Base-Recurring
ATTACHMENT J-0200000-16
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT N40084-23-R-6301
EXHIBIT A
| Line Items 0001 and 0002 Recurring Work and Non-recurring Work - Base Period |
| PROVIDE PRICES FOR RECURRING AND NON-RECURRING WORK IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 AND 4 |
ELINs A001A through A702
Note: HR = Hour LH = Labor Hour LO = Lot MO = Month
ELIN Description Quantity Unit of Issue Unit Price (Yen) Total Amount (Yen)
| RECURRING WORK (Spec Item 3) | ||||||
| A001 | PORT OPERATIONS (Annex 6) | |||||
| A001A | Hotel Services Utility Hook-up and Disconnects | |||||
| (Spec Item 3.1) | 12 | MO | 0 | |||
| A001B | Shore Utilities Support Hook-up and Disconnects | |||||
| (Spec Item 3.2) | 12 | MO | 0 | |||
| A001C | Maintain Cables, Hoses, Connectors and Devices | |||||
| (Spec Item 3.4) | 12 | MO | 0 | |||
| A001D | Disposal (Spec Item 3.5) | 12 | MO | 0 | ||
| A001E | Service Orders (Spec Item 3.6) | 12 | MO | 0 | ||
| PORT OPERATIONS - A001 TOTAL | ¥0 |
| A002 | SRF (Annex 6) | ||||
| A002A | Shore Utilities Support Hook-up and Disconnects | ||||
| (Spec Item 3.3) | 12 | MO | 0 | ||
| SRF - A002 TOTAL | ¥0 |
| A003 | UTILITIES (Annex 16, 1501000, 1502000) | |||||
| 1501000 - FACILITY MANAGEMENT | ||||||
| A003A | Facility Engineering Services (Spec Item 3.1) | 12 | MO | 0 | ||
| 1502000 - FACILITY INVESTMENT | ||||||
| A003B | Maintenance (Spec Item 3.1 except fire hydrdants) | 12 | MO | 0 | ||
| A003C | Inspection Testing and Certification Program (Spec Item 3.2) | 12 | MO | 0 | ||
| A003D | Other Recurring Services (Spec Item 3.3) | 12 | MO | 0 | ||
| 1601000 - UTILITY MANAGEMENT | ||||||
| A003E | Utility Work Reception (1601000 Spec Item 3.1) | 12 | MO | 0 | ||
| A003F | Utility Operations Support (1601000 Spec Item 3.2) | 12 | MO | 0 | ||
| A003G | UICAP Support (1601000 Spec Item 3.3) | 12 | MO | 0 | ||
| 1602000 - ELECTRICAL | ||||||
| A003H | Operation (Spec Item 3.1) | 12 | MO | 0 | ||
| A003J | Maintenance (Spec Item 3.2) | 12 | MO | 0 | ||
| A003K | Inspection, Testing, and Certification Program (Spec Item 3.3) | 12 | MO | 0 | ||
| A003L | Other Services (Spec Item 3.4, 3.5, 3.6) | 12 | MO | 0 | ||
| 1603000 - GAS | ||||||
| A003M | Operation (Spec Item 3.1) | 12 | MO | 0 | ||
| A003N | Maintenance (Spec Item 3.2, 3.3) | 12 | MO | 0 | ||
| A003P | Other Recurring Services (Spec Item 3.4) | 12 | MO | 0 | ||
| 1604000 - WASTEWATER | ||||||
| A003Q | Operation (Spec Item 3.1) | 12 | MO | 0 | ||
| A003R | Maintenance (Spec Item 3.2) | 12 | MO | 0 | ||
| A003S | Other Recurring Services (Spec Item 3.3) | 12 | MO | 0 | ||
| 1605000 - STEAM | ||||||
| A003T | Operation (Spec Item 3.1) | 12 | MO | 0 | ||
| A003U | Maintenance (Spec Item 3.2) | 12 | MO | 0 | ||
| A003V | Inspection, Testing, and Certification Program (Spec Item 3.3) | 12 | MO | 0 | ||
| A003W | Other Services (Spec Item 3.4, 3.5, 3.6, 3.7) | 12 | MO | 0 | ||
| 1606001 - POTABLE WATER | ||||||
| A003X | Operation (Spec Item 3.1) | 12 | MO | 0 | ||
| A003Y | Maintenance (Spec Item 3.2) | 12 | MO | 0 | ||
| A003Z | Other Services (Spec Item 3.3, 3.4, 3.5) | 12 | MO | 0 | ||
| A003AA | ORC and AORC for Harioshima (Spec Item 3.6) | |||||
| Including Tank Cleaning Work (Spec Item 3.3.3, for Harioshima only.) | 12 | MO | 0 | |||
| A003AA-1 | ORC and AORC for Harioshima - Start-Up Cost | 2 | MO | 0 | ||
| 1606002 - SALT WATER | ||||||
| A003AB | Operation (Spec Item 3.1) | 12 | MO | 0 | ||
| A003AC | Maintenance (Spec Item 3.2) | 12 | MO | 0 | ||
| A003AD | Inspection, Testing, and Certification Program (Spec Item 3.3) | 12 | MO | 0 | ||
| A003AE | Other Services (Spec Item 3.4, 3.5, 3.6, 3.7) | 12 | MO | 0 | ||
| 1607010 - COMPRESSED AIR | ||||||
| A003AF | Operation (Spec Item 3.1) | 12 | MO | 0 | ||
| A003AG | Maintenance (Spec Item 3.2) | 12 | MO | 0 | ||
| A003AH | Inspection, Testing, and Certification Program (Spec Item 3.3) | 12 | MO | 0 | ||
| A003AJ | Other Services (Spec Item 3.4, 3.5, 3.6) | 12 | MO | 0 | ||
| UTILITIES - A003 TOTAL | ¥0 |
| A004 | HOUSING (Annex 16) | |||
| 1604000 - WASTEWATER | ||||
| A004A | Operation and Maintenance (Spec Item 3.1 & 3.2) | |||
| Ayame WWTP | 12 | MO | 0 | |
