RFP N4008522R2681.pdf
PDF 1 MB Posted
- Solicitation number
- N4008522R2681
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 02:00 PM local time 08 Nov 2022
X
A X B X C
D
EX
X G F 165 - 184
185 - 193 X H 194 - 203 krystal.goodman@navy.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 203
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N40085 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 3 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
KRYSTAL S. GOODMAN 757-341-1957
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 2 3 - 13
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
14 - 79 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
80 - 83 84 - 132
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 133 - 136 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 137 - 140 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
141 - 162
PART II - CONTRACT CLAUSES
NAVFACSYSCOM MID-ATLANTIC
CONTRACTING CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
163 - 164
6. REQUISITION/PURCHASE NO.
ACQR5927127
5. DATE ISSUED
07 Oct 2022
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N4008522R2681
Section A - Solicitation/Contract Form
COVER SHEET
COMMANDER
NAVAL FACILITIES ENGINEERING COMMAND
MID-ATLANTIC DIVISION
CONTRACTING CORE
NORFOLK, VIRGINIA 23511-3095
NOTICE:
Proposals to be submitted by 2:00 P.M.
By Commercial Carrier to:
Krystal Goodman
NAVFAC SPECIFICATION
No. 05-22-2681
RFP NUMBER N4008522R2681
FACILITY INVESTMENT SERVICES FOR FIRE SUPPRESION PREVENTATIVE AND UTILITY
DISTRIBUTION MAINTENANCE REPAIR AND TESTING SERVICES AT NAVAL WEAPONS
STATION EARLE IN COLTS NECK, NJ AND OTHER AREAS OF RESPONSIBILITY (AOR)
NOTICE
All inquiries concerning any phase of the specification, prior to the proposal due date shall be submitted electronically, Attn: Krystal Goodman, krystal.goodman@navy.mil and Pamela Waller, pamela.a.waller2.civ@us.navy.mil
Contracts or purchase order to be awarded as a result of this contract shall be assigned (as Appropriate for specific procurement), DO-C3 rating in accordance with the provisions of DPA Regulation 3 and/or DMS Regulation 3.
Section B - Supplies or Services and Prices
GENERAL INFORMATION
B.1 Contract Title: Indefinite Delivery/Indefinite Quantity Contract for Fire Suppression and Utility
Distribution Maintenance at Naval Weapons Station Earle in Colts Neck, NJ and other areas within the Naval Facilty Systems Command in Mid-Atlantic Area of Responsibility (AOR)
B.2 Type of Contract: This is a Facilities Support, Indefinite Delivery/Indefinite Quantity Contract with Recurring and
Non-Recurring Services as noted in Section L, Instructions, Conditions, and Notices to Offeror.
B.3 Minimum Guarantee: The Recurring Price portion of the base year only is the minimum guarantee for this contract. It can be paid in either the base year or over the entire term of the contract.
B.4 Set-Aside: Unrestricted Competitive Procurement. .
B.5 NAICS Code: The NAICS Code assigned to this procurement is 561621 with a small business size standard of $22,000,000.00. Refer to On-Line Representations and Certifications Application (ORCA) via System for Award Management (SAM) at https://www.sam.gov/portal/public/SAM .
B.6 Wage Determination (Service)/Wage Decision (Construction): Service Contract Act (SCA) and Davis-
Bacon Act (DBA) wages are included in this solicitation. Refer to Section J, Attachments.
WAGE RATE REQUIREMENTS CONSTRUCTION IN FACILITY SUPPORT CONTRACTS
INCLUDING CONSTRUCTION
This contract contains only one Wage Rate Requirement Construction General Decision which shall be in effect for the life of the contract. The contractor may include in the offered price for the option years any increase needed for wages or benefits for construction work under the contract. The contractor warrants that the prices in the option years of this contract do not include any allowance for any contingency to cover increased cost for which adjustment is provided under FAR clause 52.217-43, Fair Labor Standards Act and Service Contract Act - Price Adjustment. Offerors are required to segregate Davis-Bacon hours and wages and SCA hours and wages in the payroll records.
B.7 Bid Guarantee/Bonding Requirements: NOT REQUIRED for this procurement.
B.8 Contract Term: This contract contains provisions for a Base Period with four (4) Option Periods and a six
(6) month extension in accordance with FAR 52.217-8, not to exceed a total of sixty (66) months. The Government has the option to extend the term of the contract in accordance with Section I, Contract Clauses, 52.217-9, Option to Extend the Term of the Contract-Services (Mar 2000) and FAR 52.217-8, Option to Extend Services (Nov 1999). In the option periods, the Government will adjust the prices, if applicable, based on the new Department of Labor Wage Determination.
B.9 Period of Performance: The period of performance is identified in the Delivery Information section.
B.10 Evaluation of Proposal: Proposers shall submit a lump sum price for Section B, CLINs 0001 through 0012 and unit prices for Exhibit A through Exhibit F, referenced in Section J. For purposes of evaluating offers for award, the Government will utilize the pricing submitted for the base year and all option periods. Refer to Section M, FAR 52.217-5, Evaluation of Options (JUL 1990).
