RFQ - W912DY-26-Q-A295 MC Multi Location - Rec Furniture w atts.pdf
PDF 3 MB Posted
- Solicitation number
- W912DY-26-Q-A295
About this file
This is a Request for Quote (RFQ) for the procurement and installation of recreational furniture at multiple Marine Corps installations. The solicitation number is W912DY-26-Q-A295, issued by the Department of the Army Corps of Engineers, Huntsville Center on July 10, 2026. Quotes are due by July 24, 2026 at 1:00 PM CST, with an estimated award date of September 11, 2026. This is a Women-Owned Small Business (WOSB) set-aside. The furniture installations must be completed between November 30, 2026 and December 18, 2026 across multiple locations including MCB Camp Pendleton (CA), MCB Yorktown (VA), MCB Hawaii (HI), MCAS Cherry Point (NC), Indian Head (MD), and MCAS Yuma (AZ). Contractors must provide all materials, labor, equipment, supervision, and management for delivery, removal of existing furniture, installation, and assembly. The RFQ requires quoters to provide pricing for all items in Excel format (Attachment #1), complete technical cut sheets demonstrating compliance with Furniture Item Description specifications, and a completed Technical Documents Checklist (Attachment #7). All quotes must be valid for 120 days and submitted via email to jessica.sizemore@usace.army.mil and CEHNC-FurnitureQuotes@usace.army.mil.
The recreational furniture items required include pool tables (two types), table tennis tables, foosball tables, 3-in-1 game tables, 3-in-1 game chairs, 4-way table tennis, and pool table accessories with specific stain finishes and fabric specifications varying by installation location. Pricing must include FOB Destination shipping, CONUS or OCONUS commercial shipping as applicable, installation labor, and six months of storage fees (quoted in two options—pre-CONUS departure and post-CONUS departure storage). Contractors are required to submit a Certification of Conformance for any items stored prior to installation and must coordinate with the Government Technical Representative at least 15 working days before shipping. The evaluation criteria prioritize technical acceptability (all items meet FID specifications), acceptable schedule compliance (installation dates November 30 to December 18, 2026), acceptable past performance, and lowest total evaluated price. Contractors must also comply with extensive safety requirements including submission of an Accident Prevention Plan, maintain an on-site Site Safety and Health Officer, provide monthly exposure hour reports, and adhere to all base security and access procedures. The Government intends to down-select a target of three quotes for detailed technical evaluation.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WOMEN-OWNED SMALL
BUSINESS (WOSB)
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NUMBER 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER 8. OFFER DUE DATE/
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NUMBER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
REQUEST
FOR QUOTE
(RFQ)
INVITATION
FOR BID
(IFB)
REQUEST
FOR
PROPOSAL
(RFP)
SEE ADDENDUM
19.
ITEM NUMBER
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH
AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND
ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS
SPECIFIED
29. AWARD OF CONTRACT: REFERENCE OFFER
DATED . . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NORTH AMERICAN
INDUSTRY CLASSIFICATION
STANDARD (NAICS):
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
THE DEFENSE PRIORITIES
AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FREE ON
BOARD (FOB) DESTINATION
UNLESS BLOCK IS MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3
AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
8(A)
ECONOMICALLY
DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.
Created On:
10 Jul 2026, 07:09 AM Central Daylight Time
SEE CONTINUATION
SEE CONTINUATION
SEE CONTINUATION
W912DY26QA295
DATE
10 JUL 2026
JESSICA SIZEMORE
LOCAL TIME
24 JUL 2026
01:00 PM CST
W912DY 100
W2V6 USA ENG SPT CTR HUNTSVIL
300 SECURE GATEWAY, KO CONTRACTING DIVISION
REDSTONE ARSENAL, AL 35898-0000
UNITED STATES
JESSICA SIZEMORE, EMAIL: JESSICA.SIZEMORE@USACE.ARMY.MIL
339920
SEE SCHEDULE
INSTRUCTIONS TO QUOTERS
1. FURNITURE INSTALL INFORMATION:
A. Estimated award date is: 11 Sep 2026
B. Required install dates are as follows:
MC Multiple Locations Furniture Install Start Date: 30 Nov 2026 Furniture Install Completion Date: 18 Dec 2026
MC Multiple Locations Contractor Furniture Install Start Date (FISD):
(insert date, not After Receipt of Order)
Contractor Furniture Install Completion Date (FICD):
(insert date, not After Receipt of Order)
C. Specific install instructions are contained in the Statement of Work (SOW), Attachment # 3.
2. SHIPPING/STORAGE INFORMATION
A. The Contractor shall ship goods on an FOB Destination basis.
B. Contractors shall quote six month’s storage cost in the SF-1449 form on each of the two storage CLINs to be considered eligible for award. If a storage fee is not included in pricing, the Contractor’s quote may be considered a non-conforming response to the solicitation. A quote for six months of storage is required for when the need for storage is identified prior to leaving the Continental United States (CONUS), and a quote for storage is required for when the need for storage is identified after items have departed CONUS. These two options for storage can be unilaterally exercised by the Contracting Officer for a combined total maximum of six months of storage. Storage needed for partial shipments will be prorated by the price of the items stored relative to the total price of all of the items ordered. Storage will only be funded by modification and at the discretion of the Contracting Officer. Storage will be a firm fixed price amount.
Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation.
If storage is required in excess of 6 months, a new amount will be negotiated. If the storage cost is incurred, fast payment procedures may be implemented in accordance with FAR 52.213-1. If storage is required, payment may be approved for 85% of the total supplies only. Installation and the remaining 15% of supplies will be approved for payment once all responsibilities have been completed as set forth in the contract.
Contractors shall coordinate delivery and installation with Government Technical Representative (TR) shown in the SOW, and save records of these communications with the goal of successful delivery and installation. This requirement for coordination includes, but is not limited to, communicating with the Government TR prior to shipping items in order to prevent unnecessarily expensive storage costs.
C. The Contractor shall provide a Certification of Conformance for any order that will be stored in a warehouse for which the Contractor desires partial payment in advance of installation of the furnishings. FAR 52.246-15 addresses how to complete a certificate of conformance, and can be found in Attachment # 4, “Order Clauses.”
D. Destination/Ship to Address and Transportation Information: See Table 1 in SOW, Attachment # 3.
3. INSPECTION AND ACCEPTANCE
Inspection and Acceptance must be by the Government TR. See Table 1 in SOW, Attachment # 3.