| HOUSING - A004 TOTAL | ¥0 |
| A005 | CFAS (Annex 15, 16) | |||
| 1502000 - FACILITY INVESTMENT | ||||
| A005A | Maintenance (Spec Item 3.1, for fire hydrants) | 12 | MO | 0 |
| 1602000 ELECTRICAL | ||||
| A005B | Operation (Spec Item 3.1) | 12 | MO | 0 |
| A005C | Maintenance (Spec Item 3.2) | 12 | MO | 0 |
| 1604000 - WASTEWATER | ||||
| A005D | Operation (Spec Item 3.1) | 12 | MO | 0 |
| A005E | Maintenance (Spec Item 3.2) | 12 | MO | 0 |
| 1606002 - SALT WATER | ||||
| A005F | Operation (Spec Item 3.1) | 12 | MO | 0 |
| A005G | Maintenance (Spec Item 3.2) | 12 | MO | 0 |
| CFAS - A005 TOTAL | ¥0 |
TOTAL RECURRING WORK PRICE ¥0
ELIN Product Name Description Estimated Quantity Unit of Issue Unit Price (Yen) Total Amount (Yen)
| NON-RECURRING WORK (Spec Item 4) | ||
| A701 | Unit Priced Task Work | Provide labor to perform all Unit Priced Labor work per the scope and delivery schedule specified in the order. |
Provide all materials to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Contractor's mark-up rate should be included in the proposed unit price.
| Provide all equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Contractor's mark-up rate should be included in the proposed unit price. | Not to Exceed Total of Non-Recurring Work Amount | LO | Negotiated at time of order | 70,000,000 | |||
| A702 | Flow and Pressure Test for Saltwater Pipeline for Fire Protection System in Dry Dock #2 | Provide labor, material, and equipment to perform flow and pressure test for saltwater pipeline for fire protection system per delivery schedule specified in the order. | 4 | EA | 0 | ||
| TOTAL NON-RECURRING WORK PRICE | ¥70,000,000 |
Notes for Non-Recurring Work Task Orders: (1) Unit Price - Prices must be expressed in whole YEN amounts.
(2) For all Non-recurring task order work, the Contractor shall provide a cost breakdown of labor hours, material costs, equipment costs, overhead, and profit as a part of the price proposal.
(3) The contracting officer may require, for each task order proposal, copies of at least three competitive quotes for each material and equipment to be procured and/or copies of at least three competitive quotes for each work to be performed by a subcontractor(s).
CUI//FEDCON
Source Selection Information - See FAR 2.101 & 3.104 [when filled] &KFF0000 Amendment 0009
CUI//FEDCON [when filled in] Source Selection Information - See FAR 2.101 and 3.104 [when filled in]
1ST Option
ATTACHMENT J-0200000-16
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT N40084-23-R-6301
EXHIBIT A
| Line Items 1001 and 1002 Recurring Work and Non-recurring Work - First Option Period |
| PROVIDE PRICES FOR RECURRING AND NON-RECURRING WORK IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 AND 4 |
ELINs B001A through B702
Note: HR = Hour LH = Labor Hour LO = Lot MO = Month
ELIN Description Quantity Unit of Issue Unit Price (Yen) Total Amount (Yen)
| RECURRING WORK (Spec Item 3) | ||||||
| B001 | PORT OPERATIONS (Annex 6) | |||||
| B001A | Hotel Services Utility Hook-up and Disconnects | |||||
| (Spec Item 3.1) | 12 | MO | 0 | |||
| B001B | Shore Utilities Support Hook-up and Disconnects | |||||
| (Spec Item 3.2) | 12 | MO | 0 | |||
| B001C | Maintain Cables, Hoses, Connectors and Devices | |||||
| (Spec Item 3.4) | 12 | MO | 0 | |||
| B001D | Disposal (Spec Item 3.5) | 12 | MO | 0 | ||
| B001E | Service Orders (Spec Item 3.6) | 12 | MO | 0 | ||
| PORT OPERATIONS - B001 TOTAL | ¥0 |
| B002 | SRF (Annex 6) | ||||
| B002A | Shore Utilities Support Hook-up and Disconnects | ||||
| (Spec Item 3.3) | 12 | MO | 0 | ||
| SRF - B002 TOTAL | ¥0 |
| B003 | UTILITIES (Annex 16, 1501000, 1502000) | |||||
| 1501000 - FACILITY MANAGEMENT | ||||||
| B003A | Facility Engineering Services (Spec Item 3.1) | 12 | MO | 0 | ||
| 1502000 - FACILITY INVESTMENT | ||||||
| B003B | Maintenance (Spec Item 3.1 except fire hydrdants) | 12 | MO | 0 | ||
| B003C | Inspection Testing and Certification Program (Spec Item 3.2) | 12 | MO | 0 | ||
| B003D | Other Recurring Services (Spec Item 3.3) | 12 | MO | 0 | ||
| 1601000 - UTILITY MANAGEMENT | ||||||
| B003E | Utility Work Reception (1601000 Spec Item 3.1) | 12 | MO | 0 | ||
