Copy of ATTACHMENT B - IDIQ Pricing Table - Sentinel PMO REVISED 27AUG2024.xlsx

XLSX spreadsheet 123 KB Posted

Attached to
IDIQ SENTINEL SYSTEM 3. 0: PROGRAM MANAGEMENT ORGANIZATION (PMO)
Solicitation number
RFP75F40124R00181
Issued by

About this file

This document is an IDIQ pricing table for the Sentinel 3.0 Program Management Organization (PMO) contract. The IDIQ has a base period of 12 months and 4 option periods of 12 months each. The total IDIQ ceiling is $9,500,000.

The contract includes the following task areas: 1) Collaboration Platform, 2) Sentinel Website, 3) Source Code Repository, 4) Medical Code Sets Management Tool, 5) Operations and Maintenance, 6) Development, Modernization and Enhancement (DME), 7) Regulatory Operations Support, 8) Program Management Services, 9) Transition-In Services, and 10) Transition-Out Services. The pricing table provides labor categories, rates, and estimates for each task area across the base and option periods. Additional details are provided on assumptions, funding, and travel for the contract.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IDIQ Summary Page

Pricing Table - IDIQ
Center/Office:CDER/Office of Surveillance & EpidemiologyProject Title:Sentinel 3.0 - Program Management Organization (PMO) Contract
Date:COR: Lucia MenegussiIDIQ COR: Rhoda Eniafe
INSTRUCTIONS
Labor Categories:Enter ALL proposed labor categories
Labor Rates:Use loaded Labor rates which include the percentage of overhead costs that are allocable to the contract.
Other Direct Costs:Itemize all applicable ODCs (such as supplies or special equipment) Not all requirements will have ODCs.
Travel:Use an overall estimated cost (applicable air fare, per diem, and local travel) multiplied by the estimated number of trips.
Period of PerformancePeriod of performance is for a Base and 4 Option Period(s)
Base Period: 12 MonthsOption 1: 12 MonthsOption 2: 12 MonthsOption 3: 12 MonthsOption 4: 12 MonthsOptional DME: TBD MonthsOptional Transition Out: TBD Months
Labor CategoryHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotal
Program Manager
Lead Scientific Project Manager II
Project Manager II
Technical Writer IV
IT Project Manager
Cloud Engineer II
IT Specialist II
Project Coordinator
Quality Assurance Specialist II
Project Manager II

Labor Total

Other Direct Costs
(ODCs)
Licenses (Atlassian or equivalent)
MCL License
Cloud Space
Website

Travel

ODC/Travel Subtotal
Period Total
Cumulative TOTAL

Task 1-Collaboration Platform

Pricing Table - IDIQ
Center/Office:CDER/Office of Surveillance & EpidemiologyProject Title:Sentinel 3.0 - Program Management Organization (PMO)Task Area 1 - Collaboration Platform
Date:COR: Lucia MenegussiIDIQ COR: Rhoda Eniafe
INSTRUCTIONS
Labor Categories:Enter ALL proposed labor categories
Labor Rates:Use loaded Labor rates which include the percentage of overhead costs that are allocable to the contract.
Other Direct Costs:Itemize all applicable ODCs (such as supplies or special equipment) Not all requirements will have ODCs.
Travel:Use an overall estimated cost (applicable air fare, per diem, and local travel) multiplied by the estimated number of trips.
Period of PerformancePeriod of performance is for a Base and 4 Option Period(s)
Base Period - 12 MonthsOption 1 - 12 MonthsOption 2 - 12 MonthsOption 3 - 12 MonthsOption 4 - 12 Months
Task 1-Collaboration Platform
Labor CategoryHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotalBase
Program Manager
Lead Scientific Project Manager II
Project Manager II
Technical Writer IV
IT Project Manager
Cloud Engineer II
IT Specialist II
Project Coordinator
Quality Assurance Specialist II
Project Manager II
Labor Total
Other Direct Costs
(ODCs)
Sub-contractors

