RFP Scope-of-Work - Rockport SRA Master Plan 751-18164-GAG 180820.pdf
PDF 86 KB Posted
- Solicitation number
- RFP-171-180000003329-3
- Issued by
- Roscommon County, Michigan
About this file
This is a Request for Proposal (RFP) from the Michigan Department of Natural Resources (DNR) Parks and Recreation Division for a schematic facility development master plan for the Rockport State Recreation Area, located in Alpena and Presque Isle Counties. The project involves creating a comprehensive master plan for developing approximately 4,200 acres of land with 6 miles of Lake Huron frontage, including design elements such as a 100-site modern campground, 50-site rustic campground, 8 rustic cabins, 6 backcountry campsites, a visitor center, administrative services area, day use beach access, and trail improvements. The professional services contractor (PSC) will be required to produce multiple conceptual master plan versions, attend a public open house, incorporate feedback, and deliver final rendered plans and construction cost estimates.
The RFP requires the PSC to conduct at least five meetings, including a project kick-off meeting, conceptual plan presentations, draft plan reviews, a public open house, and post-open house review. The contractor must provide biweekly progress summaries, maintain comprehensive project documentation, and deliver three 24" x 36" hard copy plans, one electronic plan, and 50 11" x 17" copies for public distribution. While no specific budget is mentioned, the project follows State of Michigan Department of Management and Budget Contract for Professional Services guidelines, with design elements required to comply with DNR campground design standards. The master plan will serve as a guiding document for pursuing future funding and implementing phased public improvements at the recreation area.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP 751/18164.GAG
RFP Scope of Work Description Rockport State Recreation Area – Development Master Plan 751/18164.GAG
Department of Natural Resources / Parks & Recreation Division
The DNR Parks and Recreation Division (PRD) is requesting assistance in creating a schematic facility development masterplan that when finalized will be used as the guiding planning document to pursue funding for implementation of phased development for public improvements at this location.
Project Background Information:
Rockport State Recreation Area is a unique environmental, historical and cultural property consisting of approximately 4,200 acres and lies in both Alpena and Presque Isle Counties in north eastern Michigan. The site provides 6 miles of frontage on Lake Huron and includes the Besser Natural Area (95 acres) at the north end and a limestone quarry at south end with unique sinkholes in the central part of the property. The Rockport boating access site and a small day use parking area also exists at the south end of the facility. An extensive non-motorized trail network is used for hiking, biking and equestrian riding.
A DNR general management plan was completed in 2008 and outlines a 20-year vision with general management zones that shape the value and general intent for the facility. In 2010 a Phase-2 plan was completed which outlines 10-year action goals and in 2015 a Phase-3 plan was completed which outlines 5-year implementation goals. In 2016 the DNR and the Michigan State University Landscape Architecture program participated in a class project to assess recreational opportunities outlined in the above plan combined with additional public input to produce conceptual plans and ideas for improvements.
Proposed Scope of Work:
Interested bidders shall provide a complete PSC Proposal for all services necessary for creating a schematic facility development master plan. Consulting services shall follow the State of Michigan, Department of Management and Budget Contract for Professional Services and DTMB Facilities Administration, Design and Construction Division policies and procedures for Phase 300 Schematic Design. Proposals shall include Phase 300 as required to produce a scaled, rendered site masterplan representing all desired elements for improvements. Deliverables shall include a general estimate of construction cost by category and recommended project phasing.
The PSC shall prepare for review and revise as necessary for acceptance, progressive schematic design architectural and or engineering drawings consistent with the Project scope of work, which depict the areas(s) and relationship of the functions outlined in the program and scope of work requirements. PSC shall establish the design basis for and show principal design elements and locations of proposed built features. PSC shall utilize existing aerial photography, USGS topographic information, and soil surveys to develop the base drawing for creation of a viable master development plan. Detailed survey work, geo-technical testing or formal environmental assessment services are not anticipated for this phase of the project.
Professional services shall include but are not limited to:
• The successful PSC shall read through all DNR PRD submitted documentation and planning information and produce a written master development plan summary for project team review and approval. The edited written summary will become the basis for the master development plan design.
• Based on the written master development plan summary a minimum of three versions of rendered conceptual schematic master plans shall be prepared for presentation to the project team at a face to face meeting.
• From this presentation, one concept or a combination of elements from multiple concepts will be consolidated into one updated conceptual master development for project team review and comment. The updated concept may be presented in an electronic GoTo Meeting format if desired.
• With project team input, the schematic master plan shall be updated and prepared for a “public open house” input session. The PSC shall attend the public open house to assist in answering questions, addressing and recording the public comment. The PSC shall provide three rendered, 24” x 36” copies of the draft schematic master plans mounted on form core board for presentation at the open house. 50 rendered, 11” x 17” copies of the plan shall also be provided for pubic distribution.
• Following the public open house, the PSC shall coordinate a GoTo Meeting discussion to review the public comments, questions and input for possible updates to the draft schematic master development plan.
• Finalize the schematic master development plan, develop preliminary estimate for construction by category and formulate recommended project phasing and submit to the project team for a 90% review.
• Complete final edits and provide three, 24” x 36” rendered hard copy schematic master development plans, one electronic plan and final estimate for construction by category and recommended project phasing.
Basic Schematic Master Development Design Elements include but shall not be limited to:
• Overall site organization and circulation system
• 100 site modern campground
• 50 site rustic campground
• Modest visitor center
• Administrative services area, headquarter, shop and outdoor storage area
• 8 rustic cabins
• 6 backcountry campsite locations
• Day use beach access, parking and supporting amenities
• Primary park entrance enhancement, defined facility vehicular and non-motorized routes and corridors
• Dark sky programming and viewing area
• Sink hole pedestrian circulation system and improved public access points
• Pier/dock rehabilitation or treatment
• Rockport Road entrance parking lot and connection to facility trail system
• All design shall comply with DNR PRD campground design guidelines
PPrrooppoossaall::
TThhee PPSSCC pprrooppoossaall sshhaallll iinncclluuddee::
•• CClleeaarr ddooccuummeennttaattiioonn ooff tthhee nnuummbbeerr ooff mmeeeettiinnggss pprrooppoosseedd,, iinnddiiccaattiinngg wwhheetthheerr tthhee mmeeeettiinnggss aarree pprrooppoosseedd ttoo bbee oonn--ssiittee,, ffaaccee ttoo ffaaccee,, bbyy tteelleepphhoonnee,, oorr iinn ssppeecciiffiicc eelleeccttrroonniicc ffoorrmmaatt.. TThhee PPSSCC sshhaallll pprroovviiddee aaggeennddaass aanndd mmeeeettiinngg mmiinnuutteess ffoorr aallll pprroojjeecctt mmeeeettiinnggss,, iinncclluuddiinngg mmeeeettiinnggss hheelldd iinn GGoo--TToo--MMeeeettiinngg ffoorrmmaatt.. TThhee PPSSCC sshhaallll iiddeennttiiffyy aanndd iitteemmiizzee aass aa rreeiimmbbuurrssaabbllee eexxppeennssee aallll rreeiimmbbuurrssaabbllee aanndd ttrraavveell eexxppeennsseess iinn tthhee PPSSCC CCoosstt PPrrooppoossaall..
