This is a set of bid drawings for a Request for Quotation (RFQ26006335) issued by the Rhode Island Division of Purchases on behalf of the Rhode Island Army National Guard (RIARNG) for the installation of a new water supply connection and pump station infrastructure from the Kent County Water Authority (KCWA) to the RIARNG Readiness Center in Coventry, Rhode Island. The project scope includes installing approximately 29,000 linear feet of 8-inch double cement-lined ductile iron water main with associated appurtenances, constructing a new 13-foot by 35-foot prefabricated pump station containing five pumps (four booster pumps ranging from 5 to 7.5 horsepower and one 100-horsepower high-capacity pump), decommissioning three existing water supply wells and one abandoned well, demolishing the existing pump station and associated underground vault, and abandoning a 12,000-gallon underground storage tank. The solicitation opened February 4, 2026, at 10:00 AM EST with a closing date of March 5, 2026, at 2:00 PM EST; a non-mandatory pre-bid conference is scheduled for February 11, 2026, at 10:00 AM at the RIARNG Readiness Center. Construction must commence immediately upon receipt of the purchase order, with substantial completion required within 18 months and final completion within 15 days thereafter, with liquidated damages of $1,200 per day assessed for delays beyond substantial completion. Vendor questions must be submitted through the Ocean State Procures system by February 18, 2026, at 2:00 PM EST.
The drawings indicate the base bid includes a $150,000 allowance for SCADA system integration and a $30,000 allowance for police detail traffic control, with an alternate item available for furnishing and installing an underground prefabricated pump. Qualified vendors must be prequalified as Tier 1 public works vendors by the Division of Purchases and hold valid Rhode Island contractors' registration certificates. All bids must be submitted electronically through the Ocean State Procures system and include a bid surety bond or certified check equal to five percent of the total cost proposal, with the successful bidder required to furnish 100 percent payment and performance bonds prior to purchase order issuance. The procurement is subject to a 15 percent minority business enterprise (MBE) participation set-aside requirement. Vendors must maintain comprehensive insurance coverage including general liability ($1,000,000 per occurrence), workers' compensation ($100,000 each accident), automobile liability ($1,000,000 each occurrence), professional liability ($2,000,000 per occurrence), and environmental/pollution liability ($1,000,000 per occurrence, $2,000,000 aggregate), and must comply with prevailing wage requirements. The State will assess a 0.33 percent contract administrative fee deducted from invoice payments, with all costs limited to parts and labor only, excluding out-of-pocket expenses such as travel and meals.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROPOSED WATER MAIN
PUMP STATION SITE
RING SITE
INDEX OF DRAWINGS
DRAWING No. DESCRIPTIONSHEET No.
BID DOCUMENTS
JULY 2025
CIVIL ENGINEER:
PREPARED FOR:
COVENTRY, RHODE ISLAND
KCWA WATER CONNECTION & PUMP STATION
RHODE ISLAND NATIONAL GUARD
READINESS CENTER
COVER SHEET
NOTES & LEGEND
WATER MAIN PLAN - 1
WATER MAIN PLAN - 2
WATER MAIN PLAN - 3
RING UTILITY SITE PLAN
PUMP STATION UTILITY SITE PLAN
CIVIL DETAILS - 1
CIVIL DETAILS - 2
PUMP STATION PROCESS PIPING PLAN
MECHANICAL DETAILS & DEMOLITION PLAN
ELECTRICAL LEGEND AND NOTES
ELECTRICAL ONE LINE DRAWINGS
ELECTRICAL SITE PLANS
ELECTRICAL PLANS
ELECTRICAL SCHEDULES AND DETAILS
G1.0
C1.0
C1.1
C1.2
C2.0
C3.0
C4.0
C4.1
M1.0
M2.0
E1.0
E1.1
E1.2
E1.3
E1.4
ENGINEERS - SCIENTISTS - PLANNERS
PARE CORPORATION
8 BLACKSTONE VALLEY PLACE
LINCOLN, RI 02865
401-334-4100
10 LINCOLN ROAD, SUITE 210
FOXBORO, MA 02035
508-543-1755
14 BOBALA ROAD, SUITE 2B
HOLYOKE, MA 01040
413.507.3448
ELECTRICAL ENGINEER:
LOCATION MAP
SCALE: 1" = 750'
PROJECT LIMITS
SPOT ELEVATION
SEWER MANHOLE
DRAINAGE MANHOLE
EDGE OF PAVEMENT
CURBING
GAS LINE
SANITARY SEWER LINE
CHAIN LINK FENCE
STONE WALL
TREE LINE
HYDRANT
CATCH BASIN
WATER LINE
DRAINAGE LINE
SETBACKS
EASEMENT LINE
PROPOSEDEXISTING
LEGEND
ELECTRIC
LIMIT OF DISTURBANCE
261.5
UTILITY POLE
WATER VALVE
GAS VALVE
SIGN
SAWCUT LINE
COMPOST FILTER SOCK
WETLAND EDGE
50' PERIMETER WETLAND
200' RIVERBANK
TELEPHONE LINE
OVERHEAD ELECTRIC LINE
LIGHT POLE
SAND BAGS
WIRE FENCE
WOOD FENCE
FENCE
REFERENCE
1. PROJECT LOCATION: RI NATIONAL GUARD READINESS CENTER, READ SCHOOLHOUSE ROAD, AND PUMP STATION SITE (Plat 66 LOT 18), IN COVENTRY RI 02816.
2. EXISTING CONDITIONS COMPILED FROM AVAILABLE RECORD PLANS:
2.1. "EXISTING CONDITIONS PLAN " PREPARED BY CROSSMAN ENGINEERING , DATED AUGUST 2018.
2.2. "FLAT RIVER ROAD AND READ SCHOOL HOUSE ROAD WATER MAINS AS BUILT PLANS " PREPARED BY GAROFALO & ASSOCIATES, INC., DATED NOVEMBER
2011.
2.3. SURVEY PREPARED BY DIPRETE ENGINEERING ON 6-2-2025 .
3. WETLAND FLAGS IDENTIFYING WETLAND RESOURCE AREAS WERE PLACED BY PARE CORPORATION ON 5-7-2025 AND LOCATED BY PARE CORPORATION USING A
GPS DEVICE.
4. ACCORDING TO THE FEMA FLOOD INSURANCE RATE MAP FOR THE AREA (MAP NUMBER 4400C010G EFFECTIVE 12/3/2010 & 4400C010C103H EFFECTIVE 10/2/2015), THE ENTIRE SITE IS LOCATED WITHIN ZONE X.
5. ELEVATIONS SHOWN HEREON, IN U.S. SURVEY FEET, ARE REFERENCED TO THE NORTH AMERICAN VERTICALDATUM OF 1988 (NAVD 88), AS DETERMINED BY
DIPRETE ENGINEERING USING REAL TIME KINEMATIC G.P.S. OBSERVATIONS.
GENERAL NOTES
1. PER AVAILABLE RIDEM MAPPING, THE PROJECT SITE IS LOCATED OUTSIDE OF A NATURAL HERITAGE AREA.
2. THE PROJECT SITE IS NOT LOCATED WITHIN AN ENVIRONMENTAL JUSTICE AREA ACCORDING TO THE RIDEM ENVIRONMENTAL RESOURCE MAP DATABASE.
3. THE CONTRACTOR SHALL MAKE ALL NECESSARY CONSTRUCTION NOTIFICATIONS AND APPLY FOR AND OBTAIN ALL NECESSARY CONSTRUCTION PERMITS, PAY ALL FEES AND POST ALL BONDS ASSOCIATED WITH THE SAME, AND COORDINATE WITH THE ENGINEER AND OWNER'S REPRESENTATIVE AS REQUIRED.
4. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR JOB SITE SAFETY. THE CONTRACTOR SHALL PROVIDE TEMPORARY FENCING AND/OR BARRIERS AROUND ALL OPEN EXCAVATED AREAS IN ACCORDANCE WITH OSHA FEDERAL, STATE, AND LOCAL REQUIREMENTS.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THAT THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS DO NOT CONFLICT WITH ANY KNOWN EXISTING OR OTHER PROPOSED IMPROVEMENTS. IF ANY CONFLICTS ARE DISCOVERED, THE CONTRACTOR SHALL NOTIFY THE OWNER AND THE ENGINEER PRIOR TO INSTALLATION OF ANY PORTION OF THE SITE WORK WHICH WOULD BE AFFECTED. NO FIELD ADJUSTMENTS IN THE LOCATION OF SITE ELEMENTS
SHALL BE MADE WITHOUT THE ENGINEER'S APPROVAL.
