RFP Questions and Answers ID04190107 27 Nov 2019.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- PEO Maritime Requirements Support
- Solicitation number
- RFP_ID04190107
About this file
This document contains a questions and answers file related to a solicitation for engineering services to support maritime systems assessments. The solicitation seeks systems engineering, research, development, prototyping and testing capabilities on behalf of the United States Special Operations Command and Program Executive Office for Maritime. Proposals are due no later than December 16, 2019 at 10:00 AM EST and shall be submitted electronically and in hard copy as specified in the solicitation. The NAICS code for this opportunity is 541330 with a size standard of $38.5 million. Previous phases of these requirements were performed under contracts with Battelle Memorial Institute that have since ended with a total value of approximately $3-4 million.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 30 Amd 01 ID04190107 27 Nov 2019.pdf | ||
| RFP_ID0419107_11.27.19.docx | DOCX document | |
| RFP Atch A Pricing Matrix ID04190107 11.27.2019.xlsx | XLSX spreadsheet | |
| RFP Atch D Pricing Matrix ID04190107001 11.27.2019.xlsx | XLSX spreadsheet | |
| RFP Atch B PPQ_ID0419107_ 11.15.2019.docx | DOCX document | |
| Exhibit A.CDRL A003 ID0419107_11.15.2019.pdf | ||
| Atch1.PEO-M PWS_ ID04190107 _11.15.2019.docx | DOCX document | |
| Draft RFP Q-A ID04190107 11.15.2019.docx | DOCX document | |
| RFP Atch C PWS_ID04190107001 _10.31.2019.docx | DOCX document | |
| Atch 2.DD 254 ID04190107_-9.17.2019 (2).pdf | ||
| RFP Atch A Pricing Matrix_ID04190107_ 11.15.2019.xlsx | XLSX spreadsheet | |
| RFP Atch D Pricing Matrix_ID04190107001_11.15.2019.xlsx | XLSX spreadsheet | |
| RFP_ID0419107_11.15.19.docx | DOCX document | |
| Exhibit A.CDRL A004 ID0419107_11.15.2019.pdf | ||
| Exhibit A.CDRL A002 ID0419107_11.15.2019.pdf | ||
| Exhibit A.CDRL A001 ID0419107__11.15.2019.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Doc Title | Page/Tab | Section | Title | Question | GSA Answer |
| RFP | 3-4 | B.2 | Item Number Structure | The solicitation indicates CLIN 0001 as CPFF completion inclusive of Labor and Materials. CLIN 0002 is Labor, CLIN 0003 is Travel, and CLIN 004 is Other Direct Costs. Please clarify the intent of CLIN 0001; specifically, will any Task Orders (TOs) be issued against CLIN 0001? | Yes, depending on the particular task order requirement, the task order will be issued using either CLIN 0001 or CLIN 0002 for the labor. Those task orders using CLIN 0001 will be for tasks requiring completion of a certain requirement. Those task orders using CLIN 0002 will be for requirements for a given time period that do not require a completed end item or product. Task Order 001 will be issued using CLIN 0001 for the labor and CLIN 0004 for travel. |
| RFP | 32 | L.3.1.2 | Small Business Subcontracting Plan | L.3.1.2 states, “…If goals were not met on the SF 294/295s or eSRSs reports, offerors shall provide a detailed explanation as to why the goals were not met.” Please confirm that the SF294/295s referenced are those that are being submitted with the Past Performance volume. | Yes, those that were submitted in Past Performance. |
| RFP | 33 | L.3.2 | Vol 2 Factor 1 Technical | The final RFP includes a Task Order PWS for Task Order 001. Please confirm that the offeror's technical approach to the TO 001 PWS should be incorporated within the overarching Technical Approach, rather than being placed in a separate section. | Any discussion of the technical approach to TO 001 should be included within the Technical Approach rather than being placed in a separate section. |
| RFP | 35 | L.3.3.2 | Vol 3 Past Perf Info Sheets | RFP L.3.3.2 states, “The offeror shall submit a maximum of three (3) and a minimum of two (2) Past Performance Information Sheets identifying active or completed contracts by the prime contractor, either Government or commercial….Past Performance Information Sheets for each contract is limited to two (2) pages…” (Emphasis in original). |
RFP L.3.3.3 states, “Offerors shall submit information on contracts that are considered relevant in demonstrating the ability to perform the proposed overall effort in the information sheets. Offerors should provide a clear, succinct narrative for each contract or subcontract listed that is anticipated to perform at least 10% of the effort based on subcontractor dollars divided by total proposed dollars. Explain the nature of the work involved and the extent the work involved was/is similar to the PEO Maritime Requirements effort in terms of operations, contract scope, schedule, and risk.”