| B003F | Utility Operations Support (1601000 Spec Item 3.2) | 12 | MO | 0 | ||
| B003G | UICAP Support (1601000 Spec Item 3.3) | 12 | MO | 0 | ||
| 1602000 - ELECTRICAL | ||||||
| B003H | Operation (Spec Item 3.1) | 12 | MO | 0 | ||
| B003J | Maintenance (Spec Item 3.2) | 12 | MO | 0 | ||
| B003K | Inspection, Testing, and Certification Program (Spec Item 3.3) | 12 | MO | 0 | ||
| B003L | Other Services (Spec Item 3.4, 3.5, 3.6) | 12 | MO | 0 | ||
| 1603000 - GAS | ||||||
| B003M | Operation (Spec Item 3.1) | 12 | MO | 0 | ||
| B003N | Maintenance (Spec Item 3.2, 3.3) | 12 | MO | 0 | ||
| B003P | Other Recurring Services (Spec Item 3.4) | 12 | MO | 0 | ||
| 1604000 - WASTEWATER | ||||||
| B003Q | Operation (Spec Item 3.1) | 12 | MO | 0 | ||
| B003R | Maintenance (Spec Item 3.2) | 12 | MO | 0 | ||
| B003S | Other Recurring Services (Spec Item 3.3) | 12 | MO | 0 | ||
| 1605000 - STEAM | ||||||
| B003T | Operation (Spec Item 3.1) | 12 | MO | 0 | ||
| B003U | Maintenance (Spec Item 3.2) | 12 | MO | 0 | ||
| B003V | Inspection, Testing, and Certification Program (Spec Item 3.3) | 12 | MO | 0 | ||
| B003W | Other Services (Spec Item 3.4, 3.5, 3.6, 3.7) | 12 | MO | 0 | ||
| 1606001 - POTABLE WATER | ||||||
| B003X | Operation (Spec Item 3.1) | 12 | MO | 0 | ||
| B003Y | Maintenance (Spec Item 3.2) | 12 | MO | 0 | ||
| B003Z | Other Services (Spec Item 3.3, 3.4, 3.5) | 12 | MO | 0 | ||
| B003AA | ORC and AORC for Harioshima (Spec Item 3.6) | |||||
| Including Tank Cleaning Work (Spec Item 3.3.3, for Harioshima only.) | 12 | MO | 0 | |||
| 1606002 - SALT WATER | ||||||
| B003AB | Operation (Spec Item 3.1) | 12 | MO | 0 | ||
| B003AC | Maintenance (Spec Item 3.2) | 12 | MO | 0 | ||
| B003AD | Inspection, Testing, and Certification Program (Spec Item 3.3) | 12 | MO | 0 | ||
| B003AE | Other Services (Spec Item 3.4, 3.5, 3.6, 3.7) | 12 | MO | 0 | ||
| 1607010 - COMPRESSED AIR | ||||||
| B003AF | Operation (Spec Item 3.1) | 12 | MO | 0 | ||
| B003AG | Maintenance (Spec Item 3.2) | 12 | MO | 0 | ||
| B003AH | Inspection, Testing, and Certification Program (Spec Item 3.3) | 12 | MO | 0 | ||
| B003AJ | Other Services (Spec Item 3.4, 3.5, 3.6) | 12 | MO | 0 | ||
| UTILITIES - B003 TOTAL | ¥0 |
| B004 | HOUSING (Annex 16) | |||
| 1604000 - WASTEWATER | ||||
| B004A | Operation and Maintenance (Spec Item 3.1 & 3.2) | |||
| Ayame WWTP | 12 | MO | 0 | |
| HOUSING - B004 TOTAL | ¥0 |
| B005 | CFAS (Annex 15, 16) | |||
| 1502000 - FACILITY INVESTMENT | ||||
| B005A | Work Reception (Spec Item 3.1) | 12 | MO | 0 |
| B005A | Maintenance (Spec Item 3.1 for fire hydrants) | 12 | MO | 0 |
| 1602000 ELECTRICAL | ||||
| B005B | Operation (Spec Item 3.1) | 12 | MO | 0 |
| B005C | Maintenance (Spec Item 3.2) | 12 | MO | 0 |
| 1604000 - WASTEWATER | ||||
| B005D | Operation (Spec Item 3.1) | 12 | MO | 0 |
| B005E | Maintenance (Spec Item 3.2) | 12 | MO | 0 |
| 1606002 - SALT WATER | ||||
| B005F | Operation (Spec Item 3.1) | 12 | MO | 0 |
| B005G | Maintenance (Spec Item 3.2) | 12 | MO | 0 |
| CFAS - B005 TOTAL | ¥0 |
TOTAL RECURRING WORK PRICE ¥0
ELIN Product Name Description Estimated Quantity Unit of Issue Unit Price (Yen) Total Amount
| NON-RECURRING WORK (Spec Item 4) | ||
| B701 | Unit Priced Task Work | Provide labor to perform all Unit Priced Labor work per the scope and delivery schedule specified in the order. |
Provide all materials to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Contractor's mark-up rate should be included in the proposed unit price.
| Provide all equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Contractor's mark-up rate should be included in the proposed unit price. | Not to Exceed Total of Non-Recurring Work Amount | LO | Negotiated at time of order | 70,000,000 | |||
| B702 | Flow and Pressure Test for Saltwater Pipeline for Fire Protection System in Dry Dock #2 | Provide labor, material, and equipment to perform flow and pressure test for saltwater pipeline for fire protection system per delivery schedule specified in the order. | 4 | EA | 0 | ||
| TOTAL NON-RECURRING WORK PRICE | ¥70,000,000 |
Notes for Non-Recurring Work Task Orders: (1) Unit Price - Prices must be expressed in whole YEN amounts.
