RFQ 2021-102 Clarifying Questions -1.pdf
PDF 398 KB Posted
- Solicitation number
- S-C01010-00001376
- Issued by
- Clackamas County, Oregon
About this file
The document is a response to clarifying questions for Request for Quotes (RFQ) #2021-102 for the Bolton Pump Station Control Panel and Variable Frequency Drives, issued by Clackamas County, Oregon. The intent of the contract is for the vendor to supply all hardware, build the panels, test them at the shop, ship to the client, and certify the installation and start-up. The installation and start-up will be completed by others under a separate contract, while the programming will be provided by the client's system integrator. The RFQ is seeking to purchase a control panel and three variable frequency drives.
The pricing terms, set-asides, incumbents, funding requirements, and other financial details are not provided in this document. The contract duration and renewal options are also not specified. The document indicates that Addendum #1 was issued on December 7, 2021 to clarify the vendor responsibilities.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PH: 503-742-5400 WWW.CLACKAMAS.US
REQUEST FOR QUOTES #2021-102
Bolton Pump Station Control Panel and Variable Frequency Drives
RESPONSE TO CLARIFYING QUESTIONS
December 7, 2021
Note that these are questions submitted by interested firms to the above referenced solicitation. The below answers are for clarification purposes only and in no way alter or amend the RFQ as published.
1. Section 40 91 00 indicates that the panel and VFD are supplied by a vendor and the programming, PLC and HMI are supplied by the client or integrator. Section 40 95 11 indicates that the vendor shall supply the entire package. Please confirm and advise.
Answer:
The intent under this contract is for the vendor to supply all hardware, build the panels, test them at the shop, ship to WES, and certify the installation and start up. See Vendor responsibilities outlined in Section 40 91 00, Paragraph 1.2. The installation and start up will be completed by others under a separate contract that WES will give to a general contractor. The programming will be provided by WES’ system integrator.
See Addendum #1, issued December 7, 2021 for the update.
End of Clarifying Questions #1
File details come from the government source that posted it. Updated .