4. LIST OF ATTACHMENTS
ATTACHMENT # 1 – LINE ITEM PRICING 20 pages ATTACHMENT # 2 – FURNITURE ITEM DESCRIPTIONS (FID) 10 pages ATTACHMENT # 3 – STATEMENT OF WORK (CAMP PENDLETON) 36 pages ATTACHMENT # 4 – CONTRACTOR PERFORMANCE EVALUATION 02 pages ATTACHMENT # 5 – ACCIDENT PREVENTION PLAN 08 pages ATTACHMENT # 6 – ORDER COMPLETION STATEMENT 01 page ATTACHMENT # 7 – TECHNICAL DOCUMENTS CHECKLIST 06 pages ATTACHMENT # 8 – ORDER CLAUSES AND PROVISIONS 36 pages
5. CONTRACTING OFFICER’S INSTRUCTIONS AFTER AWARD
A. Only a warranted Contracting Officer (either a Procuring Contracting Officer (PCO) or an Administrative Contracting Officer (ACO)), acting within their delegated limits, has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the Contracting Officer.
B. The Contractor shall be responsible to coordinate the installation of its items with the site Technical Representative at least 30 days before the installation start date. At this time any special security/install instructions will be provided by the Government to that Contractor. The Contractor shall refer to the Statement of Work (Attachment #3) for additional installation instructions. If additional days for installation are needed, a justification should be provided at the time of quote for approval by the Contracting Officer.
C. Security issues (e.g. getting on and off post), logistical discussions of the installation process shall be coordinated with the Furniture Management Officer (FMO).
D. If a subcontracted item is found to be unavailable after award, and Government acceptance of a substituted item is requested, the Contractor shall submit to the Contracting Officer copies of the contract terms and conditions along with the technical data sheets for the proposed substitute item.
E. Safety Plans. The Contractor shall be responsible for submitting a completed safety plan within one month after contract award, or where expedited installation is required NLT 10 days before installation. NO installation will be permitted without an approved safety plan. The Contractor shall not begin installing items until a safety plan has been submitted to and approved by the Government. All safety plans shall be emailed to:
furnishinginvoices@usace.army.mil
F. The Contractor shall comply with all laws, rules and regulations of the installation, including but not limited to, the following: No weapons of any kind are to be carried by any person or transported in any vehicle entering an Air Force installation. Truck drivers carrying any kind of weapon will be denied access to the Air Force installation.
G. If requested by the Contracting Officer, the Contractor shall provide reports for quoted items.
6. INVOICES
A. Partial order invoices will not be accepted. Invoices may be submitted for one building of a multi-building delivery order only with the approval of the Contracting Officer, following the complete installation of the one building by the Contractor and acceptance by the Government.
B. All invoices shall be emailed to the following email address for processing:
FurnishingInvoices@usace.army.mil
C. The Contractor shall return a signed Attachment # 7, Order Completion Statement, with its final invoice. Invoices shall not exceed the contract amount. A final invoice submitted without a signed Order Completion Statement will be rejected.
7. INSTRUCTIONS TO CONTRACTORS
A. The Contractor shall provide pricing for all items listed in the RFQ for the quote to be accepted by the Government.
B. The Contractor shall complete the furniture installation schedule under FURNITURE INSTALL INFORMATION and include in the quote submission.
mailto:furnishinginvoices@usace.army.mil mailto:FurnishingInvoices@usace.army.mil
C. All quoted items shall meet the specifications defined in the Furniture Item Description (FID), Attachment # 2.
D. Contractors shall provide name brand and model numbers for all quoted items, including pass-thru items and those manufactured by the Contractor.
E. Technical Data Sheets Required. The Contractor shall provide current and complete cut sheets for all items specified in the FID, unless otherwise specified. All salient features of items specified in the FID must be addressed on the cut sheets. When the Contractor provides more than one cut sheet for an item specified in the FID, the cut sheets and supporting documentation shall be highlighted or contain other markings that bring immediate attention to information, and enables the Government to remove all doubt whether a contractor has or has not met the specifications shown in Attachment #2. The burden of providing information, which shall be organized and sequential according to the FID, is the responsibility of the Contractor. The Government will not be held responsible for contractor information that is not organized and sequential according to Attachments # 1 & 2, or not highlighted (if within a larger document and used as proof), which prevents conclusive comparisons between the Contractor’s quoted items and the requirements during technical review.
F. Electronic Price Quote is Required. Attachment #1, “Line Item Pricing,” will be provided in an Excel spreadsheet format by the Government. The Contractor shall submit the completed Attachment #1 in Excel format to the Government by the deadline for submission of quotes set forth in this RFQ.
G. Attachment # 7, “Technical Documents Checklist,” will be provided in Word format by the Government. The Contractor shall submit a completed Attachment # 7 in Word format to the Government by the deadline for submission of quotes set forth in this RFQ.
H. Product samples are not acceptable for this RFQ, unless otherwise directed by the Contracting Officer.
I. Multiple quotes are not acceptable for this RFQ. If multiple quotes are received, only one quote (as determined by the Contracting Officer) will be evaluated by the Government.
J. The Contractor shall list any specific special features, warranty, and environmental and energy efficiency features applicable to its quoted products.
K. The Contractor shall be bound by the monthly storage fee quoted for an option for a maximum period of six months that may be unilaterally exercised by the Contracting Officer in one-month increments. If a storage fee is not included in the Contractor’s quote, the Contractor’s quote may be considered a non-conforming response to the solicitation.
L. When drawings are included as attachments, they are for visualization purposes only. The FID takes precedence over drawings unless otherwise stated. Site conditions may not align with drawings. Post-award site verifications are the responsibility of the Contractor.
M. Contractors shall submit the following with their quotation:
Company Name:
Cage Code:
Taxpayer Identification Number:
Duns Number:
POC Name:
Email Address:
Phone Number:
Mailing address
N. The Contractor shall be actively registered in the System for Award Management (SAM) with no exclusions.
8. SUBMISSION, MODIFICATION AND REVISION OF QUOTES
A. Contracting documents (RFQ (Combined Solicitation/Synopsis), SF30, Attachment # 1 in Excel format, Attachment # 7 in Word format) and technical documents (cut sheets and other supporting documents demonstrating quoted items meet the FID requirements) together create the quote. The terms, “quote,” “RFQ response,” and “response” have the same meaning in this section.
B. Quotes shall be submitted by the contractor to the Government in email, using as many emails as required to deliver a complete quote. When multiple emails are used to deliver a complete quote, contractors shall state their number to the Government.
Currently, Huntsville Center supports up to 10MB of content per email.
