RFP 36C78625R50248 Questions and Answers.docx
DOCX document 61 KB Posted
- Solicitation number
- RFP36C78625R50248
About this file
This document is a Questions and Answers (Q&A) file for RFP 36C78625R50248 for Grounds Maintenance Services at Houston National Cemetery. The solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and will be a fixed-price contract with a base year and four one-year option periods. The contract covers maintenance of 180.5 acres, including mowing, trimming, edging, fertilization, herbicide application, and floral waste removal. The current site contains 44,292 headstones and 37,031 flat markers, with approximately 1,676 headstones and 15 flat markers added annually.
Key details include a proposal due date of October 24, 2025, a mandatory site visit on October 9-10, 2025, and a contract start date of November 12, 2025. The evaluation will be Lowest Priced Technically Acceptable (LPTA). The previous contract was held by Sanford Federal (terminated in 2024) with a total value of $3,205,937.52, and current interim services are provided by Legacy Rock Corporation. The contract is managed by the Department of Veterans Affairs National Cemetery Administration, with the Contracting Officer's Representative being David Marr, and the contract specialist is Brian Werner.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78625R50248 A00002.docx | DOCX document | |
| Houston Grounds Maintenance Map.pdf | ||
| 36C78625R50248 A00001.docx | DOCX document | |
| RFP 36C78625R50248 REVISED.pdf | ||
| NCA Quality Assurance Report Houston GM.pdf | ||
| 36C78625R50248.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers RFP 36C78625R50248, Houston National Cemetery, Grounds Maintenance Services Answers listed in Bold
Q: While reviewing the solicitation documents, our team identified conflicting proposal submission dates:
· Page 1 (SF-1449 cover sheet): October 24, 2025, at 3:00 PM EST
· Page 115 (Proposal Submission Instructions): July 31, 2025, at 3:00 PM CST We kindly request your confirmation on the correct due date so that we can align our proposal development schedule and ensure full compliance with the solicitation requirements.
A: The date on page 115 is a typo. A revised RFP document has been uploaded to SAM.gov with the correction to the due date.
| Q: | I am interested in bidding on this contract. I am in the process of getting validated by the SBA to be registered as a Disabled Veteran Owned Small Business. In the meantime will my disabled veterans paperwork along with my business registration suffice? |
| A: | You must be registered with SBA at the time of offer submission. The current due date for proposals is 10/24/25. |
| Q: | I was reviewing the (36C78625R50248) Grounds Maintenance Services, Houston National Cemetery project and noticed that the Solicitation document had the “draft” watermark. Are you able to confirm if this is the final Solicitation or not? |
| A: | An updated RFP document has been uploaded to SAM.gov with the watermark removed. |
| Q: | Can you tell me what type of acquisition this will be? Simplified or Best Value? |
| A: | The evaluation criteria is Lowest Priced Technically Acceptable. The criteria for “Technically Acceptable” is outlined in clause 52.212-2 (page 109-111). |
| Q: | Fertilizer – The RFP specifies 28-07-14 SCU or equal. Can you confirm whether annual pre-approval of fertilizer products is required each performance year, or if once approved, it carries across base and option years? |
| A: | Please submit approval annually. The fertilizer information sheet must be provided 5 days ahead of each delivery. |
| Q: | Irrigation – Can you provide the number of zones, valve/controller counts, and as-builts? Please also confirm contractor responsibilities for programming, monitoring leaks, and repairs. |
| A: | The contractor will not be responsible for irrigation system aside from damage caused by Contractor operations. |
| Q: | Service Start – If awarded, what is the anticipated start date or Notice to Proceed date? |
| A: | The start date is 11/12/2025. |
| Q: | Emergency Response – Confirm the expected response sequence (acknowledgment, phone call, on-site presence within a certain timeframe). |
| A: | Phone call to COR within 10 minutes |
| Q: | Trees & Shrubs – Are pruning, limb removal, or storm cleanup included in the contractor’s scope? |
| A: | No. |
