RFQ N4215821Q0046.pdf
PDF 1 MB Posted
- Solicitation number
- N42158-21-Q-0046
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N42158210046 Ammendment 1.pdf | ||
| Attachment 3 Contract_Administration_Plan_.doc | DOC document | |
| Attachment 1 QASP maintenance Rev 1.docx | DOCX document | |
| Attachment 4 Technical Capability Certs Form.docx | DOCX document | |
| Attachment 6 Past Performance Info Form.doc | DOC document | |
| Exhibit A FINAL CDRLS N4215821Q0046.pdf | ||
| Attachment 2 Wage Determination 2015-4341 (15V).pdf | ||
| Attachment 7 Pricing Sheet.xlsx | XLSX spreadsheet | |
| Attachment 5 Past Performance Questionnaire.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
N4215821Q0046 20-Aug-2021
b. TELEPHONE NUMBER
757-396-2119
8. OFFER DUE DATE/LOCAL TIME
11:00 AM 09 Sep 2021
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
N421589. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
KARSHENA C PIERCE
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
N4215821RC10532
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
NORFOLK NAVAL SHIPYARD
ATTN: KARSHENA PIERCE
CVN SUPPORT BRANCH
C432, BLDG 65, 2ND FLOOR
PORTSMOUTH VA 23709-1022
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS AX
13b. RATING
DO-C9
CODE15. DELIVER TO CODE N42158 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
NORFOLK NAVAL SHIPYARD
SEE PERFORMANCE WORK STATEMENT
FOR DELIVERY AND CONTACT INFORMATION
PORTSMOUTH VA 23709
TEL: TEL: WITHIN FAX:
757-396-9866FAX:
TEL: 757-396-2119 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$8,000,000
NAICS:
811310
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF137
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
N4215821Q0046
Section SF 1449 - CONTINUATION SHEET
ADDENDUM FAR 52.212-1
ADDENDUM TO FAR 52.212-1
In addition to FAR 52.212-1, “Instructions to Offerors – Commercial Items,” quotations shall be received by Norfolk Naval Shipyard (NNSY) no later than the closing date of the solicitation. This requirement will be prepared in accordance with the information in FAR Subpart 12.6 and FAR Part 13.5, as supplemented with additional information included in this notice. Accordingly, FAR Subpart 13, Simplified Acquisition Procedures will be used in the evaluation and award of the contract.
Quotes are due on or before September 09, 2021 at 11:00AM Eastern. Interested offerors shall submit their quotations as a single Adobe Acrobat (.pdf) email attachment via email to Contract Specialists, Karshena Pierce at karshena,pierce@navy.mil, Cheryl Copeland at cheryl.copeland@navy.mil and to USFFNNSYC432@navy.mil.
Questions for clarification must be submitted by August 31, 2021 at 11:00AM Eastern. The Government reserves the right not to respond to any questions received concerning this solicitation after the questions receipt date.
Acknowledgement of timely receipt of offers will be made by Karshena Pierce and /or Cheryl Copeland as soon as practicable upon receipt. Late offers will be acknowledged as such and may not be considered by the Government.
The offer shall consist of one signed copy of:
1. Completed and signed standard form SF1449 with unit prices for each line item in accordance with the Contract Line Item Number (CLIN).
2. Executed copies of any amendments (if applicable);
3. All attachments completed;(Attachments 1 through 7)
4. Completed FAR 52.212-3 Representations and Certifications unless otherwise completed in SAM;
5. Technical capability information
6. Certificates of insurance giving evidence of the required coverages
7. Past performance information;(see attachments)
8. Documentation establishing proof of OEM factory training or equivalent training for each item identified in the PWS.
9. Price
On a separate sheet of paper titled “EXCEPTIONS”, the Offeror shall identify any “exceptions” to the solicitation Contract Line Item Numbers (CLIN) s, specifications in the performance work statement (PWS), or solicitation terms and conditions. State precisely how the offered supplies/services differ from the applicable CLIN, specification paragraph(s) in the statement of work or solicitation terms and conditions. Any exception which is not expressly approved by the contracting officer in writing is hereby rejected and void. Failure to comply with the submittal requirements of this paragraph may result in rejection of the offer. If no exceptions, state NONE and include an affirmative statement that the Offeror will meet the specifications in the PWS and the solicitation terms and conditions.
Award may or may not be made without any type of discussions or negotiations. This is based on the Contracting Officer’s determination after an evaluation has been completed on all quotations.
MINIMUM GUARANTEE
Per FAR 52.216-22 (b), "Indefinite Quantity" the minimum guarantee for this contract is $1,000.00.
The maximum for the contract is the total contract value.
LOA for minimum guarantee purposes:
PR#: TBA
LOA
PERFORMANCE WORK STATEMENT
Performance of Work Statement for Preventive Maintenance Program (PM), Yearly Certification and Calibration (C&C), and Remedial Maintenance with Spare Parts for
Machine Shop Equipment
1. Introduction: The requiring activity is Norfolk Naval Shipyard (NNSY), Portsmouth, Virginia. NNSY currently requires a firm, fixed price indefinite delivery / indefinite quantity (IDIQ) Contract Preventive Maintenance Program (PM), Yearly Certification and Calibration (C&C), and Remedial Maintenance that include spare parts for machine tools to ensure operational availability. Machine tools are located inside the main machine shop Building 171 and dry dock repair machine shop Building 298.
2. Performance: The contractor shall provide all Certified Technicians, transportation, equipment, parts, tools, materials, supervision and all other items / services necessary to perform on-site Preventive Maintenance Program (PM), Yearly Certification and Calibration (C&C), and Remedial Maintenance for twenty-three (23) machine tools listed in Table 1. This Performance of Work Statement (PWS) services shall consist of all the major maintenance checks and services that are recommended by each machine manufacturer along with any necessary remedial maintenance services to minimize machine down time. Equipment shall be maintained in accordance with the manufacturer’s specification by factory-trained technicians. All parts used in the repair of equipment must be Original Equipment Manufacturer (OEM) replacement parts or equivalent.
2.1. The Contractor is responsible for obtaining equipment maintenance service manuals.
Note 1. Equivalent Parts: Defined as parts that meet all technical requirements / specifications of the parts recommended by the OEM.
2.2. Period of Performance: The Period of Performance shall be one Base Year of twelve (12) months and four twelve (12)- month option years. The Period of Performance reads as follows:
2.2.1. Base Year: SEE SCHEDULE
2.2.2. Option Year One: SEE SCHEDULE
2.2.3. Option Year Two: SEE SCHEDULE
2.2.4. Option Year Three: SEE SCHEDULE
2.2.5. Option Year Four: SEE SCHEDULE
2.2.6. FAR 52.217-8 Optional six (6) month extension SEE SCHEDULE
3. Equipment Specifications: Contractor shall perform Preventive Maintenance Program (PM), Annual
Certification and Calibration (C&C), and Remedial Maintenance as specified for the machine tools listed in Table 1.