C. It is recommended that Contractors use the Procurement Integrated Enterprise Environment (PIEE). A vendor portal for solicitations was introduced as an enterprise-level service for the Department of Defense (DoD) within the Procurement Integrated Enterprise Environment (PIEE) platform. This capability allows DoD to have a more automated and secure process for capturing solicitations and their attachments and responses from industry. To obtain additional information please visit:
https://piee.eb.mil/xhtml/unauth/web/homepage/vendorGettingStartedHelp.xhtml
i. PIEE Size Limit. Each uploaded attachment can be up to 1.9 gigabytes (GB) in size. The application supports different file extensions.
ii. Notifications when an amendment to the solicitation is posted: Within a solicitation, click the checkbox next to ‘Please notify me of amendments to this https://piee.eb.mil/xhtml/unauth/web/homepage/vendorGettingStartedHelp.xhtml solicitation’ on the top left corner of the screen. You will receive email and system notification when an amendment is posted.
iii. Upload Multiple Documents in PIEE, multiple attachments may be uploaded at one time. After you click ‘Choose File,’ highlight all the files you want to upload and click ‘Open.’ If the total size of all the attachments exceeds 1.9GB (see 4.A above), upload the multiple attachments in batches that keeps each batch under the 1.9GB limit. Please contact your company’s Account Administrator for any account related issues. If you are experiencing technical problems with Procurement Integrated Enterprise Environment, please contact the DISA DECC Ogden Electronic Business Service Desk at link below:
https://piee.eb.mil/xhtml/unauth/web/homepage/vendorCustomerSupport.xhtml
D. The Government must have in its possession the contractor’s entire quote by the RFQ due date and time.
E. Contractors shall return to the Government in the same Word version format received, their responses to the Government’s requests for clarification.
F. Contractors shall not merge into a single PDF document both the technical documents (cut sheets and other supporting documents demonstrating quoted items meet the FID requirements) and the contracting documents (RFQ, SF30, Attachment #1 in Excel format, Attachment # 7 in Word format).
G. Contractors shall not intentionally quote items that do not meet the specifications of the primary requirements. The primary requirements for Administrative Office Furniture (Admin) are defined as office furniture systems and, if included in the FID, wood casegoods. The Government’s intent is to receive timely quotes that are organized, complete and technically acceptable, with no need or a minimal need for clarifications.
Quotes that do not meet the specifications of the primary requirements (documented during technical review) may receive no further consideration for award.
9. NON-CONFORMING RESPONSES
The Government is not required to accept non-conforming responses. Non-conforming responses may not receive a technical evaluation and may not receive consideration for award. The following types of responses are considered non-conforming:
A. A Contractor’s quote that does not meet the specifications of the primary requirements.
B. A Contractor’s submittal of technical documents (cut sheets and other supporting documents demonstrating quoted items meet the FID requirements) and contracting documents (SF18, SF30, Attachment # 1 in Excel, and Attachment # 7 in Word) merged into a single PDF document.
C. A Contractor’s submittal of technical documents that is incomplete or is not organized and sequential according to the FID preventing a conclusive comparison between the Contractor’s quote and the Government’s requirement.
D. A Contractor’s failure to respond to the Government’s request for clarifications in the same Word format received, in order for the Government to be able to continue to record communications with the contractor on the same form.
E. A Contractor’s submittal of electronic documents whose file names do not reflect their general content, which do not enable the reader to locate information without opening documents repeatedly to be reminded of their contents, and which harm the Government’s ability to perform technical review or other examination.
10. LATE RESPONSES / NON-RESPONSIVENESS
Late responses are in all cases contractor responses that are not in the Government’s possession by the stated due date and time. Late responses will not be evaluated by the Government.
11. AMENDMENTS
The Government may amend the RFQ for reasons that include extending the due date for submission of quotes, construction delays of buildings to be furnished, changing market conditions or Government requirements, or for other reasons that clarify the needs of the Government.
12. QUESTIONS
A. All questions shall be submitted to the Contract Specialist no later than 14 Jul 2026, 1200 CST to jessica.sizemore@usace.army.mil. All answers to question's received will be posted and made available to all interested parties via an RFQ amendment. The Contracting Officer will not address any questions received following expiration of the aforementioned time in this paragraph. When the term “hour” is used to describe the time period for questions, then it means sequential hours without interruption (24 hours = 1 calendar day), unless otherwise specified.
B. Notifications to the Government from contractors regarding limited- or non-available items, or potential errors in the Government’s specifications are welcomed.
C. A contractor’s request to change the Government’s requirement before quotes are due may not be addressed because it does not clarify the requirement for all potential quoters, and if accepted, would change the requirement.
13. DOWN-SELECT PROCESS
A. It is the Government’s intent to select a target of three quotes for a complete technical evaluation to determine whether the quoted products comply with the FID.
The Contracting Officer has discretion to include more or less than three quotes in the down-select. The down-select will be based on price, receipt of completed Attachment # 7 - Technical Documents Checklist and the contractor’s confirmation of their ability to meet the Government’s Furniture Installation Start and Completion Dates.
B. At any time following the down-select, the Government may, at the discretion of the Contracting Officer, engage in exchanges with one or more of the contractors whose quotes were down-selected, or consider additional quotes for evaluation.
14. EVALUATION CRITERIA
A. Technical Evaluation – Technical will be rated “Acceptable” if all line items meet the specifications shown in the Attachment #2 Furniture Item Description (FID).
B. Schedule – Schedule will be rated “Acceptable” if the contractor install dates are within the dates shown below.
MC Multiple Locations Furniture Install Start Date: 30 Nov 2026 Furniture Install Completion Date: 18 Dec 2026
C. Past Performance – Past Performance will be rated “Acceptable” or “Unacceptable.”
The Government will use any available information to evaluate past performance.
D. Price – Evaluated price will be the contractor’s total quoted price, which includes all supplies, services, shipping, storage and optional items.
E. The Government may, at the discretion of the Contracting Officer, engage in exchanges with contractors. However, the Government reserves the right to make award without further exchanges.
15. SELECTION OF QUOTES FOR AWARD
The successful Contractor will be the one whose quote is rated acceptable on technical, schedule and past performance, and provides the best value to the Government. Best value will be determined by the quote that is technically acceptable and has the lowest total evaluated price.
W D H 1 1 6.1 RC01-01: Pool Table $0.00 2 1 6.3 RC02: Table Tennis $0.00 3 1 6.4 RC03: Foosball Table $0.00 4 2 6.5 RC04: 3-in-1 Game Table $0.00 5 8 6.6 RC05: 3-in-1 Game Chairs $0.00
HNC Cost: $0.00
$0.00
Attachment #1 - Indian Head, Bldg 902 - Recreational Furniture
Nominal Dimensions For Information Only
Provide dimensions in Inches
HNC Unit CostModel Quoted
Tariffs Shipping (CONUS)
Qty FID Para. HNC Total CostFID Item Code / Description Vendor Quoted Product Line
Quoted#
Installation & Shipping:
Furniture Subtotals:
Do not alter any formulas in shaded cells
Removal of Existing Items and Disposal/Relocation in accordance with SOW
GRAND TOTAL:
Installation - Includes new and existing items, if applicable, in accordance with SOW
When completing this form, do not delete or alter any columns or workbook tabs.
1 3 6.5 RC04: 3-in-1 Game Table $0.00
2 12 6.6 RC05: 3-in-1 Game Chairs $0.00
HNC Cost: $0.00
$0.00
Installation & Shipping:
Furniture Subtotals:
Do not alter any formulas in shaded cells
Removal of Existing Items and Disposal/Relocation in accordance with SOW
GRAND TOTAL:
Installation - Includes new and existing items, if applicable, in accordance with SOW Tariffs Shipping (CONUS)
Qty FID Para. HNC Total CostFID Item Code / Description Vendor Quoted Product Line
Quoted#
Attachment #1 - MCAS Cherry Point - Bldg 4167 - Rec Furniture
Nominal Dimensions For Information Only
Provide dimensions in Inches
HNC Unit CostModel Quoted
1 3 6.3 RC02: Table Tennis $0.00
HNC Cost: $0.00
$0.00 Do not alter any formulas in shaded cells
Removal of Existing Items and Disposal/Relocation in accordance with SOW
GRAND TOTAL:
Installation - Includes new and existing items, if applicable, in accordance with SOW
Qty FID Para. HNC Total CostFID Item Code / Description Vendor Quoted Product Line
Quoted
Installation & Shipping:
Furniture Subtotals:
Tariffs Shipping (CONUS)
Attachment #1 - MCAS Cherry Point – Bldg. 4166 - Rec Furniture
Nominal Dimensions For Information Only
Provide dimensions in Inches
HNC Unit CostModel Quoted
Please note, if one or more of the boxes above are in amber or red, please refer to RFQ, Sect. J, Instruction to Quoters for requirements for Open Market items.
Open Market:
2 1 6.3 RC02: Table Tennis $0.00 3 3 6.5 RC04: 3-in-1 Game Table $0.00 4 12 6.6 RC05: 3-in-1 Game Chairs $0.00
HNC Cost: $0.00
$0.00
Attachment #1 - MCAS Cherry Point – Bldg. 4881 - Casegoods
Nominal Dimensions For Information Only
Provide dimensions in Inches
HNC Unit CostModel Quoted
Tariffs Shipping (CONUS)
Qty FID Para. HNC Total CostFID Item Code / Description Vendor Quoted Product Line
Quoted#
Installation & Shipping:
Furniture Subtotals:
Do not alter any formulas in shaded cells
Removal of Existing Items and Disposal/Relocation in accordance with SOW
GRAND TOTAL:
Installation - Includes new and existing items, if applicable, in accordance with SOW
1 2 6.1 RC01-01: Pool Table $0.00 2 1 6.3 RC02: Table Tennis $0.00
3 1 6.4 RC03: Foosball Table $0.00 4 3 6.5 RC04: 3-in-1 Game Table $0.00 5 12 6.6 RC05: 3-in-1 Game Chairs $0.00
HNC Cost: $0.00
$0.00
Tariffs Shipping (CONUS)
Attachment #1 - MCAS Yuma - Bldg 860 - Rec Furniture
Nominal Dimensions For Information Only
Provide dimensions in Inches
HNC Unit CostModel Quoted
Installation - Includes new and existing items, if applicable, in accordance with SOW
Qty FID Para. HNC Total CostFID Item Code / Description Vendor Quoted Product Line
Quoted
Installation & Shipping:
Furniture Subtotals:
Do not alter any formulas in shaded cells
Removal of Existing Items and Disposal/Relocation in accordance with SOW
GRAND TOTAL:
1 1 6.3 RC02: Table Tennis $0.00 2 1 6.4 RC03: Foosball Table $0.00 3 2 6.5 RC04: 3-in-1 Game Table $0.00 4 8 6.6 RC05: 3-in-1 Game Chairs $0.00
HNC Cost: $0.00
$0.00
Attachment #1 - MCB Camp Pendleton - Bldg 24080 - Recreational Furniture
Nominal Dimensions For Information Only
Provide dimensions in Inches
HNC Unit CostModel Quoted
Tariffs Shipping (CONUS)
Installation - Includes new and existing items, if applicable, in accordance with SOW
Qty FID Para. HNC Total CostFID Item Code / Description Vendor Quoted Product Line
Quoted
Installation & Shipping:
Furniture Subtotals:
Do not alter any formulas in shaded cells
Removal of Existing Items and Disposal/Relocation in accordance with SOW
1 1 6.2 RC01-02: Pool Table $0.00 2 1 6.3 RC02: Table Tennis $0.00 3 1 6.4 RC03: Foosball Table $0.00 4 1 6.5 RC04: 3-in-1 Game Table $0.00 5 5 6.6 RC05: 3-in-1 Game Chairs $0.00
HNC Cost: $0.00
$0.00
Installation & Shipping:
Furniture Subtotals:
Do not alter any formulas in shaded cells
Removal of Existing Items and Disposal/Relocation in accordance with SOW
GRAND TOTAL:
Tariffs Shipping (CONUS)
Installation - Includes new and existing items, if applicable, in accordance with SOW
Qty FID Para. HNC Total CostFID Item Code / Description Vendor Quoted Product Line
Quoted#
Attachment #1 - MCB Camp Pendleton, Bldg 41303 - Rec Furniture
Nominal Dimensions For Information Only
Provide dimensions in Inches
2 1 6.3 RC02: Table Tennis $0.00
3 1 6.4 RC03: Foosball Table $0.00 4 1 6.5 RC04: 3-in-1 Game Table $0.00 5 4 6.6 RC05: 3-in-1 Game Chairs $0.00
HNC Cost: $0.00
$0.00
Attachment #1 - MCB Camp Pendleton, Bldg 130217 - Rec Furniture
Nominal Dimensions For Information Only
Provide dimensions in Inches
HNC Unit CostModel Quoted
Tariffs Shipping (CONUS)
Installation - Includes new and existing items, if applicable, in accordance with SOW
Qty FID Para. HNC Total CostFID Item Code / Description Vendor Quoted Product Line
Quoted
Installation & Shipping:
Furniture Subtotals:
Do not alter any formulas in shaded cells
Removal of Existing Items and Disposal/Relocation in accordance with SOW
2 2 6.5 RC04: 3-in-1 Game Table $0.00 3 8 6.6 RC05: 3-in-1 Game Chairs $0.00
HNC Cost: $0.00
$0.00
Attachment #1 - MCB Camp Pendleton, Bldg 140090 - Recreational Furniture
Nominal Dimensions For Information Only
Provide dimensions in Inches
HNC Unit CostModel Quoted
Tariffs Shipping (CONUS)
Installation - Includes new and existing items, if applicable, in accordance with SOW
Qty FID Para. HNC Total CostFID Item Code / Description Vendor Quoted Product Line
Quoted
Installation & Shipping:
Furniture Subtotals:
Do not alter any formulas in shaded cells
Removal of Existing Items and Disposal/Relocation in accordance with SOW
2 1 6.4 RC03: Foosball Table $0.00 3 1 6.5 RC04: 3-in-1 Game Table $0.00 4 4 6.6 RC05: 3-in-1 Game Chairs $0.00
HNC Cost: $0.00
$0.00
Attachment #1 - MCB Camp Pendleton - Bldg 210636 - Rec Furniture
Nominal Dimensions For Information Only
Provide dimensions in Inches
HNC Unit CostModel Quoted
Tariffs Shipping (CONUS)
Installation - Includes new and existing items, if applicable, in accordance with SOW
Qty FID Para. HNC Total CostFID Item Code / Description Vendor Quoted Product Line
Quoted
Installation & Shipping:
Furniture Subtotals:
Do not alter any formulas in shaded cells
Removal of Existing Items and Disposal/Relocation in accordance with SOW
2 1 6.3 RC02: Table Tennis $0.00 3 1 6.4 RC03: Foosball Table $0.00 4 1 6.5 RC04: 3-in-1 Game Table $0.00 5 5 6.6 RC05: 3-in-1 Game Chairs $0.00
HNC Cost: $0.00
$0.00
Attachment #1 - MCB Camp Pendleton, Bldg 220191 - Rec Furniture
Nominal Dimensions For Information Only
Provide dimensions in Inches
HNC Unit CostModel Quoted
Tariffs Shipping (CONUS)
Installation - Includes new and existing items, if applicable, in accordance with SOW
Qty FID Para. HNC Total CostFID Item Code / Description Vendor Quoted Product Line
Quoted
Installation & Shipping:
Furniture Subtotals:
Do not alter any formulas in shaded cells
Removal of Existing Items and Disposal/Relocation in accordance with SOW
2 1 6.4 RC03: Foosball Table $0.00 3 1 6.5 RC04: 3-in-1 Game Table $0.00 4 4 6.6 RC05: 3-in-1 Game Chairs $0.00
HNC Cost: $0.00
$0.00
Installation & Shipping:
Furniture Subtotals:
Do not alter any formulas in shaded cells
Removal of Existing Items and Disposal/Relocation in accordance with SOW
GRAND TOTAL:
Tariffs Shipping (CONUS)
Installation - Includes new and existing items, if applicable, in accordance with SOW
Qty FID Para. HNC Total CostFID Item Code / Description Vendor Quoted Product Line
Quoted#
Attachment #1 - MCB Camp Pendleton, Bldg 620520 - Rec Furniture
Nominal Dimensions For Information Only
Provide dimensions in Inches
2 1 6.5 RC04: 3-in-1 Game Table $0.00 3 5 6.6 RC05: 3-in-1 Game Chairs $0.00 4 1 6.7 RC06: 4-Way Table Tennis $0.00 5 1 6.8 RC07: Pool Table Accessories $0.00
HNC Cost: $0.00
$0.00
Attachment #1 - MCB Yorktown, Bldg 2125 - Recreational Furniture
Nominal Dimensions For Information Only
Provide dimensions in Inches
HNC Unit CostModel Quoted
Tariffs Shipping (CONUS)
Installation - Includes new and existing items, if applicable, in accordance with SOW
Qty FID Para. HNC Total CostFID Item Code / Description Vendor Quoted Product Line
Quoted
Installation & Shipping:
Furniture Subtotals:
Do not alter any formulas in shaded cells
Removal of Existing Items and Disposal/Relocation in accordance with SOW
2 2 6.5 RC04: 3-in-1 Game Table $0.00 3 10 6.6 RC05: 3-in-1 Game Chairs $0.00 4 1 6.7 RC06: 4-Way Table Tennis $0.00 5 1 6.8 RC07: Pool Table Accessories $0.00
HNC Cost: $0.00
$0.00
Installation & Shipping:
Furniture Subtotals:
Do not alter any formulas in shaded cells
Removal of Existing Items and Disposal/Relocation in accordance with SOW
GRAND TOTAL:
Tariffs Shipping (CONUS)
Installation - Includes new and existing items, if applicable, in accordance with SOW
Qty FID Para. HNC Total CostFID Item Code / Description Vendor Quoted Product Line
Quoted#
Attachment #1 - MCB Yorktown, Bldg 2126 - Recreational Furniture
Nominal Dimensions For Information Only
Provide dimensions in Inches
HNC Unit CostModel Quoted
Please note, if one or more of the boxes above are in amber or red, please refer to RFQ, Sect. J, Instruction to Quoters for requirements for Open Market items.
Open Market:
HNC Cost: $0.00
$0.00 Do not alter any formulas in shaded cells
Removal of Existing Items and Disposal/Relocation in accordance with SOW
GRAND TOTAL:
Tariffs
Shipping (CONUS)
Installation - Includes new and existing items, if applicable, in accordance with SOW
Qty FID Para. HNC Total CostFID Item Code / Description Vendor Quoted Product Line
Quoted
Attachment #1 - MCB Hawaii - Bldg 1633 - Rec Furniture
Nominal Dimensions For Information Only
Provide dimensions in Inches HNC Unit CostModel Quoted
Commercial Shipping (OCONUS)
Installation & Shipping:
Furniture Subtotals:
HNC Cost: $0.00
$0.00 Do not alter any formulas in shaded cells
Removal of Existing Items and Disposal/Relocation in accordance with SOW
GRAND TOTAL:
Tariffs
Shipping (CONUS)
Installation - Includes new and existing items, if applicable, in accordance with SOW
Qty FID Para. HNC Total CostFID Item Code / Description Vendor Quoted Product Line
Quoted
Attachment #1 - MCAS Hawaii - Bldg 1654 - Rec Furniture
Nominal Dimensions For Information Only
Provide dimensions in Inches HNC Unit CostModel Quoted
Commercial Shipping (OCONUS)
Installation & Shipping:
Furniture Subtotals:
HNC Cost: $0.00
$0.00 Do not alter any formulas in shaded cells
Removal of Existing Items and Disposal/Relocation in accordance with SOW
GRAND TOTAL:
Tariffs
Shipping (CONUS)
Installation - Includes new and existing items, if applicable, in accordance with SOW
Qty FID Para. HNC Total CostFID Item Code / Description Vendor Quoted Product Line
Quoted
Attachment #1 - MCAS Hawaii - Bldg 5071 - Rec Furniture
Nominal Dimensions For Information Only
Provide dimensions in Inches
HNC Unit CostModel Quoted
Commercial Shipping (OCONUS)
Installation & Shipping:
Furniture Subtotals:
HNC Cost: $0.00
$0.00 Do not alter any formulas in shaded cells
Removal of Existing Items and Disposal/Relocation in accordance with SOW
GRAND TOTAL:
Tariffs
Shipping (CONUS)
Installation - Includes new and existing items, if applicable, in accordance with SOW
Qty FID Para. HNC Total CostFID Item Code / Description Vendor Quoted Product Line
Quoted
Attachment #1 - MCAS Hawaii - Bldg 7059 - Rec Furniture
Nominal Dimensions For Information Only
Provide dimensions in Inches HNC Unit CostModel Quoted
Commercial Shipping (OCONUS)
Installation & Shipping:
Furniture Subtotals:
1 3 6.1 RC01-01: Pool Table $0.00
HNC Cost: $0.00
$0.00
Commercial Shipping (OCONUS)
Installation & Shipping:
Furniture Subtotals:
Attachment #1 - MCB Hawaii - Bldg 7220 - Rec Furniture
Nominal Dimensions For Information Only
Provide dimensions in Inches HNC Unit CostModel Quoted
Do not alter any formulas in shaded cells
Removal of Existing Items and Disposal/Relocation in accordance with SOW
GRAND TOTAL:
Tariffs
Shipping (CONUS)
Installation - Includes new and existing items, if applicable, in accordance with SOW
Qty FID Para. HNC Total CostFID Item Code / Description Vendor Quoted Product Line
Quoted
HNC Cost: $0.00
$0.00
Commercial Shipping (OCONUS)
Installation & Shipping:
Furniture Subtotals:
Attachment #1 - MCB Hawaii - Bldg 7241 - Rec Furniture
Nominal Dimensions For Information Only
Provide dimensions in Inches HNC Unit CostModel Quoted
Do not alter any formulas in shaded cells
Removal of Existing Items and Disposal/Relocation in accordance with SOW
GRAND TOTAL:
Tariffs
Shipping (CONUS)
Installation - Includes new and existing items, if applicable, in accordance with SOW
Qty FID Para. HNC Total CostFID Item Code / Description Vendor Quoted Product Line
Quoted
Attachment 2 MCICOM - Multiple Locations - Recreational Furniture
Furniture Item Descriptions (FID)
Housing Furnishings Program
MC Multiple Locations - Recreational Furniture
Attachment 2 Page 2 of 10
TABLE OF CONTENTS PAGE NO.
1.0 GENERAL
1.1 Cut Sheets
1.2 Appearance of Furnishings
1.3 Finish
1.4 Upholstery
2.0-5.0 NOT USED
6.0 RECREATIONAL & EXTERIOR FURNITURE
6.1 RC01-01: Pool Table
6.2 RC01-02: Pool Table
6.3 RC02: Table Tennis
6.4 RC03: Foosball Table
6.5 RC04: 3-in-1 Game Table
6.6 RC05: 3-in-1 Game Chairs
6.7 RC06: 4-Way Table Tennis
6.8 RC07: Pool Table Accessories
Attachment 2 Page 3 of 10
1.0 GENERAL
1.1 Cut Sheets
Cut sheets are required for all items in this RFQ. A blanket statement that FID requirements are met shall be unacceptable. Cut sheets shall conform to the following requirements to be considered acceptable for this RFQ:
a. Shall be legible with highlighted model numbers, dimensions, warranty information, and all salient features required.
b. Cut sheets which have more than one model, size, type, or which show statement of line options shall be clearly marked or highlighted to show the model, size, type, and all salient features proposed.
c. Shall clearly state all required features that have been provided. List all the features if printed literature is not available. The features shall be listed on the cut sheet with the name, phone number, and company of the person who is providing the information.
d. Shall clearly state FID item number, name brand, and model numbers for all items quoted.
e. Shall include line drawings or images that address all required features.
f. Shall include color photographs of all fabric selections being submitted for approval.
Include fabric content, flame resistance, warranty, and testing.
g. Shall be provided in 1-3 searchable PDF documents or other type of searchable documents. PDFs created using scanned documents shall use text recognition, e.g., OCR, to ensure search functions are enabled.
h. Shall be assembled and labeled in numerical order based on the FID section number.
i. Label each PDF file with the pages contained within, e.g., Vendor’s cutsheets pgs. 1-
10, Vendor’s cutsheets pgs. 11-25, etc.
1.2 Appearance of Furnishings
The following characteristics shall be considered in the furniture selection and manufacturing processes:
a. All furniture in each room to include casegoods, tables, recreational furniture, and upholstered furniture shall be the same color, sheen, and finish unless otherwise noted in the FID.
b. The wood species, color, and finish on a single piece of furniture shall be uniform in appearance.
c. All furniture styles within a given room shall be uniform in appearance.
1.3 Finish
1.3.1 Wood
Attachment 2 Page 4 of 10
Wood stain shall be applied before finishing, in stain as indicated beneath each FID item below.
1.3.2 Laminate
Laminate shall be in stain as indicated beneath each FID item below.
1.4 Upholstery
Unless noted otherwise in FID, all upholstery shall meet or exceed the following requirements:
a. Fabrics shall have a minimum 5 year warranty.
b. Fabric name, pattern, color, specifications, and electronic swatch are required for this
RFQ.
c. Shall not contain perfluoro octane sulfonate (PFOS) or perfluorooctanoic acid (PFOA) fabrics or coatings.
d. Padding, barrier materials, and resilient filling materials shall comply with California
Technical Information Bulletin 117-2013 Section 1 (pass).
e. Woven Fabrics:
i. Colorfastness to Crocking – AATCC* 8 Dry Crocking Grade 4, minimum and Wet Crocking Grade 4, minimum
ii. Colorfastness to Light – AATCC* 16 Option 1 or 3, minimum Grade 4 at 40 hours
iii. Physical Properties:
a. Pilling – ASTM* D3511 (Brush Pill) or ASTM D4970 (Martindale) minimum
Class 3
b. Breaking Strength – ASTM* D5034 (Grab Test), 50 lb. minimum warp and weft
c. Seam Slippage – ASTM* D4034, 25 lb. minimum in warp and weft
iv. Abrasion – ASTM* D4157 (Oscillatory Cylinder Method) 75,000 double rubs Wyzenbeek method
v. Flammability - California Technical Information Bulletin 117-2013 Section 1 (pass)
vi. Shall have stain resistant fibers or coating
f. Coated Fabrics:
i. Colorfastness to Crocking – AATCC* 8 Dry Crocking Grade 4, minimum and Wet Crocking Grade 4, minimum
ii. Colorfastness to Light – AATCC* 16 Option 1 or 3, minimum Grade 4 at 200 hours or ASTM D4329. No appreciable change at 150 hours
iii. Physical Properties:
a. Adhesion to Coating – ASTM* D751 Sections 45-48, 3 lbs. f/inch, minimum
Attachment 2 Page 5 of 10
b. Tear Strength – ASTM* D2261 (Tongue Tear) for Knits and Woven Substrates, 4 x 4 lbs. or ASTM* D751 Sections 27-31, 4 x 4 lbs., ASTM D5733 (Trap Tear) for Nonwoven Substrates & Nonwoven Composites, 15 x 15 lbs. or ASTM D751 Sections 32-35, 15 x 15 lbs.
c. Breaking Strength – ASTM* D751 (Grab Test), 50 x 50 lbs. minimum
d. Seam Strength – ASTM* D751 (Tack Tear) Woven Substrates, 25 x 25 lbs., Knit Substrates, 30 x 25 lbs., Nonwoven Substrates & Nonwoven Composites, 35 x 35 lbs.
e. Flex Resistance – ASTM* D2097, 25,000 cycles, visual evaluation for no appreciable surface crazing, cracking, whitening, or delamination
f. Hydrolysis Resistance (Poly only) – ISO* 1419 (Tropical Test Method C), 5 weeks visual evaluation for no cracking, peeling, or delamination
iv. Abrasion – ASTM* D4157 Standard Test Method for Abrasion Resistance of Textile Fabrics (Oscillatory Cylinder Method), 100,000 double rubs Wyzenbeek method
v. Flammability - California Technical Information Bulletin 117-2013 Section 1 (pass)
g. Shall not contain perfluoro octane sulfonate (PFOS) or perfluorooctanoic acid (PFOA) fabrics or coatings.
h. Padding, barrier materials, and resilient filling materials shall comply with California Technical Information Bulletin 117-2013 Section 1 (pass).
i. Fabric substitutions equal to the specified shall be allowed. Proposed fabrics shall be equal in pattern, scale, and color to the ones listed.
j. If providing equals, Vendor shall provide documentation to verify proposed substitutes meet or exceed all requirements including salient design features, testing criteria, warranty, and all other fabric requirements.
k. Fabric name, pattern, color, specifications, and electronic swatch are required for this
RFQ.
l. Fabrics shall be warranted for a minimum of 5 years.
*AATCC refers to the American Association of Textile Chemist and Colorists @AATCC.org, ASTM refers to ASTM International @ www.astm.org, and ISO refers to the International Organization for Standardization @iso.org
2.0-5.0 NOT USED
6.0 RECREATIONAL & EXTERIOR FURNITURE
6.1 RC01-01: Pool Table
a. Shall be commercial quality model with 44”W x 88”L playing field and overall size of 59”W x 103”L x 32”H.
b. All exposed wood shall be solid hardwood and veneers.
c. Shall have a minimum 1" thick, 3-piece diamond ground slate playing area.
d. Provide the following accessories:
https://www.astm.org/
Attachment 2 Page 6 of 10
i. 4 Cue sticks
ii. 1 Set of billiard balls
iii. 1 Hard plastic triangle
iv. 1 Dust cover
v. 1 Bridge stick
vi. 1 Dozen chalk
vii. Wall mounted cue rack in finish as listed in table below 6.1.g
e. Playing surface shall be:
i. 75/25 or 80/20 Nylon/wool fabric blend, minimum 21 oz.
ii. Traditional billiard green
f. Provide minimum 1 year warranty.
g. Stain shall be as listed in table below:
Installation (Bldgs.) Stain Cue Rack
MCAS Yuma Bldg 860 Matte Fossil Gray on Tulip or equal Smoke or equal
MCB Hawaii Bldgs 7051 & 7059 American Walnut on Oak or equal
Natural Oak or equal
MCAS Cherry Point 4881 Pecan on Maple or equal Black or equal MCB Hawaii Bldgs 1633, 1654, 7220, & 7241
American Maple on Maple or equal
American Maple or equal
MCB Yorktown Bldg 2125 Natural on Oak or equal Natural or equal
MCB Yorktown Bldg 2126 Matte Fossil Grey on Tulip or equal Smoke or equal
Indian Head Bldg 902 Natural on Oak or equal Natural or equal
6.2 RC01-02: Pool Table
a. Shall be commercial quality model with 50”W x 100”L playing field and overall size of 64”W x 114”L x 32”H.
b. All exposed wood shall be solid hardwood and veneers.
c. Shall have a minimum 1" thick, 3-piece diamond ground slate playing area.
d. Provide the following accessories:
i. 4 Cue sticks
ii. 1 Set of billiard balls
iii. 1 Hard plastic triangle
iv. 1 Dust cover
v. 1 Bridge stick
vi. 1 Dozen chalk
viii. Wall mounted cue rack finish as listed in table below 6.2.g
e. Playing surface shall be:
i. 75/25 or 80/20 Nylon/wool fabric blend, minimum 21 oz.
ii. Traditional billiard green
Attachment 2 Page 7 of 10
g. Stain shall be as listed in table below:
Installation (Bldgs.) Stain Cue Rack
MCAS Pendleton, Bldg 620520 Matte Fossil Grey on Tulip or equal Smoke or equal
MCAS Pendleton, Bldgs 140090 & 210636
Mahogany on Oak or equal Mahogany or equal
MCAS Pendleton, Bldg 220191 Espresso on Maple or equal Espresso or equal
MCAS Pendleton, Bldg 41303 & 130217 Natural on Oak or equal Natural or equal
6.3 RC02: Table Tennis
a. Shall be official tournament size, commercial quality table.
b. Provide weatherproof melamine top with steel apron.
c. Shall have steel leveling legs, heavy duty wheels, and locking system.
d. Shall be folding and provided with playback feature.
e. Shall include paddle and ball storage.
f. Provide the following accessories:
i. 4 Paddles
ii. 144 Table tennis balls
iii. Net with posts
g. Shall be manufactured according to the standards of the United States Table Tennis Association.
h. Provide minimum 1 year warranty.
6.4 RC03: Foosball Table
a. Shall be 30”W x 55.25”L x 36”H overall, minimum.
b. Shall be commercial quality, full-size table.
c. Playing surface shall be 26-27”W x 46-47”L with minimum 14”D cabinet.
d. Sides shall be minimum 1½” thick particleboard with high pressure laminate.
e. Provide required accessories including 1 set of 6 foosballs.
f. The playing surface shall be non-glare and stain resistant.
g. Shall have scorekeepers and a side ball return.
h. Rods shall be solid triple chrome plated steel with ball bearings.
i. Shall have adjustable height leg levelers.
j. Shall be black.
k. Provide minimum 1 year warranty.
6.5 RC04: 3-in-1 Game Table
Attachment 2 Page 8 of 10
a. Provide a solid oak 54” Diameter table.
b. Tabletop shall include a removable wood dining top and a gaming-to-bumper pool convertible top.
c. Convertible top gaming side shall include game trays and moisture resistant cup holders.
d. Provide a set of bumper pool balls and 2 cues.
e. Convertible top shall be covered with a wool blend felt, minimum of 21 oz., in traditional green.
h. Stain shall be as listed in table below 6.5.f:
Installation (Bldgs.) Stain
MCAS Yuma Bldg 860 Teak, equal to Wilsonart – Studio Teak 7936 MCAS Cherry Point 4167 & 4881 Light, equal to Wilsonart – Washed Char 8222 MCAS Pendleton 140090 & 620520 Teak, equal to Wilsonart – Studio Teak 7936 MCAS Pendleton 220191 Dark, equal to Wilsonart - Dering Forest 8226 MCAS Pendleton 210636 Grey, equal to Wilsonart - Boardwalk Oak 7983 MCAS Pendleton 24080, 41303 & 130217
Medium, equal to Formica – Planked Urban Oak 9312
MCB Yorktown 2125 Medium, equal to Formica – Planked Urban Oak 9312
MCB Yorktown 2126 Grey, equal to Wilsonart - Boardwalk Oak 7983
Indian Head 902 Medium, equal to Formica – Planked Urban Oak 9312
6.6 RC05: 3-in-1 Game Chairs
a. Provide solid oak and/or maple chairs.
b. Shall have a solid oak and/or maple 5-star base.
c. Shall swivel and be height adjustable.
d. Shall have a fully upholstered back and seat in fabric as listed in table below 6.6.f.
e. Stain shall be as listed in table below 6.6.f:
Installation (Bldgs.) Stain Fabric
MCAS Yuma Bldg 860 Teak, equal to Wilsonart – Studio Teak 7936
Solid black vinyl fabric that is 10:1 bleach cleanable or equal
MCAS Cherry Point, Bldgs 4167 &
Light, equal to Wilsonart – Washed Char 8222
Solid dark gray vinyl fabric that is 10:1 bleach cleanable or equal
Attachment 2 Page 9 of 10
MCAS Pendleton, Bldg 140090 Teak, equal to Wilsonart – Studio Teak 7936
Solid black vinyl fabric that is 10:1 bleach cleanable or equal
MCAS Pendleton, Bldg 620520 Teak, equal to Wilsonart – Studio Teak 7936
Solid dark brown vinyl fabric that is 10:1 bleach cleanable or equal
MCAS Pendleton, Bldg 220191 Dark, equal to Wilsonart - Dering Forest 8226
Solid dark brown vinyl fabric that is 10:1 bleach cleanable or equal
MCAS Pendleton, Bldg 210636 Grey, equal to Wilsonart - Boardwalk Oak 7983
Solid black vinyl fabric that is 10:1 bleach cleanable or equal
MCAS Pendleton, Bldgs 24080 & 130217
Medium, equal to Formica – Planked Urban Oak 9312
Solid black vinyl fabric that is 10:1 bleach cleanable or equal
MCAS Pendleton, Bldg 41303 Medium, equal to Formica – Planked Urban Oak 9312
Solid dark brown vinyl fabric that is 10:1 bleach cleanable or equal
MCB Yorktown, Bldg 2125 Medium, equal to Formica – Planked Urban Oak 9312
Solid medium/neutral blue woven that has a low pile and stain resistant coating
MCB Yorktown, Bldg 2126 Grey, equal to Wilsonart - Boardwalk Oak 7983
Solid medium/neutral blue woven that has a low pile and stain resistant coating
Indian Head, Bldg 902 Medium, equal to Formica – Planked Urban Oak 9312
Solid black vinyl fabric that is 10:1 bleach cleanable or equal
6.7 RC06: 4-Way Table Tennis
a. Shall be 62-64”W x 62-64”D x 28-30”H.
b. Shall have engineered wood top and aluminum frame.
c. Shall have steel leveling legs.
d. Shall be folding and provided with handles for portability.
e. Shall include paddle and ball storage.
f. Provide the following accessories:
i. 4 Paddles
ii. 144 Table tennis balls
iii. 4-way net with posts
g. Provide minimum 90 day warranty.
6.8 RC07: Pool Table Accessories
a. Provide the following accessories:
Attachment 2 Page 10 of 10
i. 1 Set of billiard balls
ii. Pool cue stick rack
a. Corner or freestanding model
b. Minimum 24”H
c. Shall hold minimum of 6 cue sticks
d. Shall be able to store 1 set of billiard balls and billiard triangle
e. Shall be suitable for indoor use
f. Shall be black, natural wood finish, or a combination thereof
END OF FID
Attachment 3 MCICOM – Multiple Installations – Recreational Furniture
Attachment 3 Page 1 of 36
Statement of Work (SOW)
Removal and Installation of Casegoods
Housing Furnishings Program
Attachment 3 Page 2 of 36
TABLE OF CONTENTS PAGE NO.
1.0 GENERAL
2.0 DELIVERY
3.0 REMOVAL OF EXISTING FURNITURE
4.0 RECEIVE AND UNLOAD
5.0 PLACE AND INSTALL
6.0 ASSEMBLY
7.0 PROTECTION OF PROPERTY
8.0 PRODUCT DOCUMENTATION
9.0 CLEANUP
10.0 EXCESS ITEMS
11.0 SAFETY
12.0 AT-OPSEC
13.0 PROJECT INFORMATION
13.1 Pendleton 24080
13.2 Pendleton 140090
13.3 Pendleton 210636
13.4 Pendleton 41303
13.5 Pendleton 220191
13.6 Pendleton 620520
13.7 Pendleton 130217
13.8 Cherry Point 4166, 4167 & 4881
13.9 Yuma 860
13.10 Hawaii 1633, 5071, 7059, 7220, & 7241
13.11 Yorktown 2125 & 2126
13.12 Indian Head 902
Attachment 3 Page 3 of 36
1.0 GENERAL
1.1 The Contractor shall provide all necessary materials, equipment, labor, supervision, and management to (1) coordinate delivery; (2) remove existing furniture from rooms; (3) deliver removed furniture to location specified; (4) load and unload new furniture; (5) place/install in designated rooms; (6) assemble items as required; (7) secure and store, as designated and; (8) properly dispose of all associated packaging/crating materials.
1.2 Awarded Contractor is responsible for verifying all existing field conditions, i.e., electrical power including, but not limited to, voltage, hertz, amperage, and outlets at each building.