6. IF ANY DEVIATION OR ALTERATION OF THE WORK PROPOSED ON THESE DRAWINGS IS REQUIRED, THE CONTRACTOR SHALL IMMEDIATELY CONTACT AND
COORDINATE ANY DEVIATIONS WITH THE ENGINEER AND OWNER.
7. ANY AREA OUTSIDE OF THE LIMIT OF WORK THAT IS DISTURBED SHALL BE RESTORED TO ITS ORIGINAL CONDITION AT NO ADDITIONAL COST TO THE OWNER.
8. ALL SITE WORK SHALL MEET OR EXCEED THE SITE WORK SPECIFICATIONS PREPARED FOR THIS PROJECT.
9. ALL SIGNS SHALL BE REFLECTORIZED TYPE III SHEETING AND CONFORM WITH THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), LATEST
REVISION.
10. ALL UTILITIES (LOCATION AND ELEVATION) DEPICTED SHALL BE CONSIDERED APPROXIMATE ONLY. BEFORE COMMENCING SITE WORK IN ANY AREA, CONTACT "DIG SAFE" AT 1-888-DIG-SAFE (1-888-344-7233) TO ACCURATELY LOCATE UNDERGROUND UTILITIES. ANY DAMAGE TO EXISTING UTILITIES OR STRUCTURES AND THE COST TO REPAIR THE DAMAGES TO INITIAL CONDITIONS, AS DEPICTED ON THE PLANS, SHALL BE THE CONTRACTOR'S RESPONSIBILITY.
11. NO EXCAVATION SHALL BE DONE UNTIL UTILITY COMPANIES ARE PROPERLY NOTIFIED IN ADVANCE. NOTE THAT NOT ALL EXISTING UNDERGROUND UTILITIES ARE SHOWN. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTACT ALL RESPECTIVE UTILITY COMPANIES TO VERIFY AND LOCATE EXISTING UTILITIES.
DEMOLITION NOTES
1. ALL NOTED UTILITIES TO BE REMOVED AND DISPOSED OF, RELOCATED OR CAPPED REPRESENT ALL KNOWN SITE CONDITIONS TO BE DEMOLISHED. THE
CONTRACTOR SHALL COORDINATE ALL UNFORESEEN CONDITIONS WITH THE PROJECT ENGINEER, OWNER AND/OR RESPECTIVE UTILITY COMPANIES PRIOR TO
PROCEEDING WITH WORK.
2. WATER, SEWER, DRAINAGE, GAS, AND OTHER SITE UTILITIES SERVICING THE EXISTING FACILITIES ARE TO REMAIN ACTIVE THROUGHOUT CONSTRUCTION.
THERE SHALL BE NO INTERRUPTION OF UTILITY SERVICES DURING THE CONSTRUCTION OPERATION WITHOUT APPROVAL FROM THE OWNER.
GRADING AND UTILITY NOTES
1. AT ALL LOCATIONS WHERE EXISTING CURBING OR PAVEMENT ABUT NEW CONSTRUCTION, THE EDGE OF THE EXISTING CURB OR PAVEMENT SHALL BE SAWCUT
TO A CLEAN, SMOOTH EDGE. BLEND NEW PAVEMENT AND CURBS SMOOTHLY INTO EXISTING BY MATCHING LINES, GRADES AND JOINTS.
2. ALL UTILITY COVERS, GRATES, ETC. SHALL BE ADJUSTED TO BE FLUSH WITH THE SURROUNDING SURFACE OR PAVEMENT FINISH GRADE. RIM ELEVATIONS OF STRUCTURES AND MANHOLES ARE APPROXIMATE. FINAL ELEVATIONS ARE TO BE SET FLUSH AND CONSISTENT WITH THE GRADING PLANS.
3. THE CONTRACTOR SHALL MAKE ALL ARRANGEMENTS FOR THE ALTERATION OF PRIVATE UTILITIES BY THE UTILITY COMPANIES, AS REQUIRED.
4. WHERE AN EXISTING UTILITY IS FOUND TO CONFLICT WITH THE PROPOSED WORK, THE LOCATION, ELEVATION AND SIZE OF THE UTILITY SHALL BE ACCURATELY DETERMINED WITHOUT DELAY BY THE CONTRACTOR AND THE INFORMATION SHALL BE PROVIDED ON A SKETCH TO SCALE OF THE EXISTING UTILITY WITH TIES
TO KNOWN POINTS, PHOTOS AND FURNISHED TO THE ENGINEER FOR RESOLUTION.
5. THE CONTRACTOR SHALL PROTECT ALL UNDERGROUND DRAINAGE, SEWER AND UTILITY FACILITIES FROM EXCESSIVE VEHICULAR LOADS DURING CONSTRUCTION. ANY DAMAGE TO THESE FACILITIES RESULTING FROM CONSTRUCTION LOADS SHALL BE RESTORED TO ORIGINAL CONDITION AT NO
ADDITIONAL COST TO THE OWNER.
6. GAS, ELECTRIC, AND COMMUNICATIONS ROUTING ARE SUBJECT TO REVIEW AND APPROVAL BY APPROPRIATE UTILITY COMPANIES.
7. DURING CONSTRUCTION OPERATIONS, THE CONTRACTOR SHALL PROTECT EXISTING UTILITIES BY PROVIDING TEMPORARY SUPPORTS OR SHEETING AS
REQUIRED AT NO ADDITIONAL COST TO THE OWNER.
8. ALL WATER LINE BENDS AND TEES SHALL BE REINFORCED WITH THRUST BLOCKS. ALL WATER DISTRIBUTION PIPING AND FITTINGS MUST ADHERE TO THE KENT COUNTY WATER AUTHORITY (KCWA) SPECIFICATIONS AND SHALL BE INSPECTED BEFORE, DURING, AND AFTER CONSTRUCTION PRIOR TO TAPPING THE SERVICE MAIN. THE CONTRACTOR SHALL COORDINATE AND CONFIRM ALL WATER DISTRIBUTION MATERIAL PRODUCTS WITH THE KCWA PRIOR TO ORDERING OR
PURCHASING PRODUCTS.
9. EXCAVATION REQUIRED WITHIN THE PROXIMITY OF EXISTING UTILITY LINES SHALL BE DONE BY HAND. CONTRACTOR SHALL REPAIR ANY DAMAGE TO EXISTING UTILITY LINES OR STRUCTURES INCURRED DURING CONSTRUCTION OPERATIONS AT NO ADDITIONAL COST TO THE OWNER.
EROSION AND SEDIMENTATION CONTROL NOTES
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ESTABLISHING OR INSTALLING ALL TEMPORARY SEDIMENT AND EROSION CONTROLS AS SHOWN ON
THESE PLANS AND SHALL MAINTAIN ALL EROSION CONTROL MEASURES AS NECESSARY DURING THE ENTIRE CONSTRUCTION PERIOD.
2. EROSION CONTROL BARRIERS SHALL BE INSTALLED AS SHOWN ON THE EROSION CONTROL PLAN PRIOR TO COMMENCEMENT OF CONSTRUCTION
OPERATIONS.
3. SOIL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE INSPECTED AND MAINTAINED ON A WEEKLY BASIS AND AFTER EACH STORM EVENT OF 0.25 INCH OR GREATER DURING CONSTRUCTION TO ENSURE THAT CHANNELS, DITCHES AND PIPES ARE CLEAR OF DEBRIS AND THAT THE EROSION CONTROL BARRIERS ARE INTACT. IDENTIFIED DEFICIENCIES SHALL BE CORRECTED IMMEDIATELY.
4. DUST SHALL BE CONTROLLED BY WATERING OR OTHER APPROVED METHODS AS NECESSARY, OR AS DIRECTED BY THE OWNER OR OWNER'S
REPRESENTATIVE.
5. THE CONTRACTOR SHALL CLEAN AND MAINTAIN EROSION CONTROL BARRIER WHEN SEDIMENT ACCUMULATES TO ONE HALF THE HEIGHT OF THE BARRIER. MATERIAL COLLECTED FROM THE SEDIMENTATION BARRIERS SHALL BE REMOVED AS NECESSARY AND DISPOSED IN AN UPLAND AREA.
6. INSTALLATION OF THE EROSION CONTROL BARRIERS AS ILLUSTRATED IS INTENDED TO REPRESENT THE MINIMUM SEDIMENTATION CONTROL FACILITIES NECESSARY TO MEET ANTICIPATED SITE CONDITIONS. ADDITIONAL EROSION CONTROL MEASURES SHALL BE IMPLEMENTED AS CONDITIONS
WARRANT OR AS DIRECTED BY THE OWNER OR OWNER'S REPRESENTATIVE.