Table 1.
3.1. NNSY equipment maintenance requirements are subject to change by the Government when equipment addition(s) and/or deletion(s) are required due to equipment disposal or replacement. This is a non-personal services contract to provide Preventive and Corrective Maintenance Support Services on Naval Shipyard, Kittery, ME. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
The Government and the Contractor understand that the services to be provided under this contract by the Contractor are non-personal services and that no employer-employee relationship exists between the Government and the Contractor. The Government may provide technical direction which will assist the Contractor in accomplishing the PWS; however, the Government will not control the methods used by the Contractor to perform the service requirements set forth in the PWS. All references in this PWS to the “Contractor” include both Contractor employees and subcontractors.
4. Contractor Responsibilities:
4.1. Preventive Maintenance Program (PM): This maintenance service includes the care and servicing by Contractor personnel for the purpose of maintaining equipment in satisfactory operating condition in accordance with manufacturer’s recommended preventive maintenance tasks The Contractor shall provide an annual performance assurance within the preventive maintenance program. The program
MACHINE
MAKE MODEL# SERIAL# TYPE LOCATION
1 4215810251 Summit 16X40B 44210 (Manual) Lathe B163 1FL D30 2 4215810253 Summit 16X40B 44211 (Manual) Lathe B171 1FL A5 3 4215810252 Summit 16X40B 44212 (Manual)Lathe B510 1FL E9 4 4215809199 Summit 24-4X80 42292 (Manual) Lathe B298 DRY Dock Area
5 4215808948 Summit EVS-350B- CNC 8657 CNC Knee mill - Heavy D B171 1FL K6
6 4215800166 G&L 70-D4-RT 150-1049-66 (Manual) HBM B171 1FL 7 4215800167 G&L 70-D4-RT 150-1050-66 (Manual) HBM B171 1FL A18 8 4215800197 G&L 70-D4-RT 150-1090-67 (Manual) HBM B171 1FL J13 9 4215800196 G&L 70-D4-RT 150-1089-67 (Manual) HBM B171 1FL J13
10 4215800198 G&L 70-D5-T 150-1096-67 (Manual) B171 1FL B17
11 4215800136 G&L CNC8000H 760-0051-99 (CNC) HBM B171 1FL B19
12 4215801003 G&L G40-RTX 450-300-93 (CNC) HBM B171 1FL A16
13 4215800799 G&L 48” VTMC 512 512-290-90 VTC B171 1FL B9
14 4215801126 Cincinnati Milacron
315-16 11A3U1ATE-10 MILLING B171 3FL A18
15 4215801125 Cincinnati Milacron
315-16 11A3U1ATE-9 MILLING MACHINE B171 3FL A18
16 4215800839 K&T DM700 7089232 (CNC) Mill B171 1FL D7
17 4215800218 K&T 550-TF-20 57-1002-02 MILLING MACHINE B171 1FL F7
18 4215806835 Kuraki KBT11Z 3582 (CNC) HBM B171 1FL B19 19 4215809001 Samsung SL35-1500 17B730277 (CNC) Lathe B171 1FL J7 SEC400
20 4215809932 Hwacheon 450-CLMC M136367E4WC HTC B171 1FL J6
21 4215810297 Hwacheon VESTA 1300B M244374K2M VMC B171 1FL D7
22 4215810057 Hwacheon 230-CLYSMC M159367A1FD HTC B171 1FL K16
23 4215809200 Summit 16X60B 42386 (Manual) Lathe B298 Dry Dock Area
PWS Table 1 shall consist of all the major preventive maintenance checks that are recommended by each machine manufacturer. All comprehensive checks shall be made by factory trained technicians on the Mechanical, Electrical, Air, Coolant, Spindle and Way Lube systems coupled with all recommended standard checks and additionally, include yearly ball bar calibration.. Contractor shall provide Norfolk Naval Shipyard with a Preventive Maintenance report (CDRL A0001) that provides an overall assessment of machine performance (circularity). Performance tests shall provide an automatic diagnosis of up to 12 specific machine positioning errors that include the following. Each error shall be ranked according to its Company significance to overall machine performance alongside the error value CDRL A0001.
4.1.1. Servo mismatch
4.1.2. Stick-slip errors
4.1.3. Backlash
4.1.4. Repeatability
4.1.5. Scale mismatch and machine geometry
4.2. Machines: The Preventive Maintenance program shall apply to all 23 machines listed in Table 1 of this PWS. A minimum of the following areas shall be inspected on all machines as applicable.
4.2.1. Mechanical System Check machine level /verify spindle sweep
4.2.2. Check gear shift operation
4.2.3. Check spindle lube and air blast
4.2.4. Check spindle orientation alignment
4.2.5. Check shot pin operation
4.2.6. Change gearbox oil
4.2.7. Check backlash in X, Y, and Z-axis
4.2.8. Inspect drive belts
4.2.9. Inspect and adjust tool changer system
4.2.10. Inspect spindle taper condition
4.2.11. Inspect way covers & wipers
4.2.12. Check draw bar height
4.2.13. Inspect rigid tap encoder operation
4.2.14. Check tool change operation
4.2.15. Clean/lubricate tool changer.
4.2.16. Inspect counterbalance system.
4.2.17. Inspect lines, hoses and cables
4.2.18. Inspect Way Lube System for defects and proper function.
4.2.19. Clean filters
4.2.20. Inspect lines and fittings
4.2.21. Check operation of all machine functions
4.2.22. Verify lube/pump operation
4.2.23. Coolant System: Remove/check pump and motor, (Inspect or Clean coolant tank and replace coolant as needed)
4.2.24. Air System: Replace filters, Check pressure/adjust regulator, Inspect system for leaks
4.2.25. Electrical System: Check voltages, Clean electrical cabinet, Inspect connections / terminals and grounds
4.2.26. Inspect or replace tool change relays
4.2.27. Replace or clean fan filter
4.2.28. Check limit switches/safety locks for proper function.
4.2.29. Inspect motor brushes, clean & remove brush dust
4.2.30. Lathe Only: Verify turret/spindle alignment
4.2.31. Manual Machines: Change oil, filter and belts, lubricate system and clean as necessary to be qualified as working properly
4.2.32. Adjust Gibbs
4.2.33. Check level and alignment
4.3. Certification and Calibration (C&C): The following analysis inspections shall be accomplished on each machine in Table 1 as applicable within 30 days of the award of the first Task Order (TO) and yearly thereafter as part of each TO award for preventative maintenance.