Travel

ODC/Travel Subtotal
Period Total
Cumulative TOTAL

Task 2-Sentinel Website

Pricing Table - IDIQ
Center/Office:CDER/Office of Surveillance & EpidemiologyProject Title:Sentinel 3.0 - Program Management Organization (PMO)Task Area 2 - Sentinel Website
Date:COR: Lucia MenegussiIDIQ COR: Rhoda Eniafe
INSTRUCTIONS
Labor Categories:Enter ALL proposed labor categories
Labor Rates:Use loaded Labor rates which include the percentage of overhead costs that are allocable to the contract.
Other Direct Costs:Itemize all applicable ODCs (such as supplies or special equipment) Not all requirements will have ODCs.
Travel:Use an overall estimated cost (applicable air fare, per diem, and local travel) multiplied by the estimated number of trips.
Analysis SummaryAll IGCEs must include a complete Analysis Summary (See tab below). Complete form provided at template file tab with same name.
Cumulative Total:Delete total from any/all unused option periods after completing chart
Period of PerformancePeriod of performance is for a Base and 4 Option Period(s)
Base Period - 12 MonthsOption 1 - 12 MonthsOption 2 - 12 MonthsOption 3 - 12 MonthsOption 4 - 12 Months
Task 2-Sentinel Initiative Website
Labor CategoryHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotalBase
Program Manager
Lead Scientific Project Manager II
Project Manager II
Technical Writer IV
IT Project Manager
Cloud Engineer II
IT Specialist II
Project Coordinator
Quality Assurance Specialist II
Project Manager II
Labor Total
Other Direct Costs
(ODCs)
Sub-contractors

Travel

ODC/Travel Subtotal
Period Total
Cumulative TOTAL

Task 3-Source Code Repository

Pricing Table - IDIQ
Center/Office:CDER/Office of Surveillance & EpidemiologyProject Title:Sentinel 3.0 - Program Management Organization (PMO)Task Area 3 - Source Code Repository
Date:COR: Lucia MenegussiIDIQ COR: Rhoda Eniafe
INSTRUCTIONS
Labor Categories:Enter ALL proposed labor categories
Labor Rates:Use loaded Labor rates which include the percentage of overhead costs that are allocable to the contract.
Other Direct Costs:Itemize all applicable ODCs (such as supplies or special equipment) Not all requirements will have ODCs.
Travel:Use an overall estimated cost (applicable air fare, per diem, and local travel) multiplied by the estimated number of trips.
Period of PerformancePeriod of performance is for a Base and 4 Option Period(s)
Base Period - 12 MonthsOption 1 - 12 MonthsOption 2 - 12 MonthsOption 3 - 12 MonthsOption 4 - 12 Months
Task 3 - Source Code Repository
Labor CategoryHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotalBase
Program Manager
Lead Scientific Project Manager II
Project Manager II
Technical Writer IV
IT Project Manager
Cloud Engineer II
IT Specialist II
Project Coordinator
Quality Assurance Specialist II
Project Manager II
Labor Total
(ODCs)
Sub-contractors

Travel

ODC/Travel Subtotal
Period Total
Cumulative TOTAL

Task 4-Medical Code

Pricing Table - IDIQ
Center/Office:CDER/Office of Surveillance & EpidemiologyProject Title:Sentinel 3.0 - Program Management Organization (PMO)Task Area 4 - Medical Code Sets Management Tool
Date:COR: Lucia MenegussiIDIQ COR: Rhoda Eniafe
INSTRUCTIONS
Labor Categories:Enter ALL proposed labor categories
Labor Rates:Use loaded Labor rates which include the percentage of overhead costs that are allocable to the contract.
Other Direct Costs:Itemize all applicable ODCs (such as supplies or special equipment) Not all requirements will have ODCs.
Travel:Use an overall estimated cost (applicable air fare, per diem, and local travel) multiplied by the estimated number of trips.
Period of PerformancePeriod of performance is for a Base and 4 Option Period(s)
Base Period - 12 MonthsOption 1 - 12 MonthsOption 2 - 12 MonthsOption 3 - 12 MonthsOption 4 - 12 Months
Task 4- Medical Code Sets Management Tool
Labor CategoryHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotalBase
Program Manager
Lead Scientific Project Manager II
Project Manager II
Technical Writer IV
IT Project Manager
Cloud Engineer II
IT Specialist II
Project Coordinator
Quality Assurance Specialist II
Project Manager II
Labor Total
Other Direct Costs
(ODCs)
Sub-contractors