7. THE CONTRACTOR SHALL MAINTAIN A SUFFICIENT RESERVE OF VARIOUS EROSION CONTROL MATERIALS ONSITE AT ALL TIMES FOR EMERGENCY
PURPOSES OR ROUTINE MAINTENANCE.
8. EXISTING CATCH BASINS AND STORM DRAIN INLETS SHALL BE PROTECTED WITH APPROPRIATE TEMPORARY INLET PROTECTION IN ACCORDANCE WITH
THE RHODE ISLAND SOIL EROSION AND SEDIMENT CONTROL HANDBOOK.
9. DEWATERING WASTE WATERS PUMPED FROM EXCAVATIONS SHALL BE CONVEYED BY HOSE TO AN UPLAND AREA AND DISCHARGED INTO STRAW BALE
CORRALS OR SEDIMENTATION BAGS.
10. THE CONTRACTOR SHALL NOT REMOVE ANY TEMPORARY SEDIMENT CONTROL BARRIERS UNTIL THE CONTRIBUTING DRAINAGE AREA HAS BEEN
PERMANENTLY STABILIZED.
11. CONSTRUCTION SITE WASTE MATERIALS SHALL BE PROPERLY CONTAINED ONSITE AND DISPOSED OFF SITE AT A LOCATION IN ACCORDANCE WITH THE
LOCAL AND STATE REGULATIONS.
12. RIP-RAP OR OTHER ENERGY DISSIPATERS SHALL BE USED WHERE NECESSARY TO PREVENT SCOUR.
13. ALL DRAINAGE STRUCTURES SHALL BE CLEARED OF ACCUMULATED SEDIMENT PRIOR TO ACCEPTANCE OF FINAL PROJECT.
14. NEWLY VEGETATED AREAS SHALL BE MAINTAINED REGULARLY TO ENSURE STABLE VEGETATED SURFACES.
15. WHERE EROSION CONTROLS ARE NEEDED ON IMPERVIOUS SURFACES, THE CONTRACTOR SHALL PROVIDE SAND BAG EROSION CONTROL BARRIER.
GRADE TO DRAIN GTD
KCWA WATER MAIN INSTALLATION NOTES
1. ALIGNMENT: ALIGNMENT OF WATER MAIN IS DIAGRAMMATIC ONLY AND DOES NOT NECESSARILY REFLECT ALL BENDS, FITTINGS, AND APPURTENANCES THAT MAY BE REQUIRED FOR PROPER INSTALLATION. NEW WATER MAIN SHALL PASS UNDER ALL UTILITIES EXCEPT SEWER AND DRAINAGE UNLESS OTHERWISE NOTED ON THE DRAWINGS OR AS DIRECTED BY ENGINEER.
WATER MAIN CROSSING BENEATH SEWER OR LESS THAN 18-INCHES ABOVE SEWER SHALL BE SLEEVED OR ENCASED WITHIN 10 FEET OF CROSSING. PIPE DEFLECTION SHALL BE NO MORE THAN 75% OF THE MANUFACTURER'S RECOMMENDED MAXIMUM
DEFLECTION, PER KCWA REQUIREMENTS.
2. FLUSHING & DISINFECTION: ALL NEW WATER MAIN SHALL BE FLUSHED AND DISINFECTED IN ACCORDANCE WITH AWWA C651, LATEST REVISION, AND SHALL BE PERFORMED IN THE PRESENCE OF THE ENGINEER AND THE KCWA. THE FORM OF CHLORINE
USED FOR DISINFECTION SHALL BE APPROVED BY THE KCWA.
3. TESTING: ALL NEW WATER MAIN SHALL BE SUBJECTED TO PRESSURE AND LEAKAGE TESTING PER AWWA C600, LATEST REVISION. PRESSURE TEST SHALL BE 1.5 TIMES THE NORMAL PRESSURE, BUT NO LESS THAN 150 PSI FOR 2 HOURS.
4. NO NEW WATER MAINS SHALL BE PHYSICALLY CONNECTED TO EXISTING MAINS UNTIL DISINFECTION IS COMPLETED AND BACTERIA TEST ARE APPROVED BY THE KCWA. A CLOSED VALVE SHALL NOT CONSTITUTE PHYSICAL SEPARATION BETWEEN NEW AND EXISTING MAINS. AN APPROVED BACKFLOW PREVENTER MUST BE USED FOR ANY CONNECTIONS TO NEW MAINS
PRIOR TO ACCEPTANCE.
5. FOR TESTING PURPOSES, IT MAY BE NECESSARY FOR THE CONTRACTOR TO INSTALL CHLORINATION PORTS AND CORPORATIONS AT HIGH POINTS WITHIN THE PIPING SYSTEM TO FACILITATE DISINFECTION, TESTING, AND AIR RELEASE TO PROVIDE SUFFICIENT FLUSHING CAPACITY. CORPORATIONS SHALL BE INSTALLED USING A SADDLE. SUCH CORPORATIONS
SHALL BE REMOVED AND CAPPED WITH BRASS PLUG PRIOR TO ACTIVATING THE PIPELINE.
CUT AND CAP
ASSESSORS LINE
PROPERTY LINE
MAJOR CONTOUR LINE
MINOR CONTOUR LINE
BOLLARD
COUPLING
B-1 WETLAND FLAG
SEV
SOIL EVALUATION
TREE
WELL
MONITORING WELL
DOUBLE CATCH BASIN
CATCH BASIN
BENCH MARK
mw
DRILL HOLE FOUND/SET
IRON ROD/PIPE FOUND/SET
BOUND FOUND/SET
NAIL/SPIKE FOUND/SET
WELL SUPPLY
WELL DECOMMISSIONING NOTES
1. REFER TO 250-RICR-150-05-3.22(H) FOR THE RULES AND REGULATIONS ON ABANDONMENT OF PRIVATE DRINKING WATER WELLS.
2. ABANDONMENT PROCEDURES FOR MONITORING WELLS AND BORINGS CONSTRUCTED WITH AN ANNULAR SPACE:
2.1. THE BOREHOLE SHALL BE INSPECTED FROM THE LAND SURFACE THROUGH ITS ENTIRE DEPTH BEFORE IT IS SEALED, TO ENSURE AGAINST THE PRESENCE OF ANY OBSTRUCTIONS THAT WILL INTERFERE WITH SEALING OPERATIONS.
2.2. THE CASING SHALL BE REMOVED BY PULLING OR OVERDRILLING. IF THE CASING CANNOT BE REMOVED, THE SCREEN AND CASING SHALL BE SUITABLY PERFORATED FROM TOP TO BOTTOM ALLOWING FOR THE PLUGGING MATERIAL (SEE 2.3) TO PENETRATE THE ANNULAR SPACE AND FORMATION. IF THE CASING REMAINS, IT SHALL BE CUT OFF AT LEAST 4 FEET
BELOW THE GROUND SURFACE WHERE PRACTICABLE.
3. THE REMAINING CASING OR BOREHOLE SHALL BE FILLED WITH NEAT CEMENT OR NEAT CEMENT GROUT APPLIED UNDER
PRESSURE.
CONSTRUCTION SEQUENCING NOTES:
WALKER RIDGE INFRASTRUCTURE - GREEN
WASHINGTON OAK SCHOOL INFRASTRUCTURE - RED
NEW INFRASTRUCTURE - BLUE
EXISTING 20" MAIN READ SCHOOL HOUSE ROAD - CYAN
ABBREVIATIONS
CLDI CEMENT LINED DUCTILE IRON
PVC POLYVINYL CHLORIDE
DI DUCTILE IRON
DMH DRAIN MANHOLE
SMH SEWER MANHOLE
CB CATCH BASIN
UP UTILITY POLE
RCP REINFORCED CONCRETE PIPE
BIT BITUMINOUS ASPHALT
DCB DOUBLE CATCH BASIN
INV INVERT
ELEV ELEVATION
REVISIONS:
PROJECT NO.:
APPROVED BY:
DRAWN BY:
DESIGNED BY:
CHECKED BY:
SCALE:
DATE:
DRAWING NO.:
SHEET NO.
DRAWING TITLE:
OF
1"
SCALE ADJUSTMENT GUIDE
0"
ORIGINAL DRAWING
BAR IS ONE INCH ON
Z:
\J
O
BS
\2
Jo bs
\2
.0
R
IN
G
-N ew
W at er S up pl y- R
I\D W
G S\
N O
TE
S
LE
G
EN
D .d w g
K C
W A
W at er C on ne ct io n
Pu m p St at io n R
I N at io na l G ua rd C ov en try , R ho de
Is la nd
25066.00
JULY 2025
AS NOTED
KS/MDD
SPD
AWB
LMG
NOTES & LEGEND
G1.0
UP
UP
BENCHMARK
NAIL IN UP 17-50
ELEV.=447.661
READ SCHOOL HOUSE ROAD
ASPHALT BERM
GRAVEL
DRIVEWAY
ASPHALT BERM
CONCRETE BOUND FOUND IRON PIPE FOUND GRANITE BOUND FOUND
GRAVEL
DRIVEWAY
GRAVEL
DRIVEWAY GRAVEL
DRIVEWAY
CONCRETE PILLAR
ASPHALT BERM
CONCRETE CURB
F
IE
L D S
T O N E D
R
IV
E
CO
N
CR
ET
E
SI
DE
W A
LK
CO
N
CR
ET
E
CU
RB
ASPHALT BERM
ASPHALT CURB
C O N C
RET
E C
URB
CONCRETE SIDEWALK
AP 82 LOT 1
N/F
FRANK R. & BEVERLY BERCHEM
#461 READ SCHOOL HOUSE RD AP 74 LOT 10.1
N/F
RICHARD G. HOULE
#433 READ SCHOOL HOUSE RD
AP 82 LOT 53
N/F
WALKER FARM HOMEOWNERS
AP 82 LOT 11
N/F
TYLER JAMES DESROSIERS
#454 READ SCHOOL HOUSE RD
AP 82 LOT 10
N/F
WALKER RIDGE COMMON AREA
AP 74 LOT 9
N/F
ZACHARY E. & RENEE EATON
#419 READ SCHOOL HOUSE RD
CB
RIM=442.4
INV=INACCESSIBLE
(FULL OF WATER)
DMH
RIM=445
BOTTOM=442.4
(FILLED WITH DIRT WITH A 4" VERTICAL HDPE PIPE)
A B 12" PVC
12" PVC
DMH
RIM=449.4
INV(A)=444.2
INV(B)=444.2
8" CLDI
8" CLDI (PRIVATE WATER LINE)
(SEE UTILITY PLAN REFERENCES)
TERMINUS PER UTILITY PLAN REFERENCE
20" CLDI
GRASS
WOODED
WOODED
WOODED
GRASS
GRASS
GRASS
GRASS
GRASS
10" PVC
10" PVC
8" x 8" TEE
8" GATE VALVE (TYP. OF 2)
8" DOUBLE CEMENT
LINED DI WATER MAIN
SEE UTILITY
OFFSET FOR DETAIL
CONTRACTOR TO PERFORM TEST PIT TO
VERIFY SIZE AND LOCATION OF EXISTING MAIN
CONNECT TO EXISTING WATER MAIN
WITH SOLID SLEEVE COUPLING
SEE UTILITY
OFFSET FOR DETAIL
CONNECT TO EXISTING
10" PVC WITH 10" x 8"
TAPPING SLEEVE & VALVE
0+00
1+00
2+003+00
F
IE
L D S
T O N E D
R
IV
E
READ SCHOOL HOUSE ROAD
INSTALL INLET
PROTECTION
UP
UP
BENCHMARK
NAIL IN UP 19
ELEV.=459.41
CONCRETE BOUND
FOUND
R A
IN
O N E C
O U R T
ASPHALT BERM
ASPHALT BERM
AP 82 LOT 2.2
N/F
SHANNON POSILLO
#1 RAINONE CT
AP 82 LOT 51
N/F
WALKER RIDGE COMMON AREA
AP 82 LOT 2.3
N/F
ANDREA LYNNE CARSON
#1 RAINONE CT
AP 82 LOT 1
N/F
FRANK R. & BEVERLY BERCHEM
#461 READ SCHOOL HOUSE RD
DMH
RIM=460.0
INV=INACCESSIBLE(RIM SEALED)
12" PVC (PER RECORD)
20" CLDI
GRASS
WOODED
GRASS
WOODED
WOODED
GRASS
10" PVC
10" PVC
READ SCHOOL HOUSE ROAD
8" DOUBLE CEMENT
LINED DI WATER MAIN
3+00
4+00
5+00
6+00
READ SCHOOL HOUSE ROAD
R A
IN
O N E C
O U R T
REVISIONS:
PROJECT NO.:
APPROVED BY:
DRAWN BY:
DESIGNED BY:
CHECKED BY:
SCALE:
DATE:
DRAWING NO.:
SHEET NO.
DRAWING TITLE:
OF
1"
SCALE ADJUSTMENT GUIDE
0"
ORIGINAL DRAWING
BAR IS ONE INCH ON
Z:
\J
O
BS
\2
Jo bs
\2
.0
R
IN
G
-N ew
W at er S up pl y- R
I\D W
G S\
G
EN
ER
AL
P
LA
N .d w g
K C
W A
W at er C on ne ct io n
Pu m p St at io n R
I N at io na l G ua rd C ov en try , R ho de
Is la nd
25066.00
JULY 2025
AS NOTED
KS/MDD
SPD
AWB
LMG
WATER MAIN PLAN - 1
M
AT
C H
L
IN
E
TO
L O
W
ER
R
IG
H T
M
ATC
H
LIN
E TO
ABO
VE LEFT
M
AT
C H
L
IN
E
TO
S H
EE
T
C 1.
C1.0
PLAN VIEW
SCALE: 1' = 20'
PLAN VIEW
SCALE: 1' = 20'
UP
UP
XXXXX
X X X X X X X X X X X X X X X X X X X
UP
BENCHMARK
NAIL IN UP 20
ELEV.=464.11
GRAVEL
DRIVEWAY
STOCKADE FENCE
PICKET FENCE
ASPHALT
DRIVEWAY
ASPHALT BERM
ASPHALT BERM
HEADWALL
INV=465.5
ASPHALT BERM
ASPHALT BERM
CONCRETE SIDEWALK
CO
N
CR
ET
E
SI
DE
W A
LKPOST & RAIL FENCE
POST & RAIL FENCE
GRANITE BOUND FOUND
F
IE
L D S
T O N E D
R
IV
E
CO
N
CR
ET
E
CU
RB
CON
CRETE CURB
CONCRETE SIDEW
ALK
ASPHALT
DRIVEWAY
ASPHALT
DRIVEWAY
ASPHALT BERM
AP 82 LOT 4.2
N/F
MICHAEL J. & LISA CLIFT
#552 READ SCHOOL HOUSE RD
AP 82 LOT 3.1
N/F
CARLOS E. ALDANA
#521 READ SCHOOL HOUSE RD
AP 82 LOT 54
N/F
WALKER FARM HOMEOWNERS
AP 82 LOT 3.2
N/F
MICHAEL R. CORRIVEAU
#511 READ SCHOOL HOUSE RD
DMH
RIM=460
.0
INV=INACCESSIB
LE(R
IM SEA
LED)
DMH
RIM=465.3
INV=INACCESSIBLE(RIM SEALED)
12" PVC
12" PVC (PER RECORD)20" CLDI
2" WATER BLOW OFF
CONCRETE SIDEWALK
GRASS
WOODED
WOODED WOODED
WOODED
GRASS
LC
LC
10" PVC
10" PVC
10" PVC
12" RCP TERMINUS
UNKNOWN
READ SCHOOL HOUSE ROAD
8" x 8" TEE & VALVE
CONNECT TO EXISTING 8" MAIN
WITH SOLID SLEEVE COUPLING
CONTRACTOR TO PERFORM TEST PIT
TO VERIFY END OF EXISTING MAIN
8" GATE VALVE
8" DOUBLE CEMENT
LINED DI WATER MAIN
7+00
8+00 9+0010+00
F
IE
L D S
T O N E D
R
IV
E
READ SCHOOL HOUSE ROAD
UP
UP
UP
UP
UP
XXX
UP
BENCHMARK
NAIL IN UP 20-50
ELEV.=472.55
READ SCHOOL HOUSE ROAD
ASPHALT BERM
EDGE OF PAVEMENT
CONCRETE CURB
CONCRETE SIDEWALK ASPHALT
DRIVEWAY
ASPHALT
DRIVEWAY
A S P H A L T
D R
IV
E W
A
YASPHALT CURB
ASPHALT BERM
CONCRETE SIDEWALK
SI
GN
RAILROAD TIE
RETAINING WALL
FES
INV=473.4
RIP RAP
ASPHALT CURB
ASPHALT BERM
STOCKADE FENCE
ASPHALT
DRIVEWAY
HEADWALL
INV=465.5
READ SCHOOL HOUSE ROAD
NIKE SITE ROAD
AP 82 LOT 24
N/F
TOWN OF COVENTRY
IRON ROD
FOUND
AP 82 LOT 25
N/F
KENT COUNTY WATER AUTHORITY
#500 READ SCHOOL HOUSE RD AP 82 LOT 24
N/F
TOWN OF COVENTRY
AP 82 LOT 9.2
N/F
DEBORAH A. BARRETT
#600 READ SCHOOL HOUSE RD
AP 82 LOT 4.1
N/F
CONSTANTINO LEMA
#551 READ SCHOOL HOUSE RD
A
B
C
DMH
RIM=472.4
INV(A)=468.3
INV(B)=465.4
INV(C)=465.5
12" PVC
PV
C
DCB
RIM=472.2
A
B
DMH
RIM=476.1
INV(A)=470.8
INV(B)=470.8
P V C
12" HDPE
TERMINUS UNKNOWN
20" CLDI
2" WATER BLOW OFF
AP 82 LOT 5
N/F
SHEILA WENDOLOSKI REVOCABLE TRUST
#571 READ SCHOOL HOUSE RD
LC
LC
GRASS
GRASS
GRASS
WOODED
GRASS WOODED
LC
GRASS
WOODED
GRASS
10" PVC
10" PVC
d
12" RCP TERMINUS
UNKNOWN
12" RCP
8" x 8" TEE & VALVE
CONNECT TO EXISTING 10"
PVC WITH 10" x 8" TAPPING
SLEEVE & VALVE
FIRE HYDRANT
ASSEMBLY
8" GATE VALVE
8" DOUBLE CEMENT
LINED DI WATER MAIN
11+0012+0013+00
14+00
15+00
SEE UTILITY
OFFSET FOR DETAIL
READ SCHOOL HOUSE ROAD
READ SCHOOL HOUSE ROAD
NIKE SITE ROAD
SEE UTILITY
OFFSET FOR DETAIL
REVISIONS:
PROJECT NO.:
APPROVED BY:
DRAWN BY:
DESIGNED BY:
CHECKED BY:
SCALE:
DATE:
DRAWING NO.:
SHEET NO.
DRAWING TITLE:
OF
1"
SCALE ADJUSTMENT GUIDE
0"
ORIGINAL DRAWING
BAR IS ONE INCH ON
Z:
\J
O
BS
\2
Jo bs
\2
.0
R
IN
G
-N ew
W at er S up pl y- R
I\D W
G S\
G
EN
ER
AL
P
LA
N .d w g
K C
W A
W at er C on ne ct io n
Pu m p St at io n R
I N at io na l G ua rd C ov en try , R ho de
Is la nd
25066.00
JULY 2025
AS NOTED
KS/MDD
SPD
AWB
LMG
WATER MAIN PLAN - 2
M
AT
C H
L
IN
E
TO
S H
EE
T
C 1.
M
AT
C H
L
IN
E
TO
L O
W
ER
R
IG
H T
M
AT
C H
L
IN
E
TO
A
BO
VE
L
EF
TM
AT
CH
L
IN
E
TO
S
HE
ET
C 1.
C1.1
PLAN VIEW
SCALE: 1' = 20'
60' EASEMENT
N+-E S+TE 41A&
8" DOUBLE CEMENT
LINED DI WATER MAIN
16+00 17+00
18+00 19+00
20+00
N+-E S+TE 41A&
60' EASEMENT
N+-E S+TE 41A&
8" DOUBLE CEMENT
LINED DI WATER MAIN
20+00
21+00
22+00
23+00
24+00
25+00
N+-E S+TE 41A&
REVISIONS:
PROJECT NO.:
APPROVED BY:
DRAWN BY:
DESIGNED BY:
CHECKED BY:
SCALE:
DATE:
DRAWING NO.:
SHEET NO.
DRAWING TITLE:
OF
1"
SCALE ADJUSTMENT GUIDE
0"
ORIGINAL DRAWING
BAR IS ONE INCH ON
Z:
\J
O
BS
\2
Jo bs
\2
.0
R
IN
G
-N ew
W at er S up pl y- R
I\D W
G S\
G
EN
ER
AL
P
LA
N .d w g
K C
W A
W at er C on ne ct io n
Pu m p St at io n R
I N at io na l G ua rd C ov en try , R ho de
Is la nd
25066.00
JULY 2025
AS NOTED
KS/MDD
SPD
AWB
LMG
WATER MAIN PLAN - 3
M
AT
C H
L
IN
E
TO
S H
EE
T
C 1.
M
AT
C H
L
IN
E
TO
L O
W
ER
R
IG
H T
M
AT
CH
L
IN
E
TO
S
HE
ET
C 2.
M
AT
C H
L
IN
E
TO
A
BO
VE
L
EF
T
C1.2
PLAN VIEW
SCALE: 1' = 20'
E
E
E
E
E
E
E
E
3 - 8" GATE
VALVE(TYP.)
2 - 8" X 8"
TEE(TYP.)
HOT BOX ENCLOSURE (WITH
METER & BACKFLOW
PREVENTER) SEE DETAIL
SHEET M2.0
FIRE
HYDRANT
ASSEMBLY
29+04
25+00 26+00 27+00 28+00
29+00
SEE UTILITY OFFSET
FOR DETAIL
8" DOUBLE CEMENT
LINED DI WATER MAIN
CONTRACTOR TO CONNECT 50 AMP
FEEDER FROM 120/203v PANEL
LOCATED INSIDE BUILDING
INSTALL INLET
PROTECTION
INSTALL INLET
PROTECTION
INSTALL INLET
PROTECTION
INSTALL INLET
PROTECTION ECUT AND CAP
EXISTING
WATER MAIN
DECOMMISSION
WATER SUPPLY WELL
CUT AND CAP
EXISTING WATER MAIN
DECOMMISSION
WATER SUPPLY WELL
CUT AND CAP
EXISTING WATER MAIN
12,000-GALLON UNDERGROUND
STORAGE TANK TO BE FILLED
WITH GRAVEL BORROW AND
ABANDONED IN PLACE
RING PUMP STATION TO BE DEMOLISHED
SEE SHEET M2.0
DECOMMISSION
WATER SUPPLY WELL
CUT AND CAP EXISTING
WATER MAIN
CUT AND CAP EXISTING
WELL SUPPLY
REMOVE AND DISPOSE OF HATCH
RING PUMP STATION VAULT TO BE
ABANDONED IN PLACE, SEE SHEET M2.0
CONNECT TO EXISTING WATER MAIN WITH 8" X
8" TEE, 8" X 4" REDUCER, 4" GATE VALVES AND
TRANSITION COUPLINGS (TYP.)
CONTRACTOR TO PERFORM TEST PIT TO VERIFY
LOCATION OF EXISTING MAIN
29+04
29+00
8" GATE VALVE
SEE UTILITY
OFFSET FOR DETAIL
INSTALL INLET
PROTECTION
REVISIONS:
PROJECT NO.:
APPROVED BY:
DRAWN BY:
DESIGNED BY:
CHECKED BY:
SCALE:
DATE:
DRAWING NO.:
SHEET NO.
DRAWING TITLE:
OF
1"
SCALE ADJUSTMENT GUIDE
0"
ORIGINAL DRAWING
BAR IS ONE INCH ON
Z:
\J
O
BS
\2
Jo bs
\2
.0
R
IN
G
-N ew
W at er S up pl y- R
I\D W
G S\
G
EN
ER
AL
P
LA
N .d w g
K C
W A
W at er C on ne ct io n
Pu m p St at io n R
I N at io na l G ua rd C ov en try , R ho de
Is la nd
25066.00
JULY 2025
AS NOTED
KS/MDD
SPD
AWB
LMG
RING UTILITY SITE PLAN
C2.0
UTILITY PLAN
SCALE: 1' = 40'
PUMP STATION & WELL #3
SCALE: 1' = 10'
WELL #1
SCALE: 1' = 10'
WELL # 2
SCALE: 1' = 10'
KCWA WATER CONNECTION
SCALE: 1' = 10'
M
AT
C H
L
IN
E
TO
S H
EE
T
C 1.
KCWA WATER CONNECTION
PUMP STATION & WELL #3
WELL #1
WELL #2
NOTES:
1. THE DRILLED DEPTH OF WELL #3 (WL003) IS NOT IDENTIFIED,
CONTRACTOR TO FIELD VERIFY.
2. DRILLED WELL #4 (WL004) WAS ABANDONED IN OCTOBER 2024.
RHODE ISLAND NATIONAL GUARD WELL SYSTEM SUMMARY
WELL NAME
(PWS ID #)
WELL CASING
DIAMETER (IN.) WELL DEPTH (FT.) SUBMERSIBLE PUMP
DEPTH (FT.)
DRILLED WELL #1 (WL001) 8 -> 6 (TELESCOPIC) 550 300
DRILLED WELL #2 (WL002) 8 -> 6 (TELESCOPIC) 610 225
DRILLED WELL #3 (WL003) 6 -- (SEE NOTE 1) 310
X X X X X X X X
X X
XXXXXXXX
X X X X X X
X X X X X X X
UP
E
E
E
E
E
E
E
E E E E E E E E
E E
E
E
E
E
E
E
E
E
E
E
R E A D S
C H O O L H
O U S E R
O A D
WOODED
ELECTRIC METER
AP 66 LOT 17.2
N/F
KATHLEEN M. MCKINNEY
BENCHMARK
PUNCH MARK ON RIM
ELEV.=389.28
METAL BUILDING
CHAIN LINK FENCE
CHAIN LINK FENCE
CHAIN LINK FENCE
GATE
CONCRETE
METAL STRUCTURE
WOODED
WOODED
GRASS
GRAVEL ACCESS ROAD
DMH
RIM=391.2
HEADWALL
INV=382.8
12" RCP
TERMINUS UNKNOWN
AP 66 LOT 19
N/F
NIKOLAOS & PATRICE TSIGARIDAS
AP 74 LOT 20
N/F
KENT COUNTY WATER AUTHORITY
AP 74 LOT 18
N/F
W.F.P. ASSOCIATES, L.P.
100' DEED BOOK 84 PAGE 105
100'± DEED BOOK 1532 PAGE 298
STA 19+62.42, R 25.00'
IRON ROD
FOUND/HELD
GRANITE BOUND
FOUND/HELD
GRANITE BOUND
FOUND/HELD FOR LINE
0.16' SW OF LOT CORNER
GRANITE BOUND
FOUND
(SEE DETAIL)
.4
0.12'
50' WIDE
WATER & ACCESS EASEMENT
DEED BOOK 1143, PAGE 225
12" PVC (PER RECORD)
APPROXIMATE LOCATION
OF DMH PER RECORD
(NOT VISUALLY OBSERVED)
DMH
RIM=400.6
#220
SINGLE STORY
WOOD FRAME DWELLING
APPROXIMATE LOCATION
OF VAULT PER RECORD
(NOT VISUALLY OBSERVED)
S T A T E H
IG
H W A Y L
IN
E
" C
L D I
12" AC (ABANDONED)
8" BLUE BRUTE (ABANDONED)
12" PVC (PER RECORD)
12" PVC (PER RECORD)
" P
V C (P
E R R
E C O R D
E D G E O
F P
A V E M E N T
10.8'
.5
(M)
METAL BUILDING
W W W W W W W W W W W W W W W W W W W
W
W
W W W W W W W W W W W W W W W W W W
W
W W
W W
W W
W W
W W
W W
W W
" C
L D I
" C
L D I
" P
V C
8" x 8" TAPPING
SLEEVE & VALVE
10" x 8" TEE & VALVE
10" PUMP STATION DISCHARGE
12" PUMP STATION
SUCTION
MAINTENANCE
HYDRANT ASSEMBLY
EXISTING WALKER
RIDGE PUMP STATION
6' HIGH CHAIN LINK FENCE WITH 6'
WIDE DOUBLE DOOR ENTRANCE GATE
12" GATE VALVE
10" GATE VALVE
35'
12" DI
10" x 10" TAPPING SLEEVE & VALVE
12" SUCTION
WASHINGTON OAK
SCHOOL
8" SUCTION
WALKER RIDGE
8" DISCHARGE
WALKER RIDGE
APPROXIMATE BORING LOCATION.
BORINGS WERE COMPLETED BY GEOLOGIC, INC.
ON MAY 5, 2025. BORINGS WERE OBSERVED BY
PARE CORPORATION PERSONNEL.
CONTRACTOR TO PERFORM TEST PIT TO VERIFY
CONFIGURATION AND LOCATION OF EXISTING MAIN
CONNECT TO EXISTING WATER
MAIN WITH SOLID SLEEVE
COUPLING
SEV
SEV
SEV
SEV
SEV
12" TEE & 12"
GATE VALVE12" GATE VALVE
R E A D S
C H O O L H
O U S E R
O A D
AREA SUBJECT TO STORM FLOWAGE
RIDEM 75' BUFFER ZONE
RIDEM JURISDICTIONAL AREA
FIELD VERIFIED
WETLAND EDGE
EXISTING WASHINGTON OAK
SCHOOL PUMP STATION10" DISCHARGE
WASHINGTON OAK
SCHOOL
CONCRETE WALKWAY
3' WIDE
GATE
PROPOSED NEW 13' x 35'
PREFABRICATED PUMP
STATION FLUSH WITH 6"
CONCRETE PAD
DIESEL EMERGENCY/
BACKUP GENERATOR
REVISIONS:
PROJECT NO.:
APPROVED BY:
DRAWN BY:
DESIGNED BY:
CHECKED BY:
SCALE:
DATE:
DRAWING NO.:
SHEET NO.
DRAWING TITLE:
OF
1"
SCALE ADJUSTMENT GUIDE
0"
ORIGINAL DRAWING
BAR IS ONE INCH ON
Z:
\J
O
BS
\2
Jo bs
\2
.0
R
IN
G
-N ew
W at er S up pl y- R
I\D W
G S\
G
EN
ER
AL
P
LA
N .d w g
K C
W A
W at er C on ne ct io n
Pu m p St at io n R
I N at io na l G ua rd C ov en try , R ho de
Is la nd
25066.00
JULY 2025
AS NOTED
KS/MDD
SPD
AWB
LMG
0 10' 20' 40'
Scale: 1"=20'
PUMP STATION UTILITY
SITE PLAN
C3.0
WATER
FLOW
AREA TO BE
PROTECTED
WORK
AREA
AREA TO BE
PROTECTEDWORK AREA
NOTES:
1. COMPOST/ SOIL/ ROCK/ SEED FILL TO MEET APPLICATION REQUIREMENTS.
2. COMPOST MATERIAL TO BE REMOVED OR DISPERSED ON SITE AS DETERMINED BY
ENGINEER.
3. IF SOCK NETTING MUST BE JOINED, FIT BEGINNING OF NEW SOCK OVER END OF OLD
SOCK, OVERLAPPING BY 2 FEET AND STACK OVERLAP. IF SOCK NETTING IS NOT
JOINED, OVERLAP OLD SOCK WITH NEW ONE BY MINIMUM OF 2 FEET.
COMPOST FILTER SOCK DETAIL
NOT TO SCALE
COMPOST
SILTSOCK
STAKE ON 10'
LINEAL
SPACING 2"x2" WOODEN STAKE
COMPOST FILTER
SOCK (12"
MINIMUM)
3" -4
1' -0
3/4" CHAMFER (TYP)
#4 @ 12" O.C (BOTH WAYS)
COMPACTED SAND
GRAVEL FILL
95% COMPACTED
SUBGRADE
SEE PLANS FOR DIMENSIONS
M
IN
8"
(TYP)
4,000 PSI CEMENT
CONCRETE
6"
1. REINFORCING TO BE #4 GRADE 60 BARS AND SHALL CONFORM TO ASTM STANDARD
A-615 OF THE LATEST DATA. REINFORCING RODS TO BE LOCATED IN THE CENTER OF
THE SLAB, WITH A MINIMUM OF 2" CLEARANCE FROM FACE OF CONCRETE.
2. CONTRACTOR SHALL COORDINATE LOCATIONS OF OPENINGS, FENCE POSTS, OR
OTHER FEATURES IN SLAB.
NOTES:
CEMENT CONCRETE PAD
NOT TO SCALE
6" M
IN
REVEAL VARIES,
REFER TO PLANS
TRENCH
AREA
12" GRAVEL BORROW
SUBBASE.
LIMITS OF EXCAVATION
(WIDTH VARIES)
NOTES:
1. RATE OF SLOPE TO MATCH EXISTING TOWARDS EDGE OF PAVEMENT.
2. CONTRACTOR TO COORDINATE IN THE FIELD WITH THE ENGINEER FOR ALL DRIVEWAY
TRANSITIONS.
3. PAVEMENT THICKNESS TO MATCH EXISTING CONDITIONS.
4. TWO 2" LIFTS OF CLASS 19 HMA TO BE INSTALLED AT THE END OF EACH WEEK WITHIN
THE LIMITS OF EXCAVATION. THE TRENCH AREA SHALL BE LEFT 1-1/2" BELOW FINISHED
GRADE.
5. THE INITIAL TRENCH PAVEMENT SHALL REMAIN IN PLACE FOR 45-90 CALENDAR DAYS
PRIOR TO CURB-TO-CURB MILL AND OVERLAY.
6. FULL WIDTH (CURB TO CURB) MILL AND OVERLAY REQUIRED WITHIN READ SCHOOL
HOUSE ROAD TOWN RIGHT-OF WAY. 8-FOOT WIDTH MILL AND OVERLAY REQUIRED
WITHIN NIKE ROAD.
PAVEMENT RESTORATION DETAIL
NOT TO SCALE
4-INCH THICK CLASS 19
HMA PAVEMENT PLACED IN
2 COURSES
SAWCUT EXISTING PAVEMENT (TYP.)
EXISTING PAVEMENT
UNDISTURBED MATERIAL
BACKFILL COMPACTED TO
95% IN 12" LOOSE LIFTS
TYPE SS-1 EMULSION
(TACK COAT) (TYP.)
EXISTING CURB
EXISTING SIDEWALK
1-1/2" MILL AND OVERLAY WITH
CLASS 12.5 HMA (SEE NOTES
FOR REQUIRED WIDTH)
REVISIONS:
PROJECT NO.:
APPROVED BY:
DRAWN BY:
DESIGNED BY:
CHECKED BY:
SCALE:
DATE:
DRAWING NO.:
SHEET NO.
DRAWING TITLE:
OF
1"
SCALE ADJUSTMENT GUIDE
0"
ORIGINAL DRAWING
BAR IS ONE INCH ON
Z:
\J
O
BS
\2
Jo bs
\2
.0
R
IN
G
-N ew
W at er S up pl y- R
I\D W
G S\
D
ET
AI
LS
.d w g
K C
W A
W at er C on ne ct io n
Pu m p St at io n R
I N at io na l G ua rd C ov en try , R ho de
Is la nd
25066.00
JULY 2025
AS NOTED
KS/MDD
SPD
AWB
LMG
CIVIL DETAILS - 1
C4.0
REVISIONS:
PROJECT NO.:
APPROVED BY:
DRAWN BY:
DESIGNED BY:
CHECKED BY:
SCALE:
DATE:
DRAWING NO.:
SHEET NO.
DRAWING TITLE:
OF
1"
SCALE ADJUSTMENT GUIDE
0"
ORIGINAL DRAWING
BAR IS ONE INCH ON
Z:
\J
O
BS
\2
Jo bs
\2
.0
R
IN
G
-N ew
W at er S up pl y- R
I\D W
G S\
D
ET
AI
LS
.d w g
K C
W A
W at er C on ne ct io n
Pu m p St at io n R
I N at io na l G ua rd C ov en try , R ho de
Is la nd
25066.00
JULY 2025
AS NOTED
KS/MDD
SPD
AWB
LMG
CIVIL DETAILS - 2
C4.1
VFDs
TELEMETRY CABINET
ALARM LIGHT
EXTERIOR LIGHT
6'-0" DOUBLE DOOR
CONTROL PANEL
LIGHTING PANEL
DISTRIBUTION PANEL
AND TRANSFORMER
MAIN DISCONNECT
AUTOMATIC
TRANSFER
SWITCH
HVAC
UNIT
DEHUMIDIFIER
8" MAGNETIC FLOW
METERCRANE RAIL W/HOIST
AND TROLLEY
8" SUCTION
HEADER
BUILDING EXTERIOR
PUMP
#5
8" SUCTION
HEADER
8" MAGNETIC FLOW
METER
500 GALLON
HYDROPNEUMATIC
TANK
8" DI PIPE8" DI PIPE
500 GALLON
HYDROPNEUMATIC
TANK
PUMP
#1
PUMP
#2
PUMP
#3
PUMP
#4
PUMP
#1
PUMP
#2
PUMP
#3
PUMP
#4
PUMP
#5
35'-0"
'-0
8" DISCHARGE
HEADER
PUMP STATION PROCESS
PIPING PLAN
PUMP STATION
INTERIOR PIPING
SECTION
SCALE: 1/2" = 1'0"
M1.0
REVISIONS:
PROJECT NO.:
APPROVED BY:
DRAWN BY:
DESIGNED BY:
CHECKED BY:
SCALE:
DATE:
DRAWING NO.:
SHEET NO.
DRAWING TITLE:
OF
1"
SCALE ADJUSTMENT GUIDE
0"
ORIGINAL DRAWING
BAR IS ONE INCH ON
Z:
\J
O
BS
\2
Jo bs
\2
.0
R
IN
G
-N ew
W at er S up pl y- R
I\D W
G S\
M
EC
H P
LA
N
.d w g
K C
W A
W at er C on ne ct io n
Pu m p St at io n R
I N at io na l G ua rd C ov en try , R ho de
Is la nd
25066.00
JULY 2025
AS NOTED
KS/MDD
SPD
AWB
LMG
PUMP SCHEDULE
DESCRIPTION FLOW, GPM TDH, FEET MOTOR, HP
PUMP #1 40 175 5
PUMP #2 65 175 7.5
PUMP #3 65 175 7.5
PUMP #4 65 175 7.5
PUMP #5 1,000 275 100.0
PUMP STATION
INTERIOR PIPING PLAN
SCALE: 1/2" = 1'0"
30"
(MIN.)
30"
(MIN.)
(M
IN
ELECTRICAL CONDUIT FOR HEATERS
ELECTRICAL CONDUIT FOR LIGHT
ELECTRICAL CONDUIT FOR 400W
SERVICE PANEL
36" HORIZONTAL SEPARATION OF
ELECTRICAL COMPONENTS TO
ADJACENT WALL PER NEC (TYP.)
LIFTING HANDLE (TYP.)
DRAIN PORT W/
STAINLESS
STEEL RODENT
SCREEN (TYP.)
INTERNAL
ANCHOR (TYP.)
1,500W, 120V, 1-PHASE HEATER (TYP. OF 4)LIGHT (TYP.)
8" WATTS MODEL 957 S/S
REDUCED PRESSURE ZONE
BACKFLOW ASSEMBLY WITH
OS&Y GATE VALVES ASSEMBLY.
WASTE TO DRAIN PORTS (TYP.
OF 2)
NEW 14'L x 9'W x 7.5'H
ALUMINUM ENCLOSURE
ENCLOSURE SEAM (TYP.)
NEPTUNE MACH 10
ULTRASONIC FLOW
METER
NEMA 4X ELECTRICAL SERVICE
CABINET (20"L x 9"W x 24"H)
DEHUMIDIFIER (TYP.)
HESSAIRE MODEL 10SF-TH OR
APPROVED EQUIVALENT, 120 V/1 PH
SHUTTER MOUNTED FAN, 650 CFM
WITH THERMOSTAT CONTROL
30"
(MIN.)
49 34"20"23 34"
30"
(MIN.)
8" OS&Y GATE VALVE (TYP.)
PROVIDE MIN. 6" BETWEEN CEILING
AND FULLY OPEN OS&Y VALVE
8" TEE FOR BYPASS LINE
1.5" THICK
INSULATION
12" SPOOL PIECE WITH 2" TEST
PORT, PER MANUFACTURER'S
RECOMMENDATION
CONCRETE PAD (TYP.)
PROVIDE CORROSION-RESISTANT STEEL PIPE
SUPPORTS W/ 1 SF, 1/4"-THICK STEEL PLATE AT
CONCRETE TO DISTRIBUTE LOAD. SUPPORTS SHALL
BE STANDON MODEL C92 ADJUSTABLE SADDLE
CLAMP SUPPORT OR APPROVED EQUIVALENT (TYP.)
4" SUPPLY LINE FROM
STORAGE TANK
TO DISTRIBUTION
CHEMICAL FEED TUBING
FROM CHEMICAL
METERING PUMPS
CONCRETE VAULT
TO BE FILLED WITH
GRAVEL BORROW
CONTRACTOR TO
REMOVE & DISPOSE
ALL INTERIOR
EQUIPMENT
INCLUDING PUMPS,
TANKS, TUBING,
HVAC, ,
INSTRUMENTATION,
HATCH,
ELECTRICAL, ETC.
