371361 Specs Rev1 PIPII Linac WFE Vacuum Roughing Pump Procurement Specification.pdf
PDF 274 KB Posted
- Solicitation number
- RFP-371361-CM
About this file
This document is a Procurement Specification for PIP-II Linac Warm Front End (WFE) Vacuum Roughing Pumps, prepared by the Fermi National Accelerator Laboratory (FNAL) on June 30, 2025. The specification requires a subcontractor to provide seven multi-stage dry roots pumps with specific technical requirements, including a 500 l/min pumping speed, NW25 minimum inlet port, gas ballast, analog and digital I/O for PLC-based controls, 1-phase 110-120V or 208V power, noise level ≤55dB, air-cooling, and NRTL certification. Additional requirements include a 350m pump cable, necessary controllers and communication cables, new equipment, Ultra High Vacuum (UHV) cleaning and handling procedures, and a 5-year or longer service interval.
The procurement includes detailed technical specifications for cable and connector requirements, with Fermilab willing to work with vendors on cable specifications. Acceptance criteria involve inspection and powering upon arrival within 14 days, with nonconformances to be recorded and addressed by the PIP-II QA group. Vendors must provide at least three references of similar projects for laboratory or governmental entities within the last five years. The procurement is part of the Proton Improvement Plan Phase 2 (PIP-II) and is managed by the Department of Energy's Fermi National Accelerator Laboratory.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PIP-II Linac WFE Vacuum Roughing Pump
Procurement Specification Teamcenter Number: ED0041765
Preparation Date: June 30, 2025
Preparing Organization: AD/MSD/Mechanical Support Department, FNAL
Statement of Work
Fermi National Accelerator Laboratory 3
1. SCOPE
2. REQUIREMENTS
3. DELIVERY AND ACCEPTABILITY TESTING
4. PREVIOUS EXPERIENCE
Fermi National Accelerator Laboratory 4
1. SCOPE
This specification covers roughing pumps for the PIP-II Accelerator Warm Front End (WFE).
2. REQUIREMENTS
The subcontractor shall provide roughing pumps with fully functional pumping, control, and readback.
Required elements, at a minimum, shall include the following:
1. (7) Multi-stage dry roots pumps
2. 350 m Pump cable
3. Controllers needed for operation of #1
4. Control/communication cables needed for proper system function
5. Required power cables
6. Connector kits for cables (Fermilab will terminate cables) shall conform to the requirements identified below. ANY VARIANCES
MUST BE CLEARLY IDENTIFIED IN YOUR RESPONSE. Failure to identify variances may result in disqualification with no further consideration for an award.
1. Pumping speed: 500 l/min (30 m3/h) or larger
2.
3. NW25 minimum inlet port
4. Gas ballast included
5. Analog and digital I/O for PLC-based controls as well as ethernet or serial communication for general controls and monitoring are required.
6. Power: 1 phase, 110-120V or 208V
7. Noise level at ultimate pressure 55dB
8. Air-cooled
9. NRTL-certified
10. Low maintenance: 5 years or longer service interval
11. Vacuum-wetted surfaces must be oil-free and dust-free.
Fermi National Accelerator Laboratory 5
12. Roughing pump shall be cleaned and packed according to Ultra High Vacuum (UHV) cleaning and handling procedures. They shall arrive ready for UHV use.
13. Lower power consumption of operation is preferred.
14. All equipment shall be new (not used/refurbished).
15. Pump cable shall be supplied in a spool(s) 350m long. Fermilab will cut to length.
16. Pump cable shall conform to ED0014355 Cable Criteria.pdf. Pump cable and connectors shall conform to ED0014371 PIP-II Standard Cable and Connector List OR be approved by Fermilab.
Alternatively, vendor may submit their cable and connector specifications (type, part number, etc.) and Fermilab will identify and/or provide suitable replacement cable. The replacement cable may be drop-shipped to the vendor for performance testing at t
17. Pumps shall be able to operate with cables up to 90m long. Vendor shall identify maximum cable length for proper pump function in their response. While spooled cable with connector kits is preferred, pre-terminated cables will be considered (lengths will vary; Fermilab will provide a list upon request).
18. All manuals required for operation shall be provided.
3. DELIVERY AND ACCEPTABILITY TESTING
Acceptance criteria shall include inspection and powering upon arrival, within 14 days from receipt of deliverables. Nonconformances will be recorded as required by the PIP-II QA group. The corrective action for nonconformances will be determined in conjunction with the PIP-II QA group.
4. PREVIOUS EXPERIENCE
Please provide at least three prior references of similar size and scope projects for laboratory or governmental entities within the last five years.
APPENDIX ACRONYMS
FFDG FermiForward Discover Group, LLC
Fermi National Accelerator Laboratory 6
FNAL Fermi National Accelerator Laboratory
PIP-II Proton Improvement Plan Phase 2
QA Quality Assurance
File details come from the government source that posted it. Updated .