This document is a Request for Proposal (RFP) issued by the State of North Dakota Department of Transportation (NDDOT) Maintenance Division. The RFP is soliciting proposals for the purchase of a lidar-based over-height vehicle detection system and a lidar-based 3D vehicle measurement system.
The over-height detection system must measure vehicle height in real-time, capture images of over-height vehicles and their license plates, and activate warning messages on dynamic message signs. The 3D vehicle measurement system must measure vehicle height, width, and length, capture images of oversized vehicles and their license plates, and provide output to direct drivers to the nearest weigh station. The systems must be installed at designated locations in North Dakota. The RFP specifies the technical and mechanical requirements, environmental conditions, warranty terms, and project schedule. The contract will be a firm fixed price with a renewable term, and the State will not make any advance payments.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment+1.pdf | ||
| Amendment+2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF NORTH DAKOTA
DEPARTMENT OF TRANSPORTATION
MAINTENANCE DIVSION
608 EAST BOULEVARD AVENUE, BISMARCK ND 58505
REQUEST FOR PROPOSAL (RFP)
RFP Title: Over-Height Vehicle Detection System
RFP Number: 680-77-24-050-02
Issued: September 27, 2024
TABLE OF CONTENTS
SECTION ONE – INSTRUCTIONS
1.1 PURPOSE OF RFP
1.2 PROCUREMENT OFFICER CONTACT INFORMATION
1.3 DEFINITIONS
1.4 RFP SCHEDULE
1.5 ASSISTANCE TO INDIVIDUALS WITH A DISABILITY
1.6 SECRETARY OF STATE REGISTRATION REQUIREMENTS
1.7 BIDDERS LIST REGISTRATION
1.8 STATE PROCUREMENT WEBSITE (SPO ONLINE)
1.9 AMENDMENTS TO THE RFP
1.10 DEADLINE FOR QUESTIONS AND OBJECTIONS
1.11 PREPROPOSAL CONFERENCE OR SITE INSPECTION
1.12 OFFER HELD FIRM
1.13 OFFEROR RESPONSIBLE FOR COSTS
1.14 TAXES
1.15 F.O.B. POINT AND FREIGHT
1.16 PROPOSAL RECEIPT DEADLINE – LATE PROPOSALS REJECTED
1.17 PROPOSAL OPENING
1.18 AMENDMENT AND WITHDRAWAL OF PROPOSALS
1.19 NEWS RELEASES
1.20 CONFLICT OF INTEREST
1.21 ATTEMPT TO INFLUENCE PROHIBITED
1.22 COLLUSION PROHIBITED
1.23 PROTEST AND APPEAL
1.24 SPECIFICATIONS PREPARED BY NON-STATE PERSONNEL
1.25 SUPPLIER REGISTRATION (PAYEE)
2.1 BACKGROUND INFORMATION
SECTION THREE – SCOPE OF WORK
3.1 SCOPE OF WORK
3.2 APPLICABLE DIRECTIVES
3.1 REQUIREMENTS
A. DELIVERABLES
B. LOCATION OF WORK/TRAVEL
C. RISK MANAGEMENT
D. CONTRACT TERM, SCHEDULE, AND DELIVERABLES
A. Minimum Qualifications
SECTION FOUR – PROPOSAL INSTRUCTIONS
4.1 PROPOSAL PREPARATION
4.2 PROPOSAL SUBMISSION INSTRUCTIONS
4.3 PROPOSAL FORMAT
4.4 TECHNICAL PROPOSAL
4.5 COST PROPOSAL
SECTION FIVE – AWARD AND PROPOSAL EVALUATION
5.1 AWARD
5.2 RESPONSIVENESS
5.3 RESPONSIBILITY – SUPPLEMENTARY INVESTIGATION
5.4 EVALUATION CRITERIA
5.5 COST PROPOSAL EVALUATION
5.6 CLARIFICATIONS OF PROPOSALS – DISCUSSIONS
5.7 RIGHT OF REJECTION
5.8 THIRD-PARTY SECURITY QUESTIONNAIRE
5.9 BEST AND FINAL OFFERS
5.10 TIE PROPOSALS
5.11 NEGOTIATIONS
5.12 NOTICE OF INTENT TO AWARD
5.13 CONTRACT APPROVAL
5.14 EVALUATION DEBRIEFING
SECTION SIX – CONTRACT INFORMATION
6.1 NORTH DAKOTA CONTRACTUAL REQUIREMENTS – BACKGROUND
6.2 STATE CONTRACT TERMS AND CONDITIONS – OFFEROR’S PROPOSED CHANGES
6.3 CONTRACT PROVISIONS
A. Contract Type B. Payment Procedures C. Inspection & Modification D. Contract Changes – Unanticipated Amendments E. Purchasing Card
6.4 CONTRACTUAL TERMS AND CONDITIONS – NO MATERIAL CHANGES
6.5 SCOPE OF WORK
6.6 CONTRACT TERM
6.7 RIGHT TO INSPECT PLACE OF BUSINESS
ATTACHMENTS
Attachment 1 – Technical Proposal Evaluation Worksheet Attachment 2 – IT Contract Attachment 3 – Enterprise Specifications
SECTION ONE – INSTRUCTIONS
1.1 PURPOSE OF RFP
The State of North Dakota, acting through its Department of Transportation, Maintenance Division, NDDOT (the STATE) is soliciting proposals for an Over-Height Vehicle Detection System.
1.2 PROCUREMENT OFFICER CONTACT INFORMATION
The Procurement Officer is the point of contact for this RFP. Offerors shall direct all communications regarding this RFP to the Procurement Officer. Do not add the Procurement Officer to any marketing distribution lists.