CHEMICAL FEED TUBING
CHEMICAL DAY TANK
CHEMICAL FEED PUMP
CONTAINMENT
PALLET
CHEMICAL MIXER
RING PUMP
STATION VAULT
(BELOW GRADE)
CONTRACTOR TO REMOVE &
DISPOSE OF STRUCTURE
INCLUDING BUT NOT LIMITED TO,
CONCRETE BLOCKS, WALLS,
DOORS, AND ROOF
CHEMICAL FEED TUBING
CHEMICAL DAY TANK
CHEMICAL FEED PUMP
CONTAINMENT PALLET
CHEMICAL MIXER
MECHANICAL DETAILS &
DEMOLITION PLAN
HOTBOX ENCLOSURE
SCALE: NOT TO SCALE
M2.0
REVISIONS:
PROJECT NO.:
APPROVED BY:
DRAWN BY:
DESIGNED BY:
CHECKED BY:
SCALE:
DATE:
DRAWING NO.:
SHEET NO.
DRAWING TITLE:
OF
1"
SCALE ADJUSTMENT GUIDE
0"
ORIGINAL DRAWING
BAR IS ONE INCH ON
Z:
\J
O
BS
\2
Jo bs
\2
.0
R
IN
G
-N ew
W at er S up pl y- R
I\D W
G S\
M
EC
H P
LA
N
.d w g
K C
W A
W at er C on ne ct io n
Pu m p St at io n R
I N at io na l G ua rd C ov en try , R ho de
Is la nd
25066.00
JULY 2025
AS NOTED
KS/MDD
SPD
AWB
LMG
PLAN
SECTION A-A
RING PUMP STATION VAULT DEMOLITION PLAN
SCALE: NOT TO SCALE
RING PUMP STATION BUILDING DEMOLITION PLAN
SCALE: NOT TO SCALE
GENERAL NOTESELECTRICAL SYMBOLS ELECTRICAL SYMBOLS
SECURITY SYSTEM SYMBOLS
ABBREVIATIONS
REVISIONS:
PROJECT NO.:
APPROVED BY:
DRAWN BY:
DESIGNED BY:
CHECKED BY:
SCALE:
DATE:
DRAWING NO.:
SHEET NO.
DRAWING TITLE:
OF
1"
SCALE ADJUSTMENT GUIDE
0"
ORIGINAL DRAWING
BAR IS ONE INCH ON
W :\Y ea r -
5\
7.
R
IN
G N ew W at er
S up pl y
Bo os te r S ta tio n\ El ec tri ca l D ep ar tm en t\2
.0
El ec tri ca l P la ns
.d w g
K C
W A
W at er C on ne ct io n
Pu m p St at io n R
I N at io na l G ua rd C ov en try , R ho de
Is la nd
25066.00
JUNE 2025
AS NOTED
MC
MC
RB
MC
ENGINEERING, INC.
Mechanical/Electrical Engineers 150 Grossman Drive, Suite 309 Braintree, Massachusetts 02184 617-221-9220 web: www.sar.com
ELECTRICAL
LEGEND AND NOTES
E1.0 12 16
PUMP STATION ONE LINE DIAGRAM
NOT TO SCALE
HOT BOX ONE LINE DIAGRAM
NOT TO SCALE
REVISIONS:
PROJECT NO.:
APPROVED BY:
DRAWN BY:
DESIGNED BY:
CHECKED BY:
SCALE:
DATE:
DRAWING NO.:
SHEET NO.
DRAWING TITLE:
OF
1"
SCALE ADJUSTMENT GUIDE
0"
ORIGINAL DRAWING
BAR IS ONE INCH ON
W :\Y ea r -
5\
7.
R
IN
G N ew W at er
S up pl y
Bo os te r S ta tio n\ El ec tri ca l D ep ar tm en t\2
.0
El ec tri ca l P la ns
.d w g
K C
W A
W at er C on ne ct io n
Pu m p St at io n R
I N at io na l G ua rd C ov en try , R ho de
Is la nd
25066.00
JUNE 2025
AS NOTED
MC
MC
RB
MC
ENGINEERING, INC.
Mechanical/Electrical Engineers 150 Grossman Drive, Suite 309 Braintree, Massachusetts 02184 617-221-9220 web: www.sar.com
ELECTRICAL
ONE LINE DIAGRAMS
E1.1 13 16
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
REVISIONS:
PROJECT NO.:
APPROVED BY:
DRAWN BY:
DESIGNED BY:
CHECKED BY:
SCALE:
DATE:
DRAWING NO.:
SHEET NO.
DRAWING TITLE:
OF
1"
SCALE ADJUSTMENT GUIDE
0"
ORIGINAL DRAWING
BAR IS ONE INCH ON
W :\Y ea r -
5\
7.
R
IN
G N ew W at er
S up pl y
Bo os te r S ta tio n\ El ec tri ca l D ep ar tm en t\2
.0
El ec tri ca l P la ns
.d w g
K C
W A
W at er C on ne ct io n
Pu m p St at io n R
I N at io na l G ua rd C ov en try , R ho de
Is la nd
25066.00
JUNE 2025
AS NOTED
MC
MC
RB
MC
ENGINEERING, INC.
Mechanical/Electrical Engineers 150 Grossman Drive, Suite 309 Braintree, Massachusetts 02184 617-221-9220 web: www.sar.com
ELECTRICAL
SITE PLANS
E1.2
PUMP STATION SITE PLAN
SCALE: 1" = 10'
HOT BOX SITE PLAN
SCALE: 1" = 5'
14 16
REVISIONS:
PROJECT NO.:
APPROVED BY:
DRAWN BY:
DESIGNED BY:
CHECKED BY:
SCALE:
DATE:
DRAWING NO.:
SHEET NO.
DRAWING TITLE:
OF
1"
SCALE ADJUSTMENT GUIDE
0"
ORIGINAL DRAWING
BAR IS ONE INCH ON
W :\Y ea r -
5\
7.
R
IN
G N ew W at er
S up pl y
Bo os te r S ta tio n\ El ec tri ca l D ep ar tm en t\2
.0
El ec tri ca l P la ns
.d w g
K C
W A
W at er C on ne ct io n
Pu m p St at io n R
I N at io na l G ua rd C ov en try , R ho de
Is la nd
25066.00
JUNE 2025
AS NOTED
MC
MC
RB
MC
ENGINEERING, INC.
Mechanical/Electrical Engineers 150 Grossman Drive, Suite 309 Braintree, Massachusetts 02184 617-221-9220 web: www.sar.com
ELECTRICAL
PLANS
E1.3
PUMP STATION PLAN
SCALE: 1/4" = 1'
HOT BOX PLAN
SCALE: 1/4" = 1'
15 16
POWER CABLE/CONDUIT SCHEDULE
NO SCALE
DUCTBANK SECTIONS
DUCT / CABLE SCHEDULE
SECTION B-BSECTION A-A
PANEL SCHEDULE
LIGHTING FIXTURE SCHEDULE
SECTION C-C
NOT TO SCALE
RISER DETAIL
UTILITY POLE SERVICE
REVISIONS:
PROJECT NO.:
APPROVED BY:
DRAWN BY:
DESIGNED BY:
CHECKED BY:
SCALE:
DATE:
DRAWING NO.:
SHEET NO.
DRAWING TITLE:
OF
1"
SCALE ADJUSTMENT GUIDE
0"
ORIGINAL DRAWING
BAR IS ONE INCH ON
W :\Y ea r -
5\
7.
R
IN
G N ew W at er
S up pl y
Bo os te r S ta tio n\ El ec tri ca l D ep ar tm en t\2
.0
El ec tri ca l P la ns
.d w g
K C
W A
W at er C on ne ct io n
Pu m p St at io n R
I N at io na l G ua rd C ov en try , R ho de
Is la nd
25066.00
JUNE 2025
AS NOTED
MC
MC
RB
MC
ENGINEERING, INC.
Mechanical/Electrical Engineers 150 Grossman Drive, Suite 309 Braintree, Massachusetts 02184 617-221-9220 web: www.sar.com
ELECTRICAL
SCHEDULES AND
DETAILS
E1.1 16 16
E1.4
| 1 COVER SHEET |
| 2 NOTES & LEGEND |
| 3 WATER MAIN PLAN - 1 |
| 4 WATER MAIN PLAN - 2 |
| 5 WATER MAIN PLAN - 3 |
| 6 RING UTILITY SITE PLAN |
| 7 PUMP STATION UTILITY SITE PLAN |
| 8 CIVIL DETAILS - 1 |
| 9 CIVIL DETAILS - 2 |
| 10 PUMP STATION PROCESS PIPING PLAN |
| 11 MECHANICAL DETAILS & DEMOLITION PLAN |
| 12-16 ELECTRICAL DRAWINGS |