RFQ 03A 230418_0253 Cost Proposal Form.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- BID for replacement of walk-in freezer door-MSP
- Solicitation number
- RFQ - 03A - 23041800000000000253
- Issued by
- Knox County, Maine
About this file
This is a Cost Proposal Form for a freezer door replacement project at Maine State Prison, a state correctional facility located in Warren, Maine. The RFQ (Request for Quotation) is identified as 03A 230418_0253, with the original project reference number RFQ 03A 16A 230328*0238. The project involves the replacement of a walk-in freezer door at the facility. The primary contact for the procurement is Bethany Perry at the Maine State Prison, and the buyer is identified as Tom Paquette. The form requests bidders to provide detailed pricing information for the project completion.
The Cost Proposal Form requires bidders to break down costs across four categories: Material Cost, Shipping Costs, Installation Cost, and Removal Cost. Bidders must enter their proposed total cost and itemize expenses across these cost areas, with the sum of all itemized costs equaling the proposed total cost. The form currently displays zero values across all cost categories, indicating this is a blank template or a submission with incomplete pricing data. Bidders are instructed to enter "N/A" for any cost categories that are not applicable to their proposal.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MSP Freezer Door RFQ Specs.docx | DOCX document | |
| MSP Freezer Blueprint.pdf | ||
| RFQ 03A 230418_0238 Freezer Door Replacement Maine State Prison.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| FREEZER DOOR REPLACEMENT | ||
| RFQ 03A | 16A 230328*0238 | Maine State Prison |
| Contact: | Bethany Perry | 8074 Cushing Road Warren, ME 04864 |
| Buyer: | Tom Paquette |
| Bidder’s Organization Name: | Delivery Days | |
| Proposed Total Cost: | $ - 0 | |
| Proposed Total Cost Breakdown (Sum of below cost areas should equal proposed total cost amount above). Enter N/A if not applicable | ||
| Material Cost: | $ - 0 | |
| Shipping Costs: | $ - 0 | |
| Installation Cost: | $ - 0 | |
| Removal Cost: | $ - 0 | |
| Total Itemized Cost: | $ - 0 |
File details come from the government source that posted it. Updated .