RFQ abatement small cabins IACM vol.2.pdf

PDF 7 MB Posted

Attached to
PWC Pymatuning asbestos removal small cabins
Solicitation number
SRC0000034269
Issued by
Allen County, Ohio

About this file

This document is a Report of Findings for Pre-Renovation Asbestos-Containing Materials (ACM) Inspection prepared by Gandee & Associates, Inc. for the Ohio Department of Natural Resources, focusing on multiple cabins at Pymatuning State Park located in Andover, Ohio. The report covers comprehensive inspection details for Cabins 21 through 33, 36, 38, 49, 60, and 61, with the project number GA19-036, completed in February 2020. Each cabin section contains floor plans, bulk sample records, and laboratory reports to document the presence and location of asbestos-containing materials.

The document provides a systematic approach to identifying potential asbestos hazards, with each cabin's documentation organized into three primary sections: floor plans, bulk sample records, and laboratory reports. The report includes attachments detailing certifications, sampling protocols, report format, and a synopsis of applicable asbestos regulations for renovation work. The comprehensive nature of the document suggests preparation for a planned renovation or abatement project that requires thorough documentation of asbestos-containing materials to ensure safe and compliant removal procedures.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REPORT OF FINDINGS

of

PRE-RENOVATION

INSPECTIONS FOR ASBESTOS-

CONTAINING MATERIALS

of

Cabins 1 through 15, 17 through 33, 36, 38, 49, 60, & 61 at

Pymatuning State Park 6100 Pymatuning Lake Road

Andover, Ohio 44003 for

Ohio Department of Natural Resources

VOLUME II

Cabins 21 through 33, 36, 38, 49, 60, & 61

(Project Number GA19-036)

Prepared by:

Gandee & Associates, Inc.

642 Brooksedge Boulevard

Westerville, Ohio 43081

(614) 942-6040

February 2020

Cabin 21

SECTION 1 - FLOOR PLANS

SECTION 2 - BULK SAMPLE RECORDS

SECTION 3 - LABORATORY REPORTS

Cabin 22

Cabin 23

Cabin 24

Cabin 25

Cabin 26

Cabin 27

Cabin 28

Cabin 29

Cabin 30

Cabin 31

Cabin 32

Cabin 33

Cabin 36

Cabin 38

Cabin 49

Cabin 60

Cabin 61

ATTACHMENT A: CERTIFICATIONS

ATTACHMENT B: SAMPLING PROTOCOL

ATTACHMENT C: REPORT FORMAT

ATTACHMENT D: SYNOPSIS OF APPLICABLE

ASBESTOS REGULATIONS FOR RENOVATION WORK

File details come from the government source that posted it. Updated .