This is a Request for Quote (RFQ) W912DY-25-Q-2028 issued by the U.S. Army Corps of Engineers Huntsville Engineering and Support Center for appliances to be used in Unaccompanied Housing (UH) Multi Installations across various military bases. The solicitation covers procurement of appliances including refrigerators, freezers, microwaves, electric and gas ranges, washing machines, and dryers for locations in the United States, Japan, Italy, and Germany, with specific requirements for each installation.
The RFQ is a full and open competition for business sizes, with NAICS code 335220. Quotes are due by 27 August 2025 at 8:00 AM CST, with pricing valid for 120 days. The contract will be firm-fixed price, with furniture installation scheduled between 30 January and 24 April 2026. Contractors must be registered in the System of Award Management (SAM) with no exclusions. The government will evaluate quotes based on price, past performance, technical capability, and schedule, with the goal of selecting the quote that provides the best value and is technically acceptable at the lowest total price.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Air Force UH Multi Installations - Appliances
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested at this time.
The requirement is to procure appliances that will be used in UH Multi Installations. The combined synopsis/solicitation/Request for Quote (RFQ) number is W912DY-25-Q-2028. This number shall be referenced by contractors on their quotes and related correspondence. This RFQ is full and open competition to all business sizes. The NAICS code is 335220. Contractors must be registered in the System of Award Management (SAM) with no exclusions in order to be considered for award. The website for SAM is: https://www.sam.gov/portal/public/SAM/.
Contractor is required to sign this document and return 1 copy to issuing office. Contractor agrees to furnish and deliver all items set forth or otherwise identified above and on any additional sheets subject to the terms and conditions specified.
Signature of offeror/contractor: ______________________________
Name and Title of Signer: ______________________________
Questions regarding this RFQ are due no later than 19 Aug 2025, 8:00AM (CST) and sent via email to salednika.i.mckenzie@usace.army.mil.
Quotes are due no later than 27 August 2025, 8:00AM (CST) and sent via email to salednika.i.mckenzie@usace.army.mil and CEHNC-FurnitureQuotes@usace.army.mil.
***Pricing shall be valid for 120 days***
Freight On Board (FOB): Destination Furniture Installation Start Date (FISD): No earlier than 30 Jan 2026 Furniture Installation Completion Date (FICD): No later than 24 April 2026 Furniture Install Location: Refer to Table 1 in Attachment #3 Contract Type: Firm-fixed price (FFP) subject to availability of funds.
The following attachments are included in this RFQ:
(1) Attachment 1, Line Item Pricing Spreadsheet (Excel Format) – To be completed by contractor and returned to the Government POC listed.
(2) Attachment 2 – Furniture Item Description (FID)
(3) Attachment 3 – Statement of Work (ISOW)
(4) Attachment 3 – Statement of Work (OSOW)
(5) Attachment 3 – Statement of Work (RSOW)
(6) Attachment 4 – Order Clause
(7) Attachment 4 – Supplementary Clauses
(8) Attachment 4 – Italy Specific Clauses
(9) Attachment 4 – Japan Clauses with Deviation
(10) Attachment 4 – Korea Specific Clauses
(11) Attachment 5 – Contractor Performance Evaluation
(12) Attachment 6 – Accident Prevention Plan
(13) Attachment 7 – Technical Document Checklist - To be completed by contractor and returned to the Government POC listed.
The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The successful contractor will be the one whose quote is rated acceptable on technical, schedule and past performance, and provides the best value to the Government. Best value will be determined by the quote that is technically acceptable and has the lowest total price. The following factors shall be used to evaluate offers:
(1) Price;
(2) Past Performance;
(3) Technical capability of the item(s) offered to meet the Government requirement;
(4) Schedule
Amendments to this RFQ will be provided in the same manner as the initial RFQ, which is by public notice on https://sam.gov/.
The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2024-07, effective 30 September 2024. Full text versions of clauses can be found at http://farsite.hill.af.mil/. The following provisions and clauses apply to this acquisition.
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lot
Furnishings:Ansbach, Bldg. 6624
FFP
The contractor shall provide furnishings in support of the Huntsville Center Centrally Managed Furnishings Program for Ansbach, Bldg. 6624, in accordance with the attached Line Items, Item Descriptions and Statement of Work.
****Please submit quotes valid for 120 days.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
PSC CD: 7195
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1 Lot
Furnishings:Benelux,WH 06
FFP
The contractor shall provide furnishings in support of the Huntsville Center Centrally Managed Furnishings Program for Benelux, Bldg. WH 06, in accordance with the attached Line Items, Item Descriptions and Statement of Work.
