SECTION J

DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

TABLE OF CONTENTS

ATTACHMENT NUMBER ATTACHMENT TITLE

J-1502000 Functional Assessment Plan

J-1502000-01 Definitions and Acronyms J-1502000-02 References and Technical Documents J-1502000-03 Fire Protection Systems Inventory (Fire Suppression Systems)

J-1502000-03 A Fire Protection Systems Inventory (Sprinkler Systems) J-1502000-03 B Backflow Preventer Inventory J-1502000-03 C Heat Trace Systems Inventory J-1502000-03 D Utility Systems and Equipment Inventory J-1502000-03 E Sanitary Sewer Lift Station Inventory J-1502000-03 F Water Tower Inventory J-1502000-03 G Flushing Hydrant Photos J-1502000-03 G Operating Instructions Manual Automatic Flushing Hydrants

J-1502000-04 Site Maps J-1502000-05 Historical Service Order Workload J-1502000-06 Deliverable Forms Preparation

ATTACHMENT J-1502000

FUNCTIONAL ASSESSMENT PLAN

FUNCTIONAL ASSESSMENT PLAN (FAP)

FACILITY INVESTMENT

1502000

FACILITY INVESTMENT FAP

Assessment Levels (AL) Assessment Frequency (Freq)

A – Annually

Q – Quarterly

M – Once per month

BW – Once every 13-16 days

W – Once per week

R – As required

Method of Assessment (MOA)

PS – Periodic Sampling

VCC – Validated Customer Complaints

UV – Unscheduled Visits

CE – Customer’s Evaluation

AL1

Start assessment at this Level

AL2

Add this Level if Contractor performance for AL1 is Unsatisfactory

AL3

Add this Level if Contractor performance at AL1 or AL2 is Unsatisfactory

Note: Return to appropriate Assessment Level when performance improves.

Note: The first method listed in the MOA column below is the primary assessment method.

Spec Item

Performance Objective Performance Standard MOA

Assessment Level

Sample Size

Freq

AL1 AL2 AL3

UOM

(total

Norma l

Reduce d

3.1 Service Orders – All Systems

The Contractor shall perform service order work in a timely manner and ensure fire protection systems, utility distribution systems pier complex, flushing hydrants, water tower, facilities, ground structures, personal property equipment and installed equipment and systems are restored to a safe, normal working condition and function properly.

The service order response and completion time standards specified below are in compliance with NAVFAC Facility Management and Sustainment (FM&S) OSD Work-type Standards. These standards shall not be changed without prior approval by your local Public Works Department (PWD) Facility Management Division (FMD) or FEC FM&S PLC. For Joint Bases, USMC, or non- Navy contracts, these may be tailored to meet supported command requirements.

PS

VCC

N/A

10%

5%

M

Item

Performance Objective Performance Standard MOA

Assessment Level

Sample Size

Freq

AL1 AL2 AL3

UOM

(total

Norma l

Reduce d

Any itemized service order summary report of all service calls expected monthly.

Service order work is responded to and completed within the specified time, fire protection systems, utility distribution systems pier complex, facilities, ground structures, personal property equipment and installed equipment and systems are restored to normal working condition, including recertification if applicable.

When repair is complete the facility, ground structure, personal property equipment or installed equipment and system does not present danger to personnel or equipment.

3.1.1 Emergency Service Orders –

All Systems The Contractor shall respond to emergency service orders and arrest emergent conditions to minimize and mitigate damage to the fire protection systems, utility distribution systems pier complex, flushing hydrants, water tower, facilities, ground structures, personal property equipment, and installed equipment and systems and danger to personnel.

Emergency service orders responded to with contractor personal on site within one hour of receipt of call. No “Phone-in” response is acceptable.

Emergency service orders are arrested within 24 hours of receipt of call.

Work is continued without interruption until emergent condition is arrested.