(2) For all Non-recurring task order work, the Contractor shall provide a cost breakdown of labor hours, material costs, equipment costs, overhead, and profit as a part of the price proposal.
(3) The contracting officer may require, for each task order proposal, copies of at least three competitive quotes for each material and equipment to be procured and/or copies of at least three competitive quotes for each work to be performed by a subcontractor(s).
CUI//FEDCON
Source Selection Information - See FAR 2.101 & 3.104 [when filled] &KFF0000 Amendment 0009
Source Selection Information - See FAR 2.101 and 3.104 [when filled in]
2ND Option
ATTACHMENT J-0200000-16
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT N40084-23-R-6301
EXHIBIT A
| Line Items 2001 and 2002 Recurring Work and Non-recurring Work - Second Option Period |
| PROVIDE PRICES FOR RECURRING AND NON-RECURRING WORK IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 AND 4 |
ELINs C001A through C702
Note: HR = Hour LH = Labor Hour LO = Lot MO = Month
ELIN Description Quantity Unit of Issue Unit Price (Yen) Total Amount (Yen)
| RECURRING WORK (Spec Item 3) | ||||||
| C001 | PORT OPERATIONS (Annex 6) | |||||
| C001A | Hotel Services Utility Hook-up and Disconnects | |||||
| (Spec Item 3.1) | 12 | MO | 0 | |||
| C001B | Shore Utilities Support Hook-up and Disconnects | |||||
| (Spec Item 3.2) | 12 | MO | 0 | |||
| C001C | Maintain Cables, Hoses, Connectors and Devices | |||||
| (Spec Item 3.4) | 12 | MO | 0 | |||
| C001D | Disposal (Spec Item 3.5) | 12 | MO | 0 | ||
| C001E | Service Orders (Spec Item 3.6) | 12 | MO | 0 | ||
| PORT OPERATIONS - C001 TOTAL | ¥0 |
| C002 | SRF (Annex 6) | ||||
| C002A | Shore Utilities Support Hook-up and Disconnects | ||||
| (Spec Item 3.3) | 12 | MO | 0 | ||
| SRF - C002 TOTAL | ¥0 |
| C003 | UTILITIES (Annex 16, 1501000, 1502000) | |||||
| 1501000 - FACILITY MANAGEMENT | ||||||
| C003A | Facility Engineering Services (Spec Item 3.1) | 12 | MO | 0 | ||
| 1502000 - FACILITY INVESTMENT | ||||||
| C003B | Maintenance (Spec Item 3.1 except fire hydrdants) | 12 | MO | 0 | ||
| C003C | Inspection Testing and Certification Program (Spec Item 3.2) | 12 | MO | 0 | ||
| C003D | Other Recurring Services (Spec Item 3.3) | 12 | MO | 0 | ||
| 1601000 - UTILITY MANAGEMENT | ||||||
| C003E | Utility Work Reception (1601000 Spec Item 3.1) | 12 | MO | 0 | ||
| C003F | Utility Operations Support (1601000 Spec Item 3.2) | 12 | MO | 0 | ||
| C003G | UICAP Support (1601000 Spec Item 3.3) | 12 | MO | 0 | ||
| 1602000 - ELECTRICAL | ||||||
| C003H | Operation (Spec Item 3.1) | 12 | MO | 0 | ||
| C003J | Maintenance (Spec Item 3.2) | 12 | MO | 0 | ||
| C003K | Inspection, Testing, and Certification Program (Spec Item 3.3) | 12 | MO | 0 | ||
| C003L | Other Services (Spec Item 3.4, 3.5, 3.6) | 12 | MO | 0 | ||
| 1603000 - GAS | ||||||
| C003M | Operation (Spec Item 3.1) | 12 | MO | 0 | ||
| C003N | Maintenance (Spec Item 3.2, 3.3) | 12 | MO | 0 | ||
| C003P | Other Recurring Services (Spec Item 3.4) | 12 | MO | 0 | ||
| 1604000 - WASTEWATER | ||||||
| C003Q | Operation (Spec Item 3.1) | 12 | MO | 0 | ||
| C003R | Maintenance (Spec Item 3.2) | 12 | MO | 0 | ||
| C003S | Other Recurring Services (Spec Item 3.3) | 12 | MO | 0 | ||
| 1605000 - STEAM | ||||||
| C003T | Operation (Spec Item 3.1) | 12 | MO | 0 | ||
| C003U | Maintenance (Spec Item 3.2) | 12 | MO | 0 | ||
| C003V | Inspection, Testing, and Certification Program (Spec Item 3.3) | 12 | MO | 0 | ||
