J.1-C_SOD_TO_0001_ISD_LTC_Surveyor_Training_Development.DOCX
DOCX document 41 KB Posted
- Attached to
- National Surveyor Training Program Federal contract opportunity
- Solicitation number
- RFP-CMS-2015-8A-NSTP
About this file
Attachment J.1-C Task Order 0001 SOD
View the file
Other files for this federal contract opportunity
Show all 50
National Surveyor Training Program has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
National Surveyor Training Program IDIQ Chapter 5. Instructional Systems Design- Long Term Care Surveyor Training Development
SCHEDULE OF DELIVERABLES:
| Task |
| Description |
| Due Date |
| Task 1a(1) |
| Conduct the Basic Long Term Care (LTC) Instructor Training for Trainers Annually. |
| Annually, per CMS SCG Training Team Calendar |
| Task 1a(2) |
| Long Term Care ISD Classroom Attendance |
| Per CMS SCG Training Staff Calendar |
| Task 1a(3) |
| Long Term Care Needs Assessment and Job Task Analysis |
| Kick off within 90 days after award |
| Task 1a(4) |
| Basic Long Term Care Surveyor Training Video Assessment |
| Kick off within 60 days after award. Assess annually. |
| Task 1b(1) |
| Conduct the Basic Life Safety Code (LSC) Instructor Training for Trainers |
| Annually, per CMS SCG Training Team Calendar |
| Task 1b(2) |
| Life Safety Code ISD Classroom and Online Course Attendance |
| Per CMS SCG Training Staff Calendar |
| Task 1b(3) |
| Life Safety Code Needs Assessment and Job Task Analysis |
| Kick off within 90 days after award |
| Task 1b(4) |
| Basic Life Safety Code Surveyor Training Video Assessment |
| Kick off within 30 days after award. Assess annually. |
| Task 1b(5) |
| Alignment of Online BLSC and Face 2 Face BLSC Courses |
| Quarterly |
| Task 1b(6) |
| LSC Curriculum Development, Revision, and Maintenance |
| Quarterly |
| Task 1b(7A) |
| Implementation of 2012 edition of LSC Curriculum Updates |
| Quarterly |
| Task 1b(7B) |
| Implementation of 2012 edition of LSC – SOM and LSC Form Revisions (excludes Waivers and Trend Analysis) |
| Kick off within 120 days after award |
| Task 1c(1) |
| Investigative Skills for Complaint Investigations (Scenario-Based Instructor Facilitated Training Development) design plan |
| Within 60 days of award |
| Task 1d |
| Complaint Intake and Triage Training |
| Kick off within 30 days after award |
| Task 1e |
| Survey Executive Training Institute - Instructional Design and Development |
| Annually, per CMS SCG Training Staff Calendar |
| Task 1f |
| Conduct the State Agency Director Orientation Course (SADOC) |
| Annually, per CMS SCG Training Staff Calendar |
| Task 1g |
| Certification Specialist Web Based Training (WBT) Development |
| ongoing |
| Task 1h |
| Instructional Systems Design for Webinar and Web Based Training Developments |
| Per CMS SCG Training Staff Calendar |
Task 1i
| SME Support for R&D Surveyor & Certification Specialist Guidance / Training Development |
| Per CMS SCG Training Staff Calendar |
| Task 1j |
| Provide Toll Free Phone Line and Webinar Link for Work Group Teleconferences |
| Upon award |
| Task 1k |
| Graphic Subscription |
| Within 30 Days of award |
| Task 1l |
| Webinar for Working Group Meetings |
| Per Training Team Schedule |
Task 1m
ISD for Additional SCG Training Products, per CMS SCG Need
Per CMS SCG Training Staff Calendar
Task 1n
| Provide transition team support |
| Within 6 Weeks of end of Period of Performance |
SECTION 508 - ACCESSIBILITY OF ELECTRONIC AND INFORMATION TECHNOLOGY
(a) This task order is subject to Section 508 of the Rehabilitation Act of 1973 (29 U.S.C. 794d) as amended by the workforce Investment Act of 1998 (P.L. 105-220). Specifically, subsection 508(a)(1) requires that when the Federal Government procures Electronic and Information Technology (EIT), the EIT must allow Federal employees and individuals of the public with disabilities comparable access to and use of information and data that is provided to Federal employees and individuals of the public without disabilities.
(b) The EIT accessibility standards at 36 CFR Part 1194 were developed by the Architectural and Transportation Barriers Compliance Board ("Access Board") and apply to contracts and task/delivery orders, awarded under indefinite quantity contracts on or after June 25, 2001.
(c) Each Electronic and Information Technology (EIT) product or service furnished under this contract shall comply with the Electronic and Information Technology Accessibility Standards (36 CFR 1194), as specified in the contract, as a minimum. If the Contracting Officer determines any furnished product or service is not in compliance with the contract, the Contracting Officer will promptly inform the Contractor in writing. The Contractor shall, without charge to the Government, repair or replace the non-compliant products or services within the period of time to be specified by the Government in writing. If such repair or replacement is not completed within the time specified, the Government shall have the following recourses:
1. Cancellation of the contract, delivery or task order, purchase or line item without termination liabilities; or
2. In the case of custom Electronic and Information Technology (EIT) being developed by a contractor for the Government, the Government shall have the right to have any necessary changes made or repairs performed by itself or by another firm for the noncompliant EIT, with the contractor liable for reimbursement to the Government for any expenses incurred thereby.
(d) The contractor must ensure that all EIT products that are less than fully compliant with the accessibility standards are provided pursuant to extensive market research and are the most current compliant products or services available to satisfy the contract requirements.
(e) For every EIT product or service accepted under this contact by the Government that does not comply with 36 CFR 1194, the contractor shall, at the discretion of the Government, make every effort to replace or upgrade it with a compliant equivalent product or service, if commercially available and cost neutral, on either a contract specified refresh cycle for the product or service, or on a contract effective option/renewal date; whichever shall occur first.
Section 508 Compliance for Communications The contractor shall comply with the standards, policies, and procedures below. In the event of conflicts between the referenced documents and this SOW, the guidance from the COR shall take precedence.
Rehabilitation Act, Section 508 Accessibility Standards
1. 29 U.S.C. 794d (Rehabilitation Act as amended)
2. 36 CFR 1194 (508 Standards)
3. www.access-board.gov/sec508/508standards.htm (508 standards)
4. FAR 39.2 (Section 508)
5. CMS/HHS Standards, policies and procedures (Section 508) In addition, all contract deliverables are subject to these 508 standards as applicable.
Regardless of format, all Web content or communications materials produced, including text, audio or video - must conform to applicable Section 508 standards to allow federal employees and members of the public with disabilities to access information that is comparable to information provided to persons without disabilities. All contractors (including subcontractors) or consultants responsible for preparing or posting content must comply with applicable Section 508 accessibility standards, and where applicable, those set forth in the referenced policy or standards documents above. Remediation of any materials that do not comply with the applicable provisions of 36 CFR Part 1194 as set forth in the SOW, PWS, or TO, shall be the responsibility of the contractor or consultant.
The following Section 508 provisions apply to the content or communications material identified in this SOW:
36 CFR Part 1194.21 a - l 36 CFR Part 1194.22 a - p 36 CFR Part 1194.31 a - f 36 CFR Part 1194.41 a – c The contractor shall provide a completed Section 508 Product Assessment Template and the contractor shall state exactly how proposed EIT deliverable(s) meet or does not meet the applicable standards.
The following Section 508 provisions apply for software development material identified in this SOW, PWS, or TO:
For software development, the Contractor/Developer/Vendor shall comply with the standards, policies, and procedures below:
Rehabilitation Act, Section 508, Accessibility Standards
(1) 29 U.S.C. 794d (Rehabilitation Act as amended)
(2) 36 CFR 1194 (508 Standards)
| 36 CFR Part 1194.21 (a – l) |
| 36 CFR Part 1194.31 (a – f) |
| 36 CFR Part 1194.41 (a – c) |
(3) www.access-board.gov/sec508/508standards.htm (508 Standards)
(4) FAR 39.2 (Section 508)
(5) CMS/HHS Standards, policies and procedures (Section 508)
| a. Information Technology – General Information |
| (http://www.cms.hhs.gov/InfoTechGenInfo/) |
For web-based applications, the Contractor shall comply with the standards, policies, and procedures below:
Rehabilitation Act, Section 508, Accessibility Standards
(1) 29 U.S.C. 794d (Rehabilitation Act as amended)
(2) 36 CFR 1194 (508 Standards)
| 36 CFR Part 1194.22 (a – p) |
| 36 CFR Part 1194.41 (a – c) |
(3) www.access-board.gov/sec508/508standards.htm (508 Standards)
(4) FAR 39.2 (Section 508)
(5) CMS/HHS Standards, policies and procedures (Section 508)
| a. Information Technology – General Information |
| (http://www.cms.hhs.gov/InfoTechGenInfo/) |
GOVERNMENT QUALITY ASSURANCE
The Government reserves the right to perform reasonable inspections over the course of this contract. This shall include monitoring meetings, reviewing deliverables, and independent analysis of activities before, during, or after performance.
CONTRACTING OFFICER’S REPRESENTATIVE (COR)
IDIQ COR: TBD
COR: TBD
CONTRACTING OFFICER (COR)
CO: TBD
CONTRACT SPECIALIST (CS)
CS: TBD
Attachment J.1-C SOD TO 0001 ISD LTC Surveyor Training Development
File details come from the government source that posted it. Updated .