| Q: | Headstone Cleaning – Beyond sweeping or blowing clippings, are periodic chemical cleanings or scrubbing of headstones required under this contract? |
| A: | No - except for surfaces soiled or stained as a result of the Contractor’s performance. |
| Q: | Green Burial Section – Are there unique standards (e.g., reduced chemical use) that differ from the rest of the cemetery? |
| A: | See PWS 3.6.6 and 3.6.8.6. Only spot applications will be use in the Green Burial section. |
| Q: | Pest Control – Fire ant treatments are referenced. Should contractors proactively schedule these, or will they be directed by the COR? | |
| A: | PWS 3.8.3 | In accordance with the submitted Pesticide and Fertilizer Application Plan (Attachment 12), the contractor shall schedule the pesticide application date with the COR and only apply once given approval by the COR. The contractor shall give the COR a minimum five (5) business days’ notice prior to application. |
| Q: | Holiday & Special Event Restrictions – Besides Memorial Day, are there other holidays or events when work is prohibited, and how far in advance will we be notified? |
| A: | See PWS Attachment 5 General Conditions 15.d. |
| Q: | Waste & Floral Disposal – Does the floral disposal line item include all floral waste (loose stems, arrangements at gravesites), or only receptacle/central collection disposal? |
| A: | Yes, all waste on the grounds. Receptacles are not included and serviced by cemetery employees. See PWS 3.9. |
| Q: | Quality Control – The QAR requires daily COR check-ins/logs. Is there a required format or template for these reports? |
| A: | Yes, QC log will be provided. |
| Q: | Performance Evaluations – How are complaints from families/visitors logged and weighted in contractor performance reviews? |
| A: | Complaints are recorded on the contractor CPARs evaluation (if applicable) |
| Q: | Current Pain Points – Are there any particular issues, challenges, or areas of concern that the cemetery staff is currently experiencing which you would like contractors to give special attention to if awarded? |
| A: | Adhere to contract specifications. |
Q: We are considering submitting more than one proposal to present the Government with alternative technical approaches and pricing structures that may offer additional value. We understand that the solicitation does not specifically address the submission of multiple proposals, and we wish to ensure full compliance with all requirements.
Accordingly, we respectfully request written approval to submit multiple proposals under this solicitation. If there are any specific instructions or requirements for submitting alternate proposals, please advise.
A: Only one proposal per offeror will be evaluated.
Q: To ensure we fully understand the scope of work and accurately prepare our submission, we kindly request clarification and additional information on the following:
1. The total headstone count and flat marker count within the cemetery.
A: See CLIN structure. 44,292 headstones and 37,031 flat markers in base year.
1. Confirmation and/or details regarding the areas listed in the solicitation:
1. Yellow area: 26.13 acres
1. Red area: 148.70 acres
1. Green Burial Mowing area: 1.8 acres If available, please provide any maps, layouts, or supporting documentation that indicate the boundaries or descriptions of these areas.
Q: Equipment Storage & Security It has been noted that the current incumbent reportedly stores equipment and mowers off-site due to prior theft incidents. Will the Government provide or designate a secure on-site storage area (e.g., fenced yard, shed, or locked garage) for contractor use?
A: No, the provided contractor staging area is not secured or guarded.
Q: Access and Logistics What are the current gate access procedures and operating hours for contractor personnel and vehicles? Are there restrictions on after-hours equipment delivery or early-morning staging?
A: Cemetery is open during light hours
Q: Inclement Weather Protocol Will the COR issue written guidance on acceptable delay or recovery timelines following periods of excessive rainfall when mowing is suspended?
A: See PWS 3.1.10. Contractor shall be expected to ensure the grass is cut in less than seven calendar days once grass is suitable for mowing
Q: Floral Disposal Are floral waste containers provided on-site by the Government, or should the contractor plan to remove and dispose of floral debris off-site?