4.3.1. Comprehensive Calibration Test: A comprehensive calibration test shall be performed to accomplish a vibration analysis program that will diagnose a variety of problems on the machine’s spindle to include but not limited to bearings, drive motors, and electrical problems. The vibration analysis data shall be collected on-site and then analyzed to determine if any corrective and preventative actions need to be taken.
4.3.2. Drawbar Force Test: A drawbar force test shall be performed to identify tension problems with the spindle's Belleville spring stack, verification of performance of the clamping system as a whole, help prevent damage to spindle taper, premature tool wear, and other machine features critical to machining accuracy and operator safety.
4.3.3. Geometry Inspection: A geometry inspection shall be performed that will ensure machine accuracy including parallelism, Square-ness and true perpendicularity of the Cartesian coordinate system and machine.
4.3.4. Renishaw Ball Bar Test: Performance Assurance (PA) checks shall include an annual ball bar calibration. Renishaw ball bar testing shall generate a comprehensive diagnostic report that provides an overall assessment of machine performance.
4.4. Remedial Maintenance (RM) and Spare Parts Request: The contractor shall provide RM or repair on the machines listed in Table 1 upon notification that the equipment is inoperative and issuance of a task order for repairs. Remedial maintenance CLINs are priced to allow flexibility for repairs to be conducted as required throughout the year. Remedial maintenance shall be performed and billed by the contractor as repairs are required or needed. Upon receiving notification from the Contracting Officer (KO) or the COR that equipment repair is necessary, the contractor shall troubleshoot the problem and provide the COR with a repair estimate (CDRL A0001). Remedial maintenance shall be approved by Contracting Officer prior to contractor performing any repairs. Remedial maintenance shall be approved by Contracting Officer prior to the contractor performing any repairs.
4.4.1. Remedial Maintenance Requirements: The equipment shall be repaired and maintained in accordance with OEM technical manuals or equivalent specification (See Note 1). The KO shall approve all estimates prior to the repair parts ordered and repair work completed.
4.4.2. Remedial Maintenance Call during Performance Assurance service call: If RM is required while the PM technician is on site, every attempt shall be made to diagnose and fix the problem, provided the service does not impede on the technician’s ability to finish the scheduled PM for the week. If it is determined that the technician will not be able to perform the PM due to the RM service needed, another technician shall be called in to perform the necessary RM service.
4.4.3. Remedial Maintenance Response Time: The contractor shall respond on site within seven (7) business days of receiving the notification from the Contracting Officer or Contracting Officer Representative (COR). The seven day period will begin the next business day after notification of required RM by the Contracting Officer or COR.
4.4.4. Urgent Request Response Time: The contractor shall respond on site no later than two (2) business days after notification by the Contracting Officer (KO). The countdown begins the next business day after notification by the KO or COR.
4.4.4.1 Downtime Determination: Downtime will begin the next business day after the KO contacts the contractor’s representative and a TO is issued, including answering services or by e- mail during working hours.
4.5. Reports: At the end of each maintenance or repair visit, the contractor shall provide the COR with a written report (within 10 business days) detailing services rendered. Report shall be available in electronic forms (PDF).
4.5.1. PM Reports: PM reports (CDRL A0001) shall be completed and submitted for all of the items listed in Table 1. PM reports shall contain the following:
4.5.1.1 General Condition:
4.5.1.1.1 Machine Hours
4.5.1.1.2 Machine Location
4.5.1.1.3 Machine Serial number
4.5.1.2 Status of the machine by major component:
4.5.1.2.1 Corrective Action Statement:
a. Status of system and description of malfunction.
b. Location of system.
4.5.1.3 Repairs Needed:
4.5.1.3.1 List of required parts by nomenclature.
4.5.1.3.2 Cost breakdown of parts and labor.
4.5.1.4 Repairs Completed: Cost breakdown of parts and labor.
4.5.1.5 Repairs Recommended:
4.5.1.5.1 List of required parts by nomenclature.
4.5.1.5.2 Cost breakdown of parts and labor.
4.5.1.6 Estimated Repair Time(s):
4.5.1.6.1 Estimated time for parts to be received
4.5.1.6.2 Repair to be performed.
4.5.1.6.3 Cost of parts and labor.
4.5.1.7 Fire and Safety Violations:
4.5.1.7.1 Location of violations.
4.5.1.7.2 Actions taken (if any) to correct violations.
4.5.1.7.3 Cost breakdown by parts and labor to repair violations.
4.5.1.8 Electrical Code Violations:
4.5.1.8.1 Location of violations.
4.5.1.8.2 Actions taken (if any) to correct violations.
4.5.1.8.3 Cost breakdown by parts and labor to repair violations.
4.5.2. Remedial Maintenance Repair Report: The contractor shall submit a comprehensive, detailed Repair Report (CDRL A0002) for all unscheduled minor and major adjustments, repairs, emergency repairs, non-emergency repairs and repair resolution services. Unscheduled repair report shall include a description of repairs completed, cost breakdowns of parts and labor, and all applicable information regarding tests, calibrations and/or measurements taken to verify repair and operation of the machine.
4.5.3. Certification and Calibration (C&C) Report: The contractor shall submit a comprehensive detailed Certification and Calibration report (CDRL A0003) for all calibration test, drawbar force test and Geometric inspection IAW Paragraph 4.3 to the
COR.
4.6. Contractor Personnel:
4.6.1. The Contractor shall assure that Contractor personnel completely understand the requirements of this Performance Work Statement. All Contractor service technicians must have sound mechanical aptitude and ability; must have basic understanding of machinery, both mechanical and electrical; must have the ability to understand and comprehend technical manuals, drawings, diagrams and any other technical data supplied by various manufacturers. All Contractor service technicians must have working knowledge of diagnosis and repair for the types of equipment included in this PWS and be capable of diagnosis and repair.
4.7. Guarantee/Warranty—Repair Service And Repair Parts/Spare Parts:
4.7.1. Repair Service: All repair work will be guaranteed/warranted for a timeframe customary in commercial servicing of the specified machines.
4.7.2. Repair Parts/ Spare Parts: All parts, furnished either as spares or repairs parts will be guaranteed/warranted for a timeframe customary in commercial servicing of the specified machines.
4.7.2.1 The Contractor shall use only new parts, or parts which have been refurbished to “like new” condition which enable the part to function or operate at a level equal to the specification of the original equipment. The invoice and work order shall indicate if a “like new” part has been installed or used in the repair of the equipment
4.7.2.2 Parts used for PM shall not be invoiced separately but shall be included as part of the PM price.
4.7.2.3 Replacement parts required in the performance of RM shall be invoiced to the Government in accordance with the terms and conditions of this contract (FAR 52.212-4 Alternate I).