B.11 Contract Line Items And Contract Exhibit Line Items
a. Proposers shall enter unit prices and amounts for Contract Line Items (CLINs) and Contract Exhibit line items (ELINs) as indicated in the schedules and accompanying exhibits.
b. In the event there is a difference between a unit price and the extended total amount, the unit price will be held to be the intended bid and the total of the CLIN, the ELIN will be recomputed accordingly. The CLIN will also be recomputed to take into account the change in the contract ELINs. If the offeror provides a total amount for an ELIN, but fails to enter the unit price, the total amount divided by the ELIN quantity will be held to be the intended unit price.
c. The Schedule of Recurring Work (CLIN 0001, 0003, 0005, 0007, 0009, and 0011) and the Schedule of
Non-Recurring Work (CLIN 0002, 0004, 0006, 0008, 0010, and 0012) will be used as the basis for deductions in accordance with FAR Clause 52.246-4, Inspection of Services – Fixed Price, Section E.
B.12 Unit Price Adjustments In Option Periods
This contract incorporates the Service Contract Act (SCA) and the Wage Rates-Construction. The SCA Wage Determination incorporated in Section J is for the Base Year performance period only. The latest Wage Determination available at the time for each option exercise will be incorporated into the contract. Unit prices will ONLY be adjusted for the Service Contract Act (SCA) wage increases in accordance with FAR Clauses 52.222-43, Fair Labor Standards Act and Service Contract Act – Price Adjustment. The contractor warrants, by submission of his proposal, that the price does not include any contingency for future wage increases with the exception of Wage Rates-Construction.
B.13 Indefinite Quantity Individual Contract Line Item Quantities
Once the estimated quantities for individual line items shown in the Schedule have been ordered, additional quantities may be ordered as long as the overall not-to-exceed (NTE) amount of the contract per year is not exceeded and the Contractor agrees by signing the task order.
B.14 Unit Prices For Labor
a. A portion of the work included in the scope of this contract cannot be identified in advance in sufficient detail to be as a Unit Price Task in this contract. Labor for this work will be ordered and paid for based on unit prices for labor proposed by the Contractor listed in the Schedule of Non-Recurring Quantity Work.
b. Estimated hours in the Schedule are a forecast of future requirements. These estimated hours are for performing "Non-Recurring Quantity Work” accomplished in the time period shown.
c. The Contractor shall enter, in the unit price proposal space, the unit price for performing composite labor. The composite labor price shall include all direct and indirect costs associated with performing an hour of work. The composite labor price should be the Contractor's hourly craft wage adjusted to allow for the offerors work force productivity (i.e., the Contractor's estimate of how its’ work force will perform in relation to the Means Facilities Cost Data and/or the Engineered Performance Standards).
The Composite Labor Rate shall include all costs for preparation of the cost proposal, job preparation, travel, pre- expended bin materials and supplies, ordering and stockpiling job material, additional material handling, items of equipment necessary to perform work (I.e. bucket truck, lifting equipment, staging, etc.), profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, bonds, permits, insurance, etc.
B.15 Period Of Performance – Less than One Year
Offer shall be submitted for the performance of work for a period of one year. The contractor is cautioned to recognize that the initial term of the contract may be for a period of less than one year in accordance with the “Term of Contract” clause in Section F. In the event that the period of performance is less than one year, the Government will reduce the individual line item quantities to reflect work remaining in the contract term and no other adjustments to the pro-rated contract price will be made.
B.16 Government Purchase Card
Non-Recurring quantity work may be ordered at the prices offered by two ways: 1) by the issuing activity using a DD Form 1155 “Order for Supplies and Services”; 2) by an authorized Government user via a Government Purchase Card (GPC). When receiving GPC orders against Section B, the contractor shall provide the supplies and services at the offered price without additional markup or handling fee.
B.17 Contractor Support Of Electronic Facilities Support Contracting (e-FSC)
This procurement allows for the use of FEDMALL for issuing orders. Refer to Section H, Special Contract Requirement.
B.18 Incorporation of Technical Proposal
a. The Contractor’s technical proposal, including revisions and amendments made prior to contract award and a copy of which is in the possession of both parties, will be incorporated into this contract upon award by reference with the same force and effect as if set forth in full text. All contractor personnel shall meet or exceed the qualification standards, experience levels, and trade backgrounds set forth in the technical proposal.
b. In the event of an inconsistency between the provisions of this contract and the technical proposal, the inconsistency shall be resolved by giving precedence in the following order: (i) the contract (excluding the technical proposal), and then (ii) the technical proposal.
B.19 Request For Proposals (RFP) Information/Clarification Questions
Contractors are required to review the entire solicitation package before submitting questions. All questions must be submitted at least 10 days before proposals are due, by email to krystal.goodman@navy.mil and pamela.a.waller2.civ@us.navy.mil. This is the most efficient way to ensure all questions are addressed in a timely manner.
B.20 Request for Proposal (RFP) Files:
Solicitations are posted to the Contract Opportunities website (https://www.beta.sam.gov) as mandated by our Agency. By necessity, these files are protected to prevent unauthorized editing.
It is the sole responsibility of the offeror to obtain the RFP files, along with any amendments, from this website.
Unprotected editable file copies of the RFP documents including: Word, Excel and/or .pdf files (Adobe Acrobat Files) will not be provided. Please plan accordingly.