A: Dispose off-site. See PWS 3.9. 3.7.5 Removal of the floral items and disposal away from the cemetery grounds shall be included in the monthly price and is the responsibility of the Contractor
Q: Chemical Application / IPM Are there specific NCA or local VA agronomist-approved herbicide and fertilizer products currently used at the site, or may the contractor propose equivalent formulations that comply with IPM requirements?
A: The contractor may propose products aligned with the process and requirements in PWS 3.6.
Q: Transition & Mobilization Will the incumbent be required to remove all debris and restore baseline turf conditions before contract transition, or should the incoming contractor assume those preparatory responsibilities?
A: There will be a week or two (maybe longer) between contracts. The new awardee should expect some debris and turf growth in between contracts.
Q: Phase-In CLINs Can the Government provide a phase-in CLIN structure or allow offerors to include a mobilization/phase-in line item on the pricing sheet to reflect startup and transition costs?
A: CLIN pricing should be inclusive of all costs associated with the tasks outlined in the PWS to include startup and transition.
Q: Fire Ant Population How pervasive is the fire ant population at the Houston National Cemetery?
Should contractors anticipate regular mound treatment or only spot applications under the herbicide/insecticide CLINs?
A: See PWS 3.8 detailing insect applications including fire ant broadcast and spot treatments. 3.8.8 details the Grounds Management schedule.
Q: Fuel Storage Is there an approved on-site fuel storage area for contractor use, or must fuel be transported daily from an off-site location?
A: Per PWS, Attachment 5 - No flammable and combustible liquids shall be stored within the Cemetery property.
Q: Electrical Hookup Is there access to an electrical hookup on-site to allow charging of battery-operated backpack blowers or other electric equipment?
A: Per PWS, Attachment 5 - No, the contractor will need to provide the source of electrical power.
Q: Labor Relations / Unionization Is this site currently unionized, or are there any collective bargaining agreements (CBAs) in place that apply to grounds maintenance personnel?
A: There are no collective bargaining agreements in place affecting contractor personnel.
Q: Transition Timeline How many days will the Government allow for transition and phase-in activities following award before full performance begins?
A: The turf will be entering dormancy and will not need to be mowed/trimmed on a weekly basis until Jan/Feb time frame. However, other services will need to be performed.
Q: Pond Maintenance During the site visit, several ponds were observed. Will the contractor be responsible for pond upkeep, vegetation control, or water management around those areas?
A: See PWS 3.3 on unimproved grounds mowing and trimming – includes grass areas around irrigation ponds. No other services are required.
Q: Dumpster / Waste Disposal Responsibility Who is responsible for providing and servicing the monthly dumpster or roll-on/roll-off container used for debris and floral disposal?
If contractor-provided, can the Government confirm where dumpsters may be staged on the property?
A: Contractor is responsible for providing their own dumpster. There is a designated contractor staging area (subject to relocating) that the contract can use
Q: FTE Count Can the government confirm the amount of FTE's, during site visit the number 38 FTE's was provided?
A: Government employee FTE count is not applicable to contract grounds maintenance operations. Since this is a PWS, the contractor would determine the number of FTE’s needed to complete the requirements within the timeline for services (weekly).
| Q: | PWS Table 3.6 - In the pricing schedule CLIN 0008 has a QTY of 3 for the Pre-emergent. Table 3.6 has 2 applications that are split applications. Is the QTY for the Pre-emergent supposed to be 2 with the split applications or 4 to include the split applications. |
| A: | The CLIN structure contains an estimated quantity. A split application would require the use of 2 applications in the CLIN structure. |
| Q: | PWS 3.7 / Clin 0011 - The evaluation criteria is an LPTA evaluation. The way the specifications for this CLIN are currently written someone could price a agricultural grade fertilizer meeting the current specifications. The agricultural fertilizer is not a product that has uniform granules and a lot of dust and is not suitable for the turf application that the cemetery is wanting. This product is cheaper and currently would allow someone to price. Could the specification be re-done to include the grade of fertilizer that the cemetery wants? |
| A: | See PWS 3.7 – it specifies a turf fertilizer. |
| Q: | PWs 3.a – This section states that an area will be provided for storage of the contactor’s equipment and supplies. During the site visit it was stated that this area will not be provided, and the contractor will have to store equipment and material off site. Will this area be provided on site for the contractor to store equipment and materials? |
| A: | It states that an “area can be used if approved by the COR.” It does not say will. |
| Q: | PWS 4 - Will an area be provided for temporary toilets? |
| A: | Yes, in the contractor staging area |
| Q: | PWS 3.7.1 – Are we to understand that the contractor will be able to use government provided dumpster to dispose of the floral pick up? |
| A: | No. |
| 3.7.4 | Contractor will provide the necessary labor, tools, equipment, and suitable conveyance for each work day for pickup of floral items from the cemetery grounds. |
3.7.5 Removal of the floral items and disposal away from the cemetery grounds shall be included in the monthly price and is the responsibility of the Contractor
| Q: | The PWS references "red mapped" and "yellow mapped areas" to identify unimproved acreage on the east and west side of the cemetery, but the map in the PWS does not clearly identify these areas. Can the VA provide a map that clearly identifies the unimproved acreage on the east and west side of the cemetery? |
| A: | Please see the reference map provided in the CLIN structure. |
Q: Irrigation The RFP notes that “regular inspections, adjustments, minor repairs, and reporting are expected.” Please confirm how the Government prefers that costs for these services be represented. There is no dedicated CLIN for irrigation work, and including an allowance could easily result in over- or under-pricing ?
A: I am unable to find the line referenced. This contract does not include irrigation work.
Q: Mulch The RFP specifies that “annual mulch is part of the base service,” but no CLIN line exists for mulch. Should mulch be priced within the base CLIN for landscaping, or as a separate indirect cost allocation? Please confirm the expected frequency and timing of mulch applications (the PWS references “annual,” but not the target month or material specifications).
A: I am unable to find the line referenced. This contract does not include planting bed mulch.
Q: Seasonal Flower Changes The PWS states seasonal color changes are to be completed four (4) times per year.
Can the Government confirm expected timing (months or quarters) and preferred plant species or color rotation? How should this be priced given that no separate CLIN is identified?
A: I am unable to find the line referenced. This contract does not include planting bed maintenance.
Q: Sod Installation at New Burial Sites The PWS requires sod installation within 72 hours of backfilling any new gravesite.
Should pricing for this service be incorporated into the base CLIN or billed per occurrence based on the average annual number of burials?
A: I am unable to find the line referenced. This contract does not include sod installation.
Q: Restroom Facilities Please confirm whether contractor crews may use public restrooms or if designated facilities are available. Are we required to furnish our own port a potty If neither is available, may we stage a portable restroom, and where would that be located on-site?
A: See PWS Attachment 5 General Conditions 4 regarding temporary toilets. The Contractor shall provide portable chemical toilets for use by workmen as necessary to comply with applicable OSHA requirements. Locate portable toilet facilities in the COR approved “Contractor Staging Area” only
Q: Interment Coordination What is the standard advance-notice schedule for interments, and how should crews plan around those activities? Are there blackout periods or restrictions for maintenance tasks during ceremonies or events such as Memorial Day, Veterans Day, or Wreaths Across America?
A: See PWS Attachment 5 General Conditions 16 regarding maintenance during cemetery functions and 15.d on federal holidays.
Q: Irrigation System Documentation Are updated as-builts, zone maps, or mainline schematics for the irrigation system available for contractor reference?
A: The contractor is not responsible for the irrigation system. Details can be shared.
Q: Tree Trimming Please confirm whether tree pruning is included under the contract scope.
If so, what are the size or height limits for contractor responsibility?
How should removals or replanting of dead trees be handled (we observed several during the site visit)?
A: Tree maintenance is not in this contract.