3.1.2 Urgent Service Calls – All

Systems The Contractor shall complete urgent service calls in a timely manner

Urgent service orders responded to with contractor personal on site within one hour of receipt of call. No “Phone-in” response is acceptable.

Item

Performance Objective Performance Standard MOA

Assessment Level

Sample Size

Freq

AL1 AL2 AL3

UOM

(total

Norma l

Reduce d and ensure the fire protection systems, utility distribution systems pier complex, flushing hydrants, water tower, facilities, systems, equipment and installed equipment and systems are restored to a safe, normal working condition and function properly

Urgent service orders are completed within five working days or if otherwise directed by the KO.

3.1.3 Routine Service Calls – All

Systems The Contractor shall complete routine service calls in a timely manner and ensure fire protection systems, utility distribution systems pier complex, flushing hydrants, water tower, facilities, systems, equipment and installed equipment and systems are restored to a safe, normal working condition and function properly.

The PAR or Requestor shall be contacted regarding Routine service orders within two hours of notification.

Routine Service Orders shall be completed within 30 calendar days.

3.2 Preventive Maintenance (PM)

Program - All Systems The Contractor shall develop, implement and execute a PM program for the fire protection systems, utility distribution systems pier complex, flushing

Maintenance is accomplished in accordance with the Contractor’s PM program and work schedule.

PM is performed in accordance with

R

Item

Performance Objective Performance Standard MOA

Assessment Level

Sample Size

Freq

AL1 AL2 AL3

UOM

(total

Norma l

Reduce d hydrants, water tower, facilities, ground structures, personal property equipment, and installed equipment and systems to ensure proper operation, to minimize breakdowns, and to maximize useful life.

manufacturers’ recommended procedures and OEM standards.

3.2.4 Cathodic Protection Systems

The Contractor shall perform maintenance on cathodic protection systems to ensure proper operation, to minimize breakdowns, and to maximize useful life.

The Contractor shall maintain, inspect, and test cathodic protection systems in accordance with UFC 3-570-06.

3.2.7 Fire Protection Systems

The Contractor shall perform prescriptive maintenance on fire protection systems to ensure safe, reliable, uninterrupted fire protection service.

Maintenance is performed in accordance with Contractor's PM program, work schedule and in accordance with NFPA 25, UFC 3-600-02 and applicable references.

Testing of fire protection systems (fire suppression systems) shall be in accordance with NFPA 25, UFC 3-600-02 and applicable references.

3.2.10 Compressed Air Systems

maintenance on the fire protection systems compressed air distribution system, & associated equipment to ensure safe, reliable, uninterrupted service.

Maintenance is accomplished in accordance with the Contractor’s PM program and work schedule.

PM is performed in accordance with manufacturers’ recommended procedures and OEM standards.

Item

Performance Objective Performance Standard MOA

Assessment Level

Sample Size

Freq

AL1 AL2 AL3

UOM

(total

Norma l

Reduce d

3.2.14 Utility Distribution Systems

The Contractor shall perform maintenance on the utility distribution systems pier complex to ensure safe, reliable, uninterrupted service.

Maintenance is performed in accordance with Contractor's PM program and work schedule.

PM is performed in accordance with manufacturers’ recommended procedures and OEM standards.

No spills or discharge to environment due to missed or improper maintenance.

3.2.15 Backflow Prevention Devices

maintenance, repair, inspect and test backflow prevention devices to ensure they are safe, fully functional and operational.

The Contractor shall maintain, repair, inspect, and test backflow prevention devices to operate as designed in accordance with NSPC 1993, Section 10.5.6, and N.J.A.C 7:10, UFC-

3-2302-02, UG-2029-ENV, OPNAVINST-

5090.1 and any other applicable laws regulations, standards, and instructions.

PS N/A N/A 10% N/A R

3.2.16 Flushing Hydrants

The Contractor shall perform maintenance on the flushing hydrant system, and associated equipment to ensure safe, reliable, uninterrupted service.

Maintenance is performed in accordance with Contractor's PM program and work schedule.