| C003W | Other Services (Spec Item 3.4, 3.5, 3.6, 3.7) | 12 | MO | 0 | ||
| 1606001 - POTABLE WATER | ||||||
| C003X | Operation (Spec Item 3.1) | 12 | MO | 0 | ||
| C003Y | Maintenance (Spec Item 3.2) | 12 | MO | 0 | ||
| C003Z | Other Services (Spec Item 3.3, 3.4, 3.5) | 12 | MO | 0 | ||
| C003AA | ORC and AORC for Harioshima (Spec Item 3.6) | |||||
| Including Tank Cleaning Work (Spec Item 3.3.3, for Harioshima only.) | 12 | MO | 0 | |||
| 1606002 - SALT WATER | ||||||
| C003AB | Operation (Spec Item 3.1) | 12 | MO | 0 | ||
| C003AC | Maintenance (Spec Item 3.2) | 12 | MO | 0 | ||
| C003AD | Inspection, Testing, and Certification Program (Spec Item 3.3) | 12 | MO | 0 | ||
| C003AE | Other Services (Spec Item 3.4, 3.5, 3.6, 3.7) | 12 | MO | 0 | ||
| 1607010 - COMPRESSED AIR | ||||||
| C003AF | Operation (Spec Item 3.1) | 12 | MO | 0 | ||
| C003AG | Maintenance (Spec Item 3.2) | 12 | MO | 0 | ||
| C003AH | Inspection, Testing, and Certification Program (Spec Item 3.3) | 12 | MO | 0 | ||
| C003AJ | Other Services (Spec Item 3.4, 3.5, 3.6) | 12 | MO | 0 | ||
| UTILITIES - C003 TOTAL | ¥0 |
| C004 | HOUSING (Annex 16) | |||
| 1604000 - WASTEWATER | ||||
| C004A | Operation and Maintenance (Spec Item 3.1 & 3.2) | |||
| Ayame WWTP | 12 | MO | 0 | |
| HOUSING - C004 TOTAL | ¥0 |
| C005 | CFAS (Annex 15, 16) | |||
| 1502000 - FACILITY INVESTMENT | ||||
| C005A | Work Reception (Spec Item 3.1) | 12 | MO | 0 |
| C005A | Maintenance (Spec Item 3.1 for fire hydrants) | 12 | MO | 0 |
| 1602000 ELECTRICAL | ||||
| C005B | Operation (Spec Item 3.1) | 12 | MO | 0 |
| C005C | Maintenance (Spec Item 3.2) | 12 | MO | 0 |
| 1604000 - WASTEWATER | ||||
| C005D | Operation (Spec Item 3.1) | 12 | MO | 0 |
| C005E | Maintenance (Spec Item 3.2) | 12 | MO | 0 |
| 1606002 - SALT WATER | ||||
| C005F | Operation (Spec Item 3.1) | 12 | MO | 0 |
| C005G | Maintenance (Spec Item 3.2) | 12 | MO | 0 |
| CFAS - C005 TOTAL | ¥0 |
TOTAL RECURRING WORK PRICE ¥0
ELIN Product Name Description Estimated Quantity Unit of Issue Unit Price (Yen) Total Amount
| NON-RECURRING WORK (Spec Item 4) | ||
| C701 | Unit Priced Task Work | Provide labor to perform all Unit Priced Labor work per the scope and delivery schedule specified in the order. |
Provide all materials to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Contractor's mark-up rate should be included in the proposed unit price.
| Provide all equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Contractor's mark-up rate should be included in the proposed unit price. | Not to Exceed Total of Non-Recurring Work Amount | LO | Negotiated at time of order | 70,000,000 | |||
| C702 | Flow and Pressure Test for Saltwater Pipeline for Fire Protection System in Dry Dock #2 | Provide labor, material, and equipment to perform flow and pressure test for saltwater pipeline for fire protection system per delivery schedule specified in the order. | 4 | EA | 0 | ||
| TOTAL NON-RECURRING WORK PRICE | ¥70,000,000 |
Notes for Non-Recurring Work Task Orders: (1) Unit Price - Prices must be expressed in whole YEN amounts.
(2) For all Non-recurring task order work, the Contractor shall provide a cost breakdown of labor hours, material costs, equipment costs, overhead, and profit as a part of the price proposal.
(3) The contracting officer may require, for each task order proposal, copies of at least three competitive quotes for each material and equipment to be procured and/or copies of at least three competitive quotes for each work to be performed by a subcontractor(s).
CUI//FEDCON
Source Selection Information - See FAR 2.101 & 3.104 [when filled] &KFF0000 Amendment 0009
Source Selection Information - See FAR 2.101 and 3.104 [when filled in]
3RD Option
ATTACHMENT J-0200000-16
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT N40084-23-R-6301
EXHIBIT A
| Line Items 3001 and 3002 Recurring Work and Non-recurring Work - Third Option Period |
| PROVIDE PRICES FOR RECURRING AND NON-RECURRING WORK IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 AND 4 |
ELINs D001A through D702
Note: HR = Hour LH = Labor Hour LO = Lot MO = Month
ELIN Description Quantity Unit of Issue Unit Price (Yen) Total Amount (Yen)
| RECURRING WORK (Spec Item 3) | ||||||
| D001 | PORT OPERATIONS (Annex 6) | |||||
| D001A | Hotel Services Utility Hook-up and Disconnects | |||||
| (Spec Item 3.1) | 12 | MO | 0 | |||
| D001B | Shore Utilities Support Hook-up and Disconnects | |||||
| (Spec Item 3.2) | 12 | MO | 0 | |||
| D001C | Maintain Cables, Hoses, Connectors and Devices | |||||
| (Spec Item 3.4) | 12 | MO | 0 | |||
| D001D | Disposal (Spec Item 3.5) | 12 | MO | 0 | ||
| D001E | Service Orders (Spec Item 3.6) | 12 | MO | 0 | ||
| PORT OPERATIONS - D001 TOTAL | ¥0 |
| D002 | SRF (Annex 6) | ||||
| D002A | Shore Utilities Support Hook-up and Disconnects | ||||
| (Spec Item 3.3) | 12 | MO | 0 | ||
| SRF - D002 TOTAL | ¥0 |
| D003 | UTILITIES (Annex 16, 1501000, 1502000) | |||||
| 1501000 - FACILITY MANAGEMENT | ||||||
| D003A | Facility Engineering Services (Spec Item 3.1) | 12 | MO | 0 | ||
| 1502000 - FACILITY INVESTMENT | ||||||
| D003B | Maintenance (Spec Item 3.1 except fire hydrdants) | 12 | MO | 0 | ||
| D003C | Inspection Testing and Certification Program (Spec Item 3.2) | 12 | MO | 0 | ||
| D003D | Other Recurring Services (Spec Item 3.3) | 12 | MO | 0 | ||
| 1601000 - UTILITY MANAGEMENT | ||||||
| D003E | Utility Work Reception (1601000 Spec Item 3.1) | 12 | MO | 0 | ||
| D003F | Utility Operations Support (1601000 Spec Item 3.2) | 12 | MO | 0 | ||
| D003G | UICAP Support (1601000 Spec Item 3.3) | 12 | MO | 0 | ||
| 1602000 - ELECTRICAL | ||||||
| D003H | Operation (Spec Item 3.1) | 12 | MO | 0 | ||
| D003J | Maintenance (Spec Item 3.2) | 12 | MO | 0 | ||
| D003K | Inspection, Testing, and Certification Program (Spec Item 3.3) | 12 | MO | 0 | ||
| D003L | Other Services (Spec Item 3.4, 3.5, 3.6) | 12 | MO | 0 | ||
| 1603000 - GAS | ||||||
| D003M | Operation (Spec Item 3.1) | 12 | MO | 0 | ||
| D003N | Maintenance (Spec Item 3.2, 3.3) | 12 | MO | 0 | ||
| D003P | Other Recurring Services (Spec Item 3.4) | 12 | MO | 0 | ||
| 1604000 - WASTEWATER | ||||||
| D003Q | Operation (Spec Item 3.1) | 12 | MO | 0 | ||
| D003R | Maintenance (Spec Item 3.2) | 12 | MO | 0 | ||
| D003S | Other Recurring Services (Spec Item 3.3) | 12 | MO | 0 | ||
| 1605000 - STEAM | ||||||
| D003T | Operation (Spec Item 3.1) | 12 | MO | 0 | ||
| D003U | Maintenance (Spec Item 3.2) | 12 | MO | 0 | ||
| D003V | Inspection, Testing, and Certification Program (Spec Item 3.3) | 12 | MO | 0 | ||
| D003W | Other Services (Spec Item 3.4, 3.5, 3.6, 3.7) | 12 | MO | 0 | ||
| 1606001 - POTABLE WATER | ||||||
| D003X | Operation (Spec Item 3.1) | 12 | MO | 0 | ||
| D003Y | Maintenance (Spec Item 3.2) | 12 | MO | 0 | ||
| D003Z | Other Services (Spec Item 3.3, 3.4, 3.5) | 12 | MO | 0 | ||
| D003AA | ORC and AORC for Harioshima (Spec Item 3.6) | |||||
| Including Tank Cleaning Work (Spec Item 3.3.3, for Harioshima only.) | 12 | MO | 0 | |||
| 1606002 - SALT WATER | ||||||
| D003AB | Operation (Spec Item 3.1) | 12 | MO | 0 | ||
| D003AC | Maintenance (Spec Item 3.2) | 12 | MO | 0 | ||
| D003AD | Inspection, Testing, and Certification Program (Spec Item 3.3) | 12 | MO | 0 | ||
| D003AE | Other Services (Spec Item 3.4, 3.5, 3.6, 3.7) | 12 | MO | 0 | ||
| 1607010 - COMPRESSED AIR | ||||||
| D003AF | Operation (Spec Item 3.1) | 12 | MO | 0 | ||
| D003AG | Maintenance (Spec Item 3.2) | 12 | MO | 0 | ||
| D003AH | Inspection, Testing, and Certification Program (Spec Item 3.3) | 12 | MO | 0 | ||
| D003AJ | Other Services (Spec Item 3.4, 3.5, 3.6) | 12 | MO | 0 | ||
| UTILITIES - D003 TOTAL | ¥0 |
| D004 | HOUSING (Annex 16) | |||
| 1604000 - WASTEWATER | ||||
| D004A | Operation and Maintenance (Spec Item 3.1 & 3.2) | |||
| Ayame WWTP | 12 | MO | 0 | |
| HOUSING - D004 TOTAL | ¥0 |
| D005 | CFAS (Annex 15, 16) | |||
| 1502000 - FACILITY INVESTMENT | ||||
| D005A | Work Reception (Spec Item 3.1) | 12 | MO | 0 |
| D005A | Maintenance (Spec Item 3.1 for fire hydrants) | 12 | MO | 0 |
| 1602000 ELECTRICAL | ||||
| D005B | Operation (Spec Item 3.1) | 12 | MO | 0 |
| D005C | Maintenance (Spec Item 3.2) | 12 | MO | 0 |
| 1604000 - WASTEWATER | ||||
| D005D | Operation (Spec Item 3.1) | 12 | MO | 0 |
| D005E | Maintenance (Spec Item 3.2) | 12 | MO | 0 |
| 1606002 - SALT WATER | ||||
| D005F | Operation (Spec Item 3.1) | 12 | MO | 0 |
| D005G | Maintenance (Spec Item 3.2) | 12 | MO | 0 |
| CFAS - D005 TOTAL | ¥0 |
TOTAL RECURRING WORK PRICE ¥0
ELIN Product Name Description Estimated Quantity Unit of Issue Unit Price (Yen) Total Amount
| NON-RECURRING WORK (Spec Item 4) | ||
| D701 | Unit Priced Task Work | Provide labor to perform all Unit Priced Labor work per the scope and delivery schedule specified in the order. |
Provide all materials to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Contractor's mark-up rate should be included in the proposed unit price.