Q: Reporting and Quality Control What are the expectations for reporting, photo documentation, or verification of work performed (daily logs, service tickets, or other formats)?
Are site inspections conducted on a fixed schedule or on a random/audit basis by VA personnel?
A: See PWS Attachment 7 for the Quality Assurance Plan and PWS Section 4 regarding quality control, quality assurance, supervision, inspection, reporting, record keeping, submittals, etc.
Q: Utility Locates Please confirm whether the contractor is responsible for performing utility locates prior to any digging or planting activities?
A: This contract does not require digging or planting.
Q: Communication and Approvals Who will serve as the primary on-site point of contact (e.g., COR or Cemetery Manager) for schedule changes, material substitutions, or scope clarifications?
A: The primary on-site point of contact is the Contracting Officer’s Representative, David Marr.
Q: On-Site Storage and Deliveries Will contractors be provided access to on-site storage space for materials or small equipment? What is the protocol for scheduling large equipment or material deliveries (e.g., mulch, sod, or seasonal color)?
A: This contract only requires Fertilizer Delivery. See PWS 3.7. Space available for storing materials is limited at the cemetery; a very small staging area can be used if approved by the COR. Contractor may base operations out of this Staging Area, and may use it for materials and equipment storage, and administration. The Contractor can utilize the Staging Area for placing spoils, the trash dumpster area, employee lunch/break area, etc.
Q: Staffing and Cost History Does the solicitation or PWS specify a minimum manning requirement or recommended number of full-time equivalent personnel for grounds maintenance operations?
A: No
| Q: | Can the Government share how many personnel are currently staffing mowing and trimming at Houston National Cemetery under the existing contract? |
| A: | No, since this is a PWS the contractor employee staffing is dependent on what work is being completed. |
Q: Can you also provide the estimated or historical cost allocations for:
· Fertilization (FY2024 and FY2025), and
· Mowing and trimming operations (FY2024 and FY2025)?
A: We do not provide individual CLIN pricing data, only total contract value of the previous contract (provided in this Q&A document).
| Q: | Are trash bags supplied by contractor? How many bags are filled on average for flower removal each week? |
| A: | See PWS 3.7.4 - Contractor will provide the necessary labor, tools, equipment, and suitable conveyance for each work day for pickup of floral items from the cemetery grounds. |
| Q: | Please provide the square footage and of each area on campus and how often they are needing to be cut. |
| A: | See CLIN structure for area estimates and PWS 3.1, 3.2, 3.3, 3.4, 3.5 for information on mow/trim/edge operations. |
| Q: | Is this contract the same as the previous? |
| A: | The new contract has had several changes since the previous contract, both in required tasks and total acreage of the cemetery. |
| Q: | How much was the previous award? |
| A: | The previous contract was awarded to Sanford Federal, contract # 36C78623D50307, total amount $3,205,937.52. The contract was terminated in 2024. The new contract has several changes since the previous contract, both in required tasks and total acreage of the cemetery. |
| Q: | What hours can we service during the week day? |
| A: | See PWS Attachment 5, 15 regarding work hours. |
| Q: | What happens in the event of several rain days? Do they pause until the weekend or done raining? |
| A: | See PWS 3.1.10. There may be periods of excessive rainfall when the Contractor cannot access areas for mowing due to excessive wetness. |
| Q: | How many people are on campus per day now? |
| A: | This is not tracked by the government personnel. |
| Q: | How often is the lawn treated? |
| A: | I am uncertain to what this question refers. Please be more specific. |
| Q: | What chemicals are used currently and how much for the lawn care? |
| A: | I am uncertain to what this question refers. Please be more specific. |
| Q: | Do we have to take the trash off campus with us or is there a dumpster? |
| A: | See PWS 3.7.4 Contractor will provide the necessary labor, tools, equipment, and suitable conveyance for each work day for pickup of floral items from the cemetery grounds. |
| Q: | Are uniforms required? |
| A: | Yes. See PWS Attachment 5, Section 12 Standards of Employee Conduct. |
| Q: | What was the previous award amount? |
| A: | The previous contract was awarded to Sanford Federal, contract # 36C78623D50307, total amount $3,205,937.52. The contract was terminated in 2024. The new contract has several changes since the previous contract, both in required tasks and total acreage of the cemetery. |