PM is performed in accordance with manufacturers’ recommended procedures and OEM standards.

PS N/A N/A 10% N/A R

3.2.17

Water Tower maintenance on the water tower system, and associated equipment to ensure safe, reliable, uninterrupted service.

Maintenance is accomplished in accordance with the Contractor’s PM program and work schedule.

PM is performed in accordance with manufacturers’ recommended procedures and OEM standards.

PS N/A N/A 10% N/A R

3.3 Integrated Maintenance

Program (IMP)

Maintenance is performed in accordance with Contractor's IMP and work schedule.

Item

Performance Objective Performance Standard MOA

Assessment Level

Sample Size

Freq

AL1 AL2 AL3

UOM

(total

Norma l

Reduce d

The Contractor shall develop and implement an IMP program for the fire protection systems, utility distribution systems pier complex facilities, ground structures, personal property equipment, and installed equipment and systems to ensure they are safe, fully functional, and operational.

When a problem or a need for repair is identified, the Contractor shall respond within two hours and complete the repair within 48 hours.

Systems and equipment are maintained and repaired to sustain a fully functional and operable condition in accordance with OEM specifications.

When repair is complete the facility, system, or equipment does not present any hazard or danger to personnel.

3.3.2 Fire Protection Systems

The Contractor shall provide an IMP for all fire protection systems, fire distribution systems, fire hydrants, and fire pumps to ensure safe, reliable, uninterrupted fire protection service.

Maintenance is performed in accordance with Contractor's IMP, work schedule and in accordance with NFPA 25, UFC 3-600-02 and applicable references.

3.4 Inspection, Testing, and

Certification Program The Contractor shall provide inspection, testing, and certification services to ensure they are safe, fully functional, All certifications are current.

Testing, inspection, and certification services performed and completed in accordance with the inspection, testing, and certification program and schedule.

Item

Performance Objective Performance Standard MOA

Assessment Level

Sample Size

Freq

AL1 AL2 AL3

UOM

(total

Norma l

Reduce d performed in accordance with applicable references.

3.4.4 Backflow Prevention Devices

The Contractor shall prepare, inspect and test backflow prevention devices to ensure they are safe, fully functional and operational.

Testing, inspection, and certification of backflow prevention devices performed and completed in accordance with the Inspection, Testing, and Certification Program and Schedule.

Backflow prevention devices certified in accordance with N.J.A.C 7:10-10, UFC-3- 230-02, UG-2029-ENV, and OPNAVINST 5090.1.

A

3.4.7 Fire Protection Systems

The Contractor shall provide inspection, testing, and certification services to ensure all fire protection systems, fire distribution systems, fire hydrants, and fire pumps, etc. are safe, reliable and uninterrupted fire protection service.

performed and completed are in accordance with the UFC 3-600-02, NFPA 25 and applicable references for inspection, testing, and certification program and schedule.

All certifications are current.

A

3.4.8 Utility Distribution System

inspection, testing and certification services to ensure utility distribution systems and equipment are safe, fully functional and operational.

Inspection and testing shall be in accordance with UFC, OEM Manuals, regulations, and any other applicable laws, standards and instructions for utility distribution systems and equipment.

Item

Performance Objective Performance Standard MOA

Assessment Level

Sample Size

Freq

AL1 AL2 AL3

UOM

(total

Norma l

Reduce d

3.4.9 Kitchen Hoods Testing

The Contractor shall inspect and test kitchen hood fire protection systems and equipment to ensure they are safe, fully functional and operational.

Testing, inspection, and certification of Kitchen hood fire protection/prevention devices performed and completed in accordance with the Inspection, Testing, and Certification Program, applicable references, NFP’s and Schedule.

PS N/A N/A 10% N/A SA

4 IDIQ Work IDIQ work may be ordered utilizing DoD EMALL in accordance with Section H or on a task order in accordance with the

PROCEDURES

FOR ISSUING ORDERS clause in Section G. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.

As

Require d

MONTHLY PERFORMANCE ASSESSMENT SUMMARY

Contract #: N40085-21-X-XXXX Installation/Site:

Annex/sub-annex: 1502000 Facility Investment Month/Year:

Title

AL1 AL2/AL3 VCC Safety QMS review

Item E M N E M N Pos Neg Issues # Samples A U

3.1 Service Orders

3.1.1 Emergency Service

Orders

3.1.2 Urgent Service Orders

3.1.3 Routine Service Orders

3.2 Preventive Maintenance

(PM) Program

3.2.7 Fire Protection Systems

3.2.10 Compressed Air Fire

Protection Systems

3.2.3 Utility Distribution

Systems Pier Complex

3.3 Integrated Maintenance

(IMP) Program

3.3.1 Fire Protection System

3.4 Inspection, Testing, and

Certification Program

3.4.1 Fire Protection System

3.4.4 Backflow Prevention

Devices

3.4.3 Kitchen Hoods Testing

4 Non-Recurring Work

TO

Comments:

Recommended Actions:

Technical Ratings (mark using "X")

E VG S M U

Overall Technical Rating for FFP Work

Overall Technical Rating for IDIQ Work

SPAR Signature: Date:

E = Standards Exceeded; M = Standards Met; N = Standards Not Met

ATTACHMENT J-1502000-01

DEFINITIONS AND ACRONYMS

DEFINITION/ACRONYM DESCRIPTION

Crane, Category 1 Portal cranes, Hammerhead cranes, Locomotive cranes, Derricks, Floating cranes (YD), Tower cranes, Container cranes, Mobile cranes (except those indicated as category 4), including truck, cruiser, crawler, warehouse/industrial cranes, and cranes used for dragline, pile driving, clamshell, magnet, bucket work, and Aircraft crash cranes.

Crane, Category 2 & 3 Cranes with rated capacities of 20,000 pounds or greater are category 2. Examples are overhead traveling cranes, Gantry cranes (rail mounted), Wall cranes, Jib cranes, Pillar cranes, Pillar jib cranes, Monorails and associated hoists, Fixed hoists, including chain falls. Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities less than 2,000 pounds.

Crane, Category 4 Commercial truck mounted cranes, Truck mounted articulating boom cranes, Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities of 2,000 pounds and greater. Commercial truck mounted cranes and truck mounted articulating boom cranes with OEM capacities of 2,000 pounds and greater require a licensed operator even if the cranes are down rated below 2,000 pounds capacity for administrative purposes.

Equipment, Collateral Encompasses built-in and large substantially affixed equipment/property that is normally acquired and installed as part of a facility project.

Equipment, Installed Encompasses building-type equipment, built-in equipment, and large, substantially affixed equipment/property, and is normally acquired and installed as part of a facility project. Installed equipment is normally required to make a facility useful and operable.

Removing such equipment would impair the usefulness, safety, or environment of the facility or the facility restoration work required after its removal, is substantial.

Equipment, Personal Property Personal property equipment includes all equipment other than collateral equipment.

Such equipment, when acquired and used in a facility or a test apparatus, can be severed and removed aster erection or installation without substantial loss of value or damage thereto or to the premises where installed.

Facilities Life Cycle A facilities life cycle is divided into four stages, requirements (planning and design), acquisition (construction and acceptance), stewardship (operations, maintenance and repair), and disposal.

Facilities Maintenance Management

The planning, prioritizing, organizing, controlling, reporting, evaluating, and adjusting of facilities maintenance operations to support the CNO/NAVFAC facilities policy and objectives and satisfy customers’ facility needs. Defined by the International Facility Management Association as “the practice of coordinating the physical workplace with the people and work of the organization.”