| Provide all equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Contractor's mark-up rate should be included in the proposed unit price. | Not to Exceed Total of Non-Recurring Work Amount | LO | Negotiated at time of order | 70,000,000 | |||
| D702 | Flow and Pressure Test for Saltwater Pipeline for Fire Protection System in Dry Dock #2 | Provide labor, material, and equipment to perform flow and pressure test for saltwater pipeline for fire protection system per delivery schedule specified in the order. | 4 | EA | 0 | ||
| TOTAL NON-RECURRING WORK PRICE | ¥70,000,000 |
Notes for Non-Recurring Work Task Orders: (1) Unit Price - Prices must be expressed in whole YEN amounts.
(2) For all Non-recurring task order work, the Contractor shall provide a cost breakdown of labor hours, material costs, equipment costs, overhead, and profit as a part of the price proposal.
(3) The contracting officer may require, for each task order proposal, copies of at least three competitive quotes for each material and equipment to be procured and/or copies of at least three competitive quotes for each work to be performed by a subcontractor(s).
CUI//FEDCON
Source Selection Information - See FAR 2.101 & 3.104 [when filled] &KFF0000 Amendment 0009
Source Selection Information - See FAR 2.101 and 3.104 [when filled in]
4TH Option
ATTACHMENT J-0200000-16
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT N40084-23-R-6301
EXHIBIT A
| Line Items 4001 and 4002 Recurring Work and Non-recurring Work - Fourth Option Period |
| PROVIDE PRICES FOR RECURRING AND NON-RECURRING WORK IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 AND 4 |
ELINs E001A through E702
Note: HR = Hour LH = Labor Hour LO = Lot MO = Month
ELIN Description Quantity Unit of Issue Unit Price (Yen) Total Amount (Yen)
| RECURRING WORK (Spec Item 3) | ||||||
| E001 | PORT OPERATIONS (Annex 6) | |||||
| E001A | Hotel Services Utility Hook-up and Disconnects | |||||
| (Spec Item 3.1) | 12 | MO | 0 | |||
| E001B | Shore Utilities Support Hook-up and Disconnects | |||||
| (Spec Item 3.2) | 12 | MO | 0 | |||
| E001C | Maintain Cables, Hoses, Connectors and Devices | |||||
| (Spec Item 3.4) | 12 | MO | 0 | |||
| E001D | Disposal (Spec Item 3.5) | 12 | MO | 0 | ||
| E001E | Service Orders (Spec Item 3.6) | 12 | MO | 0 | ||
| PORT OPERATIONS - E001 TOTAL | ¥0 |
| E002 | SRF (Annex 6) | ||||
| E002A | Shore Utilities Support Hook-up and Disconnects | ||||
| (Spec Item 3.3) | 12 | MO | 0 | ||
| SRF - E002 TOTAL | ¥0 |
| E003 | UTILITIES (Annex 16, 1501000, 1502000) | |||||
| 1501000 - FACILITY MANAGEMENT | ||||||
| E003A | Facility Engineering Services (Spec Item 3.1) | 12 | MO | 0 | ||
| 1502000 - FACILITY INVESTMENT | ||||||
| E003B | Maintenance (Spec Item 3.1 except fire hydrdants) | 12 | MO | 0 | ||
| E003C | Inspection Testing and Certification Program (Spec Item 3.2) | 12 | MO | 0 | ||
| E003D | Other Recurring Services (Spec Item 3.3) | 12 | MO | 0 | ||
| 1601000 - UTILITY MANAGEMENT | ||||||
| E003E | Utility Work Reception (1601000 Spec Item 3.1) | 12 | MO | 0 | ||
| E003F | Utility Operations Support (1601000 Spec Item 3.2) | 12 | MO | 0 | ||
| E003G | UICAP Support (1601000 Spec Item 3.3) | 12 | MO | 0 | ||
| 1602000 - ELECTRICAL | ||||||
| E003H | Operation (Spec Item 3.1) | 12 | MO | 0 | ||
| E003J | Maintenance (Spec Item 3.2) | 12 | MO | 0 | ||
| E003K | Inspection, Testing, and Certification Program (Spec Item 3.3) | 12 | MO | 0 | ||
| E003L | Other Services (Spec Item 3.4, 3.5, 3.6) | 12 | MO | 0 | ||
| 1603000 - GAS | ||||||
| E003M | Operation (Spec Item 3.1) | 12 | MO | 0 | ||
| E003N | Maintenance (Spec Item 3.2, 3.3) | 12 | MO | 0 | ||
| E003P | Other Recurring Services (Spec Item 3.4) | 12 | MO | 0 | ||
| 1604000 - WASTEWATER | ||||||
| E003Q | Operation (Spec Item 3.1) | 12 | MO | 0 | ||
| E003R | Maintenance (Spec Item 3.2) | 12 | MO | 0 | ||
| E003S | Other Recurring Services (Spec Item 3.3) | 12 | MO | 0 | ||