4.7.2.4 Equipment lubricants and oils used in the performance of this contract shall be the same or equal to those recommended by the manufacturer’s technical manuals or specifications.
4.8. Quality Assurance (QA): The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This QASP is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) (defect rate(s)).
4.8.1. Quality Management System (QMS): The Contractor shall establish and maintain a complete Quality Management System (QMS) program in accordance with the provisions specified herein. The Contractor’s QMS program shall provide an effective and efficient means of identifying and correcting problems throughout the entire scope of operations.
The Contractor's QMS program shall address:
4.8.1.1 Accurate documentation of work processes, procedures, and output measures.
4.8.1.1.1 A systematic procedure for assessing compliance with OEM technical manuals.
4.8.1.1.2 Accurate documentation of quality inspections and surveillance conducted throughout the execution of work.
4.8.1.1.3 Assessment-driven corrective actions and process adjustments as appropriate in a timely manner.
4.8.2. Quality Management (QM) Plan: The Contractor shall develop and submit a QM Plan per the (QASP). The QM Plan (CDRL 0004) shall describe the QMS methodology and approaches used under this contract. If any changes are made during the period of performance, submit to the revised QM Plan to the COR. The COR will forward the revised QM Plan to the Contract Officer (KO) for acceptance. The Contractor’s QM Plan shall include, at a minimum, the following:
4.7.2.1 Policy and objectives of Quality Management System (QMS)
4.7.2.2 Quality Organization
4.7.2.2.1 List of personnel
4.7.2.2.2 Responsibilities & lines of authority
4.7.2.2.3 Training and qualifications
4.7.2.3 Approach to assuring quality of services provided and conformance with
OEM technical manuals or equivalent specifications
4.7.2.4 Methods and procedures for effective planning, operation and control of processes and performance of work
4.7.2.5 Procedures for inspection and surveillance of services
4.7.2.5.1 Scheduling and performance of inspection and surveillance
4.7.2.5.2 Measurement, data collection and analysis
4.7.2.5.3 Corrective action, preventive action, and continuous improvement
4.7.2.5.4 Oversight of subcontracted work
4.7.2.6 Documentation and records management
4.7.2.7 Communication with government (customers)
4.8.3. Quality Inspection and Surveillance: The Contractor shall establish and maintain a
Quality inspection and surveillance system (CDRL A0005) in accordance with the FAR Clause 52.246-4, INSPECTION OF SERVICES – FIXED PRICE, to ensure that the work performed conforms to the contract requirements. The Contractor shall document and maintain a file of all scheduled and performed inspections and surveillances, inspection and surveillance results, and dates and details of corrective and preventive actions. The quality inspection and surveillance file shall be the property of the Government and made available during the Government’s regular working hours. The file shall be turned over to the KO within five calendar days of the end of the Period of Performance.
4.8.4. Quality Inspection and Surveillance Report: The Contractor shall submit a copy of the
Contractor Quality Inspection and Surveillance Report (CDRL A0005) per the QASP. The Contractor Quality Inspection and Surveillance Report shall include a summary and results of the quality inspection and surveillance events performed and assessment-driven corrective actions and process adjustments during the previous month. The Government may adjust the frequency of the submittal based on the Contractor’s quality of performance.
4.8.5. Quality Assurance Provisions: Equipment shall be operational and serviceable after completion of each service call. Prior to leaving the area, the contractor shall demonstrate to the COR, TPOC, or designated alternate that the equipment is operational and shall provide a Certificate of Completion (COC) (CDRL A0006) attesting to the work completed meets all technical requirements. After maintenance and repairs have been completed, the contractor shall provide a Certificate of Completion (COC) attesting that the work completed meets all technical requirements .
4.8.6. Disputes: Any disputes between the maintenance technician and the COR, TPOC, or designated alternate regarding satisfactory performance will be immediately referred to the Contracting Officer (KO).
4.8.7. Repair vs Replacement: The contractor shall notify the COR if it is determined that repair of a machine would exceed the replacement cost of the same or comparable machine. The contractor shall not be expected to perform the repair if repair costs exceed the cost of replacement.
5. Shipyard Responsibilities: The shipyard shall be responsible for the following:
5.1. Lifting and Handling work involving use of a crane. The shipyards lifting and handling department may take 48 to 72 hours to provide support.
5.2. Disposal of oil waste.
6. Certification of Work Requirements: COR shall verify that quality services are accomplished in accordance with paragraph 4.7 of this PWS after each service is complete.
7. Hazardous Energy Control: Contractors and Non-NNSY Government Agencies (NNGAs) must follow NNSY OSHECM Chapter 250 and OSHA 1915.89 HEC program requirements when performing Landside Hazardous Energy Control service or maintenance work. OSHA requires contractors and NNGAs to follow the Host Employer’s (NNSY’s) HEC Program. Contractors and NNGAs are responsible for Hazardous Energy Control safety policy compliance, training, oversight and audit functions for their individual employees. Contractors and NNGAs may obtain electronic copies of OSHECM Chapter 250 (latest revision) and access the OSHA 1915.89 web site by using the following link to NNSY’s public access web site: Click on the section -"Forms" to get to the link.
http://www.navsea.navy.mil/shipyards/norfolk/default.aspx
8. Government Property Removal: If government property must be removed from the shipyard for repair the contractor shall contact the property administrator. All equipment related to the requirement has to be reported to the C420 property administrator once it is identified.
8.1.1. TBD
9. Portable Electronic Device (PED): In accordance with COMSUBLANT/COMSUBPACINST
2075.1C, the use of Portable Electronic Devices (PEDs) while in or on Department of Navy Controlled Industrial Areas are prohibited. A portable electronic device (PED) is defined as any non-stationary electronic apparatus with singular or multiple capabilities of, but not limited to recording, storing, and/or transmitting data, voice, video, or photo images e.g.: Cell Phones, laptops, tablets and wearable devices such as fitness bands and smart watches.
10. Critical time Constraints: The Preventive Maintenance program shall be performed during business days between the hours of 7:20 AM and 3:50 PM excluding any federal holidays* or when the Government facility is closed due to local or national emergencies, administrative closings, COVID-19 or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this SOW when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce is essential.
10.1. Schedule Services: The contractor shall schedule and perform PM Checks and Certification and
Calibration (C&C).The Contractor shall establish a PM schedule within 7 calendar days after the date of contract award. The Contractor shall submit the PM schedule to the Government Point of Contact (POC). The Government will accept or propose an alternate PM schedule within 5 calendar days. The initial PM Checks and (C&C), shall be conducted within 30 days of the award of the first TO for Preventative Maintenance and yearly thereafter as part of each TO award for preventative maintenance. The contractor shall coordinate with the COR at least 14 working days prior to scheduling the PM Checks and Certification and Calibration (C&C).