PROCUREMENT OFFICER: Vanessa Brosten EMAIL: vbrosten@nd.gov
PHONE: 701-328-4466
TTY Users call: 7-1-1
A person or firm interested in submitting a proposal should ensure all communications related to the procurement are only with the designated point of contact. This section does not restrict communication with state officials or any member of the legislative assembly unless the state official or member of the legislative assembly is involved directly with the procurement for which the person is interested or has submitted a bid or proposal (N.D.C.C. § 54-44.4-01.1).
Engaging in unauthorized communication or seeking to obtain information about an open solicitation with any state employee or official other than the responsible Procurement Officer or designee is sufficient grounds for suspension or debarment. (N.D.A.C. § 4-12-05-04(7))
1.3 DEFINITIONS
For the purposes of this RFP, the acronyms and defined terms are as follows:
Acronym or Term Name or Definitions Contractor Entity that has an approved contract with the State of North Dakota CT Central Time Zone OMB Office of Management and Budget RFP Request for Proposal Solicitation Closing Deadline for receipt of proposals listed in the RFP Schedule SPO Office of Management and Budget, State Procurement Office SPO Online State Procurement Office Online system TPRM Cyber Third-Party Risk Management TPSQ Third-Party Security Questionnaire https://www.ndlegis.gov/cencode/t54c44-4.pdf http://www.legis.nd.gov/information/acdata/pdf/4-12-05.pdf?20130319105642
1.4 RFP SCHEDULE
EVENT DATE and TIME RFP issued 09/27/2024 Deadline for submission of Questions and Objections 10/08/2024 by 5:00 PM, CT Solicitation Amendment with responses to Questions issued approximately (if required) 10/10/2024
Deadline for receipt of proposals (Solicitation Closing) 10/21/2024 by 2:00 PM, CT IT Review/TPRM Assessment, approximate. 10/28/2024 Proposal evaluation completed by approximately 11/04/2024 Notice of intent to award issued approximately 11/06/2024 Secretary of State Registration, if determined to be required. Prior to Contract Signing
Contract start approximately 11/14/2024
1.5 ASSISTANCE TO INDIVIDUALS WITH A DISABILITY
Contact the Procurement Officer, as soon as possible, if an individual with a disability needs assistance with the RFP, including any events in the RFP schedule, so reasonable accommodations can be made.
1.6 SECRETARY OF STATE REGISTRATION REQUIREMENTS
The North Dakota Secretary of State has registration requirements for individuals and businesses transacting business in North Dakota. If the successful Offeror is determined to have a registration requirement with the North Dakota Secretary of State, they must be registered before the contract award and registration must remain active for the duration of the contract period (N.D.C.C. § 54-44.4- 09.1)
• See the OMB Guidelines to Vendor Registry for more information.
Visit the Secretary of State's Vendor Registration webpage for information on registration requirements and fees. Visit FirstStop, the Secretary of State's business and licensing software, for online form options.
• Check the Business Records database to see if a business is registered.
• Contact Secretary of State's office by email or call 701-328-2900 (choose menu item 2, then option 1).
• If you need to register, fees apply.
• Vendors may need to obtain businesses licenses. See the list of licenses required of businesses in the State of North Dakota. The link includes information on who to contact, application fees, renewal dates, and the legal reference.
1.7 BIDDERS LIST REGISTRATION
Individuals or business entities desiring to be notified of bidding opportunities may apply to be placed on the Bidders List. (N.D.C.C. § 54-44.4-09) Bidders Lists are used to notify vendors when solicitations are issued on the State Procurement Office Online system (SPO Online). Placement on the Bidders List does not guarantee a vendor will receive notice of every solicitation (N.D.A.C. § 4-12-05-01). There are no fees to register as a bidder. The online application form requests contact information for the receipt of solicitation notices. The Bidders List application and SPO Online system use commodity codes to identify categories of goods, services, and information technology.
Visit the OMB website for instructions and the online Bidders List Application:
Bidders List Registration Website
For assistance with Bidders List Registration, contact State Procurement Help Desk at 701-328-1728 or infospo@nd.gov.
https://www.ndlegis.gov/cencode/t54c44-4.pdf https://www.ndlegis.gov/cencode/t54c44-4.pdf https://www.omb.nd.gov/sites/www/files/documents/doing-business-with-the-state/procurement/vendor-reg-guidelines.pdf https://sos.nd.gov/business/vendors.html https://sos.nd.gov/firststop.html https://firststop.sos.nd.gov/search/business mailto:sos@nd.gov https://www.ndsu.edu/agriculture/extension/extension-topics/leadership-and-civic-engagement/business-leadership-and-resources-2 https://www.ndsu.edu/agriculture/extension/extension-topics/leadership-and-civic-engagement/business-leadership-and-resources-2 https://www.ndlegis.gov/cencode/t54c44-4.pdf https://www.ndlegis.gov/information/acdata/pdf/4-12-05.pdf https://www.omb.nd.gov/doing-business-state mailto:infospo@nd.gov
1.8 STATE PROCUREMENT WEBSITE (SPO ONLINE)
This RFP and any related amendments and notices will be posted on the North Dakota OMB website using SPO Online. Offerors are responsible for checking this website to obtain all information and documents related to this RFP: https://apps.nd.gov/csd/spo/services/bidder/main.htm Select “Recent Solicitations”. Recent Solicitations are listed by close date.
Notices related to this RFP will be sent to the Bidders List for the needed commodity or service and other known potential Offerors.
Offerors not having completed the Bidders List registration may request to receive notices related to this RFP by contacting the Procurement Officer in writing with the following information: RFP title, business name, contact person, mailing address, telephone number, and email address.
1.9 AMENDMENTS TO THE RFP
If an amendment to this RFP is issued, it will be provided to all Offerors on the Bidders List for the solicitation and to those prospective Offerors who have contacted the Procurement Officer to receive notices related to the RFP. An Offeror shall include in their proposal any required acknowledgements of amendments to the RFP.