****Please submit quotes valid for 120 days.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
PSC CD: 7195
NET AMT
0003 1 Lot
Furnishings:Camp Humphreys, Bldg.900
FFP
The contractor shall provide furnishings in support of the Huntsville Center Centrally Managed Furnishings Program for Camp Humphreys, Bldg. 900, in accordance with the attached Line Items, Item Descriptions and Statement of Work.
****Please submit quotes valid for 120 days.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
PSC CD: 7195
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0004 1 Lot
Furnishings:Camp Zama, Bldg.742
FFP
The contractor shall provide furnishings in support of the Huntsville Center Centrally Managed Furnishings Program for Camp Zama, Bldg. 742, in accordance with the attached Line Items, Item Descriptions and Statement of Work.
****Please submit quotes valid for 120 days.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
0005 1 Lot
Furnishings:Camp Zama, Bldg.762
FFP
The contractor shall provide furnishings in support of the Huntsville Center Centrally Managed Furnishings Program for Camp Zama, Bldg. 762, in accordance with the attached Line Items, Item Descriptions and Statement of Work.
****Please submit quotes valid for 120 days.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
PSC CD: 7195
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0006 1 Lot
Furnishings:Camp Zama, Bldg.763
FFP
The contractor shall provide furnishings in support of the Huntsville Center Centrally Managed Furnishings Program for Camp Zama, Bldg. 763, in accordance with the attached Line Items, Item Descriptions and Statement of Work.
****Please submit quotes valid for 120 days.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
0007 1 Lot
Furnishings: Wainwright,Bldg. 1063
FFP
The contractor shall provide furnishings in support of the Huntsville Center Centrally Managed Furnishings Program for Wainwright, Bldg. 1063, in accordance with the attached Line Items, Item Descriptions and Statement of Work.
****Please submit quotes valid for 120 days.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
PSC CD: 7195
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0008 1 Lot
Furnishings: Wainwright,Bldg. 4056
FFP
The contractor shall provide furnishings in support of the Huntsville Center Centrally Managed Furnishings Program for Wainwright, Bldg. 4056 in accordance with the attached Line Items, Item Descriptions and Statement of Work.
****Please submit quotes valid for 120 days.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
0009 1 Lot
Furnishings: Wainwright,Bldg. 4063
FFP
The contractor shall provide furnishings in support of the Huntsville Center Centrally Managed Furnishings Program for Wainwright, Bldg. 4063 in accordance with the attached Line Items, Item Descriptions and Statement of Work.
****Please submit quotes valid for 120 days.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
PSC CD: 7195
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0010 1 Lot
Furnishings: Wainwright,Bldg. 4064
FFP
The contractor shall provide furnishings in support of the Huntsville Center Centrally Managed Furnishings Program for Wainwright, Bldg. 4064 in accordance with the attached Line Items, Item Descriptions and Statement of Work.
****Please submit quotes valid for 120 days.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
0011 1 Lot
Furnishings:Ft. Belvoir, Bldg. 1261
FFP
The contractor shall provide furnishings in support of the Huntsville Center Centrally Managed Furnishings Program for Ft. Belvoir, Bldg. 1261 in accordance with the attached Line Items, Item Descriptions and Statement of Work.
****Please submit quotes valid for 120 days.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
PSC CD: 7195
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0012 1 Lot
Furnishings:Ft. Belvoir, Bldg. 1262
FFP
The contractor shall provide furnishings in support of the Huntsville Center Centrally Managed Furnishings Program for Ft. Belvoir, Bldg. 1262 in accordance with the attached Line Items, Item Descriptions and Statement of Work.
****Please submit quotes valid for 120 days.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
0013 1 Lot
Furnishings:Ft. Drum, Bldg. T-1151
FFP
The contractor shall provide furnishings in support of the Huntsville Center Centrally Managed Furnishings Program for Ft. Drum, Bldg. T-1151 in accordance with the attached Line Items, Item Descriptions and Statement of Work.
****Please submit quotes valid for 120 days.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
PSC CD: 7195
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0014 1 Lot
Furnishings:Ft. Wainwright, WH 3566
FFP
The contractor shall provide furnishings in support of the Huntsville Center Centrally Managed Furnishings Program for Ft. Wainwright, Bldg. WH 3566 in accordance with the attached Line Items, Item Descriptions and Statement of Work.
****Please submit quotes valid for 120 days.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
0015 1 Lot
Furnishings:Ft. Campbell (FTCKY) WH 61
FFP
The contractor shall provide furnishings in support of the Huntsville Center Centrally Managed Furnishings Program for Ft. Campbell (FTCKY), Bldg. WH 61 in accordance with the attached Line Items, Item Descriptions and Statement of Work.
****Please submit quotes valid for 120 days.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
PSC CD: 7195
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0016 1 Lot
Furnishings:JBLM, Bldg. 9176
FFP
The contractor shall provide furnishings in support of the Huntsville Center Centrally Managed Furnishings Program for Joint Base Lewis McChord (JBLM), Bldg. 9176 in accordance with the attached Line Items, Item Descriptions and Statement of Work.
****Please submit quotes valid for 120 days.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
0017 1 Lot
Furnishings:Rheinland PFalz, Bldg. 8506
FFP
The contractor shall provide furnishings in support of the Huntsville Center Centrally Managed Furnishings Program for Rheinland Pfalz, Bldg. 8506 in accordance with the attached Line Items, Item Descriptions and Statement of Work.
****Please submit quotes valid for 120 days.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
PSC CD: 7195
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0018 1 Lot
Furnishings:Rheinland PFalz, Bldg. 8653
FFP
The contractor shall provide furnishings in support of the Huntsville Center Centrally Managed Furnishings Program for Rheinland Pfalz, Bldg. 8653 in accordance with the attached Line Items, Item Descriptions and Statement of Work.
****Please submit quotes valid for 120 days.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
0019 1 Lot
Furnishings:Stuttgart, Bldg. 196
FFP
The contractor shall provide furnishings in support of the Huntsville Center Centrally Managed Furnishings Program for Stuggart, Bldg. 196 in accordance with the attached Line Items, Item Descriptions and Statement of Work.
****Please submit quotes valid for 120 days.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
PSC CD: 7195
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0020 1 Lot
Furnishings:Vicenza, Bldg 9A9B
FFP
The contractor shall provide furnishings in support of the Huntsville Center Centrally Managed Furnishings Program for Vicenza, Bldg. 9A9B in accordance with the attached Line Items, Item Descriptions and Statement of Work.
****Please submit quotes valid for 120 days.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
0021 1 Lot
Furnishings:Vicenza, Bldg 100
FFP
The contractor shall provide furnishings in support of the Huntsville Center Centrally Managed Furnishings Program for Vicenza, Bldg. 100 in accordance with the attached Line Items, Item Descriptions and Statement of Work.
****Please submit quotes valid for 120 days.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
PSC CD: 7195
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0022 1 Lot
Furnishings:Vicenza, Bldg 101
FFP
The contractor shall provide furnishings in support of the Huntsville Center Centrally Managed Furnishings Program for Vicenza, Bldg. 101 in accordance with the attached Line Items, Item Descriptions and Statement of Work.
****Please submit quotes valid for 120 days.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
0023 1 Lot
Furnishings:Vicenza, Bldg 104
FFP
The contractor shall provide furnishings in support of the Huntsville Center Centrally Managed Furnishings Program for Vicenza, Bldg. 104 in accordance with the attached Line Items, Item Descriptions and Statement of Work.
****Please submit quotes valid for 120 days.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
PSC CD: 7195
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0024 1 Lot
Furnishings:Vicenza, Bldg 105
FFP
The contractor shall provide furnishings in support of the Huntsville Center Centrally Managed Furnishings Program for Vicenza, Bldg. 105 in accordance with the attached Line Items, Item Descriptions and Statement of Work.
****Please submit quotes valid for 120 days.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
0025 1 Lot
Furnishings:Vicenza, Bldg 170
FFP
The contractor shall provide furnishings in support of the Huntsville Center Centrally Managed Furnishings Program for Vicenza, Bldg. 170 in accordance with the attached Line Items, Item Descriptions and Statement of Work.
****Please submit quotes valid for 120 days.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
PSC CD: 7195
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0026 1 Lot
Furnishings:Vicenza, Bldg 173
FFP
The contractor shall provide furnishings in support of the Huntsville Center Centrally Managed Furnishings Program for Vicenza, Bldg. 173 in accordance with the attached Line Items, Item Descriptions and Statement of Work.
****Please submit quotes valid for 120 days.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
0027 1 Lot
Furnishings:Yongsan-Casey WH
FFP
The contractor shall provide furnishings in support of the Huntsville Center Centrally Managed Furnishings Program for Yongsan-Casey, WH in accordance with the attached Line Items, Item Descriptions and Statement of Work.
****Please submit quotes valid for 120 days.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
PSC CD: 7195
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0028 6 Months OPTION CONUS Storage: Ansbach, Bldg. 6624
FFP
***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.
Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates."
FOB: Destination
PSC CD: S215
0029 6 Months OPTION CONUS Storage: Benelux, Bldg. WH 06
FFP
***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.
Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates."
FOB: Destination
PSC CD: S215
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0030 6 Months OPTION CONUS Storage: Camp Humphreys, Bldg. 900
FFP
***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.
Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates."