B.21 Solicitation
This solicitation incorporates by reference a Performance Work Statement (PWS) developed by using NAVFAC performance-based specifications. The PWS consists of Annexes 1, 2, and 15. The contractor will be required to meet the specifications in those Annexes per Section C of this solicitation.
B.22 Notice to Offerors:
Offerors are required to submit Section B, Contract Line Items (CLINs) Schedule, and Section J, Exhibit Line Items (ELINs) with their proposal. The total of the CLIN is equal to the sum of the ELINs as shown below:
CLINS ELINs CLINs ELINs 0001 A001 through A003 0007 D001 through D003
0002 A700 through A701 0008 D700 through D701 0003 B001 through B003 0009 E001 through E003 0004 B700 through B701 0010 E700 through E701 0005 C001 through C003 0011 F001 through F003 0006 C700 through C701 0012 F700 through E701
B.23 Proposal Delivery
DBIDS INFORMATION:
Access to Installation: All Contractor personnel shall obtain access to the installation through enrollment and registration into the Defense Biometric Identification System (DBIDS).
The Contractor shall provide the KO with the name of their designated Service Contractor Administrator (SCA) for enrollment in DBIDS. Once enrolled, the Contractor must provide the DBIDS Registrar with an approved employee list and then direct their employees to register into DBIDS.
DBIDS Program: DBIDS is an enterprise identity management and perimeter installation access control solution in which Contractor personnel who enroll, and are approved, are subsequently granted access to the installation for a period up to three years, or the length of the contract, whichever is less, and are not required to obtain a new pass from the Base Pass and Identification Office for each visit. There are no fees associated with obtaining a DBIDS credential.
The Government performs background screening and credentialing. Throughout the year the Contractor employee must continue to meet background screening standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.
DBIDS Credentials: Contractor employees shall furnish a completed copy of the SECNAV 5512/1 form to obtain the required background check and visit the local Navy Installation Visitor Control Center to obtain a DBIDS credential once approved. The SECNAV 5512/1 form and additional information about DBIDS can be found at:
https://www.cnic.navy.mil/om/dbids.html .
The Contractor may initiate the adjudication process when a background screen failure results in disqualification from participation in DBIDS and the Contractor employees do not agree with the reason for disqualification. The Contractor may also apply for a waiver when a background screening failure results in disqualification from participation in DBIDS. The Commanding Officer will be the final waiver determination authority.
The Contractor shall immediately collect employee DBIDS credentials and notify the KO in writing:
(1) That an employee has departed the company without having properly returned or surrendered their DBIDS credentials.
(2) That there is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the installation or anyone therein.
DBIDS Paper Passes: In the event that a visitor, vendor, or Contractor employee elects not to participate in DBIDS, the individual will be issued DBIDS paper pass from the Base Pass and Identification Office in order to access to the installation. The time standard for the validity of a pass to access an installation will be not more than thirty (30) days and may be further restricted based on local policy or by Federal, DOD, Navy, and CNIC guidance.
The Government will not be responsible for any cost or lost time associated with obtaining paper passes or added vetting or inspections incurred by non-participants in the DBIDS credentialing process.
Submitting Your Proposal
Proposals should be sent via a commercial carrier, such as Federal Express, and shall be addressed to:
NAVFAC MIDLANT
Attn: Krystal Goodman 9324 Virginia Avenue Building Z-140, Room 216 Norfolk, Virginia 23511
Proposals that are hand carried will NOT be accepted.
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 UNDEFINED Each
BASE YEAR- RECURRING WORK
FFP
Provide all labor, management, supervision, tools, material and equipment and other items necessary to perform fire suppression and utility distribution preventative maintenance facility investment services at Naval Weapons Station Earle and other areas of responsibility within the NAVFAC Mid-Atlantic AOR.
FOB: Destination
PURCHASE REQUEST NUMBER: ACQR5927127
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
0002 UNDEFINED Each
BASE YEAR- NON-RECURRING WORK
FFP
Provide all labor, management, supervision, tools, material and equipment and other items necessary to perform fire suppression and utility distribution preventative maintenance facility investment services at Naval Weapons Station Earle and other areas of responsibility within the NAVFAC Mid-Atlantic AOR.
UNIT UNIT PRICE MAX AMOUNT
0003 UNDEFINED Each
OPTION OPTION YEAR 1 - RECURRING WORK
FFP
Provide all labor, management, supervision, tools, material and equipment and other items necessary to perform fire suppression and utility distribution preventative maintenance facility investment services at Naval Weapons Station Earle and other areas of responsibility within the NAVFAC Mid-Atlantic AOR.
UNIT UNIT PRICE MAX AMOUNT
0004 UNDEFINED Each
OPTION OPTION YEAR 1 - NON-RECURRING WORK
FFP
Provide all labor, management, supervision, tools, material and equipment and other items necessary to perform fire suppression and utility distribution preventative maintenance facility investment services at Naval Weapons Station Earle and other areas of responsibility within the NAVFAC Mid-Atlantic AOR.
UNIT UNIT PRICE MAX AMOUNT
0005 UNDEFINED Each
OPTION OPTION YEAR 2 - RECURRING WORK
FFP
Provide all labor, management, supervision, tools, material and equipment and other items necessary to perform fire suppression and utility distribution preventative maintenance facility investment services at Naval Weapons Station Earle and other areas of responsibility within the NAVFAC Mid-Atlantic AOR.
UNIT UNIT PRICE MAX AMOUNT
0006 UNDEFINED Each
OPTION OPTION YEAR 2 - NON-RECURRING WORK
FFP
Provide all labor, management, supervision, tools, material and equipment and other items necessary to perform fire suppression and utility distribution preventative maintenance facility investment services at Naval Weapons Station Earle and other areas of responsibility within the NAVFAC Mid-Atlantic AOR.
UNIT UNIT PRICE MAX AMOUNT
0007 UNDEFINED Each
OPTION OPTION YEAR 3 - RECURRING WORK
FFP
Provide all labor, management, supervision, tools, material and equipment and other items necessary to perform fire suppression and utility distribution preventative maintenance facility investment services at Naval Weapons Station Earle and other areas of responsibility within the NAVFAC Mid-Atlantic AOR.
UNIT UNIT PRICE MAX AMOUNT
0008 UNDEFINED Each
OPTION OPTION YEAR 3 - NON-RECURRING WORK
FFP
Provide all labor, management, supervision, tools, material and equipment and other items necessary to perform fire suppression and utility distribution preventative maintenance facility investment services at Naval Weapons Station Earle and other areas of responsibility within the NAVFAC Mid-Atlantic AOR.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0009 Each
OPTION OPTION YEAR 4 - RECURRING WORK
FFP
Provide all labor, management, supervision, tools, material and equipment and other items necessary to perform fire suppression and utility distribution preventative maintenance facility investment services at Naval Weapons Station Earle and other areas of responsibility within the NAVFAC Mid-Atlantic AOR.
0010 Each
OPTION OPTION YEAR 4 - NON-RECURRING WORK
FFP
Provide all labor, management, supervision, tools, material and equipment and other items necessary to perform fire suppression and utility distribution preventative maintenance facility investment services at Naval Weapons Station Earle and other areas of responsibility within the NAVFAC Mid-Atlantic AOR.
0011 Each
OPTION FAR 52.217-8 - RECURRING WORK
FFP
Provide all labor, management, supervision, tools, material and equipment and other items necessary to perform fire suppression and utility distribution preventative maintenance facility investment services at Naval Weapons Station Earle and other areas of responsibility within the NAVFAC Mid-Atlantic AOR.
0012 Each
OPTION FAR 52.217-8 - NON-RECURRING WORK
FFP
Provide all labor, management, supervision, tools, material and equipment and other items necessary to perform fire suppression and utility distribution preventative maintenance facility investment services at Naval Weapons Station Earle and other areas of responsibility within the NAVFAC Mid-Atlantic AOR.
Section C - Descriptions and Specifications
ANNEX 0100000
0100000 – General Information
Spec Item Title
1 General Information
1.1 Outline of Services
1.2 Acquisition of Additional Work
1.3 Background Information
1.4 Navy PBSA Approach
1.5 Standard Template
1.6 Related Information
1.7 Verification of Workload and Conditions
1.8 Contractor's Knowledge
1.9 Technical Proposal Certification
0100000 – General Information Spec Item Title Description 1 General
Information
1.1 Outline of Services Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined below and described in this Performance Work Statement (PWS) at Naval Weapons Station Earle (NWSE) under an Indefinite Delivery-Indefinite Quantity (IDIQ), Firm Fixed Priced (FFP) that is comprised of both Recurring Work and Non- Recurring Work Items.
Services include preventive maintenance, repair, alterations, improvements, inspection and testing of Fire Sprinkler and Suppression Systems, Fire Hydrants, PIV’s, Water Tower, Flushing Hydrants and Utility Distribution Systems in buildings (interior and exterior), grounds and roadways (aboveground and underground) at Naval Weapons Station Earle, Main Side Station, Colts Neck, NJ and Waterfront Complex, Leonardo, New Jersey. Work includes sprinkler systems including all components, valves, sprinkler heads, piping, pumps, diesel engines, electric motors, compressors, sensors, control systems, right-angle drives, drive shafts, flow indicators, tamper switches, backflow devices, freeze protection systems, heat exchangers, hydrants, expansion joints, insulation, shielding, hangers, straps, strainers, test headers, electric/electronic systems, components, wiring and power from controls and panels to controllers, pumps and all other associated equipment essential for the proper operation of all fire protection sprinkler/suppression, CO2, Anti-Freeze and Foam Systems main side, ordinance, waterfront and pier complex. Services also include all components related to the Utility Distribution Systems to include the fire and potable water, sanitary sewer and steam systems pier complex to include Trestle 1, 3 & 4, pier 3 &
4. Potable Water system includes valves, backflows, pipe connections, headers, piping, pipe leaks, and breaks, slip lining, etc. Sanitary Sewage systems include valves, connections, sanitary pipe, breaks, leaks, lift stations, pumps, controls, etc. Steam system to include strainers, expansion joints, expansion tanks, traps, etc. and all associated equipment for maintaining the utility distribution systems on the pier complex. Maintenance includes the scraping, sanding, painting, cleaning, exercising, greasing, inspecting, valves, connections, shutoffs, etc. and maintaining all, electric, electronic components, piping, mechanical systems and all other items or equipment essential to the proper operation of the Utility Distribution Systems pier complex.
The PWS is organized into annexes. Annex 1 is "General Information". Annex 2 contains the on-site project management and administration requirements. Annexes 3 through 18 contain the technical requirements. The annex numbers are identified as 1 through 18 in the description column, but the full-expanded annex numbers include seven digits (e.g., Annex 1 expanded number is 0100000 as shown in the header row at the top of this page).
Annex 1 General Information Annex 2 Management and Administration Annex 3 Command and Staff – N/A Annex 4 Public Safety – N/A Annex 5 Air Operations – N/A Annex 6 Port Operations – N/A Annex 7 Ordnance – N/A Annex 8 Range Operations – N/A Annex 9 Health Care Support – N/A Annex 10 Supply – N/A Annex 11 Personnel Support –N/A Annex 12 Morale, Welfare and Recreation Support – N/A Annex 13 Galley – N/A Annex 14 Housing – N/A
Annex 15 Facilities Support – Included Sub-Annex 1502000 – Facility Investment - Included Annex 16 Utilities – N/A Annex 17 Base Support Vehicles and Equipment – N/A Annex 18 Environmental – N/A
1.2 Acquisition of
Additional Work
The Government reserves the right to acquire additional services at additional locations, within the scope of the annexes and areas included in Spec Item 1.1 Outline of Services, in addition to the services and locations identified in the requirements of this contract. Additional services will be incorporated into the contract in accordance with the CHANGES clause, SECTION I or ordered under the non-recurring work provisions of the contract. Items of work not covered by this contract but within the general intent are considered in the scope of this contract.
1.3 Background
Information
NWSE is located approximately 50 statute miles south of New York City in the township of Colts Neck, in Monmouth County, New Jersey. The main Station area occupies 10,218 acres. There are another 670 acres occupied in the vicinity of the Waterfront area in Leonardo, New Jersey, adjacent to Sandy Hook Bay. The remaining acreage abuts the road, which connects the two areas.
NWSE mission is to receive issue, maintain, and store ammunition and explosives, and to Perform additional mission requirements as directed by the Department of the Navy (DoN). In addition, NWHE presently provides real estate, facilities administrative and logistical support to other DoD Commands including Navy and Civilian Ships.
The work shall be performed at various locations NWSE Colts Neck, NJ, State Highway 34 (main side of NWSE) and Leonardo, NJ State Highway 36 (waterfront side of NWSE) and could vary from location to location. A Government owned highway known as Normandy Road, interconnects the two activities and runs approximately 18 miles. Normandy Road is Government Property with restricted access limited to station personnel and Contractors who work at NWSE.
Climate Pattern:
The climate of Monmouth County in general is temperate humid and is characterized by warm summers and moderate winters. The weather has four seasons with a spring that normally is very rainy. During the summer toward the end of July and most of August, there is little rain and very hot, and climate temperature spans from freezing temperatures in the winter to above 90 degrees in the summer months. The Leonardo (Pier) location is influenced by the Atlantic Coast weather, while the Colt’s Neck location is approximately 15 miles west of the pier and has moderate influence by the Atlantic Coast.
1.4 Navy PBSA
Approach
The Navy’s approach to performance-based service acquisition (PBSA) includes four component parts, which are
1) Performance Outcomes
2) Measurable Standards
3) Consideration of Incentives
4) Performance Assessment Plan.
1.5 Standard Template Key to implementing the PBSA approach is using a standard template that ensures Navy-wide consistency yet affords appropriate tailoring to meet local needs. This contract conforms to the standard template and has been tailored for this solicitation. NAVFAC intends to use this template-based approach for future service contracts. Offerors should develop an understanding of the template as part of performing due diligence in reaching an understanding of the Navy’s requirements and expectations.
The standard template contains 18 standard annexes. Annex 1 will always contain General Information that is relevant to the entire scope of the contract. Annex 2 contains Management and Administration requirements that are relevant to the entire scope of the contract. Annexes 3 through 18 and their associated sub-annexes contain the General Information, Management and Administration requirements, Performance Objectives, Related Information, and Performance
Standards that are relevant to that technical annex. Except where otherwise stated, Annexes 3 through 18 and their associated sub-annex requirements are not relevant to one another. Within each technical annex and sub-annex, the organization of information and requirements are also standardized. Specification Item 1 will always contain General Information. Specification Item 2 will always contain the Management and Administrative requirements. Specification Item 3 will always contain the Recurring Work requirements. Specification Item 4 will always contain the Non-Recurring Work requirements. Requirements and standards for higher-level specification items apply to all subordinate specification items, e.g., Specification Item 3 standards apply to all recurring work specification items. Specification Item 3.1 is applicable to all 3.1 subordinate specification items. Specification Items 3.2 and 3.3 are not considered subordinate to 3.1 nor are they considered subordinate to one another. All costs associated with Annexes 1 and 2 and Specification Items 1 and 2 shall be priced, and their price shall be allocated to the Exhibit Line Items.
