RFQ27006826 Scope of Work.pdf
PDF 177 KB Posted
- Attached to
- DCAMM Medium Moran Transformer
- Solicitation number
- RFQ27006826
- Issued by
- Providence County, Rhode Island
About this file
I am unable to provide a summary as requested. While you have provided information about a Scope of Work document (RFQ27006826) related to a transformer procurement for the Moran Medium Security Prison by the Rhode Island Division of Capital Asset Management and Maintenance (DCAMM), the actual file contents were not included in your message. Only the file metadata and the related contract opportunity description were provided.
To complete an accurate summary following your specified format, I would need access to the actual document contents, including the detailed scope of work, specifications, timeline, pricing requirements, and other contractual terms outlined in the RFQ27006826 Scope of Work.pdf file.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2021-1.A Page 1 of 2 Revised 01/17/2023
AGENCY SOLICITATION SPECIFICATIONS
RFQ – REQUEST FOR QUOTE PUBLIC WORKS
HEADER: MEDUIM MORAN TRANSFORMER
TITLE: MEDUIM MORAN TRANSFORMER
DESCRIPTION: The new transformer provides the required voltage and capacity to operate the existing chiller systems, ensuring reliable cooling and uninterrupted facility operations.
SECTION A. BACKGROUND
The new transformer provides the required voltage and capacity to operate the existing chiller systems, ensuring reliable cooling and uninterrupted facility operations.
SECTION B: SCOPE OF WORK AND REQUIREMENTS
The Contractor shall furnish all labor, materials, equipment, supervision, permits, testing, and incidentals necessary to install an electrical service to support the continued operation of the existing HVAC chiller systems serving the Moran Medium Security Prison.
The work shall include, but not be limited to, the following:
1. Installation of a new pad-mounted transformer and pad-mounted switchgear to provide electrical service connection to the existing medium-voltage distribution system.
2. Construction of all associated underground electrical infrastructure, including excavation, duct banks, conduits, pull boxes, cable installation, cable terminations, grounding systems, and site restoration.
3. Installation of medium-voltage conductors and associated equipment necessary to interconnect the new transformer and switchgear with the existing 2,400-volt electrical distribution system.
4. Modification and adjustment of existing electrical protection systems and relay settings as required to safely integrate the temporary service with the existing campus electrical distribution network.
5. Coordination with RI DCAMM, facility operations personnel, and utility representatives to maintain continuous facility operations throughout construction.
6. Performance of NETA-compliant testing, commissioning, startup, and verification of all new and existing electrical equipment affected by the work, including transformers, switches, cables, terminations, and protective devices.
7. Provision of all temporary barriers, security measures, safety controls, and traffic control required to perform the work within the secure correctional facility environment.
2021-1.A Page 2 of 2 Revised 01/17/2023
8. Preparation and submission of shop drawings, product data, testing reports, startup documentation, and record drawings upon project completion.
9. Restoration of all disturbed pavement, landscaping, concrete, fencing, and site features affected by construction activities.
The completed installation shall provide a safe, reliable, and code-compliant temporary electrical service capable of supporting the existing chiller systems and maintaining uninterrupted cooling operations for the Moran Medium Security Prison. All work shall be performed in accordance with applicable codes, utility requirements, RI DCAMM standards, and the contract documents.
SECTION C: CONTRACT TIME
Start of construction: Upon issuance of purchase order
Substantial completion: 4 months from issuance of purchase order
Final completion: 6 months from issuance of purchase order
SECTION D: LIQUIDATED DAMAGES
$ ______1000.00__________ per day
| SECTION A. BACKGROUND |
| SECTION B: SCOPE OF WORK AND REQUIREMENTS |
| SECTION C: CONTRACT TIME |
| SECTION D: LIQUIDATED DAMAGES |