| The overall Past Performance volume is limited to 15 pages, of which the Past Performance Information Sheets (PPIS) (3 PPIS x 2 pp each) and the Summary Page occupy a total of only 7 pages. Accordingly, we interpret Paragraph L.3.3.3 to mean that the Government desires the submission of relevant past performance information on projects that are not covered in one of the three PPIS. Please confirm this interpretation. | There is nothing additional required or desired. The maximum number of pages for the Past Performance Volume has been updated to 10 pages total (up to three (3) pages per PPIS plus one summary page) to allow space for discussion of subcontractors proposed to accomplish at least 10% of the work. | |||||
| RFP | 38 | L.3.5.2.5 | Proposed Labor Categories | Please confirm that, if the prime contractor intends to use subcontractors, additional rows may be added to accommodate the different formulas needed to calculate direct labor vs. subcontractor labor. | No additional rows should be added to the pricing spreadsheet. If a subcontractor is planned to use for a certain category, the offeror should combine each rate proportional to the amount of work each is expected to accomplish during the life of the IDIQ contract. For example, if the prime's rate for Engineer, SME is $100 / hour and the subcontractor rate is $80 and the prime expects to accomplish 75% of the work, the combined rate entered for the Engineer, SME is $95 (100*.75+80*.25). The offeror should provide a calculation sheet to map the method and figures used to calculate the blended rate. | |
| RFP | 45 | M.3.4.3.1 | Table 7 Total Evaluated Price (TEP) | Second row, second column of Table 7. It appears that text is missing from this cell, which reads, “*Offeror Proposed fully burdened rates or Gov’t MPC if” Please confirm that the intent is to jump to the asterisked item below the table. | The table cut off in the posted RFP. The cell of the table has been updated so the cell reads, "*Offeror Proposed fully burdened rates or Gov’t MPC if necessary" | |
| Attachment A | Attachment A | TO 001 Pricing Matrix | The Pricing Matrix for Task Order 001 does not include materials. Please provide a Government plug number for materials. | The Task Order 001 Pricing Matrix has been updated to include a material plug figure. |
Note: Attachment A is the IDIQ pricing matrix used for evaluation. Attachment D is the Task Order 001 pricing matrix used to price task order 001.
| Attachment A | Attachment A | IDIQ Pricing Matrix | Please confirm that the offeror may modify the format and formulas to accurately reflect the offeror's approved bidding system and cost burdens. | If any changes are made to the pricing matrix, the changes should be clearly identified in the notes section of the pricing sheet. If an offeror would like the Government to review and provide comments about their proposed changes to the Attachment A Pricing Matrix, the offeror shall submit their proposed updated Pricing Matrix to Jonathan.Rinkinen@gsa.gov and Libia.Cristancho@gsa.gov NLT COB 09 Dec 2019. Each updated Pricing Matrix submitted for Government review will be reviewed for acceptability of the format and formula changes only. There will be no evaluation of the prices being proposed. |
| Attachment D | N/A | IDIQ Pricing Matrix | Please confirm that the offeror may modify the format and formulas to accurately reflect the offeror’s approved bidding system and cost burdens. | If any changes are made to the pricing matrix, the changes should be clearly identified in the notes section of the pricing sheet. If an offeror would like the Government to review and provide comments about their proposed changes to the Attachment D Pricing Matrix, the offeror shall submit their proposed updated Pricing Matrix to Jonathan.Rinkinen@gsa.gov and Libia.Cristancho@gsa.gov NLT COB 09 Dec 2019. Each updated Pricing Matrix submitted for Government review will be reviewed for acceptability of the format and formula changes only. There will be no evaluation of the prices being proposed. |
Note: Attachment A is the IDIQ pricing matrix used for evaluation. Attachment D is the Task Order 001 pricing matrix used to price task order 001.
| RFP | Historical Information | How are these services currently being performed? Under contract? In-house? | These services are new phases of the PEO-Maritime requirement. As such, these services were not previously performed for this phase of the requirement. Prior phases of the requirement were completed using other contracts. |
| RFP | Historical Information | If these requirements are currently being performed under a contract, A. Who is the Contractor? |
B. What is the contract number?
C. When does the contract expire?
| D. What is the current contract value? | The contracts for previous phases were performed by Battelle Memorial Institute under contracts GS00Q14OADU402, Task Order W911NF-18-F-0002 and W911NF-17-D-0011, Task Order W911NF-18-F-0065. Each contract has ended. Each contract was awarded previously by the Army. The GSA Contracting Officer does not have the exact current contract value; however, the previous phases were cumulatively in the $3-4 million range. | |||
| RFP | Historical Information | What is the anticipated RFP release date? | The RFP was released 15 Nov 2019. |