About this file
RFP Summary: Elevator Maintenance Services
This Request for Proposal (RFP2026-01) is issued by the Oklahoma City Housing Authority (OCHA) and Community Enhancement Corporation (CEC) seeking qualified elevator service contractors to provide comprehensive full-service elevator maintenance, repair, inspection, and emergency services across nine properties containing a total of 24 elevators. The properties include Marie McGuire Plaza, Wyatt F. Jeltz Center, The Towers, Classen Center, Shartel Towers, Hillcrest Senior Citizen Center, Andrews Square, Louis F. Danforth Senior Center, and Candle Lake Senior Center. A non-mandatory pre-bid conference and site visit will be held on May 21, 2026 at 9:00 a.m. at the OCHA offices located at 1700 NE 4th Street, Oklahoma City, OK 73117. Sealed proposals must be received by June 25, 2026 at 1:30 p.m. Questions must be submitted by June 4, 2026, with addenda issued by June 16, 2026. The anticipated award date is July 22, 2026. The contract will have an initial one-year term with the option to renew for up to four additional one-year periods, for a maximum contract term of five years, with renewals subject to annual review.
Pricing will be submitted as part of the proposal and evaluated on a 100-point scale, with price accounting for 25 points. Payment terms are Net thirty business days. The scope requires continuous 24-hour, 7-day coverage with emergency callback response within 60 minutes and restoration of service within 72 hours maximum. Routine maintenance shall be performed during normal business hours (8:00 a.m. to 5:00 p.m.), with service calls responded to within four hours during business hours and within two hours for after-hours emergencies. Contractors must provide comprehensive preventive maintenance per manufacturer specifications, coordinate annual inspections with the City of Oklahoma City, maintain adequate spare parts inventory, and obtain all necessary permits and licenses. Insurance requirements include Commercial General Liability of $1,000,000 per occurrence and $2,000,000 aggregate, Automobile Liability of $1,000,000 combined single limit, and Workers' Compensation coverage in accordance with Oklahoma law.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP2026-01
Elevator Maintenance and Services
REQUEST FOR PROPOSAL (RFP)
Oklahoma City Housing Authority
Request for Proposal (RFP)
RFP # P2025-005, Elevator Maintenance and Services Page 1| 5
RFP No. RFP2026-01 Elevator Maintenance
Owner:
Oklahoma City Housing Authority & Community Enhancement Corporation 1700 NE 4th St., Oklahoma City, OK 73117
Contact:
Spencer Matheny – smatheny@ochanet.org Support: Misty Johnson – mjohnson@ochanet.org
1. INTRODUCTION
The Oklahoma City Housing Authority (OCHA) and Community Enhancement Corporation (CEC) (“Owner”) hereby solicit sealed proposals from qualified, licensed, and responsible elevator service contractors to provide comprehensive full-service elevator maintenance, repair, inspection, and emergency services for multiple properties owned and operated by OCHA and CEC.
The proper�es included in this solicita�on consist of the following developments and facili�es:
• Marie McGuire Plaza, 1316 N.E. 12th Street (2 elevators)
• Wyatt F. Jeltz Center, 1225 N. Kate (4 elevators – 2 North Wing, 2 South Wing)
• The Towers, 135 N.W. 9th Street (4 elevators total – 2 Towers Building, 1 Normel Building, 1
BelAire Building)
• Classen Center, (2 elevators)
• Shartel Towers (2 elevators)
• Hillcrest Senior Citizen Center (2 elevators)
• Andrews Square (4 elevators – 2 North Wing, 2 South Wing)
• Louis F. Danforth Senior Center (2 elevators)
• Candle Lake Senior Center (2 elevators)
The intent of this RFP is to secure a contractor capable of ensuring safe, reliable, and uninterrupted elevator operations in compliance with all federal, state, and local regulations.
2. PRE-BID CONFERENCE
A Non-Mandatory Pre-Bid Conference and Site Visit will be held as follows:
Date: Thursday, May 21, 2026 at 9:00 a.m.
Time: 9:00am Location:
Oklahoma City Housing Authority 1700 NE 4th Street Oklahoma City, OK 73117
Attendance is strongly encouraged to allow proposers to review site conditions, equipment, and service expectations. Contractors will have the opportunity to ask questions and inspect representative elevator systems.
RFP # P2025-005, Elevator Maintenance and Services Page 2| 5
Failure to attend shall not relieve the Contractor of responsibility for understanding the scope and site conditions.
3. PROPOSAL SUBMISSION
Proposal Due Date and Time
Proposals must be received no later than:
Thursday June 25, 2026 at 1:30 p.m.
Proposals received after this deadline will not be accepted or considered.
Submission Requirements
Submit one (1) original hard copy in a sealed envelope clearly marked:
“RFP P2026-001 – Elevator Maintenance Services”
Delivery Address:
Oklahoma City Housing Authority Attn: Technical Services Department 1700 NE 4th Street Oklahoma City, OK 73117
It is the proposer’s sole responsibility to ensure delivery prior to the deadline. Late submissions will be returned unopened.
Questions and Addenda
All questions must be submitted through the Housing Agency Marketplace (HAM):
www.housingagencymarketplace.com
• Questions Due: Thursday, June 4, 2026
• Addenda Issued: Tuesday, June 16, 2026
Only written addenda issued by OCHA shall be binding.
4. SCOPE OF SERVICES
The Contractor shall provide full-service elevator maintenance including all labor, supervision, materials, equipment, tools, permits, insurance, and supplies necessary to maintain elevators in safe and proper opera�ng condi�on.
4.1 General Requirements
The Contractor shall maintain all hydraulic, mechanical, electrical, and electronic elevator components in proper working condition. All work must be performed by licensed and trained technicians under the direct supervision of qualified personnel. The Contractor is responsible for obtaining and maintaining all required permits, licenses, bonds, and insurance necessary to perform the work. Upon completion of http://www.housingagencymarketplace.com/
RFP # P2025-005, Elevator Maintenance and Services Page 3| 5 services, all work areas must be left clean and free of debris, and the Contractor shall be responsible for repairing any damage caused during the performance of services.
4.2 Preven�ve Maintenance
Full-service maintenance shall include preven�ve maintenance performed in accordance with manufacturer specifica�ons and industry standards. The Contractor shall provide con�nuous 24-hour, 7-day coverage and develop writen preven�ve maintenance schedules for each elevator. Rou�ne maintenance services shall be performed during normal business hours, defined as 8:00 a.m. to 5:00 p.m.
The Contractor must provide emergency callback response within sixty (60) minutes and ensure that no elevator remains out of service for more than seventy-two (72) hours, including weekends and holidays.
Failure to restore service within these required �meframes may cons�tute default under the contract.
4.3 Maintenance Responsibili�es
The Contractor shall be responsible for examining, adjus�ng, lubrica�ng, repairing, and replacing all necessary elevator components to ensure safe and reliable opera�on. This includes, but is not limited to, machines, motors, generators, bearings, brake components, coil windings, brushes, commutators, rota�ng elements, resistors, guide rails, guide shoes, rollers, hois�ng ropes, conductor cables, safety devices, governors, door operators, interlocks, signal systems, cab components, flooring, controllers, power switches, cylinders, and plungers. All replacement parts must be original manufacturer parts or Owner-approved equivalents. The Contractor shall also maintain an adequate inventory of spare parts to ensure uninterrupted service.
4.4 Annual Inspec�ons
The Contractor shall coordinate all required annual inspec�ons with the City of Oklahoma City and ensure compliance with applicable regula�ons. This includes performing load tests and five-year inspec�ons in accordance with the American Na�onal Safety Code. The Contractor is responsible for obtaining all required permits, providing test cer�ficates to the Owner, and correc�ng any deficiencies iden�fied during inspec�ons in a �mely manner.
4.5 Service Calls & Emergency Response
The Contractor shall respond to service calls within four (4) hours during regular business hours. For a�er-hours emergencies, the Contractor must provide a response within two (2) hours to ensure the safety and opera�onal con�nuity of elevator systems.
5. PROPOSAL REQUIREMENTS
Each proposal must include:
1. Company Profile and Qualifica�ons
2. Proof of Licenses
3. Preven�ve Maintenance Plan
4. Emergency Response Plan
5. Staffing Plan with Cer�fica�ons
6. Minimum of Two (2) Comparable References
RFP # P2025-005, Elevator Maintenance and Services Page 4| 5
7. Insurance Cer�ficate(s)
8. Pricing Proposal
9. All Required Forms (Sec�on 10)
Failure to submit required documents may render proposal non-responsive.
6. EVALUATION CRITERIA
Proposals will be evaluated on a 100-point scale:
• Technical Approach & Maintenance Plan – 15 points
• Experience & References – 25 points
• Staffing & Qualifica�ons – 20 points
• Emergency Response & Service Capacity – 15 points
• Price – 25 points
Award will be made to the proposer whose submission is most advantageous to OCHA.
7. CONTRACT TERMS
• Ini�al Term: One (1) year
• Renewal: Up to four (4) addi�onal one-year periods
• Maximum Term: Five (5) years
• Renewals subject to annual review
• Payment Terms: Net thirty (30) business days
• Termina�on: For cause or convenience upon writen no�ce
8. OCHA RIGHTS
OCHA reserves the right to exercise full discre�on throughout the procurement process. This includes, but is not limited to, the right to reject any or all proposals received, waive informali�es or minor irregulari�es in submissions, nego�ate terms with one or more proposers, make mul�ple contract awards if deemed in the best interest of the agency, and cancel the RFP at any �me. OCHA also reserves the right to retain all proposals submited and to decline to award a contract if it is determined that doing so would not serve the best interests of the agency.
9. INSURANCE REQUIREMENTS
The successful Contractor shall be required to maintain adequate insurance coverage throughout the duration of the contract to protect against all applicable risks associated with the performance of services. At a minimum, this shall include Commercial General Liability insurance with coverage limits of $1,000,000 per occurrence and $2,000,000 in the aggregate, Automobile Liability insurance with a combined single limit of $1,000,000, and Workers’ Compensation insurance in accordance with the laws of the State of Oklahoma. Proof of such coverage must be provided prior to contract execution and maintained for the duration of the agreement.
RFP # P2025-005, Elevator Maintenance and Services Page 5| 5
10. REQUIRED FORMS
The following must be submited:
1. OCHA 574 – Contractor Contact Form
2. Pricing Proposal
3. OCHA 565 – Debarment and Suspension Cer�fica�on
4. F3881 ACH – Vendor Payment Enrollment
5. OCHA 570 – Non-Collusive Affidavit
6. HUD-5369-C – Cer�fica�ons and Representa�ons
7. EEO-1 - Equal Employment Opportunity Form
8. IRS W-9
9. References
Reference Documents (Do Not Return):
• HUD-5369-B – Instruc�ons to Offerors
• HUD-5370-C – General Condi�ons
11. TIMELINE
• RFP Issued: May 7, 2026
• Pre-bid Conference: May 21, 2026
• Questions Due: June 4, 2026
• Addenda Issued: June 16, 2026
• Proposal Due: June 25, 2026
• Anticipated Award: July 22, 2026
| 1. INTRODUCTION |
| The Oklahoma City Housing Authority (OCHA) and Community Enhancement Corporation (CEC) (“Owner”) hereby solicit sealed proposals from qualified, licensed, and responsible elevator service contractors to provide comprehensive full-service elevator main... |
| The intent of this RFP is to secure a contractor capable of ensuring safe, reliable, and uninterrupted elevator operations in compliance with all federal, state, and local regulations. |
| 2. PRE-BID CONFERENCE |
| 3. PROPOSAL SUBMISSION |
| Proposal Due Date and Time |
| Submission Requirements |
| Delivery Address: |
| Questions and Addenda |
| 4.2 Preventive Maintenance |
| Full-service maintenance shall include preventive maintenance performed in accordance with manufacturer specifications and industry standards. The Contractor shall provide continuous 24-hour, 7-day coverage and develop written preventive maintenance s... |
| . |
| The Contractor shall coordinate all required annual inspections with the City of Oklahoma City and ensure compliance with applicable regulations. This includes performing load tests and five-year inspections in accordance with the American National Sa... |
| 4.5 Service Calls & Emergency Response |