J-10 Fully Burdened Hourly Rate Price Sheet.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- LBNF/DUNE-US Cryostat Temporary Ventilation
- Solicitation number
- RFP-LBNF-372089-BF
About this file
The file is a J-10 Fully Burdened Hourly Rate Price Sheet for labor categories, specifically for the LBNF/DUNE-US Cryostat Temporary Ventilation solicitation (RFP-LBNF-372089-BF) issued by the Department of Energy Fermi National Accelerator Laboratory. The price sheet outlines fully burdened hourly rates for labor categories including Electrician, HVAC Technician, and Laborer, with provisions for including overhead, profit, fringe, and G&A costs in the rates.
The related federal contract opportunity involves providing a temporary air handling unit for the Long Baseline Neutrino Facility (LBNF) Deep Underground Neutrino Experiment (DUNE) Far Detector Cryostat. The air handling equipment must be constructed from shipping splits, connect to the cryostat via non-conductive duct material, and be electrically connected to a designated power panel. The system is required to condition and circulate air during the installation of cryostat membrane, insulation, and detector components, using large roof feedthroughs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 03--RFP LBNF-372089-BF.pdf | ||
| Amendment 02--RFP LBNF-372089-BF.pdf | ||
| sd16.txt | TXT text file | |
| Amendment 01-RFP 370829.pdf | ||
| PF-07 Small Business Subcontracting Plan Oct 2018.xlsx | XLSX spreadsheet | |
| Hazard Analysis Pages from 013100_7-31-2025 FermiForward_South_Dakota.docx | DOCX document | |
| RFP LBNF 372089-BF Temporary Cryostat Ventilation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Labor Rates
| Labor Category | Hourly Burdened Rates | Hourly Burdened Overtime Rates |
| Electrician | ||
| HVAC Technician | ||
| Laborer |
| **Burdened rates shall include all additional costs including overhead, profit, fringe, and G&A | |
| Other Direct Costs. | |
| Description | Cost |
| (List here) | (List here) |
**Offeror shall propose any other direct cost and the Unit of Measure including rates that could be utilized for any Subcontract change order work.
Fully Burdened Rate Schedule
&N&&[Date]&T
File details come from the government source that posted it. Updated .