About this file

This document is a Questions and Answers (Q&A) and Addendum No. 1 for a Request for Qualifications (RFQ) issued by the Florida Department of Management Services (DMS) for Architect-Engineering Services for Capitol Complex Generators Replacement. The solicitation (RFQ REDM2526-04) seeks qualified firms to replace generators at the Capitol Complex, with a total project budget estimated at $16,000,000. The project will utilize a Construction Manager at Risk contracting method, not a Design Build approach. Key dates include the RFQ posting on September 9, 2025, vendor response deadline of October 9, 2025, firm interviews on November 19 and December 2, 2025, and a contract start date of December 1, 2025.

The document clarifies that no pre-submittal conference or site walk is planned, and no interested vendors list will be published. Subconsultants must be identified if they are part of the firm's qualification. The current generator capacity information will be provided to short-listed firms, with an indication that future needs will exceed current capacity. Vendor questions will be answered through the VIP website, and the solicitation does not offer preferences for Service-Disabled Veteran Owned Small Businesses. The selected Architect-Engineer and Construction Team will be responsible for developing the commissioning program and interfacing with existing switchgear.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A and Addendum No. 1 (Rev. 07/2025) RFQ REDM2526-04

Real Estate Development and Management 4050 Esplanade Way

Tallahassee, FL 32399-0950 850-488-2074

Ron DeSantis, Governor

Pedro Allende, Secretary

QUESTIONS AND ANSWERS

RFQ REDM2526-04

REQUEST FOR QUALIFICATIONS FOR ARCHITECT-ENGINEERING SERVICES

FOR CAPITOL COMPLEX GENERATORS REPLACEMENT

FAILURE TO FILE A PROTEST WITHIN THE TIME PRESCRIBED IN SECTION 120.57(3), FLORIDA

STATUTES, OR FAILURE TO POST THE BOND OR OTHER SECURITY REQUIRED BY LAW WITHIN

THE TIME ALLOWED FOR FILING A BOND SHALL CONSTITUTE A WAIVER OF PROCEEDINGS

UNDER CHAPTER 120, FLORIDA STATUTES.

The Department’s responses to timely submitted questions are below.

Question Number Question Response

1.

The RFSQ mentions a completed "Federal GSA Standard Form 330 (Rev. 8/2016)", but the only one on the GSA.gov website is dated 7/2021. Is the requested form available somewhere else?

Please use the latest form available on the GSA website.

2.

Will DMS publish an interested vendors/plan holders list (or “Intent to Participate” roster) for this solicitation? If available, could you please share the current list or where it will be posted?

This will not be published.

3.

Is there a pre-submittal conference/site walk planned? If so, please confirm date/time, location or virtual link, registration requirements, and whether attendance is mandatory.

A pre-submittal conference/site walk will not take place.

4.

Will there be a formal Q&A/Addenda process? If so, what are the deadline(s) for vendor questions, and where will addenda be posted?

See Section 3, Timeline of Events, and Section 4, Questions.

5.

At the SOQ stage, does DMS require primes to identify subconsultants in their submissions, or will subs be finalized post-shortlist?

The Qualification of the firm must be evident in the Response. If the use of subconsultants is a part of the qualification, then the subconsultants must be identified.

6. Does DMS have information on the existing system they wish to replace?

Information will be provided to the short-listed firms.

7. Does DMS give any preferences to Service-Disabled Veteran Owned Small Businesses? No.

8. Does DMS have an estimate of the value of services that can be made public?

The Total Project Budget is estimated at $16,000,000.

RFQ REDM2526-04

Real Estate Development and Management 4050 Esplanade Way

Question Number Question Response

9. Does DMS consider Design Build as a means of Contracting for replacement?

This will not be a Design Build project.

There will be a solicitation for a Construction Manager at Risk.

10. Does DMS have a Program Statement of Generator Capacity sought and is that available?

Information is not available at this time. The current capacity information will be provided to the short-listed firms, but future needs will be increased over the current capacity.

11.

Has DMS prepared an Owners Program for the Commissioning for Generator Replacement and interface with existing Switchgear?

The requested information will be part of the responsibility of the selected Architect- Engineer and the Construction Team.

RFQ REDM2526-04

Real Estate Development and Management 4050 Esplanade Way

ADDENDUM NO. 1

RFQ REDM2526-04

REQUEST FOR QUALIFICATIONS FOR ARCHITECT-ENGINEERING SERVICES

FOR CAPITOL COMPLEX GENERATORS REPLACEMENT

The purpose of this Addendum is to amend Section 3, Timeline of Events, in the Request for Qualifications. In the event of a conflict between previously released information and the information contained in this Addendum, the information herein will control. The information included in this Addendum is incorporated and made part of this solicitation. Note: This Addendum No. 1 does not need to be returned with the Response. Deletions are indicated by “strikethrough”. Additions, updates, or replacements are indicated by highlighting.

1. Section 3, Timeline of Events, is deleted in its entirety and revised as follows:

The table below contains the Timeline of Events for this RFQ. Firms shall become familiar with the Timeline of Events. The dates and times within the Timeline of Events may be subject to change. It is the firm’s responsibility to check for any changes. All changes to the Timeline of Events will be made through an addendum to the advertisement on the VIP website. Firms are responsible for submitting all required documentation by the dates and times (Eastern Time) specified below (or as revised by addenda).

Selection Schedule EVENT TIME

(ET) EVENT DATE

RFQ posted to FAR and the VIP website. September 9, 2025 Deadline to submit questions. By 5:00 p.m. September 16, 2025 Anticipated posting of answers to questions posted to the VIP website. By 5:00 p.m. September 23, 2025

Responses from Vendors due to DMS. By 4:00 p.m. October 9, 2025 Anticipated posting of the list of vendors selected for an interview and presentation to the VIP website. November 4, 2025

Firm Interviews /Presentations November 19, 2025 December 2, 2025

Anticipated posting of selection committee’s recommended selection to the VIP website. November 21, 2025

Contract Start Date December 1, 2025