COMPREHENSIVE FEE STUDIES
Solicitation number
RFP2026-3
Issued by
Broward County, Florida

About this file

This is a Building Division Fee Schedule document from the City of Cooper City, Florida, establishing construction permit fees and related development costs for the Community Development Department. The fee structure encompasses multiple permit categories including construction permits based on project costs, window/shutter permits, roof permits, HVAC and water heater permits, and miscellaneous fees such as certificates of occupancy, inspections, plan reviews, and overtime services. Construction permit fees are tiered by project value, ranging from a flat $139 fee for projects under $2,500 to percentage-based fees (3%, 2.5%, and 2%) for larger projects up to and exceeding $5,000,000. The schedule also includes discounted rates for private providers conducting plans review and inspections, with discounts ranging from 25% to 50% depending on the service type.

The fee schedule incorporates required state and county fees in addition to local charges, including an education fee of $0.20 per thousand dollars of construction cost, a Broward County Board of Rules and Appeals fee of $0.52 per $1,000 of construction cost, and state fees under Florida Statutes sections 553 and 468. The Building Official retains authority to verify the stated construction costs and may utilize signed contracts, RS Means Construction Valuation systems, or other methods to establish accurate project values for fee calculation purposes. The fee schedule is subject to annual revision on October 1st based on the Consumer Price Index for urban consumers, ensuring fees remain aligned with inflation and construction cost trends. These fees are foundational to the City's comprehensive fee study initiative, which seeks consultant recommendations for evaluating and updating fee structures across multiple municipal departments and service areas.

View the file

Other files

File Type Posted
RFP2026-3_Attachment-_Full_Cost_Allocation_Plan_FY2017.pdf PDF
COMPREHENSIVE_FEE_STUDIES_(Addendum_#3_Revision).pdf PDF
COMPREHENSIVE_FEE_STUDIES_(Addendum_#2_Revision).pdf PDF
RFP2026-3_Attachment-_2025_Fire_Methodology_Report..pdf PDF
RFP2026-3_Attachment-_Community_Development-Permit_Types_and_Categories.xlsx XLSX spreadsheet
RFP2026-3_Attachment-_Parks_and_Rec_2025-2026_Fee_Schedule.xlsx XLSX spreadsheet
Project_Reference_Form.pdf PDF
RFP2026-3_2013_Water_and_Sewer_Utility_Rate_Study.PDF PDF
RFP2026-3_Attachment-_Draft_Parks_and_Rec_2026-2027_Fee_Schedule.xlsx XLSX spreadsheet
Sample_Agreement.docx DOCX document
2025_Cooper_City_General_Terms_and_Conditions.pdf PDF
W-9_(2).pdf PDF
Scrutinized_Companies_Affidavit.pdf PDF
Sample_Certificate_of_Insurance.pdf PDF
Public_Entity_Crimes_Statement.pdf PDF
Ownership_Disclosure_Affidavit_(2).pdf PDF
Non-Conflict_of_Interest_Statement.pdf PDF
Non-Collusion_Affidavit.pdf PDF
Human_Trafficking_Affidavit_.pdf PDF
Foreign_Country_of_Concern_Affidavit.pdf PDF
Foreign_(Non-Florida)_Corporation_Form.pdf PDF
Fair_Subcontracting_Practices_Affidavit.pdf PDF
E-Verify_Affidavit.pdf PDF
Employee_Background_Verification_Affidavit.pdf PDF
Drug_free_Workplace_Certificate.pdf PDF
Domestic_Partnership_Affidavit.pdf PDF
Contractor_Due_Diligence_Affidavit.pdf PDF
Certification_Regarding_Debarment,_Suspension,_Etc..pdf PDF
Business_Entity_Affidavit.pdf PDF
American_with_Disabilities_Act_(ADA)_Nondiscrimination_Statement.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Construction Permit Fees
Construction costs up to $2,500 (per structure per trade)$139
Construction costs greater than $2,500 and up to $2,000,0003%
Construction costs greater than $2,000,000 and up to $5,000,0002.50%
Construction costs greater than $5,000,0002%
Window/Shutter Permit Fees
First Opening$139
Each Additional Opening$12
Roof Permit Fees
Maximum Residential Roof Permit Fee$500
Minimum Residential Roof Permit Fee$278
Maximum Non-Residential Roof Permit Fee$2,000
A/C and Water Heater Permit Fees
A/C Change Out (Residential)$139
Water Heater Change Out (Residential)$50
Miscellaneous Fees
Certificate of Occupancy/Completion Fee (Residential)$139
Certificate of Occupancy/Completion Fee (Non-Residential)$139
Temporary/Partial Certificate of Occupancy (1 to 90 Days)$500
Temporary/Partial Certificate of Occupancy (90 Days Not to Exceed 180 Days) - One Time$750
Additional/Partial Inspection$139
Re-Inspection Fee$139
Change of Contractor Fee$139
Permit Card/Plan Replacement$50
Notary Fee$9
Revision after Issuance Per Discipline$139
Expired Permit Renewal Fee50% of the
Original Permit Fee
Overtime Inspections3 Hour Minimum/
$139 per Hour
Overtime Plan Review3 Hour Minimum/
$139 per Hour
Work Without a PermitFBC 109 BCAP
Double the Permit Fee
3rd and Subsequent Plan Review Fee$139 Minimum per Discipline
Architectural Pre-Plan Review$150 Minimum per Discipline for 1st Hour (Total $600)/$75 per Hour per Discipline after 1st Hour
Private Providers
Plans Review Only25% Discount of Permit Fee
Inspections Only25% Discount of Permit Fee
Plans Review & Inspections50% Discount of Permit Fee
Required State and County Fees
Education Fee
$0.20 per thousand dollars (cost of construction per discipline)
Broward County Board of Rules and Appeals Fee (BRA)
$0.52 per each $1,000 or any fraction of the total cost of construction
Florida DBPR/Home Recovery Fund F.S. 553
Minimum $2 per permit, 1.5% of the Permit Fee
Building Code Administrators and Inspectors Fund F.S. 468
Minimum $2 per permit, 1% of the Permit Fee
The Building Permit Fee shall be based upon the cost of construction as attested to by the applicant on the submitted permit application. The Building Official, in addition to verifying the completeness and accuracy of the application, shall review the application for the cost of construction. If the Building Official determines that the cost of construction attested to does not accurately reflect the cost of construction for the scope of work covered by the permit, he/she can use of the following to calculate the fee:
Copy of a signed contract for work to be completed under requested permit.
Apply the values in the most current edition of the RS Means Construction Valuation system. The greatest of the methods of the applicant's statement of value, or (1) or (2) above shall be used in calculating the permit fee.
Reference: The initial permit fee shall be based on the total cost of construction. All additional sub permit fees shall be based on the job value for the work covered by that particular permit.
FEE SCHEDULE ANNUAL REVISION
On October 1st of each year, the fees referred to above shall be increased in accordance with the Consumer Price Index for urban consumers in the United States published by the Bureau of Labor Statistics for the twelve (12) months, ending April of each year.