1.6 Related
Information
There are four types of Related Information that can be found in the Description and Related Information columns of the specification as follows:
Informational Notes as used throughout this PWS provides additional information to offerors’ to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked “Informational Notes” throughout Annexes 1 through 18 and their associated sub-annexes are subject to this disclaimer. Offerors’ may not rely upon the "Informational Notes" as material representations of the Government. Information provided in "Informational Notes" does not create a contractually binding requirement on either party to this contract.
Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.
Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.
Requirement Information further describes client requirements associated with each Performance Objective.
1.7 Verification of
Workload and Conditions
Throughout the PWS, the workload data is generally referred to as being located in Section J.
Section J provides data such as system descriptions, inventories, maps, floor plans, and tables to represent the type, quantity, and location of services to be provided.
All facilities, systems, and assets identified in this contract shall be accepted by the Contractor in "AS-IS" condition. The Contractor is fully responsible for all work up to and including the limits of liabilities specified.
As prescribed in FAR 52.237-1, offerors or quoters are urged and expected to inspect the site where services are to be performed as part of Contractors due diligence and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
1.8 Contractor's
Knowledge
The Navy expects to receive insightful management from its contractors. This management will include the knowledge, skills, authority and willingness to use contractor resources to find better ways of serving Navy clients’ strategic and operational goals and objectives. The Navy's use of performance-based objectives evidences this principle. Although performance work statements will typically contain several levels of performance assessment, the Navy wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level.
1.9 Technical Proposal
Certification The Contractor warrants that its proposal incorporated herein by reference will meet or exceed the performance objectives set forth in this contract.
ANNEX 0200000
0200000 – Management and Administration Spec Item Title 2 Management and Administration
2.1 Definitions and Acronyms
2.2 General Information
2.2.1 Government Regular Working Hours
2.2.1.1 Observed Federal Holidays
2.2.1.2 Restriction to Contractor Working Hours
2.2.2 Wage Determinations
2.2.3 Requirements Hierarchy
2.3 General Administrative Requirements
2.3.1 Required Conferences and Meetings
2.3.2 Training for Maintenance and Operation of New and Replacement Systems and Equipment
2.3.3 Partnering
2.3.3.1 Informal Partnering
2.3.3.2 Contract Partnering Administration
2.3.3.3 Contract Partnering Session Attendees
2.3.4 Permits and Licenses
2.3.5 Insurance
2.3.5.1 Certificate of Insurance
2.3.5.2 Minimum Insurance Amounts
2.3.6 Protection of Government Property
2.3.7 Directives, Instructions, and References
2.3.8 Invoicing Procedures
2.3.9 Forms
2.4 Government-Furnished Items
2.4.1 Government-Furnished Property (GFP)
2.4.2 Government-Furnished Facilities
2.4.3 Government-Furnished Vehicles and Equipment
2.4.4 Government-Furnished Utilities
2.5 Contractor-Furnished Items
2.6 Management
2.6.1 Safeguarding Information
2.6.2 Dissemination of Information
2.6.3 Work Reception
2.6.4 Work Control
2.6.5 Work Schedule
2.6.6 Deliverables
2.6.7 Service Interruptions
2.6.8 NAVFAC Maximo
2.6.8.1 NAVFAC Maximo Data
2.6.8.2 NAVFAC Maximo Method of Data Entry
2.6.8.3 NAVFAC Maximo Access
2.6.8.4 NAVFAC Maximo Training
Spec Item Title
2.6.9 Quality Management System (QMS)
2.6.9.1 Quality Management (QM) Plan
2.6.9.2 Quality Inspection and Surveillance
2.6.9.3 Quality Inspection and Surveillance Report
2.6.10 Property Management Plan
2.6.11 System and Equipment Replacement
2.7 Personnel Requirements
2.7.1 Key Personnel
2.7.1.1 Project Manager (PM)
2.7.1.2 Quality Manager
2.7.1.2.1 Quality Control Personnel
2.7.1.3 Site Safety and Health Officer (SSHO)
2.7.1.4 Environmental/Energy Manager
2.7.2 Employee Requirements
2.7.2.1 Employee Certification and Training
2.7.2.2 Employee Appearance
2.7.2.3 Employee Conduct
2.7.2.4 Identification as Contractor Employee
2.7.2.5 Removal of Employees
2.7.2.6 Proof of Legal Residency
2.7.3 Service Contract Reporting (SCR)
2.8 Security Requirements
2.8.1 Employee Listing
2.8.2 Vehicles
2.8.3 Passes and Badges
2.8.4 Access to Installation
2.8.4.1 DBIDS Program
2.8.4.2 DBIDS Credentials
2.8.5 Access to Buildings
2.8.6 Access Arrangements
2.8.6.1 Escort Arrangement for Secured Areas
2.8.7 Security Clearances
2.8.8 Access to Controlled Unclassified Information
2.8.9 Access to Government Information Technology (IT), Operating Technology (OT), and Facility
Related Control Systems (FRCS)
2.8.10 Access to Navy Marine Corps Intranet (NMCI)
2.8.11 Employee Status
2.9 Contractor Safety Program
2.9.1 Contractor Safety Requirements
2.9.1.1 Experience Modification Rate (EMR)
2.9.1.2 OSHA Days Away From Work, Restricted Duty, or Job Transfer (DART) Rate
2.9.2 Accident Prevention Plan (APP)
2.9.3 Activity Hazard Analysis (AHA)
2.9.4 Safety and Occupational Health (SOH) Risks and Compliance Plans
2.9.4.1 Alcohol and Drug Abuse Prevention Plan
2.9.4.2 Chemical Hazard Communication Program
2.9.4.3 Confined Space Program
2.9.4.4 Critical Lift Plan
2.9.4.5 Fall Prevention and Protection Plan
2.9.4.6 Pathogen Exposure
2.9.4.7 Control of Hazardous Energy (lockout/tagout)
2.9.5 Crane Operations
2.9.5.1 Crane Inspections
2.9.5.2 Rigging Gear
2.9.5.3 Crane Operators
2.9.6 Accident and Damage Reporting
2.9.6.1 Accident Reporting and Notification Criteria
2.9.7 Fire Protection
2.9.8 Monthly On-Site Labor Report
2.9.9 OSHA Citations and Violations
2.9.10 Safety Inspections and Monitoring
2.9.11 Safety Certification
2.9.12 Safety Apparel on Jobsites
2.9.13 Emergency Medical Treatment
2.9.14 Excavations
2.10 Environmental Management and Sustainability
2.10.1 Energy Management Program
2.10.1.1 Water Conservation Plan
2.10.1.2 Energy Efficient Products
2.10.2 Environmental Protection
2.10.2.1 Sampling, Testing and Laboratory Services
2.10.2.2 ODS Requirements for Refrigerant Recycling
2.10.2.3 Solid Waste Management and Recycling
2.10.2.4 Non-Regulated Waste Disposal
2.10.2.5 Regulated Waste Disposal
2.10.2.6 Universal Waste
2.10.2.7 Spill Prevention, Containment, and Clean-up
2.10.2.8 Hazardous Material Management
2.10.2.9 Protection of Endangered and Threatened Species (Flora and Fauna)
2.10.2.10 Noise Control
2.10.2.11 Salvage
2.10.2.12 Asbestos Containing Material (ACM)
2.10.2.13 Clean Air Act (CAA)
2.10.3 Sustainable Procurement and Practices
2.10.3.1 Environmentally Preferable Products
2.10.3.2 Use of Recovered Materials
2.10.3.3 Use of Biobased Products
2.11 Disaster Preparedness
2.12 Technical Library
2.13 Warranty Management
2.14 Recurring Work Procedures
2.14.1 Recurring Work Preparation of Proposals
2.14.2 Notification to the Government for Work Above the Recurring Work Limitations
2.14.3 Recurring Work Exhibit Line Item Numbers (ELINs)
2.15 Non-Recurring Work
2.15.1 Unit Priced Task (UPT) Work (Non-Negotiated)
2.15.1.1 Acceptance and Performance
2.15.1.2 Invoicing and Receiving Payment
2.15.2 Unit Priced Labor (UPL)Work (Negotiated)
2.15.2.1 Non-recurring Work Preparation of Proposals
2.15.2.1.1 Labor Requirements
2.15.2.1.2 Direct Material and Construction Equipment Requirements
2.15.2.2 Issuance of Final Task Order
2.15.3 Non-Recurring Work ELINS
0200000 - Management and Administration
2 Management and
Administration
2.1 Definitions and
Acronyms
Definitions and Acronyms are listed in J-0200000-01.
2.2 General
2.2.1 Government
Regular Working Hours
The Government's regular working hours are from 0700-1600, five days per week, Monday through Friday, except observed Federal holidays. Exceptions to the regular hours of operation are detailed in subsequent sections of this PWS. Work in certain annexes or sub-annexes require Contractor continuous operations, 24 hours a day, every day of the year including holidays. The performance of other work requirements shall be accomplished within the Government’s regular working hours unless the specific work requirement specified herein necessitates otherwise. Any other work outside Government regular working hours must be authorized by the KO prior to commencement of work.
2.2.1.1 Observed
Federal Holidays
The Government observes the following holidays: New Year’s Day, Martin Luther King Jr.’s Birthday, President’s Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day.
2.2.1.2 Restriction to
Contractor Working Hours
If the Contractor wishes to work outside of the Government's regular working hours for the Contractor’s convenience, the Contractor shall submit a written Request to Work Outside Government’s Regular Working Hours per Section F. Excludes work to be performed during specified hours.
2.2.2 Wage
Determinations
Wage Determinations are included in J-0200000-02.
2.2.3 Requirements
Hierarchy
Requirements or definitions specified in each spec item of this contract apply to subordinate paragraphs. For example, requirements shown in spec item 3.1 would apply to spec items 3.1.1, 3.1.2, and 3.1.2.1 and so on.
Likewise, Performance Standards specified at a lower digit level (i.e. spec item 3.1.1, 3.1.2, 3.1.2.1) apply when performance is assessed at a higher tier (i.e., spec item 3.1) based on the composite work requirements.
2.3 General
Administrative Requirements
2.3.1 Required
Conferences and Meetings
Contractor shall attend a Pre-Performance Conference meeting. Contractor shall attend biweekly progress meeting with the Government, (FMFS Branch Manager) and shall provide agenda and meeting minutes. The contractor may be required to attend administrative and coordination meetings as directed by the KO or the FMFS Branch Manager.
2.3.2 Training for
Maintenance and Operation of New and Replacement Systems and Equipment
When construction, renovation, or repair work is performed by means other than this contract, the Contractor shall attend Government provided training, as applicable, for maintenance and operation of new and replacement systems and equipment at no additional cost to the Government.
2.3.3 Partnering The Government requires cohesive partnerships with its Contractors and subcontractors.
Key stakeholders, including the supported commands who will receive services, principal individuals from NAVFAC, the performance assessment team, and representative(s) of the installation(s) will be invited to participate in the partnering process. Key members of the prime and sub-contractor teams, including senior management personnel must participate.
The partnership will draw on the strength of each organization in an effort to achieve quality contract services done right the first time, within the contract price, as scheduled, and without any safety mishaps.
The goal of Partnering is to develop a cohesive team with common purpose, commitment and established communication processes.
2.3.3.1 Informal
Partnering
The Contracting Officer shall organize the initial Partnering Meeting with key personnel of the project team, including Contractor's personnel and Government personnel. The initial session will be scheduled concurrent with the Pre-Performance Conference and held no later than 30 days after award and will be held at a Government provided facility as designated by the KO.
The Initial Informal Partnering Session will be conducted and facilitated using electronic media (a video and accompanying forms) provided by Contracting Officer. The senior Government stakeholder present will lead the meeting, however, the Contractor’s PM or senior representative is encouraged to participate as co-lead.
The Partners will determine the frequency of the follow-on sessions.
2.3.3.2 Contract
Partnering Administration
Upon award, the ACO will contact the Contractor, supported command(s), Region, and Installation(s) stakeholders, and the performance assessment team to discuss implementation of partnering. A partnership agreement, The Charter, should be in place as early as possible so issues arising, even before work begins, can be resolved using the issues resolution process. Replacement of Core Management Team members (stakeholders who attended the initial session and manage the contract work day-to-day) is discouraged since it will disrupt the synergy that has been developed. If replacement of a team member proves to be unavoidable, a follow-on partnering session must be held to officially turn the responsibilities of the position over to the new member.
The Core Management Team consisting of the attendees below must be present during the initial and all follow-on partnering sessions. These are the core mandatory attendees. Other stakeholders may attend if they desire or as recommended by the partners.
2.3.3.3 Contract
Partnering Session Attendees
The Contractor shall bring the necessary personnel to successfully partner on this contract.
Asterisk indicates mandatory personnel.
President/Vice President
* Project Manager
* Quality Manager Site Safety and Health Officer Sub-Contractor Reps
2.3.4 Permits and
Licenses
The Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with all the applicable Federal, state and local laws and regulations. The Contractor shall submit copies of Permits and Licenses per Section F before work commences and at other times as requested by the KO.
2.3.5 Insurance The Contractor shall submit a Certificate of Insurance per Section F as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause 52.228-5, INSURANCE – WORK ON A GOVERNMENT INSTALLATION. This insurance must be maintained during the performance period.
2.3.5.1 Certificate of
Insurance
The Certificate of Insurance shall provide for at least 30 calendar days written notice to the KO by the insurance company prior to cancellation or material change in policy coverage.
Other requirements and information are contained in the aforementioned insurance clause.
2.3.5.2 Minimum
Insurance Amounts
The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage:
Ensure insurance amounts are current:
Comprehensive General Liability: $500,000 per occurrence
Automobile Liability: $200,000 per person, $500,000 per occurrence, $20,000 per occurrence for property damage
Workmen's Compensation: As required by Federal and state worker's compensation and occupational disease statutes
Employer's Liability coverage: $100,000, except in states where worker's compensation may not be written by private carriers
Other as required by state law
2.3.6 Protection of
Government Property
During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of Contractor negligence under this contract to their original condition at no cost to the Government.
2.3.7 Directives, Instructions, and References
Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of Naval Operations (OPNAV), and other applicable Directives, Instructions, and References are listed in J-0200000-03. The Contractor shall comply with the most current version of directives, instructions, and references including versions published during the term of the contract.
2.3.8 Invoicing
Procedures
Refer to Section G for invoicing instruction and reference Invoice Form J-0200000-04 for sample.
Invoices shall be submitted in a format compatible with the most recent Government installed Microsoft Office Version (currently 2010). Invoice data shall be capable of being sorted by CLIN, annex/sub-annex, spec item, spec item title, and ELIN/Sub-ELIN.
2.3.9 Forms Forms referenced in this Annex, e.g. accident reporting, and damage reporting are included among the Forms in J-0200000-05.
2.4 Government-
Furnished Items
Except for items identified below as Government-Furnished, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services described in this Performance Work Statement (PWS).
Government-Furnished Items will be provided in "AS-IS" condition and their use is at the option of the Contractor. The total or partial breakdown or failure of Government-Furnished Items shall not relieve the Contractor of the responsibility to perform the requirements of this contract.
The Contractor shall provide periodic servicing, maintenance, and repair of the Government-Furnished Items accepted for use at no additional cost to the Government.
Servicing, maintenance, and repair shall be provided in accordance with the manufacturer’s recommendations. The Contractor shall generate work orders in NAVFAC Maximo per Spec Item 2.6.8 for all servicing, maintenance, and repair activities performed on Government-Furnished Items.
At the…
This is the start of the file's text. The full file is on GovTribe.