•• WWhhiillee ssoommee pprroojjeecctt tteeaamm ppllaannnniinngg mmeeeettiinnggss mmaayy bbee ccoonnssiiddeerreedd iinn tthhee ffoorrmm ooff ccoommppuutteerr--bbaasseedd mmeeeettiinnggss ((ee..gg.. GGooTTooMMeeeettiinnggss)),, kkeeyy rreevviieeww mmeeeettiinnggss sshhaallll bbee iinn ppeerrssoonn.. FFoorr aallll mmeeeettiinnggss bbeeiinngg hheelldd ffoorr ddooccuummeenntt rreevviieeww,, aallll rreeqquuiirreedd rreevviieeww iinnffoorrmmaattiioonn sshhaallll bbee ssuubbmmiitttteedd eelleeccttrroonniiccaallllyy aanndd iinn hhaarrdd ccooppyy ffoorrmmaattss 1144 ddaayyss pprriioorr ttoo tthhee mmeeeettiinnggss.. AAtt aa mmiinniimmuumm 55 mmeeeettiinnggss wwiillll bbee rreeqquuiirreedd iinncclluuddiinngg:: 11)) aa ffaaccee ttoo ffaaccee pprroojjeecctt ppllaannnniinngg kkiicckk ooffff mmeeeettiinngg iinncclluuddiinngg ssiittee aasssseessssmmeenntt;; 22)) ffaaccee ttoo ffaaccee pprreesseennttaattiioonn ooff tthhee 33 ccoonncceeppttuuaall mmaasstteerr ppllaann ooppttiioonnss,, 33)) CCoonnssoolliiddaatteedd ddrraafftt sscchheemmaattiicc mmaasstteerr ddeevveellooppmmeenntt ppllaann rreevviieeww mmeeeettiinngg ((mmaayy bbee aann eelleeccttrroonniicc GGooTToo MMeeeettiinngg)),, 44)) PPuubblliicc OOppeenn HHoouussee mmeeeettiinngg,, 55)) PPoosstt PPuubblliicc OOppeenn HHoouussee rreevviieeww mmeeeettiinngg ((mmaayy bbee eelleeccttrroonniicc GGooTToo MMeeeettiinngg))
•• PPrroovviiddee aa bbiiwweeeekkllyy pprrooggrreessss ssuummmmaarryy eemmaaiill ttoo tthhee pprroojjeecctt tteeaamm,, bbrriieeffllyy ddooccuummeennttiinngg tthhee pprriioorr 22--wweeeekk’’ss pprrooggrreessss bbyy tthhee PPSSCC aanndd ddiissppllaayy tthhee iinniittiiaall pprroojjeecctt sscchheedduullee aanndd ccuurrrreenntt sscchheedduullee ssttaattuuss..
•• AA ggrraapphhiicc bbaarr--cchhaarrtt sscchheedduullee ((iinn wweeeekkss)) iinnddiiccaattiinngg tthhee PPSSCC’’ss pprrooppoosseedd ttiimmeelliinnee ffoorr sseerrvviicceess bbaasseedd oonn aa pprrooppoosseedd PPSSCC CCoonnttrraacctt ssttaarrtt ddaattee.. FFoorr sscchheedduulliinngg ppuurrppoosseess,, aassssuummee 1144 ccaalleennddaarr ddaayyss eeaacchh OOwwnneerr rreevviieeww ssuubbmmiissssiioonn..
TThhee PPSSCC sshhaallll bbee rreeqquuiirreedd ttoo mmaaiinnttaaiinn aa ccoommpplleettee pprroojjeecctt ffiillee ooff aallll pprroojjeecctt ddooccuummeennttaattiioonn iinncclluuddiinngg,, bbuutt nnoott lliimmiitteedd ttoo,, bbaassee iinnffoorrmmaattiioonn,, ccoonnttrraacctt ddooccuummeennttss,, aallll ccoorrrreessppoonnddeennccee,, aallll ee--mmaaiillss,, aallll RRFFII’’ss aanndd aannsswweerrss,, FFiieelldd OOrrddeerrss aanndd ccoommmmuunniiccaattiioonn tteelleepphhoonnee llooggss.. TThhee pprroojjeecctt ffiilleess sshhaallll bbee mmaaiinnttaaiinneedd iinn aa hhaarrdd ccooppyy ffoorrmmaatt aanndd ddeelliivveerreedd ttoo tthhee LLaannssiinngg ooffffiiccee ooff tthhee DDTTMMBB DDeessiiggnn aanndd CCoonnssttrruuccttiioonn DDiivviissiioonn wwiitthh tthhee PPSSCC ffiinnaall PPaayymmeenntt RReeqquueesstt..
MMaaiinnttaaiinniinngg aann iinncclluussiivvee,, ttrraannssppaarreenntt aanndd iinnffoorrmmaattiivvee rreellaattiioonnsshhiipp wwiitthh DDTTMMBB aanndd DDNNRR--PPRRDD iiss eesssseennttiiaall..
File details come from the government source that posted it. Updated .