| Q: | Is the contractor responsible for supplies such as garbage bags? If, so, how many bags per week are generally filled for flower removal? |
| A: | See PWS 3.7.4 Contractor will provide the necessary labor, tools, equipment, and suitable conveyance for each work day for pickup of floral items from the cemetery grounds. |
| Q: | What square footage of each area is required to be cut per week or annually? |
| A: | See CLIN structure for area estimates. |
| Q: | Is this contract the same requirements as the previous? |
| A: | The new contract has several changes since the previous contract, both in required tasks and total acreage of the cemetery. |
| Q: | Are uniforms required? |
| A: | Yes. See PWS Attachment 5, Section 12 Standards of Employee Conduct. |
| Q: | What happens on days with excessive rain? Do we wait until it finished and just pick up trash and resort to the weekend? |
| A: | See PWS 3.1.10. There may be periods of excessive rainfall when the Contractor cannot access areas for mowing due to excessive wetness. |
| Q: | What are the allowed hours of service? |
| A: | See PWS Attachment 5, 15 regarding work hours. |
| Q: | Are we provided with a schedule of all activities happening on campus so we can ensure we do not interfere? |
| A: | See PWS Attachment 5, Section 16. The COR or his/her representative shall furnish the Contractor with a schedule of all interments and/or ceremonies no later than the close of business of the day prior to the scheduled internment, and a minimum of three (3) days before any ceremonial events. |
| Q: | How often is lawn treated in each area? |
| A: | I am uncertain to what this question refers. Please be more specific. |
| Q: | Will the Government confirm that price evaluations will include verification of SCA wage compliance and a price realism review to ensure all proposed labor rates and total pricing reflect compliance with the Service Contract Act and Executive Order 14026 minimum wage requirements? |
| A: | Yes, the technical evaluation will consider applicable wage rates. |
| Q: | Could you please provide incumbent information for the current contract? |
| A: | The previous contract was awarded to Sanford Federal, contract # 36C78623D50307, total amount $3,205,937.52. The contract was terminated in 2024. The new contract has several changes since the previous contract, both in required tasks and total acreage of the cemetery. |
| Q: | What type of insurance is required for contractors and sub-contractors? |
| A: | See PWS Attachment 5, Section 17 on permits and licenses as wella s PWS 4.5 Submittal Schedule. |
| Q: | Can they provide the quantity of flat markers and upright headstones? |
| A: | See CLIN structure. 44,292 headstones and 37,031 flat markers in base year. |
| Q: | Is there a limit on how large a mower we can utilize onsite? |
| A: | Mower size will be limited by headstone spacing or other objects present that limit maneuverability (slopes, trees, etc) and will vary by section type. |
| Q: | Are we able to operate autonomous mowers? |
| A: | Yes. |
Questions 36C78625R50248
| Q: | Please confirm if contractors can store a Connex box on the property? |
| A: | No Connex |
| Q: | Please provide a map with boundary lines delineating the green burial mowing areas that are mowed twice per year. |
| A: | See additional maps provided. The Green Burial is located in Area 4: |
| Q: | Please confirm what the # symbols represent on the attached map. |
| A: | I am uncertain to what symbols or which map this question refers to. |
| Q: | Please provide the total number of flat markers and headstones that are currently on site. |
| A: | See CLIN structure. 44,292 headstones and 37,031 flat markers in base year. |
| Q: | Please provide the number of added flat markers and headstones (separately) each year. |
| A: | See CLIN structure. An additional 1,676 headstones and 15 flat markers are added each year. |
| Q: | Please confirm if contractors will be responsible for delivery of turf fertilization only and will not be responsible for applying the fertilization to turf areas. |
| A: | Contract is for fertilizer delivery only. |
| Q: | Is E-Verify required of contractors for this project and if not, why not? |
| A: | Yes. |
| Q: | Please provide a copy of the current contract. |
| A: | We do not disclose this information. |
| Q: | Please provide a copy of the previous bid tab. |
| A: | We do not disclose this information. |
| Q: | Please provide the budget for this project. |
| A: | We do not disclose this information. |
| Q: | Who is the current contractor(s) servicing this contract now? |
| A: | Services are currently being provided by Legacy Rock Corporation on an interim basis. |
Q: Are pre-emergent and post-emergent herbicide applications inclusive of bed/planting areas, or turf areas only? Does the acreage reflect this split as well?
A: The broadcast applications are for turf areas only – 180.5 acres.
| Q: | Should the OPTION Fertilizer Delivery line be priced at 16 tons or 34,000 lbs.? 16 tons would be 32,000 lbs., not 34,000 lbs. (1 ton = 2,000 lbs. therefore 34,000 lbs. = 17 tons) |
| A: | Please excuse the typo, and thank you for catching – yes, it should be 17 tons (34,000 pounds). |
| Q: | The detailed specifications for CLIN 007 states that Feature Edging is to be done 4 times per year, but the pricing line shows 36 weeks. Please clarify if this edging is required 4 times per year, or 36 times per year. |
| A: | Use the CLIN estimated quantity. The specifications also state: “Additional edging events may be scheduled by the COR.” |
| Q: | Table 3.6 states that the herbicide program is for 169 acres, but the pricing line items for pre-emergent and post-emergent herbicide applications list 185.371 acres. Please clarify which acreage our pricing is to cover. |
| A: | Table 3.6 is included as an example. Follow the CLIN and pricing structure for acreage. |
| Q: | Have there been any known army worm infestations over the past 3-5 years on site? If so, what percentage of total turf area was generally impacted? |
| A: | Yes, there have been army worms located through out the entire cemetery in the last year. They have been treated when identified. |
Q: On the site map provided, there does not appear to be colored delineations of certain areas as described in the specifications, specifically for the Westside (Yellow), Eastside (Red) and Green Burial Mowing areas. Please provide an updated site map which shows these areas as described in the specifications.
A: See attached map.
| Q: | Will H2B Visa workers be allowed to work on site? |
| A: | There are no current restrictions for H2B Visa workers. |
| Q: | What areas need to be pest controlled? The main buildings or all the acreage? |
| A: | The PWS (3.6 and 3.8) has specifications for weed and insect control in the turf acreage. |
| Q: | Pest control for rodents? Fire Ants? Birds? |
| A: | See PWS 3.8 for specifications regarding insect control. |
| Q: | For the pest control, what is the amount of insurance that needs to be carried? |
| A: | See PWS Attachment 5, Section 17 on permits and licenses as wella s PWS 4.5 Submittal Schedule. |
| Q: | Are we trimming trees? |
| A: | No. The contract contains no specifications for trees. |
| Q: | What is the schedule for fertilizing for the year? How much fertilizer in pounds is needed per fertilization period? |
| A: | See CLIN structure for fertilizer delivery amounts. PWS 3.7 details timeframes. |
| Q: | What is the reason your current contractor is not being renewed? |
| A: | The previous contract was terminated for government’s convenience in 2024. |
| Q: | What is the "Contractor Staging Area"? |
| A: | The Contractor can utilize the Staging Area for placing spoils, the trash dumpster area, employee lunch/break area, etc. |
| Q: | Is there any area onsite where contractor equipment can be stored overnight? Does all contractor equipment have to be removed from Houston National Cemetery every night? |
| A: | Space available for storing materials is limited at the cemetery; a very small staging area can be used if approved by the COR. It is understood the Government will not be held responsible for any damage to or loss of the Contractor’s equipment, materials, supplies or the like which may result from vandalism, theft etc. while on site. |