This is a Questions and Answers document with Addendum No. 1 issued by the Florida Department of Management Services, Division of Real Estate Development and Management, for Request for Qualifications (RFQ) REDM2526-04 for Architect-Engineering Services for Capitol Complex Generators Replacement. The project involves comprehensive architectural and engineering services for replacing the Capitol Complex generator system, including development of construction-ready documents, technical specifications, permitting support, bidding assistance, and construction administration. The RFQ was posted to the Florida Administrative Register (FAR) and Vendor Inventory Program (VIP) website on September 9, 2025, with a deadline for submitting vendor questions by 5:00 p.m. Eastern Time on September 16, 2025. Responses from vendors are due by 4:00 p.m. Eastern Time on October 9, 2025. Answers to questions will be posted by 5:00 p.m. on September 23, 2025. Shortlisted firms will be announced on November 4, 2025, followed by firm interviews and presentations scheduled for November 19-December 2, 2025. The selection committee's recommended selection will be posted on November 21, 2025, with an anticipated contract start date of December 1, 2025. No pre-submittal conference or site walk is planned.

The total project budget is estimated at $16,000,000. The procurement does not include Design Build delivery; rather, a Construction Manager at Risk will be selected following the architect-engineer selection. The RFQ does not provide Design Build as a contracting option, and DMS does not offer preferences to Service-Disabled Veteran Owned Small Businesses. Information regarding the existing generator system capacity will be provided only to shortlisted firms, though future capacity needs will exceed current capacity. Firms must use the latest GSA Standard Form 330 available on the GSA website (replacing the referenced Rev. 8/2016 version). The solicitation requires that if subconsultants are integral to the firm's qualifications, they must be identified in the Statement of Qualifications submission. No interested vendors or Intent to Participate roster will be published by DMS.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A and Addendum No. 1 (Rev. 07/2025) RFQ REDM2526-04

Real Estate Development and Management 4050 Esplanade Way

Tallahassee, FL 32399-0950 850-488-2074

Ron DeSantis, Governor

Pedro Allende, Secretary

QUESTIONS AND ANSWERS

RFQ REDM2526-04

REQUEST FOR QUALIFICATIONS FOR ARCHITECT-ENGINEERING SERVICES

FOR CAPITOL COMPLEX GENERATORS REPLACEMENT

FAILURE TO FILE A PROTEST WITHIN THE TIME PRESCRIBED IN SECTION 120.57(3), FLORIDA

STATUTES, OR FAILURE TO POST THE BOND OR OTHER SECURITY REQUIRED BY LAW WITHIN

THE TIME ALLOWED FOR FILING A BOND SHALL CONSTITUTE A WAIVER OF PROCEEDINGS

UNDER CHAPTER 120, FLORIDA STATUTES.

The Department’s responses to timely submitted questions are below.

Question Number Question Response

1.

The RFSQ mentions a completed "Federal GSA Standard Form 330 (Rev. 8/2016)", but the only one on the GSA.gov website is dated 7/2021. Is the requested form available somewhere else?

Please use the latest form available on the GSA website.

2.

Will DMS publish an interested vendors/plan holders list (or “Intent to Participate” roster) for this solicitation? If available, could you please share the current list or where it will be posted?

This will not be published.

3.

Is there a pre-submittal conference/site walk planned? If so, please confirm date/time, location or virtual link, registration requirements, and whether attendance is mandatory.

A pre-submittal conference/site walk will not take place.

4.

Will there be a formal Q&A/Addenda process? If so, what are the deadline(s) for vendor questions, and where will addenda be posted?

See Section 3, Timeline of Events, and Section 4, Questions.

5.

At the SOQ stage, does DMS require primes to identify subconsultants in their submissions, or will subs be finalized post-shortlist?

The Qualification of the firm must be evident in the Response. If the use of subconsultants is a part of the qualification, then the subconsultants must be identified.

6. Does DMS have information on the existing system they wish to replace?

Information will be provided to the short-listed firms.

7. Does DMS give any preferences to Service-Disabled Veteran Owned Small Businesses? No.

8. Does DMS have an estimate of the value of services that can be made public?

The Total Project Budget is estimated at $16,000,000.

RFQ REDM2526-04

Real Estate Development and Management 4050 Esplanade Way

Question Number Question Response

9. Does DMS consider Design Build as a means of Contracting for replacement?

This will not be a Design Build project.

There will be a solicitation for a Construction Manager at Risk.

10. Does DMS have a Program Statement of Generator Capacity sought and is that available?

Information is not available at this time. The current capacity information will be provided to the short-listed firms, but future needs will be increased over the current capacity.

11.

Has DMS prepared an Owners Program for the Commissioning for Generator Replacement and interface with existing Switchgear?

The requested information will be part of the responsibility of the selected Architect- Engineer and the Construction Team.

RFQ REDM2526-04

Real Estate Development and Management 4050 Esplanade Way

ADDENDUM NO. 1

RFQ REDM2526-04

REQUEST FOR QUALIFICATIONS FOR ARCHITECT-ENGINEERING SERVICES

FOR CAPITOL COMPLEX GENERATORS REPLACEMENT

The purpose of this Addendum is to amend Section 3, Timeline of Events, in the Request for Qualifications. In the event of a conflict between previously released information and the information contained in this Addendum, the information herein will control. The information included in this Addendum is incorporated and made part of this solicitation. Note: This Addendum No. 1 does not need to be returned with the Response. Deletions are indicated by “strikethrough”. Additions, updates, or replacements are indicated by highlighting.

1. Section 3, Timeline of Events, is deleted in its entirety and revised as follows:

The table below contains the Timeline of Events for this RFQ. Firms shall become familiar with the Timeline of Events. The dates and times within the Timeline of Events may be subject to change. It is the firm’s responsibility to check for any changes. All changes to the Timeline of Events will be made through an addendum to the advertisement on the VIP website. Firms are responsible for submitting all required documentation by the dates and times (Eastern Time) specified below (or as revised by addenda).

Selection Schedule EVENT TIME

(ET) EVENT DATE

RFQ posted to FAR and the VIP website. September 9, 2025 Deadline to submit questions. By 5:00 p.m. September 16, 2025 Anticipated posting of answers to questions posted to the VIP website. By 5:00 p.m. September 23, 2025

Responses from Vendors due to DMS. By 4:00 p.m. October 9, 2025 Anticipated posting of the list of vendors selected for an interview and presentation to the VIP website. November 4, 2025

Firm Interviews /Presentations November 19, 2025 December 2, 2025

Anticipated posting of selection committee’s recommended selection to the VIP website. November 21, 2025

Contract Start Date December 1, 2025