11. Security:
11.1. Contractor will need CIA access and PPE. "Per FAR 22.102-1(a) entitled "Safety", Contractors are hereby informed that their employees or representatives present on property under Norfolk Naval Shipyard cognizance must follow Federal and State OSHA requirements and Norfolk Naval Shipyard OSHE Program Manual, NAVSHIPYDNORINST P5090.2 requirements or safety requirements for site specific location of the contract."
11.2. Initial Entry:
11.2.1. Contractor shall provide a SECNAV Form 5512 and a CNRMA Installation Access Screening Request form that will be provided by the technical point of contact. These documents will be endorsed by the TPOC and forwarded to the NNSY Pass Office to obtain DBIDS card and Green Badge. Contractor shall submit documents a minimum of 30 days before arrival.
11.2.2. Contractor personnel involved in civil crimes and/or other incidents of misconduct may be restricted entry to the base. The Contractor is responsible for insuring the badges are returned within three (3) calendar days of employee termination or contract completion.
11.2.3. Vehicle Entry: The company name shall be displayed on each door of the Contractor's vehicles in a manner and size that is clearly visible. All vehicles shall display a valid state license plate that complies with State Vehicle Code.
Vehicles shall meet all other requirement of the State Vehicle Code, such as safety standards, and shall carry proof of insurance and state registration. Passes will be issued for vehicles to enter the shipyard. A separate pass is required for entering the Controlled Industrial Area (CIA).
12. Requests for Base Access
12.1 Defense Biometric Identification System (DBIDS):
12.1.1 Any new contractor, vendor or supplier requesting base access AFTER 31 May 2017 will be required to obtain a DBIDS credential. NCACS credentials will no longer be issued.
12.1.2 Only DBIDS credentials will be issued to ALL contractors, vendors and suppliers seeking base access AFTER 14 August 2017.
12.1.3 Defense Biometric Identification System (DBIDS) increases installation security and communications by receiving frequent database updates on changes to personnel/credential status, law enforcement warrants, lost/stolen cards, and force protection conditions. The system provides a continuous vetting anytime the DBIDS card is scanned at an installation entry point.
12.2 NCACS Card Holders
12.2.1 If you currently have a Navy Commercial Access Control System (NCACS) card, the following is required to get a DBIDS credential:
12.2.1.1 Present your NCACS Card and a completed copy of the SECNAV FORM 5512/1 to the base Visitor Control Center representative.
12.2.1.2 The VCC will pull up your information in the computer, ensuring all information is current and correct.
12.2.1.3 Once your information is validated, a temporary DBIDS credential is provided.
12.2.1.4 Your temporary credential will have an expiration date, prior to which you will need to obtain your permanent DBIDS credential (~ 90 days).
12.2.1.5 For each additional U.S. Navy installation to which you need access, the first time you visit you only need to bring your DBIDS credential and statement of purpose for base access when arriving at the Visitor Control Center.
12.2.1.6 The representative will enter base access authorization and then you may proceed to work.
12.3 Non-NCACS Card Holders
12.3.1 If you do NOT have an NCACS Card, the following is required to obtain a DBIDS credential:
12.3.1.1 Present a letter or official document from my government sponsoring organization that provides the purpose for your access.
12.3.1.2 Present valid identification, such as a passport or Real ID Act-compliant state driver's license.
12.3.1.3 Present a completed copy of the SECNAV 5512/1 form to obtain your background check.
12.3.1.4 Upon completion of the background check, the Visitor Control Center representative will complete the DBIDS enrollment process, which includes your photo, finger prints, base restrictions, and several other assessments; after all this is done, you will be provided with your new DBIDS credential.
12.3.1.5 You may now proceed to work.
12.4 Non-Participants
12.4.1 One-Day Passes: Participation in the DBIDS is not mandatory, and if the Contractor chooses to not participate, the Contractor's personnel will have to obtain daily passes, be subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government will not be responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.
12.5 FOR ADDITIONAL QUESTIONS ABOUT OBTAINING A DBIDS CARD, CONTACT YOUR
LOCAL BASE VISITOR CONTROL CENTER. INFORMATION IS ALSO PROVIDED AT:
www.cnic.navy.mil/om/dbids.html
13. Additional Ordering Instructions
13.1 A task order issued under Preventive Maintenance CLINs shall be issued at the beginning of each option period to perform required Annual Maintenance for all machines listed in section 3 of the PWS.
13.2 Task orders and delivery orders for remedial maintenance CLINs, travel CLINs, and spare parts CLINs shall be issued as needed.
13.3 Task order requirements will be issued via email (or other acceptable means authorized by applicable regulation).The contractor is not authorized to commence performance until prior to issuance of a signed task order.
13.4 The contractor agrees to accept and perform task orders issued by the Contracting Officer within the scope of this contract. No combination of any task orders or total amount of task orders will exceed the ceiling limit. It is understood and agreed that the Government has no obligation to issue any task order(s) except the minimum obligation/guarantee.
13.5 The Government intends to award orders under this contract in accordance with FAR Part 16, DFARS Part 216 and other pertinent regulations. Orders will be tailored to specific project requirements.
13.6 Task orders shall either be funded at the time of award or in accordance with FAR 52.232-18 Availability of Funds.
13.7 The Government reserves the right to issue distinct task order(s) for preventative maintenance, several repairs, and/or inspections. The Government also reserves the right to issue a single task order to address any combination of preventative maintenance, repairs, and/or inspections
14. Location: NNSY, Various Locations at NNSY
15. Technical POC: TBD
16. Contracting Officer Representative (COR): TBD
17. Source POC: TBD
18. Travel Charge: All travel will be IAW Joint Travel Regulation and calculated at the prevailing JTR rates.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 3 Lot
PREVENTATIVE MAINTENANCE PROGRAM
FFP
PREVENTATIVE MAINTENANCE (PM) ON MACHINE TOOLS SPECIFIED
ON TABLE 1 UNDER SECTION 3 OF THE SOW FOUND HERE IN.
PREVENTATIVE MAINTENANCE WILL BE COMPLETED IAW SECTIONS
4.1-4.3 OF THE SOW. TRAVEL COSTS ASSOCIATED WITH PM SERVICES
SHALL BE INCLUDED WITHIN THE TOTAL COST OF THIS CLIN.
MAKE MODEL SERIAL
Summit 16X40B 44210 Summit 16X40B 44211 Summit 16X40B 44212
FOB: Destination
MILSTRIP: N4215821RC10532
PURCHASE REQUEST NUMBER: N4215821RC10532
PSC CD: J034
NET AMT
0002 1 Lot
PREVENTATIVE MAINTENANCE PROGRAM
FFP
PREVENTATIVE MAINTENANCE (PM) ON MACHINE TOOLS SPECIFIED
ON TABLE 1 UNDER SECTION 3 OF THE SOW FOUND HERE IN.
PREVENTATIVE MAINTENANCE WILL BE COMPLETED IAW SECTIONS
4.1-4.3 OF THE SOW. TRAVEL COSTS ASSOCIATED WITH PM SERVICES
SHALL BE INCLUDED WITHIN THE TOTAL COST OF THIS CLIN.
MAKE MODEL SERIAL
Summit 24-4X80 42292
FOB: Destination
MILSTRIP: N4215821RC10532
0003 1 Lot
PREVENTATIVE MAINTENANCE PROGRAM
FFP
PREVENTATIVE MAINTENANCE (PM) ON MACHINE TOOLS SPECIFIED
ON TABLE 1 UNDER SECTION 3 OF THE SOW FOUND HERE IN.
PREVENTATIVE MAINTENANCE WILL BE COMPLETED IAW SECTIONS
4.1-4.3 OF THE SOW. TRAVEL COSTS ASSOCIATED WITH PM SERVICES
SHALL BE INCLUDED WITHIN THE TOTAL COST OF THIS CLIN.
MAKE MODEL SERIAL
Summit EVS-350B- CNC 8657
FOB: Destination
MILSTRIP: N4215821RC10532
0004 4 Lot
PREVENTATIVE MAINTENANCE PROGRAM
FFP
PREVENTATIVE MAINTENANCE (PM) ON MACHINE TOOLS SPECIFIED
ON TABLE 1 UNDER SECTION 3 OF THE SOW FOUND HERE IN.
PREVENTATIVE MAINTENANCE WILL BE COMPLETED IAW SECTIONS
4.1-4.3 OF THE SOW. TRAVEL COSTS ASSOCIATED WITH PM SERVICES
SHALL BE INCLUDED WITHIN THE TOTAL COST OF THIS CLIN.
MAKE MODEL SERIAL
G&L 70-D4-RT 150-1049-66
G&L 70-D4-RT 150-1050-66
G&L 70-D4-RT 150-1090-67
G&L 70-D4-RT 150-1089-67
0005 1 Lot
PREVENTATIVE MAINTENANCE PROGRAM
FFP
PREVENTATIVE MAINTENANCE (PM) ON MACHINE TOOLS SPECIFIED
ON TABLE 1 UNDER SECTION 3 OF THE SOW FOUND HERE IN.
PREVENTATIVE MAINTENANCE WILL BE COMPLETED IAW SECTIONS
4.1-4.3 OF THE SOW. TRAVEL COSTS ASSOCIATED WITH PM SERVICES
SHALL BE INCLUDED WITHIN THE TOTAL COST OF THIS CLIN.
MAKE MODEL SERIAL
G&L 70-D5-T 150-1096-67
FOB: Destination
MILSTRIP: N4215821RC10532
0006 1 Lot
PREVENTATIVE MAINTENANCE PROGRAM
FFP
PREVENTATIVE MAINTENANCE (PM) ON MACHINE TOOLS SPECIFIED
ON TABLE 1 UNDER SECTION 3 OF THE SOW FOUND HERE IN.
PREVENTATIVE MAINTENANCE WILL BE COMPLETED IAW SECTIONS
4.1-4.3 OF THE SOW. TRAVEL COSTS ASSOCIATED WITH PM SERVICES
SHALL BE INCLUDED WITHIN THE TOTAL COST OF THIS CLIN.
MAKE MODEL SERIAL
G&L CNC8000H 760-0051-99
FOB: Destination
MILSTRIP: N4215821RC10532
0007 1 Lot
PREVENTATIVE MAINTENANCE PROGRAM
FFP
PREVENTATIVE MAINTENANCE (PM) ON MACHINE TOOLS SPECIFIED
ON TABLE 1 UNDER SECTION 3 OF THE SOW FOUND HERE IN.
PREVENTATIVE MAINTENANCE WILL BE COMPLETED IAW SECTIONS
4.1-4.3 OF THE SOW. TRAVEL COSTS ASSOCIATED WITH PM SERVICES
SHALL BE INCLUDED WITHIN THE TOTAL COST OF THIS CLIN.
MAKE MODEL SERIAL
G&L G40-RTX 450-300-93
FOB: Destination
MILSTRIP: N4215821RC10532
0008 1 Lot
PREVENTATIVE MAINTENANCE PROGRAM
FFP
PREVENTATIVE MAINTENANCE (PM) ON MACHINE TOOLS SPECIFIED
ON TABLE 1 UNDER SECTION 3 OF THE SOW FOUND HERE IN.
PREVENTATIVE MAINTENANCE WILL BE COMPLETED IAW SECTIONS
4.1-4.3 OF THE SOW. TRAVEL COSTS ASSOCIATED WITH PM SERVICES
SHALL BE INCLUDED WITHIN THE TOTAL COST OF THIS CLIN.
MAKE MODEL SERIAL
G&L 48” VTMC 512 512-290-90
FOB: Destination
MILSTRIP: N4215821RC10532
0009 2 Lot
PREVENTATIVE MAINTENANCE PROGRAM
FFP
PREVENTATIVE MAINTENANCE (PM) ON MACHINE TOOLS SPECIFIED
ON TABLE 1 UNDER SECTION 3 OF THE SOW FOUND HERE IN.
PREVENTATIVE MAINTENANCE WILL BE COMPLETED IAW SECTIONS
4.1-4.3 OF THE SOW. TRAVEL COSTS ASSOCIATED WITH PM SERVICES
SHALL BE INCLUDED WITHIN THE TOTAL COST OF THIS CLIN.
MAKE MODEL SERIAL
Cincinnati Milacron 315-16 11A3U1ATE-10 Cincinnati Milacron 315-16 11A3U1ATE-9
FOB: Destination
MILSTRIP: N4215821RC10532
0010 1 Lot
PREVENTATIVE MAINTENANCE PROGRAM
FFP
PREVENTATIVE MAINTENANCE (PM) ON MACHINE TOOLS SPECIFIED
ON TABLE 1 UNDER SECTION 3 OF THE SOW FOUND HERE IN.
PREVENTATIVE MAINTENANCE WILL BE COMPLETED IAW SECTIONS
4.1-4.3 OF THE SOW. TRAVEL COSTS ASSOCIATED WITH PM SERVICES
SHALL BE INCLUDED WITHIN THE TOTAL COST OF THIS CLIN.
MAKE MODEL SERIAL
K&T DM700 7089232
FOB: Destination
MILSTRIP: N4215821RC10532
0011 1 Lot
PREVENTATIVE MAINTENANCE PROGRAM
FFP
PREVENTATIVE MAINTENANCE (PM) ON MACHINE TOOLS SPECIFIED
ON TABLE 1 UNDER SECTION 3 OF THE SOW FOUND HERE IN.
PREVENTATIVE MAINTENANCE WILL BE COMPLETED IAW SECTIONS
4.1-4.3 OF THE SOW. TRAVEL COSTS ASSOCIATED WITH PM SERVICES
SHALL BE INCLUDED WITHIN THE TOTAL COST OF THIS CLIN.
MAKE MODEL SERIAL
K&T 550-TF-20 57-1002-02
FOB: Destination
MILSTRIP: N4215821RC10532
0012 1 Lot
PREVENTATIVE MAINTENANCE PROGRAM
FFP
PREVENTATIVE MAINTENANCE (PM) ON MACHINE TOOLS SPECIFIED
ON TABLE 1 UNDER SECTION 3 OF THE SOW FOUND HERE IN.
PREVENTATIVE MAINTENANCE WILL BE COMPLETED IAW SECTIONS
4.1-4.3 OF THE SOW. TRAVEL COSTS ASSOCIATED WITH PM SERVICES
SHALL BE INCLUDED WITHIN THE TOTAL COST OF THIS CLIN.
MAKE MODEL SERIAL
Kuraki KBT11Z 3582
FOB: Destination
MILSTRIP: N4215821RC10532
0013 1 Lot
PREVENTATIVE MAINTENANCE PROGRAM
FFP
PREVENTATIVE MAINTENANCE (PM) ON MACHINE TOOLS SPECIFIED
ON TABLE 1 UNDER SECTION 3 OF THE SOW FOUND HERE IN.
PREVENTATIVE MAINTENANCE WILL BE COMPLETED IAW SECTIONS
4.1-4.3 OF THE SOW. TRAVEL COSTS ASSOCIATED WITH PM SERVICES
SHALL BE INCLUDED WITHIN THE TOTAL COST OF THIS CLIN.
MAKE MODEL SERIAL
Samsung SL35-1500 17B730277
FOB: Destination
MILSTRIP: N4215821RC10532
0014 1 Lot
PREVENTATIVE MAINTENANCE PROGRAM
FFP
PREVENTATIVE MAINTENANCE (PM) ON MACHINE TOOLS SPECIFIED
ON TABLE 1 UNDER SECTION 3 OF THE SOW FOUND HERE IN.
PREVENTATIVE MAINTENANCE WILL BE COMPLETED IAW SECTIONS
4.1-4.3 OF THE SOW. TRAVEL COSTS ASSOCIATED WITH PM SERVICES
SHALL BE INCLUDED WITHIN THE TOTAL COST OF THIS CLIN.
MAKE MODEL SERIAL
Hwacheon 450-CLMC M136367E4WC
FOB: Destination
MILSTRIP: N4215821RC10532
0015 1 Lot
PREVENTATIVE MAINTENANCE PROGRAM
FFP
PREVENTATIVE MAINTENANCE (PM) ON MACHINE TOOLS SPECIFIED
ON TABLE 1 UNDER SECTION 3 OF THE SOW FOUND HERE IN.
PREVENTATIVE MAINTENANCE WILL BE COMPLETED IAW SECTIONS
4.1-4.3 OF THE SOW. TRAVEL COSTS ASSOCIATED WITH PM SERVICES
SHALL BE INCLUDED WITHIN THE TOTAL COST OF THIS CLIN.
MAKE MODEL SERIAL
Hwacheon VESTA 1300B M244374K2M
FOB: Destination
MILSTRIP: N4215821RC10532
0016 1 Lot
PREVENTATIVE MAINTENANCE PROGRAM
FFP
PREVENTATIVE MAINTENANCE (PM) ON MACHINE TOOLS SPECIFIED
ON TABLE 1 UNDER SECTION 3 OF THE SOW FOUND HERE IN.
PREVENTATIVE MAINTENANCE WILL BE COMPLETED IAW SECTIONS
4.1-4.3 OF THE SOW. TRAVEL COSTS ASSOCIATED WITH PM SERVICES
SHALL BE INCLUDED WITHIN THE TOTAL COST OF THIS CLIN.
MAKE MODEL SERIAL
Hwacheon 230-CLYSMC M159367A1FD
FOB: Destination
MILSTRIP: N4215821RC10532
0017 1 Lot
PREVENTATIVE MAINTENANCE PROGRAM
FFP
PREVENTATIVE MAINTENANCE (PM) ON MACHINE TOOLS SPECIFIED
ON TABLE 1 UNDER SECTION 3 OF THE SOW FOUND HERE IN.
PREVENTATIVE MAINTENANCE WILL BE COMPLETED IAW SECTIONS
4.1-4.3 OF THE SOW. TRAVEL COSTS ASSOCIATED WITH PM SERVICES
SHALL BE INCLUDED WITHIN THE TOTAL COST OF THIS CLIN.
MAKE MODEL SERIAL
Summit 16X60B 42386
0018 1 Lot
REMEDIAL MAINTENANCE
FFP
REMEDIAL MAINTENANCE (RM) SERVICE ON MACHINE TOOLS
SPECIFIED ON TABLE 1 UNDER SECTION 3 OF THE SOW FOUND HERE
IN. REACTIVE SERVICE WILL BE COMPLETED IAW SECTION 4.4 OF THE
SOW. SPARE PARTS FOR REACTIVE SERVICE ON MACHINE TOOLS
SPECIFIED IN TABLE 1 SECTION 3 OF THE PWS WILL BE PROVIDED
IAW SECTION 4.4 OF THE PWS. INVOICING OF THIS CLIN WILL BE IAW
SECTION 4.4.1 OF THE SOW TRAVEL COSTS ASSOCIATED WITH RM
SERVICE SHALL BE INCLUDED WITHIN THE TOTAL COST OF THIS
CLIN. ESTIMATED TOTAL
REMEDIAL MAINTENANCE HOURS= 336 HOURS * subject to change FOB: Destination
MILSTRIP: N4215821RC10532
0019 100 Set
DATA
FFP
Exhibit A CONTRACT DATE REQUIREMENT LIST (CDRL) A001- A005 AS
SPECIFIED IN THE PWS.
FOB: Destination
MILSTRIP: N4215821RC10532
1001 3 Lot
OPTION PREVENTATIVE MAINTENANCE PROGRAM
FFP
PREVENTATIVE MAINTENANCE (PM) ON MACHINE TOOLS SPECIFIED
ON TABLE 1 UNDER SECTION 3 OF THE SOW FOUND HERE IN.
PREVENTATIVE MAINTENANCE WILL BE COMPLETED IAW SECTIONS
4.1-4.3 OF THE SOW. TRAVEL COSTS ASSOCIATED WITH PM SERVICES
SHALL BE INCLUDED WITHIN THE TOTAL COST OF THIS CLIN.
MAKE MODEL SERIAL
Summit 16X40B 44210
1002 1 Lot
OPTION PREVENTATIVE MAINTENANCE PROGRAM
FFP
PREVENTATIVE MAINTENANCE (PM) ON MACHINE TOOLS SPECIFIED
ON TABLE 1 UNDER SECTION 3 OF THE SOW FOUND HERE IN.
PREVENTATIVE MAINTENANCE WILL BE COMPLETED IAW SECTIONS
4.1-4.3 OF THE SOW. TRAVEL COSTS ASSOCIATED WITH PM SERVICES
SHALL BE INCLUDED WITHIN THE TOTAL COST OF THIS CLIN.
MAKE MODEL SERIAL
Summit 24-4X80 42292
1003 1 Lot
OPTION PREVENTATIVE MAINTENANCE PROGRAM
FFP
PREVENTATIVE MAINTENANCE (PM) ON MACHINE TOOLS SPECIFIED
ON TABLE 1 UNDER SECTION 3 OF THE SOW FOUND HERE IN.
PREVENTATIVE MAINTENANCE WILL BE COMPLETED IAW SECTIONS
4.1-4.3 OF THE SOW. TRAVEL COSTS ASSOCIATED WITH PM SERVICES
SHALL BE INCLUDED WITHIN THE TOTAL COST OF THIS CLIN.
MAKE MODEL SERIAL
Summit EVS-350B- CNC 8657
1004 4 Lot
OPTION PREVENTATIVE MAINTENANCE PROGRAM
FFP
PREVENTATIVE MAINTENANCE (PM) ON MACHINE TOOLS SPECIFIED
ON TABLE 1 UNDER SECTION 3 OF THE SOW FOUND HERE IN.
PREVENTATIVE MAINTENANCE WILL BE COMPLETED IAW SECTIONS
4.1-4.3 OF THE SOW. TRAVEL COSTS ASSOCIATED WITH PM SERVICES
SHALL BE INCLUDED WITHIN THE TOTAL COST OF THIS CLIN.
MAKE MODEL SERIAL
G&L 70-D4-RT 150-1049-66
G&L 70-D4-RT 150-1050-66
1005 1 Lot
OPTION PREVENTATIVE MAINTENANCE PROGRAM
FFP
PREVENTATIVE MAINTENANCE (PM) ON MACHINE TOOLS SPECIFIED
ON TABLE 1 UNDER SECTION 3 OF THE SOW FOUND HERE IN.
PREVENTATIVE MAINTENANCE WILL BE COMPLETED IAW SECTIONS
4.1-4.3 OF THE SOW. TRAVEL COSTS ASSOCIATED WITH PM SERVICES
SHALL BE INCLUDED WITHIN THE TOTAL COST OF THIS CLIN.
MAKE MODEL SERIAL
G&L 70-D5-T 150-1096-67
1006 1 Lot
OPTION PREVENTATIVE MAINTENANCE PROGRAM
FFP
PREVENTATIVE MAINTENANCE (PM) ON MACHINE TOOLS SPECIFIED
ON TABLE 1 UNDER SECTION 3 OF THE SOW FOUND HERE IN.
PREVENTATIVE MAINTENANCE WILL BE COMPLETED IAW SECTIONS
4.1-4.3 OF THE SOW. TRAVEL COSTS ASSOCIATED WITH PM SERVICES
SHALL BE INCLUDED WITHIN THE TOTAL COST OF THIS CLIN.
MAKE MODEL SERIAL
G&L CNC8000H 760-0051-99
1007 1 Lot
OPTION PREVENTATIVE MAINTENANCE PROGRAM
FFP
PREVENTATIVE MAINTENANCE (PM) ON MACHINE TOOLS SPECIFIED
ON TABLE 1 UNDER SECTION 3 OF THE SOW FOUND HERE IN.
PREVENTATIVE MAINTENANCE WILL BE COMPLETED IAW SECTIONS
4.1-4.3 OF THE SOW. TRAVEL COSTS ASSOCIATED WITH PM SERVICES
SHALL BE INCLUDED WITHIN THE TOTAL COST OF THIS CLIN.
MAKE MODEL SERIAL
G&L G40-RTX 450-300-93
1008 1 Lot
OPTION PREVENTATIVE MAINTENANCE PROGRAM
FFP
PREVENTATIVE MAINTENANCE (PM) ON MACHINE TOOLS SPECIFIED
ON TABLE 1 UNDER SECTION 3 OF THE SOW FOUND HERE IN.
PREVENTATIVE MAINTENANCE WILL BE COMPLETED IAW SECTIONS
4.1-4.3 OF THE SOW. TRAVEL COSTS ASSOCIATED WITH PM SERVICES
SHALL BE INCLUDED WITHIN THE TOTAL COST OF THIS CLIN.
MAKE MODEL SERIAL
G&L 48” VTMC 512 512-290-90
1009 2 Lot
OPTION PREVENTATIVE MAINTENANCE PROGRAM
FFP
PREVENTATIVE MAINTENANCE (PM) ON MACHINE TOOLS SPECIFIED
ON TABLE 1 UNDER SECTION 3 OF THE SOW FOUND HERE IN.
PREVENTATIVE MAINTENANCE WILL BE COMPLETED IAW SECTIONS
4.1-4.3 OF THE SOW. TRAVEL COSTS ASSOCIATED WITH PM SERVICES
SHALL BE INCLUDED WITHIN THE TOTAL COST OF THIS CLIN.
MAKE MODEL SERIAL
Cincinnati Milacron 315-16 11A3U1ATE-10 Cincinnati Milacron 315-16 11A3U1ATE-9
1010 1 Lot
OPTION PREVENTATIVE MAINTENANCE PROGRAM
FFP
PREVENTATIVE MAINTENANCE (PM) ON MACHINE TOOLS SPECIFIED
ON TABLE 1 UNDER SECTION 3 OF THE SOW FOUND HERE IN.
PREVENTATIVE MAINTENANCE WILL BE COMPLETED IAW SECTIONS
4.1-4.3 OF THE SOW. TRAVEL COSTS ASSOCIATED WITH PM SERVICES
SHALL BE INCLUDED WITHIN THE TOTAL COST OF THIS CLIN.
MAKE MODEL SERIAL
K&T DM700 7089232
1011 1 Lot
OPTION PREVENTATIVE MAINTENANCE PROGRAM
FFP
PREVENTATIVE MAINTENANCE (PM) ON MACHINE TOOLS SPECIFIED
ON TABLE 1 UNDER…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .