMAL BREAK
TREATMENT, FIRE PROOFING, AND WEATHER PROOFING.
(A) ALL CONCRETE, UNO 4000 PSI (NORMALWEIGHT)
(A) STEEL REINFORCEMENT ASTM A615 GRADE 60 (YIELD STRESS 60,000 PSI)
N.T.S.4
SLAB INFILL CONNECTION DETAIL
C CONCRETE
C1 CONCRETE WORK SHALL CONFORM TO "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE" (ACI 318-14)
C2 CONCRETE SHALL BE CONTROLLED CONCRETE, PROPORTIONED, MIXED, AND PLACED IN THE PRESENCE OF A REPRESENTATIVE OF AN APPROVED TESTING
AGENCY.
C3 UNLESS NOTED OTHERWISE, CONCRETE SHALL HAVE A MINIMUM 28-DAY COMPRESSIVE STRENGTH AND BE OF A TYPE AS FOLLOWS:
C4 REINFORCEMENT SHALL NOT BE TACK-WELDED. FIELD BENDING OF REINFORCEMENT IS NOT ALLOWED UNLESS SHOWN ON THE DRAWINGS OR APPROVED
BY THE ARCHITECT.
C5 STEEL REINFORCEMENT, UNLESS NOTED OTHERWISE, SHALL CONFORM TO THE FOLLOWING:
N.T.S.3
CMU WALL BRACING DETAIL
N.T.S.1
NON-LOAD BEARING CMU WALLS AND PARTITIONS
N.T.S.5
CMU PARTITION ANCHORAGE DETAILS
RIC THORP HALL ELECTRICAL ROOM
RENOVATIONS
CONSTRUCTION DOCUMENTS
19 OCTOBER 2026
RIC THORP HALL ELECTRICAL ROOM
RENOVATIONS
CONSTRUCTION DOCUMENTS
19 OCTOBER 2026
CONSTRUCTION DO
19 OCTOBER 2026
Revisions
RIC THORP HALL ELECTRICAL ROOM
RENOVATIONS
MEP WORK ONLY
DEMO CONCRETED PAD
DEMO CONCRETED PAD
VCT FLOORING TO BE ABATED
REFER TO ABATEMENT PLAN
EXPOSED CONCRETE
WITH RESIDUAL GLUE
DEMO LOUVERS
WINDOW ETR. DEMOLISH
TRIM ON BOTH SIDES
APPROX. LOCATION OF BUILDING
DOOR ACCESS CONTROLLER. SEE
TEL-COM DRAWINGS. EXISTING TO
REMAIN. DO NOT RELOCATE.
MEP WORK ONLY
DEMO EXISTING
LIGHT FIXTURE
EXG. WALL TO BE DEMO
EXG. WALL TO REMAIN
DEMOLITION LEGEND
EXG DOOR TO REMAIN
EXG. DOOR TO BE DEMO
EXG WALL TO BE DEMO
EXG WALL TO REMAIN
DEMOLITION LEGEND - RCP
EXG LIGHT FIXTURE TO REMAIN
EXG LIGHT FIXTURE TO BE DEMO
5 4 3 2 1
A
B
C
Drawing Title
Revisions
Project Information
Project Location
D
AD1.00AD1.00
DEMOLITION PLANS
R
EN
O
VA
TI
O
N T
O
R
IC
T H
O R
P H
AL
L
EL
EC
TR
IC
AL
R
O O
M
RIC THORP HALL ELECTRICAL ROOM
RENOVATIONS
CONSTRUCTION DOCUMENTS
19 OCTOBER 2026
THORP HALL
600 MT PLEASANT AVE
PROVIDENCE, RI 02908
AD1.00 SCALE: 1/4" = 1'-0"
11 DEMOLITION FLOOR PLAN
NN
4'
AD1.00 SCALE: 1/4" = 1'-0"
22 DEMOLITION CEILING PLAN
Revisions
RIC THORP HALL ELECTRICAL ROOM
RENOVATIONS
A8.00
D5
D2
C6
C2
REMOVED ELECTRICAL
SWITCHGEAR 101
MAIN ELECTRICAL ROOM
ALIGN
6'-3"
0'-6"
21'-11"
6" CMU, TYP. MAIN
ELECTRICAL ROOM
LOUVER OPENING (SEE
DETAIL C3-A9.00)
SWITCHBOARD Approx. 12'x3'
SEE ELEC. DRAWINGS
B2 A8.00
MEP WORK ONLY
104A
101A
100B
103A
100A
105B
105A
BASEMENT
ELECTRICAL ROOM
LOUVER OPENING (SEE
DETAIL C3-A9.00)
101B
VESTIBULE
CLEAN WINDOW AND
FRAME. PROVIDE NEW
PAINTED HARDWOOD TRIM
A8.00B6
TEL/DATA
9' -1
1/
2" 0'
-6
6' -0
0'
-5
10'-0" S3A
M6
STEAM LINE ABV.
'-6
6'-3"
RELOCATED TEL/DATA
EQUIP, SEE TC-SERIES
DRAWINGS
M6
M6
S3A
NEW LOUVER
B2 A8.00
MEP WORK ONLY
NEW LIGHT FIXTURES
THROUGHOUT PATCH SLAB
OPENING. REFER TO
STRUCTURAL
DRAWINGS.
NEW PARTITION WALL
EXISTING WALL TO REMAIN
PLAN LEGEND
GENERAL NOTES
1.
2.
3.
PATCH AND REPAIR CONCRETE SLAB WHERE DAMAGED BY REMOVAL OF
EQUIPMENT PADS AND OTHER DEMOLITION ACTIVITIES. GRIND DOWN HIGH
SPOTS AND FILL IN VALLEYS WITH LEVELERS TO CREATE A SMOOTH SURFACE
ALIGNING WITH THE EXISTING SLAB.
APPLY CONCRETE SEALER IN ROOMS 100, 101, 103, AND 105.
PAINT WALLS IN ROOMS 100, 101, 103, 104 AND 105.
5 4 3 2 1
A
B
C
Drawing Title
Revisions
Project Information
Project Location
D
A1.00A1.00
PROPOSED PLANS
R
EN
O
VA
TI
O
N T
O
R
IC
T H
O R
P H
AL
L
EL
EC
TR
IC
AL
R
O O
M
RIC THORP HALL ELECTRICAL ROOM
RENOVATIONS
CONSTRUCTION DOCUMENTS
19 OCTOBER 2026
THORP HALL
600 MT PLEASANT AVE
PROVIDENCE, RI 02908
A1.00 SCALE: 1/4" = 1'-0"
11 PROPOSED FLOOR PLAN
A1.00 SCALE: 1/4" = 1'-0"
22 PROPOSED CEILING PLAN
NN
4'
Revisions
RIC THORP HALL ELECTRICAL ROOM
RENOVATIONS
B2 A8.00
103A
PATCH, REPAIR, AND
PAINT CONCRETE WALL
PATCH, REPAIR, AND
PAINT CONCRETE WALL
LOUVER OPENING (SEE
DETAIL C3-A9.00)
ETR. FIXTURE, TYP.
NEW HYDRONIC UNIT HEATER. SEE
MECH. DRAWINGS
100B104A
4" WALL BASE, TYP. WALL
TYPE S3A
PAINTED GWB
B2 A8.00
101B
PATCH, REPAIR, AND
PAINT CONCRETE WALL
CLEAN WINDOW AND
FRAME. PROVIDE NEW
PAINTED HARDWOOD
TRIM
4" WALL BASE, TYP. WALL
TYPE S3A
PAINTED GWB
PAINTED CMU WALL
EXG. STEAM PIPE
PENETRATION THROUGH
WALL
NEW 6" CMU, TYP
SWITCH
BOARD101A
NEW LOUVER (SEE DETAIL
C3-A9.00)
SEE STRUCT. DRAWINGS FOR
CONNECTION DETAIL
SEE STRUCT. DRAWINGS FOR
CONNECTION DETAIL
NEW ELEC. DISCONNECT
SWITCH, SEE E-SERIES
DRAWINGS
NEW LOUVERS
ELEC. EQUIP, ETR, TYP
105A
5 4 3 2 1
A
B
C
Drawing Title
Revisions
Project Information
Project Location
D
A8.00A8.00
INTERIOR/EXTERIOR ELEVATIONS
R
EN
O
VA
TI
O
N T
O
R
IC
T H
O R
P H
AL
L
EL
EC
TR
IC
AL
R
O O
M
RIC THORP HALL ELECTRICAL ROOM
RENOVATIONS
CONSTRUCTION DOCUMENTS
19 OCTOBER 2026
THORP HALL
600 MT PLEASANT AVE
PROVIDENCE, RI 02908
A8.00 SCALE: 1/4" = 1'-0"
D5D5 INTERIOR ELEVATION - NORTH
A8.00 SCALE: 1/4" = 1'-0"
D2D2 INTERIOR ELEVATION - EAST
A8.00 SCALE: 1/4" = 1'-0"
C2C2 INTERIOR ELEVATION - WEST
A8.00 SCALE: 1/4" = 1'-0"
C6C6 INTERIOR ELEVATION - SOUTH
A8.00 SCALE: 1/4" = 1'-0"
B2B2 INTERIOR SECTION
A8.00 SCALE: 1/4" = 1'-0"
B6B6 EXTERIOR ELEVATION
Revisions
RIC THORP HALL ELECTRICAL ROOM
RENOVATIONS
EXTERIORINTERIOR
NEW 2"
BLANK OFF
PANEL
EXG.
CONCRETE
WALL
NEW 4"
LOUVER
CAULKING
9 1/2" 2"
LOUVER
4"
A9.00 A3
EXTERIORINTERIOR
A9.00 B3
NEW 4" LOUVER
EXG. CONCRETE
WALL
NEW 2" BLANK
OFF PANEL
EXTERIORINTERIOR
CONT. SILL
PAN
FLASHING
NEW 2"
BLANK OFF
PANEL
EXG.
CONCRETE
WALL
NEW 4"
LOUVER
CAULKING
9 1/2" 2"
LOUVER
4"
SEE PARTITION TYPES
1 3/4"
2" U
N O
3/ 8"
SEE DOOR SCHED.
FIELD FINISHED WELDED
HM FRAME W/ ANCHOR
COORD. RATING w/SCHED.
SEALANT EACH SIDE, TYP.;
RATING PER SCHED.
GROUT PER STRUCT. DWGS.
REINFORCEMENT BAR; SEE
STRUCT. DWGS.
CMU, SEE STRUCT. DWGS.
3/
4"
2" UNO
3/8"
SEE DOOR SCHED.
FIELD FINISHED WELDED HM
FRAME w/ANCHOR; COORD.
RATING w/SCHED.
SEALANT EACH SIDE, TYP.;
RATING PER SCHED.
GROUT PER STRUCT. DWGS
REINFORCEMENT BAR; SEE STRUCT.
DWGS
CMU, SEE STRUCT. DWGS.
DOOR FRAME ANCHOR
COORD. w/PTN & DOOR SCHED.
ON RATING REQ.
SE
E
PA
RT
IT
IO
N T
YP
ES
REFER TO SCHED.
RE
FE
R
TO
S
CH
ED
HM:1
0'-2" REFER TO SCHED. 0'-2"
0' -2
RE
FE
R
TO
S
CH
ED
HM:A
B1
A1
B2
B1
HARDWARE SET 16.0
3 EA
1 EA
1 EA
1 EA
1 EA
HINGE (HEAVY WEIGHT)
STOREROOM LOCK
SMALL FORMAT INTER CORE
DOOR CLOSER
DOOR STOP
T4A3786 QTY AND OPTIONS PER SPECS.
72 R8204 RNJ
33600006N
351 P10 OR O ARM PER SPECS.
RM860 or R850 AS CONDITIONS REQ.
US26D
US32D
EN
US26D
MK 087100
SA 087100
MC 087100
SA 087100
RO 087100
3 EA SILENCER 608 RO 087100
3/
4"
SEE DOOR SCHED.
FIELD FINISHED WELDED HM
FRAME w/ANCHOR; COORD.
RATING w/SCHED.
DOOR FRAME ANCHOR
5/8" GWB, BOTH SIDES TYP.
3-5/8" MTL STUD 16" O.C.
SE
E
PT
N
. T
YP
ES
SEE DOOR SCHED.
FIELD FINISHED WELDED HM
FRAME w/ANCHOR; COORD.
RATING w/SCHED.
DOOR FRAME ANCHOR
5/8" GWB, BOTH SIDES TYP.
3-5/8" MTL STUD 16" O.C.
1 3/4"
0'-5 1/2"
TYPE "M6"
SIDE A SIDE B
TYPE "S3A"
SIDE A SIDE B
4 7/8"
5/8" 3 5/8" 5/8"
5/8" GYPSUM WALL
BOARD, BOTH SIDES
3-5/8" METAL STUDS,
16" O.C.
6" x 8" x 16" CMU BLOCK
EXTEND TO SLAB
ABOVE
SEAL AROUND ALL PIPE
PENETRATIONS, TYP.
4" COVE BASE, BOTH
SIDES TYP.
0' -2
HARDWARE SET 10.0
3 EA
1 EA
1 EA
1 EA
1 EA
HINGE, FULL MORTISE
RIM EXIT DEVICE
SMALL FORMAT INTER CORE
SURFACE CLOSER
WALL STOP
TA2714 NRP 4-1/2" X 4-1/2"
12 43 72 8843 ETNJ
33600006N
351 P10
US26D
US32D
EN
US26D
(HI-7) MCKINNEY
(ED-5) SARGENT
(CY-4) MEDECO
(CL-6) SARGENT
(ST-3) ROCKWOOD
NEW
TRANSFORMER
FRONT ACCESS
FROM ROAD
2'-6" MIN.2'-6" MIN.
2' -0
" M
IN
TRANSFORMER FENCE - PLAN
-0
' M
AX
9' -6
'-0
12"
4"
10'-0" MAX
9'-6"
TRANSFORMER FENCE - SIDE ELEVATION
2 7/8" DIA. POST,
TYP.
1 5/8" DIA. TOP
RAIL, TYP.
1 5/8" DIA.
BOTTOM RAIL,
TYP.
9 GA. 2" FABRIC
DOME CAP
CONC. FOOTING
AT CORNERS
TENSION
BANDS 1' O.C.,
TYP.
'-0
12"
4"
11'-11"
TRANSFORMER FENCE - FRONT/BACK ELEVATION
2 7/8" DIA. POST,
TYP.
1 5/8" DIA. TOP
RAIL, TYP.
1 5/8" DIA.
BOTTOM RAIL,
TYP.
9 GA. 2" FABRIC
DOME CAP
CONC. FOOTING
AT CORNERS
TENSION
BANDS 1' O.C.,
TYP.
1 5/8" BRACE RAIL
EQ
EQ
3/8" TRUSS W/
TURNBUCKLES
3" BOX HINGES
GATE
LATCH
NOTES:
1. CONCRETE FOOTINGS 3000 PSI
2. GATES ON SIDES FACING AND OPPOSITE OF ROAD
3. COORDINATE WITH ACTUAL EQUIPMENT SIZE
4. SUBMIT SHOP DRAWINGS FOR APPROVAL
1 5/8" BRACE RAIL
EQ
EQ
11'-11"
2' -0
" M
IN
CONCRETE FOOTING
LOCATIONS
5 4 3 2 1
A
B
C
Drawing Title
Revisions
Project Information
Project Location
D
A9.00A9.00
DOOR & FRAME TYPES AND
SCHEDULE
R
EN
O
VA
TI
O
N T
O
R
IC
T H
O R
P H
AL
L
EL
EC
TR
IC
AL
R
O O
M
RIC THORP HALL ELECTRICAL ROOM
RENOVATIONS
CONSTRUCTION DOCUMENTS
19 OCTOBER 2026
THORP HALL
600 MT PLEASANT AVE
PROVIDENCE, RI 02908
DOOR & FRAME SCHEDULE
DOOR NUMBERDOOR NUMBER ROOM LOCATIONROOM LOCATION
DIEMNSIONS (INCHES)DIEMNSIONS (INCHES) DOORDOOR FIREFIRE
RATINGRATING
DETAILSDETAILS FRAMEFRAME HARDWAREHARDWARE
SETSET REMARKSREMARKSWIDTHWIDTH HEIGHTHEIGHT THICK.THICK. TYPETYPE MATERIALMATERIAL FINISHFINISH HEADHEAD JAMBJAMB TYPETYPE MATERIALMATERIAL FINISHFINISH
100A BASEMENT 48" 84" 1 3/4" HM:1 HM PNT ETR ETR HM:A HM PNT 10.0
100B BASEMENT 48" 84" --- N/A ETR ETR ETR ETR N/A ETR ETR
101A MAIN ELECTRICAL ROOM 36" 84" 1 3/4" HM:1 HM PNT HM:A HM PNT 16.0
101B MAIN ELECTRICAL ROOM 36" 84" 1 3/4" HM:1 HM PNT HM:A HM PNT 16.0
103A ELECTRICAL ROOM 48" 84" --- N/A ETR ETR ETR ETR N/A ETR ETR
104A TEL/DATA 36" 84" 1 3/4" HM:1 HM PNT HM:A HM PNT 16.0
105A VESTIBULE 48" 84" --- N/A ETR ETR ETR ETR N/A ETR ETR EXG DOOR; REFURBISH AND PAINT
105B VESTIBULE 36" 84" --- N/A ETR ETR ETR ETR N/A ETR ETR EXG DOOR; REFURBISH AND PAINT
A9.00 SCALE: 3" = 1'-0"
B3B3 HEAD DETAIL - LOUVER - NEW
A9.00 SCALE: 3/4" = 1'-0"
C3C3 LOUVER - NEW
A9.00 SCALE: 3" = 1'-0"
A3A3 SILL DETAIL - LOUVER - NEW
A9.00 SCALE: 3" = 1'-0"
B1B1 TYP. DR DTL - HM - MASONRY - HEAD DETAIL
A9.00 SCALE: 3" = 1'-0"
A1A1 TYP. DR DTL - HM - MASONRY - JAMB DETAIL
A9.00 SCALE: 1/2" = 1'-0"
C2C2 DOOR TYPES
A9.00 SCALE: 1/2" = 1'-0"
C1C1 DOOR FRAMES
A9.00 SCALE: 3" = 1'-0"
A2A2 TYP. DR DTL - HM - MTL STUD - JAMB DETAIL
A9.00 SCALE: 3" = 1'-0"
33 TYP. DR DTL - HM - MTL STUD - HEAD DETAIL
A9.00 SCALE: 3" = 1'-0"
A6A6 PARTITION TYPES
A9.00 SCALE: 1/4" = 1'-0"
C6C6 TRANSFORMER FENCE DETAILS
MAIN ELECTRICAL ROOM
BASEMENT
ELECTRICAL ROOM
VESTIBULE
TEL/DATA
ETR
ETR
ETR
ETRETR
ETRETRETR
ETR
ETR
1"
1"
1"
1" 1"
1"
1"
1"
NEW UPRIGHT
SPRINKLER
(TYPICAL FOR 6)
ETR FIRE SERVICE,
BACKFLOW PREVENTER
& WET ALARM VALVE.
ETR FIRE MAIN
AT CEILING
5 4 3 2 1
A
B
C
Drawing Title
Revisions
Project Information
Project Location
D
RE
N
O
VA
TI
O
N T
O T
O
RI
C
TH
OR
P
HA
LL
E
LE
CT
RI
CA
L
RO
OM
RIC THORP HALL ELECTRICAL ROOM RENOVATIONS
CONSTRUCTION DOCUMENTS
14 AUGUST 2026
THORP HALL
600 MT PLEASANT AVE
PROVIDENCE, RI 02908
66 Main Street N. Easton, MA 02356 T 508.230.0260 F 508.230.0265 ber@ber-engineering.com
351 Centerville Road
T 401.384.7682 www.ber-engineering.com
BUILDING ENGINEERING RESOURCES, INC.
E RB
Warwick, RI 02886
Office Commons 95
FP1.01
FIRE PROTECTION
PLAN, LEGEND & DETAILS
SCALE: 1/4" = 1' - 0"1 FIRE PROTECTION FLOOR PLAN
EXISTING PIPING TO BE REMOVED
EXISTING TO REMAIN (INDICATED AS LIGHT LINE)
CONNECT TO EXISTINGCTE
RE
FIRE PROTECTION LEGEND
NEW WORK PIPING (INDICATED AS HEAVY LINE)
ETR
WET SPRINKLER PIPEWSWS
CONT CONTINUATION
UPRIGHT WET SPRINKLERU
HANGER ROD
LOCKING NUT
SUPPORT NUT
BAND HANGER
CLEVIS HANGER
PIPE
4 INCH AND LARGER 3 INCH AND SMALLER
HANGER ROD SCHEDULE
PIPE SIZE ROD SIZE
UP TO 2" 3
8" DIA.
2" &3"
4" AND 5"
6" - 8" 3 4"
10" & 12" 7 8"
8"
2" DIA.
HANGER ROD SPACING
PIPE SIZE MAX. ALLOWABLE SPACING
1" 7'
4"
2"
2" 10'
2" 11'
9' 8'
3" - 12" 12'
FIRE PROTECTION SYSTEMS
TYPICAL PIPE HANGER DIAGRAM2
NTS
BRANCHLINE PIPING
EXPOSED UPRIGHT SPRINKLER
EXPOSED UPRIGHT
SPRINKLER
(TYPICAL)
1" OUTLET
1" x 1/2"
REDUCER
NTS
Revisions
RIC THORP HALL ELECTRICAL ROOM
RENOVATIONS
EQUIPMENT DESIGNATION
TAG LEGEND
NUMBER
EQUIPMENT
(REQUIRING
POWER)
EQUIPMENT DESIGNATION
NUMBER
EQUIPMENT
(NON-POWERED)
T-
REGISTERS,
GRILLES &
DIFFUSERS
DESIGNATION
BALANCE TO CFM INDICATED
TYPICAL FOR #
1. HVAC GENERAL NOTES, LEGENDS, SYMBOLS AND DETAILS ARE APPLICABLE TO ALL "M" SERIES DRAWINGS.
2. PROVIDE LABOR, MATERIALS AND EQUIPMENT NECESSARY TO COMPLETE THE WORK OF THIS SECTION.
COMPLY WITH ALL APPLICABLE FEDERAL AND STATE LAWS, AND ALL LOCAL CODES, BY-LAWS AND ORDINANCES. REQUEST INSPECTIONS FROM AUTHORITIES HAVING JURISDICTION. OBTAIN ALL PERMITS AND PAY FOR ALL FEES AND INSPECTION CERTIFICATES AS APPLICABLE AND/OR REQUIRED. ALL PERMITS AND CERTIFICATES SHALL BE TURNED OVER TO THE OWNER UPON COMPLETION OF THE WORK. ALL WORK, EQUIPMENT AND MATERIALS SHALL CONFORM TO THE BUILDING CONSTRUCTION RULES AND
REGULATIONS.
3. DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED TO INDICATE CAPACITY, SIZE, AND APPROXIMATE
LOCATIONS AND GENERAL ARRANGEMENT. DETERMINE EXACT LOCATIONS OF SYSTEMS AND
COMPONENTS IN FIELD.
4. COORDINATE WORK OF THIS SECTION WITH THAT OF OTHER SECTIONS AND EXISTING CONDITIONS FOR RENOVATION WORK. ALL WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED IN PROJECT SCOPE.
DUCTWORK AND PIPING OFFSETS AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST.
5. REFER TO HVAC LEGENDS, DETAILS, SCHEDULES, FLOW DIAGRAMS, CONTROLS, AND SPECIFICATIONS FOR
ADDITIONAL REQUIREMENTS.
6. SUBMIT ALL DEVICES AND EQUIPMENT FOR REVIEW AND ARCHITECT/ENGINEER'S APPROVAL PRIOR TO
PURCHASE.
7. ABATEMENT WORK: SPECIFIC REFERENCE IS MADE TO DIVISION 2 - ASBESTOS ABATEMENT. MECHANICAL SCOPE OF WORK DOES NOT INCLUDE ABATEMENT OF ASBESTOS-CONTAINING MATERIALS (ACM) AS SUCH WORK MUST BE COMPLETED BY A LICENSED ASBESTOS ABATEMENT CONTRACTOR. IF DURING THE COURSE OF DEMOLITION AND/OR REMOVAL WORK THAT IS COVERED UNDER THE SCOPE OF PLUMBING DEMOLITION WORK ANY MATERIALS ARE FOUND THAT MAY BE CONSIDERED ACM'S, IMMEDIATELY STOP WORK IN THAT LOCATION AND INFORM THE G.C. SO THAT PROPER DEMOLITION SERVICES CAN BE
OBTAINED.
8. CLEANING: UPON COMPLETION ALL SHEET METAL WORK SPECIFIED UNDER THIS CONTRACT IS TO BE CLEANED. ALL EQUIPMENT IS TO BE CLEANED, ALL TRIM INSTALLED, ALL PROTECTIVE OIL, TAPE OR OTHER MATERIALS USED TO PROTECT WORK ARE TO BE REMOVED. ALL DUCTS, FANS, AND EQUIPMENT SHALL BE THOROUGHLY CLEANED INSIDE AND OUTSIDE AND BLOWN OUT TO PREVENT AND DEBRIS FROM DAMAGING FAN SHIELDS OR DEBRIS HANGING THROUGH REGISTERS OR DIFFUSERS WHEN SYSTEMS ARE PLACED IN OPERATION. ALL TEMPORARY CONNECTIONS REQUIRED FOR BLOWING OUT THE SYSTEMS, CHEESECLOTH FOR ALL DUCT OPENINGS, AND ANY OTHER EQUIPMENT OR LABOR FOR CLEANING, SHALL BE PROVIDED BY THE HVAC CONTRACTOR. ANY DAMAGE TO CEILINGS BY THE HVAC CONTRACTOR SHALL BE RECTIFIED BY
THEM AT NO ADDITIONAL CHARGE TO THE OWNER.
9. ALL WORK COMPLETED AS PART OF THIS CONTRACT SHALL BE GUARANTEED FOR A PERIOD OF (1) YEAR
FROM THE DATE OF ACCEPTANCE BY THE OWNER UNLESS SPECIFIED FOR A LONGER DURATION.
10.REFER TO THE CONTROL DIAGRAMS, SEQUENCES & SPECIFICATIONS FOR ALL ASSOCIATED AUTOMATIC
TEMPERATURE CONTROLS WORK TO BE INCLUDED AS PART OF THIS CONTRACT. FOR NEW HVAC
EQUIPMENT AND SYSTEM CONTROLLERS, COORDINATE A SUITABLE LOCATION WITH THE OWNER'S PROJECT MANAGER WITHIN THE BUILDING. COORDINATE NETWORK INTERFACE OF NEW CONTROLLERS WITH THE EXISTING FACILITIES ENERGY MANAGEMENT SYSTEM INFRASTRUCTURE. WHERE CENTRAL BUILDING AUTOMATION SYSTEM IS NOT PROVIDED, REMOTE CONTROL PANELS SHALL BE PROVIDED FOR
EACH INSTANCE OF ROOF MOUNTED PACKAGED EQUIPMENT.
11. ALL ROOF AND GRADE MOUNTED EQUIPMENT LOCATED EXTERIOR TO THE BUILDING SHALL BE INSTALLED, ANCHORED, AND SUPPORTED IN ACCORDANCE WITH BUILDING DESIGN WIND SPEED CONDITIONS.
EQUIPMENT SUPPORT DESIGN SHALL BE DELEGATED DESIGN BY STRUCTURAL ENGINEER UNDER THIS
CONTRACT. SUBMIT DESIGN CALCULATIONS FOR APPROVAL.
12. ACCESS PANELS SHALL BE PROVIDED IN ALL HARD SUSPENDED CEILINGS AND WALLS FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, CONTROLS, ETC. THAT REQUIRE MAINTENANCE AND INSPECTION.
COORDINATE LOCATION WITH FINAL EQUIPMENT LAYOUT.
13. ALL PIPING, DUCTS, AND CONTROLS IN FINISHED ROOMS SHALL BE INSTALLED TIGHT TO STRUCTURE
ABOVE HARD SUSPENDED CEILING OR ABOVE ACOUSTICAL CEILING. ANY COMPONENTS PASSING
VERTICALLY THROUGH A FINISHED SPACE SHALL BE CONCEALED IN A FURRED CHASE. EQUIPMENT ABOVE CEILING REQUIRING MAINTENANCE ACCESS SHALL NOT BE LOCATED GREATER THAN 4'-0" ABOVE THE
CEILING PLANE.
14.SLEEVES SHALL BE PROVIDED FOR ALL DUCT AND PIPING PENETRATIONS THROUGH WALLS, FLOORS, CEILINGS AND ROOF ASSEMBLIES.
15. ALL PIPE AND DUCT PENETRATIONS OF FIRE AND/OR SMOKE RATED ASSEMBLIES SHALL BE FIRE-STOPPED AROUND PENETRATION. AIR GAP AROUND PENETRATIONS THROUGH NON-RATED ASSEMBLIES SHALL BE
FILLED WITH MINERAL WOOL CAULKED WITH NON-HARDENING SEALANT.
16. ALL EQUIPMENT WITH ROTATING OR MOTORIZED COMPONENTS (FANS, PUMPS, COMPRESSORS, ETC.)
SHALL BE PROVIDED WITH SPRING VIBRATION MOUNTS OR HANGERS.
GENERAL NOTESHVAC DEMOLITION GENERAL NOTES
1. REFER TO ALL DRAWINGS FOR GENERAL DESCRIPTION OF AREAS REQUIRING DEMOLITION.
2. DEMOLITION SHALL BE COORDINATED WITH OWNER, ARCHITECT, GENERAL CONTRACTOR, CONSTRUCTION
MANAGER AND ENGINEER.
3. REFER TO DRAWING AND GENERAL CONTRACTOR INSTRUCTIONS FOR ALL EXISTING EQUIPMENT AND
MATERIALS THAT SHALL REMAIN THE PROPERTY OF THE OWNER.
4. ITEMS OF VALUE WHICH ARE NOT DIRECTED TO BE RETURNED TO THE OWNER, SHALL BECOME THE
PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED FROM SITE AND LEGALLY DISPOSED OF. STORAGE
OR SALE OF ITEMS ON THE PROJECT SITE IS PROHIBITED.
5. DEMOLITION SHALL BE COORDINATED WITH OWNER, ARCHITECT, GENERAL CONTRACTOR, CONSTRUCTION
MANAGER AND ENGINEER.
6. PROVIDE MECHANICAL DEMOLITION TERMINATION; CUT, VALVE AND CAP. DROP MECHANICAL DISTRIBUTION TO
FLOOR. REMOVAL OF SYSTEM EQUIPMENT SHALL BE BY THE HVAC CONTRACTOR.
7. PROVIDE 2 WEEKS NOTICE TO OWNER OPERATIONS FOR SHUT DOWN OF ANY SERVICES AND/OR SYSTEMS.
8. PERSONNEL PROTECTION: ENSURE THE SAFE PASSAGE OF PERSONS IN AND AROUND THE BUILDING DURING
DEMOLITION. PREVENT INJURY TO PERSONS AND DAMAGE TO PROPERTY. PROVIDE ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE. IMMEDIATELY REPAIR DAMAGED PROPERTY TO THE CONDITION BEFORE
BEING DAMAGED. TAKE EFFECTIVE MEASURES TO PREVENT WINDBLOWN DUST.
9. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT INTERRUPT UTILITIES SERVING OCCUPIED AREAS WITHOUT
FIRST OBTAINING PERMISSION FROM OWNER. PROVIDE TEMPORARY SERVICES AS REQUIRED.
10. THESE DRAWINGS ARE DIAGRAMMATIC ONLY AND REFLECT OVERALL SYSTEM REMOVAL. NOT EVERY ITEM OR
COMPONENT OF A SYSTEM IS SHOWN.
11. WHERE REMOVAL OF EQUIPMENT IS INDICATED, SCOPE OF WORK SHALL INCLUDE REMOVAL OF CONTROLS WIRING, CONDUIT AND DEVICES, HANGERS, SUPPORTS, AND ALL OTHER ASSOCIATED APPURTENANCES.
12. THIS CONTRACTOR SHALL PROVIDE SHUT DOWN OF SERVICES (FANS, PUMPS, AHU's, ETC.) AND TRACING OF
ALL RISERS WITHIN BASE BID.
13. PROVIDE TEMPORARY ADHESIVE FILM CAP OVER ALL OPEN ENDED DUCTWORK AND PLUGS ON PIPING DURING
CONSTRUCTION TO PREVENT DUST AND DEBRIS FROM ENTERING SYSTEM.
DUCTWORK LEGEND
DOUBLE LINE
SYMBOL
SINGLE LINE
SYMBOL DESCRIPTION
DUCTWORK & EQUIPMENT TO BE
DEMOLISHED
ALTERNATIVE DUCTWORK & EQUIP TO BE
DEMOLISHED
AIR ENTERING OPENING
AIR LEAVING OPENING
MANUAL VOLUME DAMPER
RECTANGULAR RETURN OR EXHAUST GRILLE
VD
DUCTWORK LEGEND (CT'D)
AD ACCESS DOOR
AFF ABOVE FINISHED FLOOR
AH AIR HANDLER
AHJ AUTHORITY HAVING JURISDICTION
AHU AIR HANDLING UNIT
APD AIR PRESSURE DROP
AWT AVERAGE WATER TEMPERATURE
BHP BREAK HORSEPOWER
BTU BRITISH THERMAL UNIT
BTUH BTU/HOUR
CAP CAPACITY
COP COEFFICIENT OF PERFORMANCE
CFM CUBIC FEET PER MINUTE
CNV CONVECTOR
CRD CEILING RADIATION DAMPER
CUH CABINET UNIT HEATER
DAH DUCTLESS AIR HANDLER
dB DECIBELS
DHP DUCTLESS HEAT PUMP
DX DIRECT EXPANSION
EAT ENTERING AIR TEMPERATURE (DRY BULB)
EDB ENTERING DRY BULB TEMPERATURE
EER ENERGY EFFICIENCY RATIO
ESP EXTERNAL STATIC PRESSURE
EWB ENTERING WET BULB TEMPERATURE
EWT ENTERING WATER TEMPERATURE
°F DEGREES FAHRENHEIT
FT FEET
FT WG FEET WATER GAUGE
FLA FULL LOAD AMPS
FPM FEET PER MINUTE
HP HORSEPOWER
HSPF HEATING SEASON PERFORMANCE FACTOR
IN INCHES
IN WG INCHES WATER GAUGE
KW KILOWATTS
LAT LEAVING AIR TEMPERATURE
LDB LEAVING DRY BULB
LWB LEAVING WET BULB
MAX MAXIMUM
MBH THOUSANDS OF BTU / HOUR
MCA MINIMUM CIRCUIT AMPACITY
MIN MINIMUM
NTS NOT TO SCALE
PH PHASE
PSIG POUNDS PER SQUARE INCH GAUGE
QTY QUANTITY
RPM REVOLUTIONS PER MINUTE
SEER SEASONAL ENERGY EFFICIENCY RATIO
SP STATIC PRESSURE
SPD STATIC PRESSURE DROP
TSP TOTAL STATIC PRESSURE
TYP TYPICAL
UOI UNLESS OTHERWISE INDICATED
MOP MAXIMUM OVERCURRENT PROTECTION
ABBREVIATIONS
EBB ELECTRIC BASEBOARD
AP ACCESS PANEL
NO NORMALLY OPEN
NC NORMALLY CLOSED
ABBREVIATION
DOWNDN
VRF VARIABLE REFRIGERANT FLOW
BMS BUILDING MANAGEMENT SYSTEM
ATC AUTOMATIC TEMPERATURE CONTROL
OA OUTSIDE AIR
OAT OUTSIDE AIR TEMPERATURE (DRY BULB)
ODB OUTSIDE DRY BULB TEMPERATURE
OWB OUTSIDE WET BULB TEMPERATURE
E.C. ELECTRICAL CONTRACTOR (DIV 26)
G.C. GENERAL CONTRACTOR
M.C. MECHANICAL CONTRACTOR (DIV 23)
EF EXHAUST FAN
EH ELECTRIC HEATER
FD FIRE DAMPER
L LOUVER
RF RETURN FAN
SD SMOKE DAMPER
SF SUPPLY FAN
TF TRANSFER FAN
UH UNIT HEATER
VD VOLUME DAMPER
VFD VARIABLE FREQUENCY DRIVE
ETR EXISTING TO REMAIN
RE REMOVE EXISTING
DESCRIPTION
PIPING PLAN GENERAL NOTES
1. UOI IN FLOOR PLANS, SCHEDULES OR DETAILS; BRANCH PIPES TO TERMINAL UNITS SHALL BE AS FOLLOWS:
2. GRAVITY DRAIN COOLING COIL CONDENSATE PIPING SHALL BE PITCHED DOWNWARD TO DRAIN AT MINIMUM 1/4" PER 1'-0". CONDENSATE SHALL BE AT MINIMUM FULL SIZE OF CONDENSATE EQUIPMENT CONNECTION. PROVIDE P-TRAP W/ CLEANOUT AT ALL EQUIPMENT CONNECTIONS. COOLING COIL CONDENSATE PIPING WITHIN THE BUILDING SHALL TERMINATE ABOVE AN INDIRECT WASTE RECEIVER, WITH A MINIMUM 2" AIR GAP ABOVE THE FLOOD RIM OF THE RECEIVER. JANITORS SINKS AND LAUNDRY TUBS MAY BE USED AS RECEIVERS. WHERE THERE ARE NO JANITORS SINKS OR LAUNDRY TUBS WITHIN THE VICINITY FOR PROPER GRAVITY DRAINAGE, PROVIDE TRAPPED, VENTED, AND PRIMED INDIRECT WASTE RECEIVERS CONNECTED TO THE BUILDING
PLUMBING SYSTEM AS REQUIRED.
3. PROVIDE VENTS AT HIGH POINTS IN PIPING SYSTEMS AND DRAIN VALVES AT LOW POINTS.
4. PROVIDE AT LEAST THREE-ELBOW SWING FOR PIPE TAKE-OFFS TO TERMINAL EQUIPMENT AND RISERS.
5. BULLHEAD TEES NOT ALLOWED. PROVIDE OFFSET TAKEOFFS WITH MINIMUM 3 PIPE DIAMETERS BETWEEN.
6. PROVIDE STAINLESS STEEL BRAIDED FLEX CONNECTIONS TO ALL MECHANICAL TERMINAL EQUIPMENT WITH
ROTATING OR MOTORIZED COMPONENTS. PROVIDE DOUBLE SPHERE CONNECTOR W/ CONTROL RODS AT ALL
PUMP CONNECTIONS.
7. PROVIDE ISOLATION VALVE EXTENSIONS TO ACCOMMODATE SPECIFIED PIPING INSULATION THICKNESS.
8. ALL PIPING TESTS SHALL BE PERFORMED AND APPROVED SUBMITTAL RESPONSE RECEIVED PRIOR TO
INSULATING.
9. ISOLATION VALVES IN PIPING SYSTEMS ARE NOT SHOWN ON PLANS (FOR CLARITY) BUT ARE REQUIRED AT ALL
PIPE BRANCHES AND CONNECTIONS TO EQUIPMENT. REFER TO DETAIL SHEETS AND FLOW DIAGRAMS.
10. PROVIDE HANGERS, CLAMPS, OFFSETS, EXPANSION JOINTS, ANCHORS AND GUIDES AS NECESSARY TO PREVENT
STRESS ON PIPING.
11. CONFIRM HYDRONIC SYSTEM CAPACITY THROUGH PRE-CONSTRUCTION TESTING AND BALANCING REPORTS OF
SYSTEMS TO BE EXTENDED. REPORTS SHALL INCLUDE PIPE SIZE, FLOW RATE, SUPPLY PRESSURE AND RETURN PRESSURE. PROVIDE HYDRONIC SYSTEM FLOW (GPM) AND PIPE SYSTEM PRESSURE (PSIG) MEASUREMENTS IN PIPING SYSTEMS TO DOCUMENT PERFORMANCE AT ALL SPACES SERVED BY SYSTEM, BOTH WITHIN PROJECT
WORK SCOPE AREA AND AND AT MAJOR BRANCHES BEYOND PROJECT WORK SCOPE AREA.
GPM BRANCH PIPES
3/4" 1"
TO0.0 3.0
3.1 TO 6.5
GPM
2-1/2" 2"
1-1/4" 1-1/2"
3" 4"
40.1 65.0TO
65.1 TO 115.06.6 12.0TO
115.1 TO 240.012.1 20.0TO
TO20.1 40.0
BRANCH PIPES
ELBOW UP
ELBOW DOWN
FLOW DIRECTION
BALL VALVE
BUTTERFLY VALVE
PIPING TO BE DEMOLISHED
GATE VALVE
CAP
FLANGE OR UNION (BY PIPE SIZE)
AIR VENT - MANUAL
BALL VALVE W/ HOSE BIB, CAP AND CHAIN
PLUG VALVE
MODULATING CONTROL VALVE W/ SPRING RETURN
TWO POSITION CONTROL VALVE W/ SPRING RETURN
FLEXIBLE CONNECTOR
SYMBOL
PIPING LEGEND
BALL VALVE W/ MEMORY STOP
MV
DESCRIPTION
UNIT HEATER SCHEDULE - ELECTRIC
TAG
UNIT DATA ELECTRIC COIL ELECTRICAL DATA
MFR MODEL
NUMBER REMARKSUNIT
TYPE
MOUNTING
TYPE CFM
OUTPUT
(KW)
OUTPUT
(MBH) V PH HZ FLA
EWH-1 WALL
MOUNTED RECESSED 100 1.5 5.1 120 1 60 14.4 QMARK AWH3150FNW 1,2,3,4
REMARKS:
1. PROVIDE DISCONNECT SWITCH.
2. PROVIDE BUILT-IN THERMOSTAT STAGED.
3. PROVIDE WALL MOUNT BRACKET AND MOUNTING FRAME.
4. MIN. MOUNTING HEIGHT FROM FLOOR: 0'-10".
AUTOMATIC CONTROL DAMPER W/ ACCESS
DOOR
ACD
UNDERCUT DOOR
FAN SCHEDULE
TAG LOCATION SERVICE
FAN DATA MOTOR DATA
WEIGHT
(LBS) MFR MODEL NUMBER REMARKS
TYPE CFM
ESP
(IN WG)
OUTLET
VELOCITY
FAN
SPEED
(RPM)
EFF
DRIVE
(DIRECT OR
BELT)
SPEED
(RPM) MCA HP V PH HZ
EF-1 101- ELEC 101-ELEC INLINE 500 0.12 500 1641 50 DIRECT 1800 3.5 1/6 120 1 60 45 GREENHECK SQ-90-VG 1,2,3,4
REMARKS:
1. PROVIDE SPACE MOUNTED TEMPERATURE SENSOR AND CONTROLLER TO MAINTAIN 80°F SPACE TEMPERATURE.
2. PROVIDE CEILING HANGING BRACKET WITH VIBRATION ISOLATION.
3. BACKDRAFT DAMPER.
4. DISCONNECT SWITCH.
5. MOTOR GUARD.
CONNECT TO EXISTING
HYDRONIC HEATER SCHEDULE
TAG
HEAT
OUTPUT
(BTU/LF)
MOUNTING
(SURF. OR
LAY-IN)
PIPE DIA.
(IN)
ROOM
TEMP
(°F)
WATER DATA ELEMENT / ENCLOSURE
MFR MODEL
NUMBER REMARKSEWT
(°F)
AWT
(°F) GPM
WPD
(FT. WG)
WORKING
PRESSURE
(PSIG)
MATERIAL
PANEL
WIDTH
(IN)
LENGTH
(FT)
HUH-1/2 15650 CEILING HUNG 0.75 68 140 130 1.9 2.2 56 - - - STERLING HS-118A 1,2,3
REMARKS:
1. PROVIDE NON-FUSED DISCONNECT AND UNIT MOUNTED 3-SPEED FAN SWITCH
2. PROVIDE CEILING HANDING BRACKET, MOUNT 8' AFF
3. PROVIDE WALL MOUNTED THERMOSTAT
LIMIT OF DEMOLITION
MOTOR DATA
SPEED
(RPM) MCA HP V PH HZ
1550 1.0 (16WATT) 120 1 60
EF-2 103- ELEC WALL MOUNTED 250 0.2 676 1673 19 DIRECT 1800 3.5 1/6 120 1 60 20 GREENHECK SE1-8-440-VG103- ELEC 1,2,3,4,5
FIRE DAMPER (2 HR)FD
INDOOR SPLIT SYSTEM SCHEDULE - AIR SOURCE HEAT PUMP
INDOOR
UNIT
TAG
OUTDOOR
UNIT
TAG
REF.
TYPE
COOLING HEATING INDOOR UNIT
MFR MODEL
NUMBER REMARKSTOTAL
CAPACITY
(MBH)
SENSIBLE
CAPACITY
(MBH)
EAT
DB
(°F)
EAT
WB
(°F)
OUTDOOR DB
TEMP
(°F)
CAPACITY
@47F
(MBH)
CAPACITY
@17F
(MBH)
CAPACITY @5F
(MBH) UNIT STYLE
CFM
(H/L)
SOUND PRESSURE
@ MAX CFM
(dBA)
POWERED
FROM OD UNIT
(Y/N)
WEIGHT
(LBS)
AC-1 ACCU-1 R454B 36.0 20.4 80 67 95 40.0 23.2 20.0 WALL
MOUNT 920/705 49 Y 46 MITSUBISHI PKA-AK36NL ALL
REMARKS:
1. PROVIDE WIRED PROGRAMMABLE THERMOSTAT WITH BMS CONNECTIVITY.
2. PROVIDE 120V CONDENSATE PUMP. BLUE DIAMOND (MAXIBLUE ADVANCED) MINI CONDENSATE PUMP W/ RESERVOIR & SENSOR
3. HEATING AT 47F: EAT DB/WB: 70 DB/60 WB, OUTDOOR DB: 47F
4. HEATING AT 17F: EAT DB/WB: 70 DB/60 WB, OUTDOOR DB: 17F
5. HEATING AT 5F: EAT DB/WB: 70 DB/60 WB, OUTDOOR DB: 5F
6. DISCONNECT SWITCH.
OUTDOOR SPLIT SYSTEM SCHEDULE - AIR SOURCE HEAT PUMP
OUTDOOR
UNIT
TAG
REF.
TYPE
PERFORMANCE OUTDOOR UNIT ELECTRICAL DATA
MFR MODEL
NUMBER REMARKSNOMINAL
TONS
COOLING
EFFICIENCY
SEER2
COP
@47F
COP
@17F
COP
@5F HSPF2
MAX SOUND
PRESSURE
(dBA)
SEACOAST
COATING (Y/N)
WEIGHT
(LBS) V PH HZ MCA
ACCU-1 R454B 3.0 20.3 4.1 2.8 2.7 9.4 53 Y 224 208 1 60 34 MITSUBISHI PUZ-AK36NLHZ ALL
REMARKS:
1. REFRIGERANT PIPING BETWEEN INDOOR AND OUTDOOR UNIT TO BE SIZED BY MANUFACTURER. EQUIPMENT SELECTION SHALL ACCOUNT FOR DERATE FOR OVERALL PIPING LENGTH AND ELEVATION DIFFERENCE.
2. OUTDOOR UNIT SHALL BE MOUNTED ON WALL MOUNTED BRACKET MINIMUM 36" ABOVE GRADE.
3. FRONT WIND BAFFLE
4. SNOW/RAIN DIVERTER
5. CENTRALIZED DRAIN PAN
RFS
5 4 3 2 1
A
B
C
Drawing Title
Revisions
Project Information
Project Location
D
RE
N
O
VA
TI
O
N T
O T
O
66 Main Street N. Easton, MA 02356 T 508.230.0260 F 508.230.0265 ber@ber-engineering.com
351 Centerville Road
T 401.384.7682 www.ber-engineering.com
BUILDING ENGINEERING RESOURCES, INC.
E RB
Warwick, RI 02886
Office Commons 95
R
IC
T H
O R
P H
AL
L
EL
EC
TR
IC
AL
R
O O
M
RIC THORP HALL ELECTRICAL ROOM
RENOVATIONS
CONSTRUCTION DOCUMENTS
19 OCTOBER 2026
THORP HALL
600 MT PLEASANT AVE
PROVIDENCE, RI 02908
M0.01
MECHANICAL
LEGEND, NOTES &
SCHEDULES
Revisions
RIC THORP HALL ELECTRICAL ROOM
RENOVATIONS
MAIN ELECTRICAL ROOM
BASEMENT
ELECTRICAL ROOM
VESTIBULE
TEL/DATA
PROVIDE NEW 3/4" HWS PIPING TO EXISTING HWS PIPING AS
SHOWN.
A
NEW WORK KEYNOTES
EF
T
EWH
TEMPERATURE CONTROLLER SHALL ENERGIZE EF-1 AND
OPEN L-1 UPON A RISE IN TEMPERATURE ABOVE 80°F. ONCE
TEMPERATURE IS BELOW 80°F EF-1 SHALL DE-ENERGIZE
AND L-1 SHALL BE CLOSED.
B
BT
TEMPERATURE CONTROLLER SHALL ENERGIZE EF-2 AND
UPON A RISE IN TEMPERATURE ABOVE 80°F. ONCE
TEMPERATURE IS BELOW 80°F EF-2 SHALL DE-ENERGIZE.
C
10x10 DUCTWORK TO TERMINATE WITH WIRE MESH SCREEN.D
PROVIDE CEILING HANGING BRACKET.E
PROVIDE BACK TO BACK 12x12 TRANSFER GRILLES, ABOVE
DOOR, FOR MAKE-UP AIR PATHWAY, PRICE MODEL 620 OR
SIMILAR
F
FD
ACD
ACD
ACD
E
E
HWS
HWR
HWS
HUH
3/4" HWS
L-1
L-2
L-3
F
EF
UTILIZE OPENING FROM REMOVED GENERATOR DUCTWORK.
INFILL OPENING NO LONGER IN USE. COORDINATE WITH G.C.
G
G T H
A
H ROUTE 3/4"CONDENSATE TO INDIRECT WASTE RECEIVER
WITHIN MECHANICAL ROOM.
3/4 " H
W S
3/4 " H
W R
HUH
I PROVIDE EMERGENCY DRIP PAN WITH EMERGENCY LEAK
DETECTION BELOW PIPING CROSSING ELECTRICAL/IT ROOM.
PAN SHALL BE PITCHED AT 1/16" PER FOOT AND SHALL HAVE
EMERGENCY DRAIN DISCHARGE WHERE VISUAL INDICATION
OF LEAKS CAN BE IDENTIFIED WITHIN MECHANICAL ROOM.
COORDINATE LOCATION WITH FACULTY.
I
AC
CP
ACCU
RE
F
B
C
T
J PROVIDE WALL MOUNTED BRACKET AND MOUNT BOTTOM
OF UNIT 36" ABOVE GRADE, ENSURE UNIT DOES NOT
INTERFERE WITH ADJACENT LOUVER LOCATION.
J
H 3/4" COND CO
PROVIDE BACK TO BACK 14x8 TRANSFER GRILLES WITHIN
12" OF FINISHED CEILING AND 12" ABOVE FINISHED FLOOR.
PRICE MODEL 620 OR SIMILAR. OPENINGS REQUIRED FOR
A2L COMPLIANCE.
K
K
D
PROVIDE NEW 3/4" OUTLET DRAIN OFF VALVE, ISOLATION
VALVE, AND 3/4" COPPER PIPING TO TERMINATE WITHIN 6"
OF THE FLOOR. ROUTE PIPING DOWN ADJACENT WALL.
L
L
M
ROUTE 1" DRAIN LINE TO INDIRECT WASTE RECIVER.M
FCU
DEMO
HWS
HW
S
HW
R
REMOVE EXISTING FCU IN ITS ENTIRETY INCLUDING ALL
HANGERS, SUPPORTS, DUCTWORK, CONTROLS, AND
ASSPCOATED APPERTUNATANCES.
A
DEMOLITION KEYNOTES
REMOVE EXISTING HWS&R PIPING AS SHOWN. CAP AT
NEAREST MAIN.
B
REMOVE EXISTING LOUVER. COORDINATE WITH G.C. TO
INFILL EXISTING BUILDING OPENING AS REQUIRED.
C
C
A
B
CAP AND SEAL DUCTWORK AT DECK LEVEL, DUCTWORK
RISE ON FLOOR ABOVE TO BE ABANDONED IN PLACE.
D
D
CUH
DEMO
REMOVE EXISTING CUH IN ITS ENTIRETY. CAP EXISTING
PIPING AT CEILING AND PREP FOR NEW CONNECTION,
REFER TO NEW WORK PLAN.
E
E
HWS
HWRHWR
HWR
CAP EXISTING HWR
PIPING WITHIN
MECHANICAL ROOM.
CAP EXISTING HWS
PIPING WITHIN
MECHANICAL ROOM.
HWS
REMOVE EXISTING DUCTWORK, DAMPERS, HANGERS, AND
SUPPORTS. EXISTING LOUVER TO BE INFILL.
F
F
G
REMOVE EXISTING LOUVER AND ASSOCIATED DUCTWORK
AND DAMPER.
G
G
EXISTING HOSE BIB ON EXISTING 3" DOMESTIC COLD WATER
(V.I.F.) SHALL BE REMOVED. REFER TO NEW WORK FOR
REQUIRED MODIFICATION.
H
H
5 4 3 2 1
A
B
C
Drawing Title
Revisions
Project Information
Project Location
D
RE
N
O
VA
TI
O
N T
O T
O
66 Main Street N. Easton, MA 02356 T 508.230.0260 F 508.230.0265 ber@ber-engineering.com
351 Centerville Road
T 401.384.7682 www.ber-engineering.com
BUILDING ENGINEERING RESOURCES, INC.
E RB
Warwick, RI 02886
Office Commons 95
R
IC
T H
O R
P H
AL
L
EL
EC
TR
IC
AL
R
O O
M
RIC THORP HALL ELECTRICAL ROOM
RENOVATIONS
CONSTRUCTION DOCUMENTS
19 OCTOBER 2026
THORP HALL
600 MT PLEASANT AVE
PROVIDENCE, RI 02908
M1.01
MECHANICAL DEMOLITION
AND NEW WORK PLANS
SCALE: 1/4" = 1' - 0"1 ELECTRICAL PROPOSED FLOOR PLAN - LIGHTING
SCALE: 1/4" = 1' - 0"2 ELECTRICAL PROPOSED FLOOR PLAN - POWER
Revisions
RIC THORP HALL ELECTRICAL ROOM
RENOVATIONS
GRILLE
NTSDIRECT DRIVE CABINET EXHAUST FAN DETAIL4
PROVIDE ROUND TO RECTANGULAR
TRANSITION AS REQUIRED FOR FAN
INTEGRAL GRAVITY BACKDRAFT
DAMPER
CEILING (BY OTHERS)
ROUND/RECTANGULAR OUTLET
CEILING CABINET FAN
PROVIDE ALUMINUM RIGID
DUCTWORK TO COMMON
VENT OR TERMINATION
POINT
PROVIDE METALLIC FLEX
DUCT FOR FIRST 4"
SIDE VIEW
NTSINLINE FAN DETAIL6
FLEX CONNECTION
RUBBER & SHEAR VIBRATION
ISOLATION
TRANSITION AS REQUIRED TO
LOWER VELOCITY (700 FPM
MAX.)
SUPPORT ROD
CEILING
T
NTSHOT WATER UNIT HEATER DETAIL5
HANG FROM
ABOVE W/
VIBRATION
ISOLATORS
SEE NOTE
INSECT SCREEN
PITCH TO OUTSIDE
DN
"D"
LOUVER PLENUM
EXTERNALLY INSULATE ALL
EXPOSED PARTS AS
SPECIFIED.
NOTE: UOI, DEPTH "D" OF LOUVER
SHALL BE MINIMUM 24"
NTSLOUVER CONNECTION DETAIL7
SEAL AND CAULK
ALL AROUND
SEAL AND CAULK ALL AROUND
ACCESS DOOR
(12"x12" MINIMUM)
SOLDER BOTTOM JOINTS
AND SIDES UP 12" FROM
BOTTOM
STORM-PROOF
LOUVER
RETURN
SUPPLY
PT
PT PT
DOV
MV
NOTES:
1. DETAIL APPLIES TO SINGLE DUCT MOUNTED COILS, FAN COIL UNITS, UNIT HEATERS, WATER-SOURCE
HEAT PUMPS, ETC.
2. PIPING FOR MULTIPLE ROW COILS SHALL BE CONNECTED IN COUNTERFLOW ARRANGEMENT.
3. ACCEPTABLE TO RELOCATE MANUAL AIR VENT AND DRAIN OFF VALVE TO COIL IF CONNECTION IS
PROVIDED BY THE COIL MANUFACTURER.
4. SUBSTITUTE BUTTERFLY VALVES FOR BALL VALVES IF PIPING IS 2-1/2" NPS OR LARGER.
5. COMBINATION COIL PACK KITS ARE ACCEPTABLE IN LIEU OF INDIVIDUAL COMPONENTS SHOWN.
6. REMOVE STRAINER BASKETS AFTER INITIAL STARTUP AND SYSTEM FLUSH IS COMPLETE.
7. WHERE COIL CONNECTIONS ARE NOT IN SAME VERTICAL PLANE, SUPPLY SHALL BE THROUGH THE
BOTTOM CONNECTION.
8. WHERE WATER COIL IS INSTALLED IN A FLOOR MOUNTED CABINET TYPE UNITS, ALL VALVES SHALL
FIT WITHIN CABINET.
9. PROVIDE 12 INCH LONG SS BRAIDED HOSE FOR ALL TERMINAL EQUIPMENT W/ MOTORIZED ROTATING
EQUIPMENT.
SPACE OR UNIT MOUNTED THERMOSTAT
AS SHOWN ON THE DRAWINGS
ADJUSTABLE HANGER
WITH ROLLER
LOCKING NUT
SUPPORT NUT INSULATION
PIPE
PIPE COVERING
PROTECTION
16 GA SADDLE
GALVANIZED
INSULATION
SHIELD 12"LONG.
MIN.9 lb/cft
DENSITY RIGID
INSULATION AT
SHIELD
HEAVY DUTY
CLEVIS HANGER
(FOR 1/2" UP TO
& INCL. 3" PIPE)
(FOR 4" TO 6" PIPE)
NTSPIPE HANGER DETAIL3
NOTES:
1. SEE SPECIFICATION FOR HANGER SIZES.
2. FOR CHW SERVICE OVER 3" REPLACE SADDLE WITH 12" LONG 14 GA SHIELD WITH RIGID
INSULATION BETWEEN PIPE AND SHIELD.
PIPE SUPPORT ACROSS ROOF
NTSSPLIT SYSTEM REFRIGERANT PIPING DETAIL2
NOTES:
1. INVERTED TRAPS TO EXTEND A MINIMUM OF 7 1
2"
ABOVE THE BASE OF THE COIL. ENSURE TRAPS CLEAR
DOOR SWINGS.
2. INSULATE BOTH SUCTION AND LIQUID LINES. REFER
TO SPECIFICATIONS FOR INSULATION INFORMATION.
3. PIPING SHALL BE ANCHORED TO SATISFY PROJECT
WIND SPEED. REFER TO DELEGATED DESIGN OF WIND
SUPPORTS IN SPECIFICATIONS.
MOUNT ACCU ON 18" TALL
EQUIPMENT SUPPORT WITH
NEOPRENE ISOLATORS .
PROVIDE 4" CONCRETE
MOUNTING PAD FOR GRADE
MOUNTED UNIT
DRAIN PAN OVERFLOW
SWITCH WIRED TO UNIT
DISCONNECT
AC UNIT
CONDENSATE DRAIN & TRAP
TRAP AT BOTTOM
OF RISER
TRAP EVERY 20 FT. OF
VERTICAL RISE IN
SUCTION LINELIQUID LINE
SUCTION LINE
SCHRADER VALVE
SHUT-OFF VALVE (TYP)
INSTALL INVERTED TRAP
AT COIL CONNECTION
PER NOTE 1
INSULATED REF. PIPING
STAINLESS STEEL PIPE CLAMPS
ACCU UNIT
CORROSION RESISTANT
UNISTRUT MOUNTED TO
POLYCARBONATE BASE (MIRO
12-BS-12 AS BASIS OF DESIGN,
REFER TO DELEGATED DESIGN
OF WIND SUPPORTS FOR
SELECTION OF SUPPORTS AND
ANCHORING REQUIREMENTS)
NTS1
(TYP)
1/2" MAX
(TYP)
1/2" MAX
PARTITION
NOTE 2
PARTITION
NOTES:
1. CUT GYPSUM TO PROVIDE 1/2" GAP AROUND PENETRATING OBJECT. GAP SHALL BE FROM EDGE OF
OBJECT INSULATION. INCREASE GAP ONLY WHERE SPRING ISOLATION TRAVELS EXCEEDS 1/2".
2. TIGHTLY PACK ENTIRE GAP WITH MINERAL WOOL, GLASS FIBER, OR BACKER ROD. CAULK ENTIRE
PERIMETER OF GAP ON BOTH SIDES OF PARTITION. AT FIRE RATED PARTITIONS, ADD ADDITIONAL LAYER
OF UL-LISTED FIRE STOP INSULATION AROUND PENETRATION.
3. AT PIPING PENETRATIONS, PROVIDE SHEET METAL OR PIPE SLEEVE.
4. WHERE DUCT PENETRATION EXPOSED TO THE ROOM, PROVIDE 1-1/2"X1-1/2" SHEET METAL ANGLE
FRAME AROUND DUCT PERIMETER. 22GA MINIMUM OR SAME AS DUCT CONSTRUCTION, WHICHEVER IS
GREATER.
5. WHERE PIPING PENETRATION EXPOSED TO ROOM, PROVIDE ESCUTCHEON PLATE
6. DUCT PENETRATION SHOWN IS WHERE FIRE DAMPER IS NOT REQUIRED BY CODE.
NOTE 4
NOTE 3
NTSDUCT AND PIPING PARTITION PENETRATION DETAIL8
DUCTWORK PIPING
NTS
GRADE
FLOOR
GRAVITY OR
PUMPED
CONDENSATE LINE
FROM AIR
HANDLING UNIT(S)
WATER-TIGHT
CAP/SEAL
1" PVC OUTER DRAIN
RECEPTOR, SEE NOTE
NOTE: PITCH INTERIOR PORTION OF OUTER
RECEPTOR TO DRAIN TO OUTDOORS
CONDENSATE REMOVAL TO EXTERIOR PIPING DIAGRAM9
RUN WITHIN WALL ON
WARM SIDE OF
INSULATION
SPACE MTD
C
P
C
P
INDOOR
EVAPORATOR
REMOTE
CONDENSER
GENERAL
1. MANFACTURER PROVIDED EQUIPMENT CONTROLLER SHALL BE COMPATIBLE WITH CAMPUS BMS
SYSTEM. ALL ALARMS, OPERATING MODES, AND SPACE TEMPERATURE SET POINTS SHALL BE
MONITORED AND ACCESSIBLE WITHIN THE CAMPUS BMS SYSTEM.
2. UNLESS NOTED OTHERWISE THE FOLLOWING SHALL BE INITIAL SPACE TEMPERATURE AND
HUMIDITY SETPOINTS (ADJUSTABLE):
a. TELCOM ROOMS
COOLING OR VENTILATION 78 DEGREES F (24 HOURS), 50% MAXIMUM
HEATING 65 DEGREES F MIN (24 HRS), NO HUMIDIFICATION
3. SCHEDULES:
OCCUPIED 24 HOURS / 7 DAYS A WEEK, 365 DAYS PER YEAR
SAFETIES
1. UPON DETECTION OF HIGH WATER IN DRAIN PAN VIA YS-01, UNIT SHALL SHUTDOWN AND ALARM AT
BAS.
2. UPON DETECTION OF TT-01 SETPOINT NOT MET FOR 10 MINUTES AND OUTDOOR UNIT ON, UNIT
SHALL SHUTDOWN AND ALARM AT BAS.
3. UPON DETECTION OF EQUIPMENT FAILURE OR…