FOB: Destination
0031 6 Months OPTION CONUS Storage: Camp Zama, Bldg. 742
FFP
***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.
Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates."
FOB: Destination
0032 6 Months OPTION CONUS Storage: Camp Zama, Bldg. 762
FFP
***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.
Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates."
FOB: Destination
PSC CD: S215
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0033 6 Months OPTION CONUS Storage: Camp Zama, Bldg. 763
FFP
***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.
Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates."
FOB: Destination
0034 6 Months OPTION CONUS Storage: Fort Wainwright,Bldg.1063
FFP
***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.
Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates."
FOB: Destination
0035 6 Months OPTION CONUS Storage: Fort Wainwright,Bldg.4056
FFP
***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.
Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates."
FOB: Destination
PSC CD: S215
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0036 6 Months OPTION CONUS Storage: Fort Wainwright,Bldg.4063
FFP
***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.
Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates."
FOB: Destination
0037 6 Months OPTION CONUS Storage:Fort Wainwright, Bldg.4064
FFP
***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.
Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates."
FOB: Destination
0038 6 Months OPTION CONUS Storage: Ft. Belvoir, Bldg. 1261
FFP
***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.
Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates."
FOB: Destination
PSC CD: S215
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0039 6 Months OPTION CONUS Storage: Ft. Belvoir, Bldg. 1262
FFP
***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.
Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates."
FOB: Destination
0040 6 Months OPTION CONUS Storage: Ft. Drum, Bldg. T-1151
FFP
***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.
Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates."
FOB: Destination
0041 6 Months OPTION CONUS Storage:Ft. Wainwright,Bldg.WH3566
FFP
***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.
Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates."
FOB: Destination
PSC CD: S215
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0042 6 Months OPTION CONUS Storage:Ft.Campbell(FTCKY) WH61
FFP
***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.
Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates."
FOB: Destination
0043 6 Months OPTION CONUS Storage:JBLM, Bldg. 9176
FFP
***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.
Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates."
FOB: Destination
0044 6 Months OPTION CONUS Storage:Rheinland Pfalz, Bldg.8506
FFP
***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.
Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates."
FOB: Destination
PSC CD: S215
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0045 6 Months OPTION CONUS Storage:Rheinland Pfalz,Bldg.8653
FFP
***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.
Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates."
FOB: Destination
0046 6 Months OPTION CONUS Storage:Stuggart,Bldg.196
FFP
***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.
Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates."
FOB: Destination
0047 6 Months OPTION CONUS Storage:Vicenza, Bldg. 9A9B
FFP
***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.
Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates."
FOB: Destination
PSC CD: S215
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0048 6 Months OPTION CONUS Storage:Vicenza, Bldg. 100
FFP
***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.
Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates."
FOB: Destination
0049 6 Months OPTION CONUS Storage:Vicenza, Bldg. 101
FFP
***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.
Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates."
FOB: Destination
0050 6 Months OPTION CONUS Storage:Vicenza, Bldg. 104
FFP
***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.
Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates."
FOB: Destination
PSC CD: S215
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0051 6 Months OPTION CONUS Storage:Vicenza, Bldg. 105
FFP
***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.
Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates."
FOB: Destination
0052 6 Months OPTION CONUS Storage:Vicenza,Bldg.170
FFP
***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.
Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates."
FOB: Destination
0053 6 Months OPTION CONUS Storage:Vicenza,Bldg.173
FFP
***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.
Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates."
FOB: Destination
PSC CD: S215
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0054 6 Months OPTION CONUS Storage:Yongsan-Casey, WH
FFP
***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.
Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates."
FOB: Destination
0055 6 Months OPTION OCONUS Storage:Ansbach, Bldg. 6624
FFP
***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.
Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates."
FOB: Destination
0056 6 Months OPTION OCONUS Storage: Benelux, WH 06
FFP
***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.
Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates."
FOB: Destination
PSC CD: S215
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0057 6 Months OPTION OCONUS Storage:Camp Humphreys, Bldg.900
FFP
***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.
Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates."
FOB: Destination
0058 6 Months OPTION OCONUS Storage:Camp Zama, Bldg. 742
FFP
***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.
Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates."
FOB: Destination
0059 6 Months OPTION OCONUS Storage:Camp Zama, Bldg. 762
FFP
***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.
Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates."
FOB: Destination
PSC CD: S215
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0060 6 Months OPTION OCONUS Storage:Camp Zama, Bldg. 763
FFP
***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.
Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates."
FOB: Destination
0061 6 Months OPTION OCONUS Storage:Fort Wainwright,Bldg.1063
FFP
***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.
Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates."
FOB: Destination
0062 6 Months OPTION OCONUS Storage:Fort Wainwright,Bldg.4056
FFP
***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.
Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.).
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .