RFQ_CDS250560_Euster_Brown_Rehabilitation_-_Addendum_2.pdf

PDF 137 KB Posted

Attached to
Euster Brown Rehabilitation
Solicitation number
RFQ# CDS/250560
Issued by
Marion County, Orlando City, Florida

About this file

This document is Addendum #2 for the City of Ocala's Request for Quotation (RFQ# CDS/250560) for the Euster Brown Rehabilitation project. The addendum provides specific details for contractors regarding rehabilitation work, including modifications to plumbing, HVAC, electrical systems, and water heater installation. Key scope items include adding a cleanout at the front of the home, installing a shower valve/head trim kit, building a closet for the air handler, replacing interior and exterior light fixtures with LED-compatible options, and installing the water heater in the same closet as the air handler. The addendum is dated June 23, 2025, and is addressed to all bidders, with instructions that all proposed changes and fixtures must be approved by the owner or Rehab Specialist.

While the addendum itself does not provide pricing or funding details, the associated contract opportunity summary indicates this is a comprehensive residential rehabilitation project for a property located at 617 NW 1st Street in Ocala, Florida. The project requires Florida-licensed General or Building Contractors to complete a full home renovation within 90 days, with a 10-day maximum start after the Notice to Proceed. Contractors must have a minimum of three years of residential rehabilitation experience and carry $1,000,000 per occurrence Commercial General Liability insurance. The project includes a $300 permit cost allowance, requires obtaining all necessary City of Ocala permits, and mandates a 12-month material and labor warranty.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: June 23, 2025

To: All bidders

From: Ashley Presley, Buyer

Solicitation Number: RFQ# CDS/250560

Solicitation Title: Euster Brown Rehabilitation

Item 2 Plumbing

• Add cleanout at the front of home between city sewer and vent. Secure vent from falling as necessary.

Install shower valve/head trim kit in front bathroom. Replace valve as necessary.

Item 4 HVAC

• Build closet in area where current air handler is located. Closet shall be closed on all sides except for access door/s at the front. Closet shall be built from wall to wall.

Item 5 Electrical

• Install LED bulbs in exterior all exterior fixtures. Replace all interior light fixtures with builder grade

(Project Source equal/better) fixtures capable of receiving standard LED bulbs w/medium base.

Replace ceiling fans with similar size. Living room chandelier can remain if owner wants to keep it and it works, otherwise replace with standard fixture. Fixtures shall be approved by the owner or the

Rehab Specialist. Smoke alarms are addressed in the Work Write Up.

Item 6 Water Heater

• Water heater shall be installed in the same closet as the air handler.

Addendum # 2

SECTION 1. SOLICITATION ADDITIONS, CLARIFICATIONS AND CORRECTIONS

Item 2 Plumbing
Add cleanout at the front of home between city sewer and vent. Secure vent from falling as
necessary.
Install shower valve/head trim kit in front bathroom. Replace valve as necessary.
Item 4 HVAC
Item 5 Electrical
Item 6 Water Heater
Water heater shall be installed in the same closet as the air handler.

File details come from the government source that posted it. Updated .