Integrated Maintenance Program (Imp)

IMP is a recurring state-of-the-art, reliability-centered inspection, testing, maintenance and repair program that determines best practices for managing the functions and consequences of failures of facilities equipment and system components. IMP encompasses accepted commercial practices, including reactive, preventive, predictive and proactive maintenance, into one optimal program. The IMP approach gives the Contractor full responsibility to maintain systems and equipment and perform repairs whenever necessary to ensure equipment and systems are operational and remain in a constant state of readiness. Service calls will not be issued for accomplishment of repairs on systems and equipment maintained under IMP.

Life-Cycle Costs A form of economic analysis that considers the total cost of owning, operating, and maintaining a building or system over its useful life.

Maintenance, Preventive Maintenance designed to increase the availability of the facilities/equipment by reducing the number of unexpected breakdowns or service interruptions. It is any planned maintenance activity that improves equipment life and avoid any unplanned maintenance requirements.

Management Information Systems - Maintenance

A computerized system that will provide sufficient information for management to evaluate differences between budgets and actual costs and evaluate performance.

Repair Repair is the restoration of facilities or equipment to such a condition that it may be effectively utilized for its designated purposes by overhaul, reconstruction, or replacement of constituent parts or materials which have deteriorated by action of the elements or usage, and which have not been corrected through maintenance. This term also applies to replacement of the entire unit or system if beyond economical repair. The intent of repair is to have the equipment at normal working condition.

Replacement Replacement, as a distinct work element, is confined to a program of planned replacement of a facility or its components. It may be further limited to major components such as air conditioning compressors, furnaces or hot water heaters.

Replacement is performed when the equipment has reached the end of its useful life;

when it no longer can perform due to degradation of its internal components and repair is no longer cost effective. Included under the replacement would be the major rebuilding of any component, since rebuilding also restores performance.

Restoration Restoration of real property to such a condition that it can be used for its intended purpose. Includes repair or replacement work to restore facilities damaged by inadequate sustainment, excessive age, natural disaster, fire, accident or other causes.

Sustainment Maintenance and repair activities necessary to keep a typical inventory of facilities in “normal working condition”. Sustainment includes regularly scheduled maintenance as well as cyclical major repairs or replacement of components that occur periodically over the expected service life of the facilities.

Service Order Any work required to return a facility, system, equipment or component to normal working condition. Service orders are minor facility problem requests or requests for other non-recurring work that is too small to be planned and estimated.

The purpose of a service order is to provide the Government with a means of issuing work up to a defined liability limit for requirements occurring outside of the specified recurring work. The Government may utilize service orders to accomplish any work up to the respective liability limit based on the service order classification.

Service Order Cycle Count down starts when the customer is notified that the work has been accepted to be accomplished to the time when the work chit is turned in by the craftsmen as complete is one complete cycle period for a service order.

Service Order Emergency Emergency is defined as any facility deficiency that immediately compromises the mission or life, health and safety. Always includes, but is not limited to, failure of any utility, fire protection, environmental control, or security alarm systems.

Service Order Urgent Urgent is defined as any deficiency that does not immediately endanger personnel or property, but extended delays of repairs could result in damage to Government property, or soon affect the security, health, or well-being of personnel or the continued operation of a service or system.

Service Order Routine Routine is defined as any work requirement within the defined LOL that does not qualify as emergency or urgent.

Weight Handling Equipment (Whe)

Weight handling equipment consists of cranes (e.g., portal cranes, jib cranes), rigging gear (e.g., slings, shackles), and associated equipment (e.g., portable hoists, dynamometers). For purposes of this technical sub-annex, WHE does not include mobile or transportable truck, crawler, and railway mounted locomotive cranes covered in 1700000 BSVE.

ATTACHMENT J-1502000-01

DEFINITIONS AND ACRONYMS

Acronym Title SRM Sustainment, Restoration, and Modernization UG User Guide UFC Unified Facilities Criteria

ATTACHMENT J-1502000-02

REFERENCES AND TECHNICAL DOCUMENTS

REFERENCE TITLE

ANSI Al0.6 Safety & Health Program Requirements for Demolition Operations ANSI Al0.8 Scaffolding Safety Requirements ANSI Al0.16 Safety Requirements for Tunnels, Shafts and Caissons ANSI Al0.32 Personal Fall Protection for use in Construction and Demolition Operations ANSI Al0.34 Protection of the Public on or Adjacent to Construction Sites ANSI Al0.43 Confined Spaces ANSI Al0.44 Control Energy Source (Lockout/Tag out) ANSI Al0.48 Safety Practices with Construction, Demolition, Modification & Maintenance ANSI A14 Al0.48 Ladder Safety Requirements ANSI/ASSE A1264 Workplace Surface Safety ANSI/ASSE Z359 Fall Protection ANSI/ASSP Z10.0 Occupational Health & Safety ANSI/ISEA 101 Clothing & Equipment Safety ANSI/ISEA 107-2010 High Visibility Garment Standard ANSI Z359.l Safety Requirements Personal Fall Arrest Systems, Subsystems and

Components ANSI Z490.1 Criteria for Accepted Practices in Safety, Health & Environmental Training ASMEB 30.5 Mobile Crane Standards ASMEB 30.8 Floating Cranes and Floating Derricks ASMEB30.22 Articulating Boom Cranes 29 CFR 1904 Recording and Reporting Occupational Injuries and Illness 29 CFR 1910 Occupational Safety and Health Standards 29 CFR 1910.1025 Toxic and Hazardous substances - Lead 29 CFR 1910.120 Hazardous Materials - Hazardous waste operations and emergency response 29 CFR 1910.134 Personal Protective Equipment-Respiratory protection.

29 CFR 1915 Occupational Safety and Health Standards for Shipyard Employment 29 CFR 1926 Safety and Health Regulations for Construction 29 CFR 1926.59 Occupational Health and Environmental Controls - Hazard communication 29 CFR 1926.62 Occupational Health and Environmental Controls - Lead 40 CFR247 Comprehensive Procurement Guideline for Products Containing Recovered

Materials 40 CFR82 Protection of Stratospheric Ozone CNSSI 1253 Security Categorization and Control Selection for National Security Systems DFARS 252.223-7004 Drug Free Work Force DoD Directive 5200.2 DoD Personnel Security Program (PSP) DoDI 8582.01 Security of Unclassified DoD Information on Non-DoD Information Systems DoDI TM 5-610 Preventive Maintenance Facilities, Buildings & Structures DoDI TM 5-624 Maintenance Waterfront Facilities DoDI TM 5-6653 Steam, Water, Utilities Distribution Inspection & Maintenance DODD 6055.9 DoD Explosives Safety Management and the DoD Explosives Safety Board EM 385-l-l U.S. Army Corps of Engineers Safety and Health Requirements EP 1110-1-8 US Army Corps of Engineers Construction Equipment Ownership and

Operating Expense Schedule E.O.13423 Executive Order Strengthening Federal Environmental, Energy, and '

Transportation Management E.O. 13514 Federal Leadership in Environmental, Energy, and Economic Performance

FAR 52.223-2 Affirmative Procurement of Biobased Products under Service and Construction Contracts

FAR 52.223-3 Hazardous Material Identification and Material Safety Data Sheet FAR 52.232-36 Payment by Third Party NAVFAC 5252.245-9300 Government Furnished Property, Materials and Services NAVFAC MO200 Facilities Engineering, Electrical Exterior Facilities NAVFAC P-307 Management of Weight Handling Equipment NAVFAC P-78 Real Property Inventory Procedures Manual NEC National Electric Code NFPA 1 Fire Code NFPA 3 Standard for Commissioning of Fire Protection and Life Safety Systems NFPA 10 Standard for Portable Fire Extinguishers NFPA 11 Standard for Low, Medium and High-Expansion Foam NFPA 12 Standard on Carbon Dioxide Extinguishing Systems NFPA 13 Standard for the Installation of Sprinkler Systems NFPA 14 Standard for the Installation of Standpipe and Hose Systems NFPA 17 Standard for Dry Chemical Extinguishing Systems NFPA 20 Standard for the Installation of Stationary Pumps For Fire Protection NFPA 22 Standard for Water Tanks for Private Fire Protection NFPA 25 Standard for Inspection, Testing, and Maintenance of Water-Based Fire

Protection Systems NFPA 30 Flammable and Combustible Liquids NFPA 51B Standard for Fire Prevention During Welding, Cutting and other Hot Work NFPA 70 National Electric Code NFPA 70E Standard for Electrical Safety in the Workplace NFPA 72 National Fire Alarm Code NFPA 80 Standard for Fire Doors and Other opening Protectives NFPA 96 Standard for Ventilation Control and Fire Protection of Commercial Cooking

Operations NFPA 101 Life Safety Code NFPA 241 Standard for Safeguarding Construction, Alteration, and Demolition

Operations NFPA 291 Recommended Practice for Fire Flow Testing and Marking of Hydrants

NJAC 5.23-2.23, 5.23-3.15 &

10.5.6

Maintenance and Testing of Backflow Prevention Devices

NJAC 7:10 Safe Drinking Water Act Rules NSPC National Standard Plumbing Code OPNAVINST 11000.16 Command Responsibility for Shore Activity Land and Facilities P.L. 91-596 Occupational Safety and Health Act UFC Unified Facilities Criteria UFC 1-200-01 DoD Building Code UFC 3-230-02 Operations and Maintenance: Water Supply Systems UFC 3-240-03 Operations and Maintenance: Wastewater UFC 3-420-01 Plumbing Systems UFC 3-420-02FA Compressed Air UFC 3-430-07 Operations and Maintenance: Inspection and Certification of Boilers and

Unfired Pressure Vessels UFC 3-570-06 Operations and Maintenance: Cathodic Protection Systems UFC 3-560-01 Operation and Maintenance: Electrical Safety

UFC 3-600-01 Fire Protection Engineering for Facilities UFC 3-601-02 Operation and Maintenance: Inspection, Testing, and Maintenance of Fire

Protection Systems UFC 4-150-07 Maintenance of Waterfront Facilities

UFGS 01 35 26

Unified Facilities Guide Specifications https://www.wbdg.org/FFC/DOD/UFGS/UFGS%2001%2035%2026.pdf

UG 2029-ENV Cross Connection Control & Backflow Prevention Program Implementation at Navy Shore Facilities

UPC Uniform Plumbing Code

ATTACHMENT J-1502000-03

Fire Protection Systems Inventory (Fire Suppression Systems)

See separately attached “1502000-03 Attachment Inventories”.

ATTACHMENT J-1502000-03 A

Fire Protection Systems Inventory (Sprinkler Systems)

See separately attached “1502000-03 A Attachment Inventories”.

ATTACHMENT J-1502000-03 B

Backflow Preventer Inventory

See separately attached “1502000-03 B Attachment Inventories”.

ATTACHMENT J-1502000-03 C

Heat Trace Systems Inventory

See separately attached “1502000-03 C Attachment Inventories”.

ATTACHMENT J-1502000-03 D

Utility Systems & Equipment Inventory

See separately attached “1502000-03 D Attachment Inventories”.

ATTACHMENT J-1502000-03 E

Sanitary Sewer Lift Station Inventory

See separately attached “1502000-03 E Attachment Inventories”.

ATTACHMENT J-1502000-03 F

Water Tower Inventory & O & M

See separately attached “1502000-03 F Attachment Inventories”.

ATTACHMENT J-1502000-03 G

Flushing Hydrants

See separately attached “1502000-03G”.

ATTACHMENT J-1502000-04

Site Maps

See separately attached “1502000-04”. Per Request

ATTACHMENT J-1502000-05

Historical Service Order Workload

See separately attached “1502000-05”.

ATTACHMENT J-1502000-06

Deliverable Forms Preparation

See separately attached “1502000-06” Attachment Deliverable Forms Preparation