Travel

ODC/Travel Subtotal
Period Total
Cumulative TOTAL

Task 5-Operations & Maintenance

Pricing Table - IDIQ
Center/Office:CDER/Office of Surveillance & EpidemiologyProject Title:Sentinel 3.0 - Program Management Organization (PMO)Task Area 5 - Operations and Maintenane
Date:COR: Lucia MenegussiIDIQ COR: Rhoda Eniafe
INSTRUCTIONS
Labor Categories:Enter ALL proposed labor categories
Labor Rates:Use loaded Labor rates which include the percentage of overhead costs that are allocable to the contract.
Other Direct Costs:Itemize all applicable ODCs (such as supplies or special equipment) Not all requirements will have ODCs.
Travel:Use an overall estimated cost (applicable air fare, per diem, and local travel) multiplied by the estimated number of trips.
Period of PerformancePeriod of performance is for a Base and 4 Option Period(s)
Base Period - 12 MonthsOption 1 - 12 MonthsOption 2 - 12 MonthsOption 3 - 12 MonthsOption 4 - 12 Months
Task 5 -Operations & Maintenance
Labor CategoryHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotalBaseOption 1-4
Operations & Maintenance
Program Manager
Lead Scientific Project Manager II
Project Manager II
Technical Writer IV
IT Project Manager
Cloud Engineer II
IT Specialist II
Project Coordinator
Quality Assurance Specialist II
Project Manager II
Labor Total
Other Direct Costs
(ODCs)
Sub-contractors

Travel

ODC/Travel Subtotal
Period Total
Cumulative TOTAL

Task 6- DME Plat,Web,SCR

Pricing Table - IDIQ
Center/Office:CDER/Office of Surveillance & EpidemiologyProject Title:Sentinel 3.0 - Program Management Organization (PMO) ContractTask Area 6DME
Date:COR: Lucia MenegussiIDIQ COR: Rhoda Eniafe
INSTRUCTIONS
Labor Categories:Enter ALL proposed labor categories
Labor Rates:Use loaded Labor rates which include the percentage of overhead costs that are allocable to the contract.
Other Direct Costs:Itemize all applicable ODCs (such as supplies or special equipment) Not all requirements will have ODCs.
Travel:Use an overall estimated cost (applicable air fare, per diem, and local travel) multiplied by the estimated number of trips.
Period of PerformancePeriod of performance is for a Base and 4 Option Period(s)
Base Period - (9/29/24 –9/30/29)Option 1Option 2Option 3Option 4Optional DME
Task 6 -DME of the Collaboration Platform, Website and Source Code Repository
Labor CategoryHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotal
Operations & Maintenance
Program Manager
Lead Scientific Project Manager II
Project Manager II
Technical Writer IV
IT Project Manager
Cloud Engineer II
IT Specialist II
Project Coordinator
Quality Assurance Specialist II
Project Manager II
Labor Total
Other Direct Costs
(ODCs)
Sub-contractors

Travel

ODC/Travel Subtotal
Period Total
Cumulative TOTAL

Task 7-Regulatory Opr Support

Pricing Table - IDIQ
Center/Office:CDER/Office of Surveillance & EpidemiologyProject Title:Sentinel 3.0 - Program Management Organization (PMO) ContractTask Area 7Regulatory Operations Support
Date:COR: Lucia MenegussiIDIQ COR: Rhoda Eniafe
INSTRUCTIONS
Labor Categories:Enter ALL proposed labor categories
Labor Rates:Use loaded Labor rates which include the percentage of overhead costs that are allocable to the contract.
Other Direct Costs:Itemize all applicable ODCs (such as supplies or special equipment) Not all requirements will have ODCs.
Travel:Use an overall estimated cost (applicable air fare, per diem, and local travel) multiplied by the estimated number of trips.
Period of PerformancePeriod of performance is for a Base and 4 Option Period(s)
Base Period - (9/29/24 –9/30/29)Option 1Option 2Option 3Option 4
Task 7 - Regulatory Operations Support
Labor CategoryHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotalBaseOption 1-4
Program Manager30%
Lead Scientific Project Manager II50%60%
Project Manager II50%60%
Technical Writer IV70%
IT Project Manager5%
Cloud Engineer II0%
IT Specialist II0%
Project Coordinator30%
Quality Assurance Specialist II5%
Project Manager II60%
Labor Total
Other Direct Costs
(ODCs)
Sub-contractors

