RFP2026-3_Attachment-_Community_Development-Permit_Types_and_Categories.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- COMPREHENSIVE FEE STUDIES
- Solicitation number
- RFP2026-3
- Issued by
- Broward County, Florida
About this file
This file is an attachment to an RFP issued by the City of Cooper City, Florida, containing a detailed breakdown of community development permit types and categories used for fee study analysis. The attachment provides a comprehensive classification system of permits and associated fees that fall under the City's community development jurisdiction, serving as a reference document for consultants responding to the City's request for proposals on the Community Development Fee Study component of the broader comprehensive fee and rate study initiative.
The permit types and categories detailed in this attachment are essential baseline data for consultants to understand the scope and complexity of the City's development-related fee structure. This reference document enables proposing firms to accurately assess the work required to evaluate existing permit fees, inspection fees, and other applicable development-related charges, and to develop recommendations aligned with cost-of-service principles and industry best practices. The attachment supports consultants in scoping their methodologies, data collection requirements, and analytical approaches for the Community Development Fee Study service area, one of five potential service areas available for proposal under the comprehensive fee studies RFP.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Construction Permit Fees | |
| Construction costs up to $2,500 (per structure per trade) | $139 |
| Construction costs greater than $2,500 and up to $2,000,000 | 3% |
| Construction costs greater than $2,000,000 and up to $5,000,000 | 2.50% |
| Construction costs greater than $5,000,000 | 2% |
| Window/Shutter Permit Fees | |
| First Opening | $139 |
| Each Additional Opening | $12 |
| Roof Permit Fees | |
| Maximum Residential Roof Permit Fee | $500 |
| Minimum Residential Roof Permit Fee | $278 |
| Maximum Non-Residential Roof Permit Fee | $2,000 |
| A/C and Water Heater Permit Fees | |
| A/C Change Out (Residential) | $139 |
| Water Heater Change Out (Residential) | $50 |
| Miscellaneous Fees | |
| Certificate of Occupancy/Completion Fee (Residential) | $139 |
| Certificate of Occupancy/Completion Fee (Non-Residential) | $139 |
| Temporary/Partial Certificate of Occupancy (1 to 90 Days) | $500 |
| Temporary/Partial Certificate of Occupancy (90 Days Not to Exceed 180 Days) - One Time | $750 |
| Additional/Partial Inspection | $139 |
| Re-Inspection Fee | $139 |
| Change of Contractor Fee | $139 |
| Permit Card/Plan Replacement | $50 |
| Notary Fee | $9 |
| Revision after Issuance Per Discipline | $139 |
| Expired Permit Renewal Fee | 50% of the |
| Original Permit Fee | |
| Overtime Inspections | 3 Hour Minimum/ |
| $139 per Hour | |
| Overtime Plan Review | 3 Hour Minimum/ |
| $139 per Hour | |
| Work Without a Permit | FBC 109 BCAP |
| Double the Permit Fee | |
| 3rd and Subsequent Plan Review Fee | $139 Minimum per Discipline |
| Architectural Pre-Plan Review | $150 Minimum per Discipline for 1st Hour (Total $600)/$75 per Hour per Discipline after 1st Hour |
| Private Providers | |
| Plans Review Only | 25% Discount of Permit Fee |
| Inspections Only | 25% Discount of Permit Fee |
| Plans Review & Inspections | 50% Discount of Permit Fee |
| Required State and County Fees | |
| Education Fee | |
| $0.20 per thousand dollars (cost of construction per discipline) | |
| Broward County Board of Rules and Appeals Fee (BRA) | |
| $0.52 per each $1,000 or any fraction of the total cost of construction | |
| Florida DBPR/Home Recovery Fund F.S. 553 | |
| Minimum $2 per permit, 1.5% of the Permit Fee | |
| Building Code Administrators and Inspectors Fund F.S. 468 | |
| Minimum $2 per permit, 1% of the Permit Fee | |
| The Building Permit Fee shall be based upon the cost of construction as attested to by the applicant on the submitted permit application. The Building Official, in addition to verifying the completeness and accuracy of the application, shall review the application for the cost of construction. If the Building Official determines that the cost of construction attested to does not accurately reflect the cost of construction for the scope of work covered by the permit, he/she can use of the following to calculate the fee: | |
| Copy of a signed contract for work to be completed under requested permit. | |
| Apply the values in the most current edition of the RS Means Construction Valuation system. The greatest of the methods of the applicant's statement of value, or (1) or (2) above shall be used in calculating the permit fee. | |
| Reference: The initial permit fee shall be based on the total cost of construction. All additional sub permit fees shall be based on the job value for the work covered by that particular permit. | |
| FEE SCHEDULE ANNUAL REVISION | |
| On October 1st of each year, the fees referred to above shall be increased in accordance with the Consumer Price Index for urban consumers in the United States published by the Bureau of Labor Statistics for the twelve (12) months, ending April of each year. |