| 1605000 - STEAM | ||||||
| E003T | Operation (Spec Item 3.1) | 12 | MO | 0 | ||
| E003U | Maintenance (Spec Item 3.2) | 12 | MO | 0 | ||
| E003V | Inspection, Testing, and Certification Program (Spec Item 3.3) | 12 | MO | 0 | ||
| E003W | Other Services (Spec Item 3.4, 3.5, 3.6, 3.7) | 12 | MO | 0 | ||
| 1606001 - POTABLE WATER | ||||||
| E003X | Operation (Spec Item 3.1) | 12 | MO | 0 | ||
| E003Y | Maintenance (Spec Item 3.2) | 12 | MO | 0 | ||
| E003Z | Other Services (Spec Item 3.3, 3.4, 3.5) | 12 | MO | 0 | ||
| E003AA | ORC and AORC for Harioshima (Spec Item 3.6) | |||||
| Including Tank Cleaning Work (Spec Item 3.3.3, for Harioshima only.) | 12 | MO | 0 | |||
| 1606002 - SALT WATER | ||||||
| E003AB | Operation (Spec Item 3.1) | 12 | MO | 0 | ||
| E003AC | Maintenance (Spec Item 3.2) | 12 | MO | 0 | ||
| E003AD | Inspection, Testing, and Certification Program (Spec Item 3.3) | 12 | MO | 0 | ||
| E003AE | Other Services (Spec Item 3.4, 3.5, 3.6, 3.7) | 12 | MO | 0 | ||
| 1607010 - COMPRESSED AIR | ||||||
| E003AF | Operation (Spec Item 3.1) | 12 | MO | 0 | ||
| E003AG | Maintenance (Spec Item 3.2) | 12 | MO | 0 | ||
| E003AH | Inspection, Testing, and Certification Program (Spec Item 3.3) | 12 | MO | 0 | ||
| E003AJ | Other Services (Spec Item 3.4, 3.5, 3.6) | 12 | MO | 0 | ||
| UTILITIES - E003 TOTAL | ¥0 |
| E004 | HOUSING (Annex 16) | |||
| 1604000 - WASTEWATER | ||||
| E004A | Operation and Maintenance (Spec Item 3.1 & 3.2) | |||
| Ayame WWTP | 12 | MO | 0 | |
| HOUSING - E004 TOTAL | ¥0 |
| E005 | CFAS (Annex 15, 16) | |||
| 1502000 - FACILITY INVESTMENT | ||||
| E005A | Work Reception (Spec Item 3.1) | 12 | MO | 0 |
| E005A | Maintenance (Spec Item 3.1 for fire hydrants) | 12 | MO | 0 |
| 1602000 ELECTRICAL | ||||
| E005B | Operation (Spec Item 3.1) | 12 | MO | 0 |
| E005C | Maintenance (Spec Item 3.2) | 12 | MO | 0 |
| 1604000 - WASTEWATER | ||||
| E005D | Operation (Spec Item 3.1) | 12 | MO | 0 |
| E005E | Maintenance (Spec Item 3.2) | 12 | MO | 0 |
| 1606002 - SALT WATER | ||||
| E005F | Operation (Spec Item 3.1) | 12 | MO | 0 |
| E005G | Maintenance (Spec Item 3.2) | 12 | MO | 0 |
| CFAS - E005 TOTAL | ¥0 |
TOTAL RECURRING WORK PRICE ¥0
ELIN Product Name Description Estimated Quantity Unit of Issue Unit Price (Yen) Total Amount
| NON-RECURRING WORK (Spec Item 4) | ||
| E701 | Unit Priced Task Work | Provide labor to perform all Unit Priced Labor work per the scope and delivery schedule specified in the order. |
Provide all materials to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Contractor's mark-up rate should be included in the proposed unit price.
| Provide all equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Contractor's mark-up rate should be included in the proposed unit price. | Not to Exceed Total of Non-Recurring Work Amount | LO | Negotiated at time of order | 70,000,000 | |||
| E702 | Flow and Pressure Test for Saltwater Pipeline for Fire Protection System in Dry Dock #2 | Provide labor, material, and equipment to perform flow and pressure test for saltwater pipeline for fire protection system per delivery schedule specified in the order. | 4 | EA | 0 | ||
| TOTAL NON-RECURRING WORK PRICE | ¥70,000,000 |
Notes for Non-Recurring Work Task Orders: (1) Unit Price - Prices must be expressed in whole YEN amounts.
(2) For all Non-recurring task order work, the Contractor shall provide a cost breakdown of labor hours, material costs, equipment costs, overhead, and profit as a part of the price proposal.
(3) The contracting officer may require, for each task order proposal, copies of at least three competitive quotes for each material and equipment to be procured and/or copies of at least three competitive quotes for each work to be performed by a subcontractor(s).
CUI//FEDCON
Source Selection Information - See FAR 2.101 & 3.104 [when filled] &KFF0000 Amendment 0009
Source Selection Information - See FAR 2.101 and 3.104 [when filled in]