1.10 DEADLINE FOR QUESTIONS AND OBJECTIONS
Offerors should carefully review the RFP including all Attachments. Offerors may ask questions to obtain clarification and request additional information, or object to material in the RFP. Questions and objections must be submitted to the Procurement Officer in writing by the deadline identified in the RFP Schedule. If no deadline is specified, questions or objections must be received at least seven days prior to the Solicitation Closing deadline. The Procurement Officer may elect to respond to questions received after the deadline.
Questions and objections should include a reference to the applicable RFP section or subsection. Email is the preferred method of submission with the RFP number and title cited in the email subject line.
Responses to questions will be distributed as a solicitation amendment unless the question can be answered by referring the Offeror to a specific section of the RFP.
1.11 PREPROPOSAL CONFERENCE OR SITE INSPECTION
The STATE will not hold a preproposal conference or site inspection for this RFP.
1.12 OFFER HELD FIRM
Offerors must hold proposals firm for at least 180 days from the deadline for receipt of proposals (Solicitation Closing). The STATE may send a written request to all Offerors to hold their offer firm for a longer period of time.
1.13 OFFEROR RESPONSIBLE FOR COSTS
Offeror is responsible for all costs associated with the preparation, submittal, and evaluation of any proposal including any travel and per diem associated with demonstrations and presentations.
1.14 TAXES
The STATE is not responsible for and will not pay itemized local, state, or federal taxes. Purchases of tangible personal property made by a state government agency is exempt from sales tax. The state sales tax exemption number is E-2001, and certificates will be furnished upon request by the purchasing agency. The contractor must provide a valid Vendor Tax Identification Number as a provision of the contract.
The purchasing agency will determine if services provided under this contract are Form 1099 reportable. The purchasing agency may require the contractor to submit an IRS Form W-9.
The state tax exemption number should not be used by contractors in the performance of a contract.
A contractor or service provider performing any contract, including service contracts, for the United States Government, State of North Dakota, counties, cities, school districts, park board or any other https://apps.nd.gov/csd/spo/services/bidder/main.htm political subdivisions within North Dakota is not exempt from payment of sales or use tax on materials, tangible personal property, and supplies used or consumed in carrying out contracts. In these cases, the contractor is required to file returns and pay sales and use tax just as required for contracts with private parties. Contact the North Dakota Tax Department at 701-328-1246 or visit their website at https://www.nd.gov/tax/tax-resources/ for more information.
A contractor performing any contract, including a service contract, within North Dakota is also subject to the corporation income tax, individual income tax, and withholding tax reporting requirements, whether the contract is performed by a corporation, partnership, or other business entity, or as an employee of the contractor. In the case of employees performing the services in the state, the contractor is required to withhold state income tax from the employees’ compensation and remit to the state as required by law. Contact the North Dakota Tax Department at 701-328-1248 or visit their website for more information.
1.15 F.O.B. POINT AND FREIGHT
All commodities purchased through this contract will be Free on Board (“F.O.B.”) final destination, freight prepaid. Unless specifically stated otherwise, all prices offered must include the delivery cost.
1.16 PROPOSAL RECEIPT DEADLINE – LATE PROPOSALS REJECTED
An Offeror is solely responsible for ensuring their proposal is received by the STATE prior to the Solicitation Closing deadline identified in the RFP schedule regardless of the method of submission. A solicitation amendment will be issued if this deadline is changed. An Offeror may contact the Procurement Officer to inquire whether their proposal has been received. Proposals delivered late will be rejected pursuant to N.D.A.C. § 4-12-08-13.
1.17 PROPOSAL OPENING
A public opening will not be held.
This is a formal sealed Request for Proposal (RFP) process. Proposals will be secured and held unopened until the Solicitation Closing deadline. Per N.D.A.C § 4-12-08-04, the openings may be made public at the discretion of the purchasing agency. If a public opening is held, only the names of Offerors that submitted proposals can be revealed at the opening, and each proposal will be opened in a manner to avoid disclosure of the contents to the competing Offerors.
1.18 AMENDMENT AND WITHDRAWAL OF PROPOSALS
Offeror may amend, supplement, or withdraw proposal prior to the Solicitation closing deadline. No changes will be accepted after the Solicitation closing deadline. After the Solicitation closing deadline, Offeror may make a written request to withdraw their proposal and shall provide evidence that a substantial mistake has been made, at which point the STATE may permit withdrawal.
1.19 NEWS RELEASES
Offerors shall not make any news releases related to this RFP without prior approval of the STATE.
1.20 CONFLICT OF INTEREST
Under state laws and rules, a state employee or official shall not participate directly or indirectly in a procurement when the state employee or official knows of a conflict of interest. Potential conflicts of interest include state employees or their immediate family members employed by the firm, seeking employment with the firm, or with a financial interest in the firm. Potential conflicts of interest will be addressed in accordance with N.D.A.C. § 4-12-04-04. (N.D.C.C. § 12.1-13-03)
Persons employed by the State of North Dakota, or within one year thereafter, may be prohibited from acquiring a pecuniary interest in a public contract or transaction. Offerors should review N.D.C.C. § 12.1-13-02 to ensure compliance and avoid such conflict(s) of interest.
1.21 ATTEMPT TO INFLUENCE PROHIBITED
Offerors must not give or offer to give anything to a state employee or official that might influence or appear to influence procurement decisions. Suspected attempts to influence will be handled in accordance with N.D.A.C. § 4-12-04-05.
https://www.nd.gov/tax/tax-resources/ http://www.legis.nd.gov/information/acdata/pdf/4-12-08.pdf?20130424100739 https://www.legis.nd.gov/information/acdata/html/4-12.html http://www.legis.nd.gov/information/acdata/pdf/4-12-04.pdf?20140130144222 https://www.ndlegis.gov/cencode/t12-1c13.pdf https://www.legis.nd.gov/cencode/t12-1c13.html https://www.legis.nd.gov/cencode/t12-1c13.html http://www.legis.nd.gov/information/acdata/pdf/4-12-04.pdf?20140130144222
1.22 COLLUSION PROHIBITED
Offerors must prepare proposals independently, without collusion. Suspected collusion will be handled in accordance with N.D.A.C § 4-12-04-06.
1.23 PROTEST AND APPEAL
An interested party may protest a solicitation pursuant to N.D.C.C. § 54-44.4-12 and N.D.A.C. § 4-12- 14-01. When a solicitation contains a deadline for submission of questions and objections, protests of the solicitation will not be allowed if these faults have not been brought to the attention of the Procurement Officer before the specified deadline. If no deadline for questions is specified, protests based upon defects in the solicitation must be made at least seven calendar days before the deadline for receipt of proposals.
An Offeror that has submitted a response to a solicitation and is aggrieved may protest an award or notice of intent to award pursuant to N.D.C.C. § 54-44.4-12 and N.D.A.C. § 4-12-14-02. The protest must be submitted in writing to the Procurement Officer during the protest period, which is seven calendar days beginning the day after the notice of intent to award is issued.
The protestor may appeal the decision of the Procurement Officer to the Director of OMB or designee in writing within seven calendar days after receiving notice of the decision pursuant to N.D.C.C. § 54-44.4- 12 and N.D.A.C. § 4-12-14-03.
1.24 SPECIFICATIONS PREPARED BY NON-STATE PERSONNEL
When a purchasing agency has specifications prepared by someone other than a state employee or official on behalf of the STATE, that person or business entity must be excluded from submitting bids or proposals in accordance with N.D.A.C. § 4-12-06-06.
1.25 SUPPLIER REGISTRATION (PAYEE)
The successful Offeror will be required to complete Supplier Registration, if not already registered as a Supplier. Any individual or business who will be receiving payment from a state agency or higher education institution must complete a registration process to collect important financial and taxpayer information. Payments are generally made by check or automatic clearing house (ACH), and taxpayer information must be collected in compliance with IRS requirements. The State and North Dakota University System (NDUS) have separate financial systems and vendor registration processes.
http://www.legis.nd.gov/information/acdata/pdf/4-12-04.pdf?20140130144222 http://www.legis.nd.gov/cencode/t54c44-4.pdf?20130417132347 http://www.legis.nd.gov/information/acdata/pdf/4-12-14.pdf?20130417132435 http://www.legis.nd.gov/information/acdata/pdf/4-12-14.pdf?20130417132435 http://www.legis.nd.gov/cencode/t54c44-4.pdf?20130417132347 http://www.legis.nd.gov/information/acdata/pdf/4-12-14.pdf?20130417132435 http://www.legis.nd.gov/cencode/t54c44-4.pdf?20130417132347 http://www.legis.nd.gov/cencode/t54c44-4.pdf?20130417132347 https://www.legis.nd.gov/information/acdata/pdf/4-12-14.pdf https://www.ndlegis.gov/information/acdata/pdf/4-12-06.pdf?20140130144222
SECTION TWO – BACKGROUND
2.1 BACKGROUND INFORMATION
North Dakota Department of Transportation’s (NDDOT’s) mission is to safely move people and goods.
The Office of Operations maintenance division is responsible for NDDOT property and facilities; health, safety and emergency responses; non-project related right-of-way; budgeting for maintenance operations, capital improvements, maintenance equipment, pavement marking program, static traffic signs, maintenance specifications; pavement reservation program; Road Weather Information System (RWIS), Intelligence Transportation System (ITS); load restriction and road condition reports.
Our agency is conducting this solicitation because bridges are consistently getting hit due to incorrect routing based on vehicle’s size, inaccurate measurements, or incorrect permitting and routing.
Obtaining accurate measurements of an oversize vehicle is currently difficult to do and relies on transportation companies to accurately measure these and request the appropriate permits.
Unfortunately, these measurements can be inaccurate, leading to collisions with bridges and overpasses, resulting in hundreds of thousands of dollars in damages and significant safety issues on roadways. NDDOT has plans to combat this issue with the use of oversize vehicle measuring system technology.
SECTION THREE – SCOPE OF WORK
3.1 SCOPE OF WORK
The Department of Transportation, Division of Maintenance (STATE) is soliciting proposals for the purchase of lidar based over-height detection system to detect and warn drivers of a low bridge near the 16th St crossing on US in Minot, ND. The department will also be purchasing a lidar based 3D vehicle measurement system to be installed on I-29 NB near RP 23.
The department has hired SRF Consulting Group to develop the plan set to support the sensors. The plan set will consist of the following work.
a. Design of the DMS for each system
b. Design and siting of mounting structures.
The contractor will work with SRF Consulting Group to make sure the mounting structures are designed correctly for each sensor.
c. Design electrical requirements.
d. Design integration of detection system with DMS.
The sensors will be installed during the 2025 construction season. The contractor will need to coordinate installation with the contractor who is awarded the bid for the above plan set.
3.2 APPLICABLE DIRECTIVES
This information technology project is subject to the following:
• N.D.C.C. § 54-10-28 related to the state auditor’s authority to conduct information technology compliance reviews.
• N.D.C.C.§ 54-59 related to the Information Technology Department
• If applicable, N.D.C.C. §§ 54-35-15.2, 54-35-15.3, and 54-35-15.4 related reporting to and review by the Legislative Council Information Technology Committee.
3.1 REQUIREMENTS
A. DELIVERABLES
The contractor will be required to provide the following to achieve the objective of this project:
1. Over-height detection system
a. Must measure vehicle height in real time at posted speeds using lidar technology.
Accuracy must be within +/- 2 inches of actual height.
b. Must capture image displaying the entire vehicle if an over height condition is detected.
c. Must capture an image of the license plate of an over height vehicle.
d. Must perform optical character recognition of the vehicle license plate and store plate information along with date and time of detection in a central data store.
e. System must provide an output usable by a Dynamic Message Sign (DMS) controller to activate a warning message for the driver of the over height vehicle.
f. Must record and log all data associated with each occurrence.
g. The central data store must include images captured for each vehicle with its license plate data.
h. Data must be accessible by NDDOT and North Dakota Highway Patrol (NDHP) staff through a web-based portal. Active directory authentication is required.
i. Must provide sensors for both directions of travel on the designated roadway.
j. Systems must be commissioned by a certified manufactures technician.
2. 3D vehicle measurement System
a. Must measure vehicle height, width, and length in real time at posted speeds using lidar technology. Accuracy for all dimensions must be within +/- 2 inches.
b. Must capture image of oversize vehicle.
c. Must capture an image of the license plate of an over size vehicle.
d. Must perform optical character recognition of the vehicle license plate and store plate information along with date and time of detection in a central data store.
e. System must provide an output to a DMS controller to display a message instructing the driver to enter the next weigh station ramp for permit compliance verification.
f. System must be capable of measuring two travel lanes simultaneously at the specified location.
g. The central data store must include images captured for each vehicle with its license plate data and measured dimensions.
h. Data must be accessible by NDDOT and NDHP staff through a web-based portal.
Active directory authentication is required.
i. It is desired to have the system integrate with the NDDOT’s permit system to verify the load is properly permitted and in compliance.
j. Systems must be commissioned by a certified manufactures technician.
3. Mechanical Requirements
a. The external enclosure of the equipment shall serve as an effective weatherproof barrier to protect the operating equipment. The enclosure shall maintain its structural integrity for the operational life of the equipment and shall allow ready access for control adjustment and electrical interconnection.
b. Each of the equipment units shall be provided with means for rigidly attaching the unit to a vertical or horizontal member without requiring any machining operation.
The attachment means shall not stress or deform the unit and shall prevent the movement of the unit in any direction by wind force. The mounting means shall allow simple adjustment of the vertical position on the pole. The mounting means for the units shall have the capability of adjusting the angular orientation of the optical axes in both the horizontal and vertical plane over an angular range of plus or minus five degrees from nominal. The unit shall be mounted to detect the presence of vehicles that exceed the specified height.
c. Detection and measurement equipment shall be mounted and equipped with appropriate guard devices to minimize contamination of lenses or emitters by dirt, water, or road-spray.
4. Environmental Requirements
a. All equipment shall operate and meet all the requirements of this Specification under the following atmospheric conditions:
Temperature -40° F to 135° F Relative Humidity 0 to 95% non-condensing Rain 2 inches per hour rate Snow 5 inches per hour rate Fog 200 foot visibility Wind Velocity 0 to 90 miles per hour
b. The detection and measurement equipment shall operate properly when the sun is positioned within 30 degrees of the extended optical axes of the receiver unit in its installed configuration. If the above requirements cannot be met, the equipment will be deemed satisfactory if explicit installation information is given such that the rays of the sun cannot interfere with the proper operation of the equipment. This provision includes reflections from vehicles.
c. The variation in light intensity caused by the shadow of passing clouds shall not interfere with the proper operation of the equipment.
5. Warranty
a. The supplier shall warranty all equipment supplied, including equipment from other manufacturers, against defective materials and workmanship. The supplier shall provide the warranties certifications.
b. During the first 365 calendar days following system acceptance by the Department, all repairs, including all labor, materials, and traffic control necessary to correct any failures will be at no cost to the Department.
During the following 365 calendar days, the warranty will be limited to the replacement of any materials including shipping charges. Any labor costs during this time will be the responsibility of Department. The supplier will provide warranty service within 48 hours of being notified of problems.
If the Contractor or Manufacturer’s standard warranty exceeds the warranty terms specified in this section, the standard warranty will apply. The Contractor shall provide a copy of the written warranty in their proposal.
c. All systems shall have a minimum operational uptime of 99% not to include power failures, measured on an annual basis. Provide how vendor tracks system health.
d. Contractor shall provide, and STATE may subscribe to, Maintenance Services, including software/hardware updates and technical support services for the products delivered pursuant to this Contract commencing at the end of the warranty period.
Contractor and STATE shall negotiate the terms and price of such Maintenance Services. Contractor warrants that it will continue to offer Maintenance Services for the products for a minimum of five (5) years from the date of final acceptance or installation date of any software/product update.
B. LOCATION OF WORK/TRAVEL
The contractor will be required to travel to each location to install and commission the sensors.
Site 1 – Minot, ND – US 2 @ RP 145 near the 16th St bridge Site 2 – Mooreton, ND – I-29 @ RP 25 near the Mooreton, ND weigh scale
The contractor should include in its price proposal: transportation, lodging, and per diem costs associated with installation and commissioning.
C. RISK MANAGEMENT
The contractor will take appropriate measures to ensure the safety of their employees, state employees, the public, and property. The contractor must identify any potential risks, issues and problems associated with the project and identify ways to mitigate those potential risks.
D. CONTRACT TERM, SCHEDULE, AND DELIVERABLES
1. Contract Term The term of this contract will be from the date of execution, until completion. See the attached contract for extension provisions.
2. Schedule and Deliverables The STATE has identified the following deliverables which are significant work products or milestones in the project. The STATE requires these deliverables to be addressed in the Contract Schedule, at a minimum. The contractor shall develop a schedule for accomplishing the Scope of Work, including these specific deliverables. The final schedule shall be agreed upon between the STATE and the successful Offeror and incorporated into the contract. EXPERIENCE AND QUALIFICATIONS
A. Minimum Qualifications No specific minimum qualifications have been set for this RFP.
SECTION FOUR – PROPOSAL INSTRUCTIONS
4.1 PROPOSAL PREPARATION
The STATE discourages overly lengthy and costly proposals. An Offeror must prepare their proposal using the prescribed proposal format and provide all the requested information; this will enable the proposal to be evaluated fairly and completely. If an Offeror submits more than one proposal, each proposal must be prepared in accordance with these instructions.
Each proposal will include a Technical Proposal and a Cost Proposal prepared in accordance with these instructions. The Technical Proposal and the Cost Proposal must be submitted as separate documents, clearly labeled with the name of the Offeror, and marked “Technical Proposal” and “Cost Proposal.” Costs must not be revealed in the Technical Proposal. Options may be discussed in the technical proposal, but all cost information must be in the Cost Proposal only. DO NOT submit documents that are embedded into proposal documents or that contain links to documents on an external website.
4.2 PROPOSAL SUBMISSION INSTRUCTIONS
Sealed proposals are required; therefore, proposals cannot be submitted by email to the Procurement Officer.
UPLOAD RESPONSE THROUGH THE STATE PROCUREMENT ONLINE SYSTEM (SPO ONLINE):
Offeror must electronically submit proposals through the State Procurement Office Online system (SPO Online) by the Solicitation Closing deadline.
DO NOT WAIT UNTIL THE “LAST MINUTE” TO SUBMIT A RESPONSE. We recommend uploading your response 24 hours prior to the Solicitation Closing deadline.
Offeror must begin the electronic submission process well in advance of the Solicitation Closing deadline to allow for transmission and resolution of any technical difficulties. Be advised that the STATE is not responsible for an Offeror’s failure to timely submit a proposal due to any technical difficulties. If you experience any technical difficulties, contact the Procurement Officer or the State Procurement Office at infospo@nd.gov or 701-328-2740.
If documents are in the process of being uploaded when the Solicitation Closing deadline occurs, the upload process will stop. The attempted submission will not be uploaded successfully and is ineligible for consideration. The STATE takes no responsibility for electronic submissions that are captured, blocked, filtered, quarantined, or otherwise prevented from uploading by any anti-virus or other security software.
1. This solicitation is posted on SPO Online at: https://apps.nd.gov/csd/spo/services/bidder/main.htm
2. Select “Recent Solicitations” and find the solicitation. Solicitations are listed by close date.
3. Use “Upload Response” to upload a maximum of five (5) clearly labeled documents before the Solicitation Closing deadline provided in the RFP Schedule.
4. Offeror must upload their Technical Proposal and Cost Proposal in separate files.
5. The maximum file size allowed is 50 MB per file.
6. There is a 50 character file name limitation for the document being uploaded.
7. There is 75 character limit in the TITLE field within SPO Online.
8. All SPO Online field entries must be alphanumeric. Dashes and underscores are allowed; however, the system DOES NOT accept other special characters such as apostrophe, & symbol, quotation marks, etc.
9. DO NOT submit documents that are embedded (zip files), movies, wmp, encrypted, or mp3 files.
10. Offeror will receive an email confirmation from infospo@nd.gov that the upload response was received including the “File Description” for the uploaded files. Review this email to ensure all files mailto:infospo@nd.gov https://apps.nd.gov/csd/spo/services/bidder/main.htm were successfully uploaded. If Offeror DOES NOT receive an email confirmation, the upload was NOT successful, and the files will need to be uploaded again. If Offeror does not receive an email confirmation after the reattempt, contact the Procurement Officer or the State Procurement Office at infospo@nd.gov or 701-328-2740.
Visit https://www.omb.nd.gov/sites/www/files/documents/doing-business-with-the-state/procurement/spo-electronic-response-external-job-aid.pdf for the SPO Electronic Response Job Aid which describes how to submit an electronic response.
4.3 PROPOSAL FORMAT
Prepare the Technical Proposal and Cost Proposal in accordance with these instructions.
Technical Proposal – Format the proposal with the following labeled sections:
Section 1 – Cover Letter Section 2 – RFP Amendments Section 3 – Scope of Work Strategy Section 4 – Experience and Qualifications Section 5 – Contract Provisions Section 6 – Open Records and Confidentiality
Cost Proposal – The Cost Proposal must be a separate document. Format the Cost Proposal following the RFP instructions.
4.4 TECHNICAL PROPOSAL
SECTION 1 – COVER LETTER
Proposals shall include a cover letter that includes the following:
1. The name of the Offeror, name of the person to contact regarding the proposal, email address, telephone number, and mailing address.
2. Offerors are instructed to review the “Conflict of Interest” provisions in RFP Section 1
“Instructions.” If the firm, its employees, or subcontractors working on the contract have an apparent or actual conflict of interest, provide a statement disclosing the circumstances of the apparent or actual conflict of interest. Otherwise, provide a statement that your firm, employees, and subcontractors do not have a conflict of interest.
3. The cover letter must be signed by an individual with authority to bind the Offeror. By signing the cover letter, an Offeror certifies that it complies with:
a. All the requirements, terms, and conditions as set forth in this RFP.
b. The requirement that the Offeror’s proposal accurately describes the goods and services being offered to the STATE, and the proposal will be held firm for the period specified.
c. All local, state, and federal laws, rules, code laws, rules, code, regulation, and policies, including those relating to nondiscrimination, accessibility, civil rights, and equal employment.
d. The requirement that this proposal was prepared independently without collusion.
SECTION 2 – RFP AMENDMENTS
Provide signed copies of all Solicitation Amendments issued by the STATE that were required to be acknowledged by Offerors.
SECTION 3 –SCOPE OF WORK STRATEGY
Offeror must review the requirements and deliverables provided in RFP Section 3, Scope of Work.
1. Applicable Directives. The Offeror must identify any state and federal requirements that apply to the contract.
mailto:infospo@nd.gov https://www.omb.nd.gov/sites/www/files/documents/doing-business-with-the-state/procurement/spo-electronic-response-external-job-aid.pdf https://www.omb.nd.gov/sites/www/files/documents/doing-business-with-the-state/procurement/spo-electronic-response-external-job-aid.pdf
2. Strategy for Scope of Work Requirements. The Offeror must provide narrative statements to demonstrate their understanding of the scope of work requirements. Explain the proposed strategy to accomplish the scope of work, meet all requirements, and provide the deliverables described in the scope of work within the STATE’s project schedule.
3. Value-Added Options. Offerors may include any optional services or goods that are not required by the STATE but are within the scope of work (e.g., an option for a higher level of service, equipment accessories, extended warranty options, etc.). Describe any value-added options being offered.
4. Location of Work. The proposal must respond to the STATE’s Location of Work instructions within the RFP Scope of Work. Describe where the work will be performed and any proposed travel.
5. State Furnished Property and Services. Provide a detailed breakdown of the Offeror’s expectations for STATE resources that will be needed for the project, including number of staff, qualifications, roles and responsibilities, and time requirements for the various phases of the project.
6. Risk Management. Offerors must describe measures to be taken to ensure the safety of its employees, state employees, the public, and property. Offerors must also identify any pertinent issues and potential problems related to the project and describe how those potential issues and problems could be mitigated.
7. Project Management Plan. The proposal must describe how the contractor intends to manage the project to ensure the work is accomplished on time, within budget, and meet quantity and quality standards. Offerors may provide a narrative or organizational chart to illustrate the lines of authority and accountability.
8. Proposed Schedule and Deliverables. The proposal must provide a timeline for accomplishing the work, in consideration of the STATE’s Contract Schedule within the RFP Scope of Work.
SECTION 4 –EXPERIENCE AND QUALIFICATIONS
Mandatory Requirements. An Offeror must provide information to demonstrate meeting the Offeror Experience and Qualifications Requirement in RFP Section 3, Scope of Work, Experience and Qualifications.
Experience and Qualifications of the Firm Provide a brief history and describe the organization of the firm. Describe the number of years the Offeror has provided the type of work requested in this RFP. Describe specific experience of their firm in completing similar projects. Provide a description of the project, approximate time frame of the project, and contact information for the customer. Offerors may provide letters of reference from customers.
Experience and Qualifications of the Project Team Provide a narrative or organizational chart that describes the organization of the proposed project team. Provide information for key project team members, including:
1. Description of anticipated work they will perform and approximate estimated hours;
2. Resume or description of the relevant education, training, experience, skills, and qualifications;
3. Offeror must provide a designated executive level contact that will act as a point of contact for any issues that need escalation or to discuss the needs of the STATE. This point of contact will be required to participate in any requested demonstration or presentation requested during the RFP process. They will discuss how the contract will be supported and how the Offeror and STATE will work together to ensure a successful outcome;
4. If the Offeror has vacant positions, identify the job description and minimum qualifications for staff members to be recruited;
5. Subcontractors. If an Offeror intends to use subcontractors, the Offeror must identify in the proposal the names of the subcontractors and the portions of the work the subcontractors will perform. Provide a statement that the Offeror will ensure that the subcontractor has or will obtain any required licenses and registrations, including registration with the North Dakota Secretary of State; and
6. Joint Venture. If submitting a proposal as a joint venture, provide narrative statements that describe the roles and responsibilities of each party to the joint vendor. If available, submit a copy of the joint venture agreement that identifies the parties involved and their rights and responsibilities.
References Provide three (3) references for similar projects the Offeror has completed. Offerors must include the name of a contact person, address, email, and telephone number. Offerors are responsible for providing accurate reference contact information and are instructed to notify the reference that the STATE may be contacting them. Reference checks may begin within one (1) business day of the Solicitation Closing deadline. Evaluation may be impacted if the STATE is unable to contact the reference or the reference does not provide the requested information in a timely fashion.
SECTION 5 – CONTRACT PROVISIONS
Offeror shall review the RFP Section 6 and the STATE’s contract – Attachment 2.
The proposal must indicate whether the Offeror accepts the terms and conditions in the STATE’s contract.
An Offeror may state that they accept the STATE’s contract as written.
An Offeror may state any objections or propose changes or additions to the STATE’s contract.
Describe the changes to the contract being proposed or provide a red-line of the STATE’s contract.
Offeror is not to submit their own contract or standard terms and conditions with their proposals.
Offeror should address the specific language in the attached contract and submit any proposed changes.
North Dakota procurement statutes, rules, and policies allow some negotiation of the terms and conditions. No changes to the terms and conditions will be permitted without prior written approval from the STATE.
SECTION 6 – OPEN RECORDS AND CONFIDENTIALITY
All proposals and other material submitted become the property of the STATE and may be returned only at the STATE’s discretion. The State of North Dakota has broad open records laws. Proposals received are exempt from open record requirements until an award is made, in accordance with N.D.C.C. § 54-44.4-10(2). After award, proposals are subject to the North Dakota open records laws. Proposals or portions of proposals may be confidential only if specifically stated in law.
Offerors are instructed not to mark their entire proposal as “confidential”.
Offeror must provide one of the following in their proposal:
• Provide a statement indicating that their proposal does not contain any confidential information, OR
• Make a written request to hold confidential any trade secrets and other proprietary data contained in their proposal. Offeror must clearly identify the material considered confidential and http://www.legis.nd.gov/cencode/t54c44-4.pdf?20131002103938 explain why the material is confidential. See the North Dakota Office of the Attorney General website for additional information at https://www.legis.nd.gov/cencode/t44c04.pdf and https://attorneygeneral.nd.gov/open-records-meetings If the STATE receives a request for public information, the Procurement Officer, in consultation with the Office of the Attorney General, shall determine whether the information is an exception to the North Dakota open records laws, and the information shall be processed accordingly.
4.5 COST PROPOSAL
Total Cost. Cost proposals must provide the total proposed cost for completing the RFP requirements.
Itemized Costs. Include a detailed itemization of the Cost Proposal, including all direct and indirect costs:
• One time or startup costs
• Ongoing/Lifecycle Costs (For example, consumables, maintenance and support, software license, subscription services, etc.)
• Commodities/Equipment/Supplies
• Total labor, including a breakdown of the number of hours at the various hourly rates
• Subcontractor costs
• Travel expenses
• Overhead
• Etc.
Value-Added Options. Offeror may include pricing for any value-added options that are described in the Offeror’s proposal as options, but not included in the total cost. Any options must be within the scope of work (e.g., an option for a higher level of service, equipment accessories, extended warranty options, etc.). Provide details related to initial cost, reoccurring costs, and options. The STATE shall not consider these costs as part of cost evaluation scoring.
All costs must be stated in U.S. currency. Any commodities being imported must be identified, and the price must include any applicable shipping and handling, customs, brokerage agency fees, and duties.
Offeror should describe any discount terms for prompt payment. Discounts for prompt payment will not be considered in evaluating costs.
https://www.legis.nd.gov/cencode/t44c04.pdf https://attorneygeneral.nd.gov/open-records-meetings
SECTION FIVE – AWARD AND PROPOSAL EVALUATION
5.1 AWARD
The STATE intends to award a contract to the responsible Offeror whose proposal is determined to be responsive to the requirements of the solicitation and is determined to be the most advantageous in consideration of the RFP evaluation criteria.
5.2 RESPONSIVENESS
All proposals will be evaluated to determine if they are responsive to the requirements of the solicitation. The STATE reserves the right to waive minor informalities in accordance with N.D.A.C.
chapter 4-12-10. Minor informalities are insignificant omissions or nonjudgmental mistakes that are matters of form rather than substance, evident from RFP document, with a negligible effect on price, quantity, quality, delivery, or contractual conditions that can be waived or corrected without prejudice to other Offerors. Responsive proposals will be evaluated by the Procurement Officer or evaluation committee using the evaluation criteria stated within the RFP.
5.3 RESPONSIBILITY – SUPPLEMENTARY INVESTIGATION
The STATE reserves the right to contact references, other customers, including state and local government agencies, regarding past experience with the Offeror. Prior experience of the state agency or institution with any prospective Offeror may also be taken into consideration during evaluation.
The STATE may, at any time, make a supplementary investigation as to the responsibility of any Offeror in accordance with N.D.A.C. § 4-12-11-04. This investigation may include, but is not limited to, financial responsibility, capacity to produce, sources of supply, performance record, or other matters related to the Offeror’s probable ability to deliver if a contract is awarded to the Offeror. If it is determined that an Offeror appears not to be sufficiently responsible, the proposal will be rejected.
5.4 EVALUATION CRITERIA
Proposals will be evaluated using a 100 point scale. The evaluation committee will award points based on the questions in the Technical Proposal Evaluation Worksheet – Attachment Insert number. The Technical Proposal evaluation score and Cost Proposal evaluation score will be added together to determine the total evaluation score. After the initial evaluation, the evaluation committee may determine which proposals are reasonably susceptible for award and continue the evaluation process with only those Offerors. Offerors whose proposals are not selected for further evaluation may request a debrief from the Procurement Officer after an award notice is issued. The final evaluation score will consider information received by the STATE, including but not limited to, discussions with Offerors, demonstrations, presentations, site visits, reference checks, and best and final offers.
The evaluation criteria and relative weight is as follows:
Technical Proposal Evaluation: 60 Points A. Scope of Work Strategy –40 Points B. Experience and Qualifications –20 Points
Cost Proposal Evaluation: 40 Points
Minimum Technical Score: Technical proposals must receive at least 70 percent or 42 points of the total points available for the Technical Score to be considered responsive to the RFP requirements.
Preference Laws: Any applicable preference laws will be applied. For more information, refer to the Guidelines to Preference Laws.
5.5 COST PROPOSAL EVALUATION
The STATE will calculate evaluation points awarded to Cost Proposals. Any prompt payment discount terms proposed by the Offeror will not be considered in evaluating cost.
http://www.legis.nd.gov/information/acdata/pdf/4-12-10.pdf?20130430132759 http://www.legis.nd.gov/information/acdata/pdf/4-12-10.pdf?20130430132759 http://www.legis.nd.gov/information/acdata/pdf/4-12-11.pdf?20140130152917 https://www.omb.nd.gov/sites/www/files/documents/doing-business-with-the-state/procurement/guidelines-to-nd-purchasing-preference-laws.pdf
The reciprocal preference law, N.D.C.C. § 44-08-01, was repealed effective August 1, 2023.
The cost amount used for evaluation may be affected by the application of other costs required to implement the proposed solution to determine the total cost of the solution (i.e. cost for ITD to host a STATE hosted solution).
The lowest Cost Proposal will receive the maximum number of points allocated to cost. Cost proposals will be evaluated using the following formula.
Price of Lowest Cost Proposal Price of Proposal Being Rated X Total Points for Cost Available = Awarded Points
5.6 CLARIFICATIONS OF PROPOSALS – DISCUSSIONS
To determine if a proposal is reasonably susceptible for award, communications by the Procurement Officer or evaluation committee are permitted with an Offeror to clarify uncertainties or eliminate confusion concerning the contents of a proposal and determine responsiveness to the RFP requirements.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .