Attachment 1 QASP maintenance Rev 1.docx
DOCX document 20 KB Posted
- Solicitation number
- N42158-21-Q-0046
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N42158210046 Ammendment 1.pdf | ||
| Attachment 3 Contract_Administration_Plan_.doc | DOC document | |
| Attachment 4 Technical Capability Certs Form.docx | DOCX document | |
| Attachment 6 Past Performance Info Form.doc | DOC document | |
| Exhibit A FINAL CDRLS N4215821Q0046.pdf | ||
| Attachment 2 Wage Determination 2015-4341 (15V).pdf | ||
| RFQ N4215821Q0046.pdf | ||
| Attachment 7 Pricing Sheet.xlsx | XLSX spreadsheet | |
| Attachment 5 Past Performance Questionnaire.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix A Quality Assurance Surveillance Plan (QASP)
This Quality Assurance Surveillance Plan (QASP) includes performance standards. The Government will use these standards to determine contractor performance and shall complete contractor performance to the Acceptable Quality Level (AQL). The COR will use this document to rate contractor. Rating will be either SAT or UNSAT. Any USAT rating will be explained in the notes block.
PWS
Paragraph
Task
Performance Standard
| Acceptable Quality Levels (AQL) |
| Surveillance Method / By Whom |
| Performance Rating |
Sat / Unsat
4.1.
The contractor shall perform annual Preventive Maintenance (PM) on all machines listed in table 1
The contractor shall coordinate arrival with COR and perform PM successfully.
| 0 (zero) failures to respond to agreed upon arrival date or perform successful PM. |
| 100% |
Inspection – COR will inspect.
4.3 The contractor shall perform a Certification and Calibration test on machines listed in table 1
The contractor shall coordinate arrival with COR and perform Certification and Calibration test successfully.
0 (zero) failures to respond to agreed- upon arrival date or perform successful comprehensive calibration test.
100% Inspection – COR will inspect
4.4
The contractor shall perform remedial service repair response.
The contractor shall respond to phone call within allotted time and perform maintenance successfully.
1 failure to respond in allotted time or perform maintenance successfully
Periodic Inspection – COR will review inspect.
4.5
The contractor shall supply report.
The contractor shall supply COR with maintenance report within 10 days of completion of maintenance.
0 (zero) failures to supply report within 10 days.
100% Inspection – COR will inspect.
Notes:
APPENDIX B
Deliverables Schedule
| Deliverable |
| Frequency |
| Copies |
| Medium/Format |
| Submit To |
4.5.1 PM service report
(CDRL A0001)
Within 7 calendar days after each PM
As specified/ Electronic
COR
4.5.2 Remedial service report
(CDRL A0002)
Within 7 calendar days after each RM
As specified/ Electronic
COR
4.5.3 Certification and Calibration report
(CDRL A0003)
Within 7 calendar days after each Certification and Calibration
As specified/ Electronic
COR
4.7.2 Quality Management Plan
(CDRL A0004)
| Within 15 calendar days after award and within seven calendar days of changes. |
| 2 |
| As specified/ Electronic |
| COR |
4.7.4 Quality Inspection and Surveillance Report
(CDRL A0005)
Within 15 calendar days of each Quality Inspection and Surveillance
| As specified/ Electronic |
| COR |
4.7.5 Certificate of Completion (COC)
(CDRL A0006)
After each PM and RM service
| As specified/ Electronic |
| COR |
File details come from the government source that posted it. Updated .