Travel

ODC/Travel Subtotal
Period Total
Cumulative TOTAL

Task 8-Prog Mgmt Services

Pricing Table - IDIQ
Center/Office:CDER/Office of Surveillance & EpidemiologyProject Title:Sentinel 3.0 - Program Management Organization (PMO) ContractTask Area 8Program Management Services
Date:COR: Lucia MenegussiIDIQ COR: Rhoda Eniafe
INSTRUCTIONS
Labor Categories:Enter ALL proposed labor categories
Labor Rates:Use loaded Labor rates which include the percentage of overhead costs that are allocable to the contract.
Other Direct Costs:Itemize all applicable ODCs (such as supplies or special equipment) Not all requirements will have ODCs.
Travel:Use an overall estimated cost (applicable air fare, per diem, and local travel) multiplied by the estimated number of trips.
Period of PerformancePeriod of performance is for a Base and 4 Option Period(s)
Base Period - (9/29/24 –9/30/29)Option 1Option 2Option 3Option 4
Task 8-Program Management Services
Labor CategoryHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotalBaseOption 1-4
Program Manager
Lead Scientific Project Manager II
Project Manager II
Technical Writer IV
IT Project Manager
Cloud Engineer II
IT Specialist II
Project Coordinator
Quality Assurance Specialist II
Project Manager II
Labor Total
ODC/Travel Subtotal
Period Total
Cumulative TOTAL

Task 9-Transition-In Services

Pricing Table - IDIQ
Center/Office:CDER/Office of Surveillance & EpidemiologyProject Title:Sentinel 3.0 - Program Management Organization (PMO) ContractTask Area 9Transition-In Services
Date:COR: Lucia MenegussiIDIQ COR: Rhoda Eniafe
INSTRUCTIONS
Labor Categories:Enter ALL proposed labor categories
Labor Rates:Use loaded Labor rates which include the percentage of overhead costs that are allocable to the contract.
Other Direct Costs:Itemize all applicable ODCs (such as supplies or special equipment) Not all requirements will have ODCs.
Travel:Use an overall estimated cost (applicable air fare, per diem, and local travel) multiplied by the estimated number of trips.
Period of PerformancePeriod of performance is for a Base and 4 Option Period(s)
Base Period - (9/29/24 –9/30/29)Option 1Option 2Option 3Option 4
Task 9-Transition-In Services
Labor CategoryHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotalBase
Program Manager
Lead Scientific Project Manager II
Project Manager II
Technical Writer IV
IT Project Manager
Cloud Engineer II
IT Specialist II
Project Coordinator
Quality Assurance Specialist II
Project Manager II
Labor Total
Other Direct Costs
(ODCs)
Sub-contractors

Travel

ODC/Travel Subtotal
Period Total
Cumulative TOTAL

Task 10-Transition-Out Serv

Pricing Table - IDIQ
Center/Office:CDER/Office of Surveillance & EpidemiologyProject Title:Sentinel 3.0 - Program Management Organization (PMO) ContractTask Area 10Transition-Out Services
Date:COR: Lucia MenegussiIDIQ COR: Rhoda Eniafe
INSTRUCTIONS
Labor Categories:Enter ALL proposed labor categories
Labor Rates:Use loaded Labor rates which include the percentage of overhead costs that are allocable to the contract.
Other Direct Costs:Itemize all applicable ODCs (such as supplies or special equipment) Not all requirements will have ODCs.
Travel:Use an overall estimated cost (applicable air fare, per diem, and local travel) multiplied by the estimated number of trips.
Period of PerformancePeriod of performance is for a Base and 4 Option Period(s)
Base Period - (9/29/24 –9/30/29)Option 1Option 2Option 3Option 4Optional Transition Out
Task 10-Transition-Out Services
Labor CategoryHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotal
Program Manager
Lead Scientific Project Manager II
Project Manager II
Technical Writer IV
IT Project Manager
Cloud Engineer II
IT Specialist II
Project Coordinator
Quality Assurance Specialist II
Project Manager II
Labor Total
Other Direct Costs
(ODCs)
Sub-contractors

Travel

ODC/Travel Subtotal
Period Total
Cumulative TOTAL

Total ALL-Projects

Pricing Table - IDIQ
Center/Office:CDER/Office of Surveillance & EpidemiologyProject Title:Sentinel 3.0 - Program Management Organization (PMO) ContractTask Area 1 - 10All Task Areas
Date:COR: Lucia MenegussiIDIQ COR: Rhoda Eniafe
INSTRUCTIONS
Labor Categories:Enter ALL proposed labor categories
Labor Rates:Use loaded Labor rates which include the percentage of overhead costs that are allocable to the contract.
Other Direct Costs:Itemize all applicable ODCs (such as supplies or special equipment) Not all requirements will have ODCs.
Travel:Use an overall estimated cost (applicable air fare, per diem, and local travel) multiplied by the estimated number of trips.
Period of PerformancePeriod of performance is for a Base and 4 Option Period(s)
Option 1 - 12 MonthsOption 2 - 12 MonthsOption 3 - 12 MonthsOption 4 - 12 Months
Task 1-Collaboration PlatformTask 1-Collaboration Platform
Labor CategoryHoursRateTotalLabor CategoryHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotal
Program ManagerProgram Manager
Lead Scientific Project Manager IILead Scientific Project Manager II
Project Manager IIProject Manager II
Technical Writer IVTechnical Writer IV
IT Project ManagerIT Project Manager
Cloud Engineer IICloud Engineer II
IT Specialist IIIT Specialist II
Project CoordinatorProject Coordinator
Quality Assurance Specialist IIQuality Assurance Specialist II
Project Manager IIProject Manager II
Labor TotalLabor Total
Other Direct CostsOther Direct Costs
(ODCs)(ODCs)
Sub-contractorsSub-contractors
Licenses (Atlassian or equivalent)Licenses (Atlassian or equivalent)
MCL LicenseMCL License
Cloud SpaceCloud Space
WebsiteWebsite
TravelTravel
ODC/Travel SubtotalODC/Travel Subtotal
Period TotalPeriod Total
Cumulative TOTALCumulative TOTAL
Task 2 - Sentinel Initiative WebsiteTask 2 - Sentinel Initiative Website
Labor CategoryHoursRateTotalLabor Category
Program ManagerProgram Manager
Lead Scientific Project Manager IILead Scientific Project Manager II
Project Manager IIProject Manager II
Technical Writer IVTechnical Writer IV
IT Project ManagerIT Project Manager
Cloud Engineer IICloud Engineer II
IT Specialist IIIT Specialist II
Project CoordinatorProject Coordinator
Quality Assurance Specialist IIQuality Assurance Specialist II
Project Manager IIProject Manager II
Labor TotalLabor Total
Other Direct CostsOther Direct Costs
(ODCs)(ODCs)
Sub-contractorsSub-contractors

Travel Travel

ODC/Travel SubtotalODC/Travel Subtotal
Period TotalPeriod Total
Cumulative TOTALCumulative TOTAL
Task 3 - Source Code RepositoryTask 3 - Source Code Repository
Labor CategoryHoursRateTotalLabor CategoryHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotal
Program ManagerProgram Manager
Lead Scientific Project Manager IILead Scientific Project Manager II
Project Manager IIProject Manager II
Technical Writer IVTechnical Writer IV
IT Project ManagerIT Project Manager
Cloud Engineer IICloud Engineer II
IT Specialist IIIT Specialist II
Project CoordinatorProject Coordinator
Quality Assurance Specialist IIQuality Assurance Specialist II
Project Manager IIProject Manager II
Labor TotalLabor Total
Other Direct CostsOther Direct Costs
(ODCs)(ODCs)
Sub-contractorsSub-contractors

Travel Travel

ODC/Travel SubtotalODC/Travel Subtotal
Period TotalPeriod Total
Cumulative TOTALCumulative TOTAL
Task 4 - Medical Code Sets Management ToolTask 4 - Medical Code Sets Management Tool
Labor CategoryHoursRateTotalLabor CategoryHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotal
Program ManagerProgram Manager
Lead Scientific Project Manager IILead Scientific Project Manager II
Project Manager IIProject Manager II
Technical Writer IVTechnical Writer IV
IT Project ManagerIT Project Manager
Cloud Engineer IICloud Engineer II
IT Specialist IIIT Specialist II
Project CoordinatorProject Coordinator
Quality Assurance Specialist IIQuality Assurance Specialist II
Project Manager IIProject Manager II
Labor TotalLabor Total
Other Direct CostsOther Direct Costs
(ODCs)(ODCs)
Sub-contractorsSub-contractors

Travel Travel

ODC/Travel SubtotalODC/Travel Subtotal
Period TotalPeriod Total
Cumulative TOTALCumulative TOTAL
Task 5 - Operations & MaintenanceTask 5 - Operations & Maintenance
Labor CategoryHoursRateTotalLabor CategoryHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotal
Program ManagerProgram Manager
Lead Scientific Project Manager IILead Scientific Project Manager II
Project Manager IIProject Manager II
Technical Writer IVTechnical Writer IV
IT Project ManagerIT Project Manager
Cloud Engineer IICloud Engineer II
IT Specialist IIIT Specialist II
Project CoordinatorProject Coordinator
Quality Assurance Specialist IIQuality Assurance Specialist II
Project Manager IIProject Manager II
Labor TotalLabor Total
Other Direct CostsOther Direct Costs
(ODCs)(ODCs)
Sub-contractorsSub-contractors

Travel Travel

ODC/Travel SubtotalODC/Travel Subtotal
Period TotalPeriod Total
Cumulative TOTALCumulative TOTAL
Task 7 - Regulatory Operations SupportTask 7 - Regulatory Operations Support
Labor CategoryHoursRateTotalLabor CategoryHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotal
Program ManagerProgram Manager
Lead Scientific Project Manager IILead Scientific Project Manager II
Project Manager IIProject Manager II
Technical Writer IVTechnical Writer IV
IT Project ManagerIT Project Manager
Cloud Engineer IICloud Engineer II
IT Specialist IIIT Specialist II
Project CoordinatorProject Coordinator
Quality Assurance Specialist IIQuality Assurance Specialist II
Project Manager IIProject Manager II
Labor TotalLabor Total
Other Direct CostsOther Direct Costs
(ODCs)(ODCs)
Sub-contractorsSub-contractors

Travel Travel

ODC/Travel SubtotalODC/Travel Subtotal
Period TotalPeriod Total
Cumulative TOTALCumulative TOTAL
Task 8-Program Management ServicesTask 8-Program Management Services
Labor CategoryHoursRateTotalLabor CategoryHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotal
Program ManagerProgram Manager
Lead Scientific Project Manager IILead Scientific Project Manager II
Project Manager IIProject Manager II
Technical Writer IVTechnical Writer IV
IT Project ManagerIT Project Manager
Cloud Engineer IICloud Engineer II
IT Specialist IIIT Specialist II
Project CoordinatorProject Coordinator
Quality Assurance Specialist IIQuality Assurance Specialist II
Project Manager IIProject Manager II
Labor TotalLabor Total
ODC/Travel SubtotalODC/Travel Subtotal
Period TotalPeriod Total
Cumulative TOTALCumulative TOTAL
Task 9-Transition-In ServicesTask 9-Transition-In Services
Labor CategoryHoursRateTotalLabor CategoryHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotal
Program ManagerProgram Manager
Lead Scientific Project Manager IILead Scientific Project Manager II
Project Manager IIProject Manager II
Technical Writer IVTechnical Writer IV
IT Project ManagerIT Project Manager
Cloud Engineer IICloud Engineer II
IT Specialist IIIT Specialist II
Project CoordinatorProject Coordinator
Quality Assurance Specialist IIQuality Assurance Specialist II
Project Manager IIProject Manager II
Labor Total
Other Direct CostsOther Direct Costs
(ODCs)(ODCs)
Sub-contractorsSub-contractors

Travel Travel

ODC/Travel SubtotalODC/Travel Subtotal
Period TotalPeriod Total
Cumulative TOTALCumulative TOTAL
Base YearTotalCumulative TOTAL
Labor CategoryHoursRateTotalTask 9-Transition-In Services
Program ManagerLabor CategoryHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotal
Lead Scientific Project Manager IIProgram Manager
Project Manager IILead Scientific Project Manager II
Technical Writer IVProject Manager II
IT Project ManagerTechnical Writer IV
Cloud Engineer IIIT Project Manager
IT Specialist IICloud Engineer II
Project CoordinatorIT Specialist II
Quality Assurance Specialist IIProject Coordinator
Project Manager IIQuality Assurance Specialist II
Labor TotalProject Manager II
Other Direct CostsLabor Total
(ODCs)Other Direct Costs
Sub-contractors(ODCs)
Sub-contractors
Travel
Travel
ODC/Travel SubtotalODC/Travel Subtotal
Period TotalPeriod Total
Cumulative TOTALCumulative TOTAL
Task 10-Transition-Out ServicesTask 10-Transition-Out Services
Labor CategoryHoursRateTotalLabor CategoryHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotal
Program ManagerProgram Manager
Lead Scientific Project Manager IILead Scientific Project Manager II
Project Manager IIProject Manager II
Technical Writer IVTechnical Writer IV
IT Project ManagerIT Project Manager
Cloud Engineer IICloud Engineer II
IT Specialist IIIT Specialist II
Project CoordinatorProject Coordinator
Quality Assurance Specialist IIQuality Assurance Specialist II
Project Manager IIProject Manager II
Labor TotalLabor Total
Other Direct CostsOther Direct Costs
(ODCs)(ODCs)
Sub-contractorsSub-contractors

Travel Travel

ODC/Travel SubtotalODC/Travel Subtotal
Period TotalPeriod Total
Cumulative TOTALCumulative TOTAL

Base Year Total $ - 0 Option Year 1 -4 plus DME & TO Total $ tc={01ABAD84-FDFD-4DBB-AC5C-18049228DFF0}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

No Change in Pricing tc={BAAD2AD5-878B-4A77-8A21-D8AA8519281C}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

No Change in Pricing tc={62E80652-B204-4114-A78E-345A1ACAE2E2}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

No Change in Pricing tc={C567322B-D1B0-4C8D-9596-B5A0838618E0}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

No Change in Pricing tc={6CBA05DA-E864-4862-B710-135F1D392E66}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

No Change in Pricing tc={E36F4337-3149-4FCF-ADC4-DA688E1BBED7}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

No Change in Pricing tc={CE1FF9CC-A7CC-4AEA-B8BC-2064BA9C34A2}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

No Change in Pricing

Assumptions Page

PROJECT TITLE: Sentinel System 3.0 Program Management Organization (PMO)

Ground Rules and Assumptions

General Assumptions:
* Period of PoP for IDIQ: Base with 4 (12-Month) Option Years
* Contract Type: Single-Contract Indefinite Delivery-Indefinite Quantity (IDIQ) Award. Authorized contract types under this IDIQ are: Labor-Hour (LH), Time-and-Materials (T&M), and Firm-Fixed-Price (FFP). Option periods may be included in task order awards.
* Task Order 1: Time and Materials (T&M) (Non-severable project)
* Stakeholders: CDER/Office of Surveillance and Epidemiology
* IDIQ Ceiling: The maximum aggregate dollar value of all task orders awarded over the 5-year ordering period of this IDIQ cannot exceed the IDIQ ceiling amount of $9,500,000.00
* NAICS Code: 518210-computing-infrastructure-providers-data-processing-web-hosting-and-related-services; 541690 - OTHER SCIENTIFIC AND TECHNICAL CONSULTING SERVICES (PT)
* Product Service Code: SUPPORT- MANAGEMENT: OTHER - R799
* Budget Object Classification Code: 25235 All Other Non-Federal Services
Labor Hours and Labor Rate Assumptions:
* 1 FTE = 1920 hours/year
* Labor rates fully burden for the IDIQ and Task Order 1
* Rates based on Contractor site. Work performed under this contract will be at the Contractor's location.
Funding Assumptions
* Funding: FY2024 $1,500,000.00. Fund Types: PDUFA GDUFA, BSUFA, and BA
* Funding: Include other Stakeholders - CDER/OSE
* Additional Related Costs: Not Applicable
* ODCS - Types of ODCS anticipated are: Software Licienses and Cloud Space
Material/HW/SW Assumptions
* Technology:
* Risk:
* Mitigation:
Travel Assumptions
There are some travel costs associated with this project.
Source Links:
Per Diem: https://www.gsa.gov/travel/plan-book/per-diem-rates
Car Rental: https://www.enterprise.com/en/home.html
Average Air Fare: https://www.transtats.bts.gov/AverageFare/default.aspx
Private Automobile: privately-owned conveyance within the continental United States by the traveler will be reimbursed to the Contractor at the mileage rate allowed by Federal Travel Regulations
Fee/Factors
Fully Loaded Labor Rates are applied to Task Order 1 for T&M services. See Task Areas Below:
1. Collaboration Platform
2. Sentinel Initiative Website
3. Source Code Repository
4. Medical Code Sets Management Tool
5. O&M for the Collaboration Platform, Website and Source Code Repository
6. DME for the Collaboration Platform, Website and Source Code Repository
7. Regulatory Operations Support
8. Program Management Plans
9. Transition-In Services
10. Transition-Out Services

File details come from the government source that posted it. Updated .